1 Transformer & Substation Testing System (TRAX) NETA Power Test 2016 Fort Worth, TX

Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

Embed Size (px)

Citation preview

Page 1: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

1

Transformer & Substation Testing System

(TRAX)

NETA Power Test 2016

Fort Worth, TX

Page 2: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

2

TRAX

Transformer & Substation Test System

Page 3: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

3

Job Order Perform following tests on a D-Y 500 kV/138 kV 400 MVA

• Turns Ratio

• Winding Resistance

• Power Factor

• Leakage Reactance

• DRM for LTC diagnostics

Perform following test on a SF6 500 HV Circuit Breaker

• Contact Resistance

• Breaker Motion and Timing

Page 4: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition
Page 5: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Instrument view (”My TRAX”)

Page 6: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – TTR @ 250/2000 V

Page 7: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Excitation Current

Page 8: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Power Factor Amplifier

Page 9: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Power Factor @ 12 kV

Page 10: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Winding Resistance @ 16/100 A

Page 11: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Adaptive Demagnetization

Page 12: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

Measure/calculate voltage-time integral (V*s) at high current (above

saturation current)

Create demagnetization cycles by reducing Vs value (typically 20%

reduction/step)

Effective • Verified against true AC demagnetization. Similar results in excitation current

and magnetic balance verification measurements

Fast • Significantly faster than static demagnetization algorithms for smaller

transformers (40 cycles demagnetization in less than 1 minute for 0.5 MVA

transformer)

Adaptive demagnetization

Magnetic balance after AC demag b-n Magnetic balance after adaptive demag b-n

a-n b-n c-n a-n b-n c-n

100% 68% 31% 100% 68% 31%

50% 100% 50% 50% 100% 50%

32% 67% 100% 31% 68% 100%

Page 13: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

DRM on LTC - Patent pending Measure current , HV voltage, LV voltage (LV open)

R1 and R2 transition resistor values per tap (value/10). All within spec (± 10%)

Current

”ripple”

HV

voltage LV voltage

Page 14: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Short-Circuit Impedance (Leakage Reactance)

Page 15: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

Circuit Breaker Testing

Page 16: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Contact Resistance @ 100 A

Page 17: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX – Relay/timing

Page 18: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX Solution – Apps!

Page 19: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

10.4” touch screen

Dial

TRAX Top Panel

Page 20: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

21

Page 21: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

AUX

LINK

Ethernet

MAIN FUSES

MAINS

INPUT

AUX GROUND

AC OUTPUT

200A

800A

DC OUTPUT

100A

DC

OUTPUT

16A

DC OUTPUT

300V

AC

OUTPUT

2200V

AC

OUTPUT

250V

GROUN

D

AUX

POWER

TRAX Side Panel

Page 22: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

DC INPUTS

VOLTAGE INPUTS CURRENT INPUTS

FUSE 1-4 500

mA

LED indicators

TRAX – Top Panel - Analog Inputs

Page 23: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

TRAX Solution – Apps!

Page 24: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

25

TRAX – Test Report w/ Nameplate Info

Page 25: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

26

Manual Operation

Page 26: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

27

TRAX Objective - Simplification

Page 27: Transformer & Substation Testing System (TRAX) · Transformer & Substation Testing System (TRAX) ... Perform following test on a SF6 500 HV Circuit Breaker ... R1 and R2 transition

30

New Megger Products

Visit us at

Booth 225

SMRT46D MWA SPI225 DLRO-100