Transition Plan for Removing Wind Phase 1 Generic Models. WECC SRWG Meeting July 2014 Eric Bakie. Proposed WECC REMTF Renewable Energy Model Implementation Plan. Agenda. Review Wind and Solar Records in Current WECC MDF Review MDF Parsing Spreadsheet Tool MDF Review Results - PowerPoint PPT Presentation

Citation preview

Page 1: Transition Plan for Removing Wind Phase 1 Generic Models

Transition Plan for Removing Wind Phase 1 Generic Models

WECC SRWG Meeting

July 2014

Eric Bakie

Page 2: Transition Plan for Removing Wind Phase 1 Generic Models

2

Proposed WECC REMTFRenewable Energy Model Implementation Plan

Key stakeholder input (REMTF, IEEE, IEC)

Model specifications approved by MVWG and TSS

Prototype model implementation tested

Model validation against plant-level field data (difficult and ongoing)

Models implemented in release version of commercial software programs

Model user guidelines

Webinar on WECC/REMTF model development, deployment process

Update Approved Dynamic Models List

WECC workshop on RE modeling

Model validation guidelines and tools (in process)

WECC request for data submittal using new models, with grace period

Page 3: Transition Plan for Removing Wind Phase 1 Generic Models

3

Agenda

• Review Wind and Solar Records in Current WECC MDF

• Review MDF Parsing Spreadsheet Tool– MDF Review Results

• Review Proposed Implementation Timeline for Phase 2 REMTF Wind and Solar Models

• Group Discussion

Page 4: Transition Plan for Removing Wind Phase 1 Generic Models

4

Wind and Solar DynamicModel Records in WECC MDF

Model WECC MDF

gewtg 133

exwtge 70

ewtgfc 30

wndtge 54

Wind 50

Solar 44

Model WECC MDF

wt1g 15

wt1t 15

wt1p 15

Model WECC MDF

wt2g 26

wt2e 22

wt2t 22

wt2p 22

Model WECC MDF

pv1g 2

pv1e 2

Model WECC MDF

wt3g 87

wt3e 82

wt3t 80

wt3p 74

Model WECC MDF

wt4g 79

wt4e 76

wt4t 53

Wind 39

Solar 40

Model WECC MDF

genwri 12

exwtg1 12

wndtrb 1

• Approved Models

• Un-Approved Models

Model WECC MDF

motor1 54

Wind 40

Model WECC MDF

genrou 132

Page 5: Transition Plan for Removing Wind Phase 1 Generic Models

5

Est. Total MDF Records forTransition to REMTF Phase 2 Wind / Solar Models

Modeling Package WECC MDF

WT1 15

WT2 26

WT3 87

WT4 79

GE WTG 133

GENWRI 12

PV1 2

MOTOR1 40

GENROU (????)

132

Est. TOTAL 526

Page 6: Transition Plan for Removing Wind Phase 1 Generic Models

6

• Conversion to Phase 2 estimate is 526 records

motor1 Model Conversion Progress (12 mo.)

Case Rep Log Number of unapproved models (motor1, in WECC Basecase

data

14hps1a July 2013 36

14hs4a Nov 2013 31

14ls1a March 2014 31

15hsp1a July 2014 31

Model Conversion of Type 1 Wind using motor1 from SRWG RepLog

Page 7: Transition Plan for Removing Wind Phase 1 Generic Models

7

MDF Review Observations• Large blocks of units represented using synchronous generator

models (i.e. genrou(tpj), exst1, ggov1, etc.)

• Dynamics Data records do not match Powerflow Turbine Type• Turbine Type 21 – Type 1 Wind Turbine

• MDF Comment = Type 4 Plant• Model Records = Type 3 Models

• Large blocks represented without dynamic control models• gewtg or genrou – model only

• Large blocks represented without full collector system equivalent

Page 8: Transition Plan for Removing Wind Phase 1 Generic Models

8

Implementation Plan Goal

• Update existing WECC wind/solar dynamic records with REMTF Phase 2 Wind and Solar Models

Typos in Table 1 / 1A:

wt1p(2p) => wt1p_b

VRGTPA => VTGTPAT

FRQTPA => FRQTPAT

Page 9: Transition Plan for Removing Wind Phase 1 Generic Models

9

Notes on wt1p and wt2p

• REMTF recommended removing wt1p and wt2p models from the WECC Approved Model List– No pitch controller for passive stall turbines– wt1p_b should be used for active stall turbines

• REMTF will take action to inspect MDF– Make recommendation of either deleting wt1p and wt2p records or

replacing records with wt1p_b models

Page 10: Transition Plan for Removing Wind Phase 1 Generic Models

10

2014 SRWG Base Case Compilation Schedule

Data Request to Start Transition

Page 11: Transition Plan for Removing Wind Phase 1 Generic Models

11

2015 SRWG Base Case Compilation Schedule

Phase 2 Target Completion DateRemove Phase 1 Models

Add un-converted models to PPMDTF list

PPMDTF review target completion date

Page 12: Transition Plan for Removing Wind Phase 1 Generic Models

12

Proposed Implementation Timeline

• MVWG Renewables Workshop 6/17/2014

• Initial WECC Data Request 7/18/2014

• Target Completion Date 6/05/2015

• Remove Ph. 1 Models from Approved List 6/05/2015

• Begin PPMDTF Review 7/10/2015

• Target Completion of PPMDTF Review 12/18/2015

Page 13: Transition Plan for Removing Wind Phase 1 Generic Models

13

Relevant Timeline for NERC Modeling Data Verification Standards

• MOD-026-1– R1, R3, R4, R5, R6 07/1/2014– R2 (30%) 07/1/2018– R2 (50%) 07/1/2020– R2 (100%) 07/1/2024

• MOD-027-1– R1, R3, R4, R5 07/1/2014– R2 (30%) 07/1/2018– R2 (50%) 07/1/2020– R2 (100%) 07/1/2024

Page 14: Transition Plan for Removing Wind Phase 1 Generic Models

14

Relevant Timeline for NERC Modeling Data Reporting Standards

• MOD-032-1– R1 07/1/2015– R2 07/1/2016

Page 15: Transition Plan for Removing Wind Phase 1 Generic Models

15

SRWG Discussion

• Is the proposed implementation plan reasonable?

• SRWG Member Recommendations

Page 16: Transition Plan for Removing Wind Phase 1 Generic Models

16

Next Steps

• Add SRWG Member Comments

• Publish Phase 2 Implementation Plan– Post to SRWG Site

• Develop Tool for Tracking Progress– Stand Alone or Replog

• Encourage data submitters to improve steady-state and dynamic data representation of wind and solar plants in WECC Basecases– Encourage use of WECC Wind and Solar Modeling Guidelines

• Develop Tool for checking Powerflow Turbine Type Data against dynamics data modeling records

Page 17: Transition Plan for Removing Wind Phase 1 Generic Models

17

Resources/References

• WECC Wind Plant Dynamic Modeling Guidelines– http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/

Shared%20Documents/MVWG%20Approved%20Documents/WECC%20Wind%20Plant%20Dynamic%20Modeling%20Guidelines.pdf

• WECC Solar Plant Dynamic Modeling Guidelines– http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/

Shared%20Documents/MVWG%20Approved%20Documents/WECC%20Solar%20Plant%20Dynamic%20Modeling%20Guidelines.pdf

• Status Update of WECC Models 2014-6-19– http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/

20140617/Lists/Presentations/1/Status%20Update%20of%20WECC%20Models%202014-6-19.docx

Page 18: Transition Plan for Removing Wind Phase 1 Generic Models

18

Questions