35
Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Embed Size (px)

Citation preview

Page 1: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Page 2: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

2

Corporate Overview

• Formed in 2003.• Based in Toronto.• Original focus was on correlation based Leak Detection

Equipment, specifically for PVC.• Developed Non Destructive pipe condition assessment

technology• Changed focus to service offerings:

▸ Leak detection for Large diameter mains▸ Condition assessment for ferrous and asbestos cement mains

Page 3: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

3

Agenda

• Correlation Theory Review• Echologics • Key Advantages• Leak Detection Case Studies• Condition Assessment Background• Condition Assessment Case Studies• Summary

Page 4: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Correlation Theory

Page 5: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

5

Correlation: a Review • Old technology: proven on metallic distribution mains• Manufacturer’s began to work on plastic and other types of

pipes: made claims that could not be consistently achieved!• Required a different approach to:

▸ Sensors▸ Signal Processing▸ Amplifiers

• Echologics achieved some extraordinary success, other manufacturers immediately introduced ‘trunk main correlators’, but have never achieved our level of success

• Development continues; now on our 5th generation of hardware

Page 6: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

6

Correlation Theory

• Leaks make noise• Time of flight technology• Correlation function:

▸ Leak bracketed with 2 Sensors▸ Leak noise takes longer to arrive at Sensor 1 than Sensor 2▸ Correlator measures time difference to identify exact leak location

Page 7: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

7

Why is Echologics Successful

• Advances in sensor design, signal processing, correlation algorithms

• Advances in post processing of data• Advances in field techniques• It is as much about the people, as it is about the equipment

Page 8: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

8

Sensor development• We have done extensive R&D into

plastic and transmission main sensor requirements, developed both hydrophones and accelerometers for large diameter

The People• We have an intense training

program and detailed field / data analysis processes

• We have a young, passionate team of engineers

Page 9: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Echologics CorrelationAdvantages

Page 10: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

10

Advantage and Disadvantages

• Advantages:▸ Easily implemented with existing fittings▸ No requirement to close service take offs or laterals▸ No requirement to alter the flow in the pipe▸ Can ‘see’ leaks many km away; will find largest leaks first▸ Will find small leaks (typical results 2 LPM on 1500mm pipe at 3.5 bar,

1100m)

• Disadvantages:▸ Will not find very small leaks (<1LPM)▸ Accuracy of location needs to be carefully verified

Page 11: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

11

Technology ComparisonTechnology Pros Cons

Traditional Correlation • Non-Intrusive and Non-destructive

• Poor performance on PVC and Large Diameter (LD) mains

Echologics Correlation • Same as above• Works on PVC and

LD mains• Cost Effective

• Cannot find small leaks (<1 lpm)

• ‘Averaged’ condition assessment results

In-Pipe Tethered and Free Swimming

• Can find small leaks

• Works on long sections of pipe with minimal access

• Intrusive• Special Insertion

Points are required• Isolation of all

laterals is required

Page 12: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Leak Detection Case Studies

Page 13: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

13

Case Study: SABESP

• Leak discovered by Smart Ball Pilot• Dry hole had been dug based on Smartball location• Requested by Genival Abdias to try and pinpoint the leak• Echologics correlated the leak to within <1m accuracy

13

Page 14: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

14

Site Location

Page 15: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

15

Leak Location Excavation

Page 16: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

16

Successful Leak Location

Page 17: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

17

• Echologics performed a transmission main leak detection pilot survey on 8km of UWNJ transmission mains▸ 24” to 42” diameter

• Testing revealed 5 leaks• One major leak discovered on a pipeline section outside of

the boundaries of the original test plan• We first saw this leak 3 km from the eventual location

Case Study: United Water New Jersey

Page 18: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

18

Out of Bracket Leak Detected

Correlations provided evidence of leakage outside the current test area

Page 19: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

19

Isolated Leak Under a Stream• Correlation across the river crossing revealing a prominent

peak 40m east of fitting on the main

Page 20: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

20

UWNJ 42” RCP Repair Pictures

Page 21: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

21

Other Examples:

• Thames Water, England• Bristol Water, England• Las Vegas Valley Water Department• Springfield, Massachusetts

▸ Echologics confirmed 2 leaks that was already discovered by expensive in-pipe technologies - 36”(915mm) and 48” (1200mm) main

• Sydney, Australia• Barrie, Ontario• New Orleans

Page 22: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

Condition Assessment Background

Page 23: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

23

Remaining Pipe Wall Thickness Measurement

• Metallic pipes lose thickness from internal and external corrosion

• Asbestos cement pipes lose “effective thickness” from aggressive waters leaching calcium out of cement and weakening walls

• Physical wall thickness doesn’t change, but the pipe loses structural stiffness and strength

Page 24: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

24

Velocity Measurement

Wave propagation velocity (v) = D/ΔT, where ΔT is time delay between signals 1 and 2

Noise Source

Measure the sound velocity

Page 25: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

25

Minimum1 Average2 Wall Thickness1. Minimum around

the circumference

2. Averaged along the length

Page 26: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

26

Las Vegas, NV: LVVWD Pilot• Two sections of 6” AC pipe tested• .73” remaining structural thickness was measured by

Echologics• Results indicated that pipe met requirements of PC200• Excavated pipe to confirm results• Testing confirmed that our results accurately represented

the remaining structural thickness of the pipe

Page 27: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

27

Las Vegas: Velocity Measurement & Results

Page 28: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

28

Las Vegas, NV: Excavated Pipe

Page 29: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

29

Results of 14” lab testing

Page 30: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

30

White area has lost structural integrity

Pink area represents structurally sound concrete

Page 31: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

31

Newark, NJ: Pilot on cast iron pipe

• Pilot study on cast iron pipe installed in 1910• Pipe had been chosen for cement mortar lining as a

rehabilitation technique• Our study determined that it was highly degraded and

required a structural lining• We also found a leak during the study, losing about $20,000

worth of water a year

Page 32: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

32

Newark, New Jersey

32

Pit #1 - Valve

Pit #1 - Valve

Pit #2Pit #2

Pit #3Pit #3

Fire HydrantFire Hydrant

Service Leak at House #195

Service Leak at House #195

Average Pipe Wall Thickness of 0.18”, 63.9% loss

Average Pipe Wall Thickness of 0.18”, 63.9% loss

Page 33: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

33

Newark, New Jersey

33ConfidentialUse pursuant to

Company instructions

This is the remaining structural thickness!

Page 34: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

34

• Dayton, Ohio• Sweetwater, California• Hamilton, Ontario• Chicago, Illinois

▸ Successfully identified 3000ft section of reinforced concrete cylinder pipe with a significant number of wire breaks

• Calgary, Alberta• Maple Ridge, British Columbia• Bloemfontein, South Africa

Other Examples:

Page 35: Transmission Main Leak Detection and Condition Assessment: Brazil Trade Mission 2012

35

Summary• Echologics has pioneered the effective use of correlators on large diameter

pipe, and continues to develop the technology• In North America, we are now considered a viable alternative to insertion

technologies: numerous successful studies have been completed• Claims made by other manufacturers continue to throw the technology into

doubt• In several projects we have been directly compared to Sahara and have

found the same leaks• Our condition assessment technology can accurately determine the

remaining structural wall thickness of pipes• There is return on investment from:

• Prioritizing which pipes require rehab or replacement• Performing leak detection simultaneously• Ensuring the correct decision is made with respect to rehab or replacement