Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell Sanders LLP Hoecker Energy Law & Policy PLLC Former Chairman, Federal Energy Regulatory Commission EMERGING TRENDS IN RENEWABLE ENERGY enXco RANCHO MIRAGE, CALIFORNIA FEBRUARY 2010 1

Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Embed Size (px)

Citation preview

Page 1: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Transmission TrendsTransmission Trends: Current Policy and Regulatory Issues and What They

Mean for Renewables

Remarks of James HoeckerHusch Blackwell Sanders LLP

Hoecker Energy Law & Policy PLLCFormer Chairman, Federal Energy Regulatory Commission

EMERGING TRENDS IN RENEWABLE ENERGY

enXcoRANCHO MIRAGE, CALIFORNIA

FEBRUARY 2010

1

Page 2: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Aging and deteriorating infrastructure More dispersed resources of generation Wholesale competition among generators Complex bulk power markets Arrival of the digital economy Electricity consumption doubled 1980-2007 Shifts of public policy (e.g., RPS, efficiency,

demand response)

Challenges to The Transmission SystemChallenges to The

Transmission System

2

Page 3: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Challenges to New Transmission Construction

Challenges to New Transmission Construction

“Not in my backyard” or “not in my term of office” Conflicts between local, state and regional interests Inconsistent state and local regulation Uncoordinated environmental reviews Federal land authorization, esp. in the West Lack of timing coordination among siting entities Varying GHG restrictions and RPS’s Difficulty right-sizing for short and long-term needs Uncoordinated siting of lines and generators Timing of “need” determinations

3

Page 4: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Will We Build More Transmission?Will We Build More Transmission?

NERC: Transmission additions will triple to 3100 miles/year 2009-2018. Project proposals abound: 90 planned projects each greater than $100 million (totaling $120 Billion)

Prospects for a clean energy economy—RPS, climate legislation, smart grid; renewable energy projects mean jobs and will drive major transmission expansions and upgrades; 20-30% wind penetration in the East = > $100 Billion for transmission (NREL)

Other drivers: reliability, cyber security, replacements, new technologies, load growth

PROBLEM: approval processes are out of sync with the realities of multi-state, multi-system, multi-purpose transmission

4

4

Page 5: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Siting – Location, Location...and Need States consider “need” for facilities when siting them

Cost allocation – Who Pays? Who Benefits? States are influenced by the rate impacts on citizens when considering need; FERC defers to states and stakeholders

Planning – Which Projects Are Needed? Stakeholders & regional planners determine whether projects satisfy reliability, economic, environmental,

or public policy needs

Q. Who Decides If A Line Is Needed? A. Everybody

Q. Who Decides If A Line Is Needed? A. Everybody

5

Page 6: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

State vs. Federal Siting– A StruggleState vs. Federal Siting– A Struggle

Section 216, Federal Power Act (Sec. 1221, EPAct 2005)National Interest Electric Transmission CorridorLimited FERC backstop authority within NIETCs

FERC’s Aggressive Interpretation of Its AuthorityRegional State Compacts

New Siting Approaches?Pre-emptive federal backstopNatural gas pipeline model; federal siting for high priority linesInterstate siting compactsAdoption of federal, state and local “best practices” for

Valuing their viewshed Land conservationMulti-agency permitting Protecting Property values

6

Page 7: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

“The result of the Fourth Circuit decision is nullification of the comprehensive scheme erected by Congress with respect to U.S. transmission policy. The goal of Congress was to strengthen the interstate grid to support competitive markets, assure reliability, and promote development of renewable energy capacity. Congress recognized that development of larger interstate transmission projects is necessary to accomplish those policy goals, and also appreciated that state and local siting is poorly suited for development of such projects…. [T]he Fourth Circuit has interpreted Congress’ intent as maintaining each state’s veto authority over new interstate transmission facilities no matter how vital to the national interest.”

Amicus Brief By FourFormer FERC Chairmen

Federal Siting Fares Badly In Court Federal Siting Fares Badly In Court

Piedmont Environmental Council v. FERC (4thCircuit Court of Appeals)

7

Page 8: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Transmission Cost Allocation—Unresolved

Transmission Cost Allocation—Unresolved

Project Causers vs. Project Beneficiaries New renewable generator = direct causer and beneficiary Load under RPS = beneficiary, not a cost causer Future generation in the area = beneficiary, not a cost causer; BUT If transmission addresses a NERC standard, the owner is a causer and a beneficiary, and local load and local generation are beneficiaries

Transmission Access vs. Transmission Use Access-based allocation is based on installed capacity, peak demand, or

T service Usage-based allocation is based on energy injections and withdrawals

Local vs. Interregional Benefits and Use Local transmission serves local generation and load, provides market

access for generators and load seeking diverse suppliers Interregional facilities enhance system flexibility, reliability, and economy of

production Other issues 8

Page 9: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Allocation Methodologies– -- License Plate-- Beneficiary Pays

-- Postage Stamp-- Direct Assignment-- Highway/Byway

-- Injection/Withdrawal-- Merchant Recovery

Difficult-to-Quantify & Often Ignored Benefits-- -- Enhanced Market Competitiveness, Liquidity-- Economic value of reliability-- Insurance and risk mitigation-- Capacity benefits

-- Environmental and renewable energy

Who Pays? Who Pays? EquityEquity vs. Efficiency vs. Efficiency

9

Page 10: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Transmission Planning—Key Transmission Planning—Key

Historically, system by system to ensure reliability for native load customers and meet the needs of incremental generation.

Increasingly, facilities are multi-state and multi-purpose, facilitate economy energy transactions, and a liquid bulk power market, and will serve a flexible low-carbon fuel mix.

Individual utilities plan; RTOs plan; ad hoc regional groups and reliability organizations plan; and even groups of governors plan. No single entity is responsible for executing

on a plan. 10

Page 11: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

Positive Investment Trends in All Regions: quadruple the 1990s Interconnection-wide planning efforts (ARRA-funded) More FERC leadership in cost allocation and planning, although

far from preemption Pending transmission legislation could address planning, siting,

and cost allocation to varying degrees– S.1462 American Clean Energy Leadership Act (E&NR

Comm.) “Climate Bill” H.R. 2454 American Clean Energy & Security

Act (Waxman-Markey) Speculation of a political nature

Trends & PrognosisTrends & Prognosis

11

Page 12: Transmission Trends Transmission Trends: Current Policy and Regulatory Issues and What They Mean for Renewables Remarks of James Hoecker Husch Blackwell

James J. Hoecker, JD, Ph.DHusch Blackwell Sanders LLP

Hoecker Energy Law & Policy [email protected]

www.helppllc.com202-378-2300