27
TRANSNET PORT TERMINALS Transnet Port Terminals capacity expansion master plan - Logan Naidoo, Capital Projects, Transnet Port Terminals 25 June 2013

TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

  • Upload
    vancong

  • View
    227

  • Download
    4

Embed Size (px)

Citation preview

Page 1: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TRANSNET PORT TERMINALS

Transnet Port Terminals capacity expansion master plan

- Logan Naidoo, Capital Projects, Transnet Port Terminals

25 June 2013

Page 2: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TABLE OF CONTENTS

• BRICS

• Transnet State Owned Company Limited

• Market Demand Strategy

• Infrastructure Development – next 10 years

Source of picture: www.newstimeafrica.com

• Infrastructure Development – last 10 years

Page 3: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

Supporting

3

Capital Projects Transnet

Foundation Property

Transnet Pipelines

(TPL)

Transnet Engineering

(TE)

Transnet Freight Rail

(TFR)

Transnet Port

Terminals (TPT)

Transnet National

Ports Authority

(TNPA)

Pipelines Rail Ports

• 16 Cargo Terminals operating across 7 SA ports

• Revenue 7 bn

• Assets R13.5 bn

• 6 324 employees

• 8 Commercial ports along 2943km of coastline

• Revenue R8.4bn

• Assets R56 bn

• 3558 employees

• 20 500 km of railway track

• 182 million tons of freight

• General freight & 2 heavy haul export lines

• Revenue 22.2 bn

• Assets R54.7 bn

• 24 177 employees

• Support TFR for rolling stock and TPT for lifting equipment maintenance

• Revenue 9.8 bn

• Assets R8.6 bn

• 13 020 employees

• 18 billion litres of petroleum products and gas through 3 000 km of pipelines, mainly to Gauteng

• Revenue 1.3 bn

• Assets R20.1 bn

• 600 employees

• R300 billion of capital investments over next 6 years

• CSI in Education, Health, Sport, Arts & Agriculture

• Property Management

Page 4: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

4

4

Page 5: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TABLE OF CONTENTS

• BRICS

• Transnet State Owned Company Limited

• Market Demand Strategy

• Infrastructure Development – next 10 years

Source of picture: www.newstimeafrica.com

• Infrastructure Development – last 10 years

Page 6: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

6

6

Shortest Trade Route between Shanghai and Santos is via South Africa 10,972nm = 21 days @ 21 knots via Panama Canal12,967nm = 26 days + transit fee via Suez Canal 13,544nm = 28 days + transit fee Source: http://www.searates.com/reference/portdistance/

Page 7: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

7

Monrovia (Liberia)

Lome (Togo)

Port Louis (Mauritius)

Toamasina (Madagascar)

Takoradi (Ghana)

San Pedro (Côte d'Ivoire))

Lagos (Nigeria)

Cotonou (Benin)

Walvis Bay (Namibia)

Tema (Ghana)

Abidjan (Côte d'Ivoire)

Cape Town (SA)

Dar es Salaam (Tanzania)

Tanga (Tanzania)

Mombasa (Kenya)

Nacala (Mozambique) Beira

(Mozambique)

Maputo (Mozambique)

Richards Bay (SA)

Durban (SA)

East London (SA) Ngqura (SA)

Libreville (Gabon)

Pointe Noire Matadi (Congo)

Douala (Cameroon)

Source: Team analysis

Port Elizabeth (SA)

Lobito (Angola)

Luanda (Angola)

7

Page 8: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TABLE OF CONTENTS

• BRICS

• Transnet State Owned Company Limited

• Market Demand Strategy

• Infrastructure Development – next 10 years

Source of picture: www.newstimeafrica.com

• Infrastructure Development – last 10 years

Page 9: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

9 Source: Africa Team analysis

Market Demand Strategy - 2012 to 2019

• R300bn Transnet-wide capital investment

programme over next 7-years

• Expanding rail, port and pipeline infrastructure

• Increase in capacity to meet market demand

• Continued financial stability and strength

• Significant productivity and operational efficiency

improvements

• Shift from road to rail – reducing the cost of

doing business and carbon emissions

• Enabling economic growth

• Job creation, skills development, localisation,

empowerment and transformation opportunities

• TPT will invest R33bn

Divisional split (Rbn)

11

33

47

4

201 4

Other

TPL

TPT

TNPA

TRE

TFR

Other

29% Maintain

71%

Expand

Change in emphasis

Page 10: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TABLE OF CONTENTS

• BRICS

• Transnet State Owned Company Limited

• Market Demand Strategy

• Infrastructure Development – next 10 years

Source of picture: www.newstimeafrica.com

• Infrastructure Development – last 10 years

Page 11: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

• Pier 1: 720K TEU RTG/RMG Terminal, commissioned in Durban [R1.9bn]

• DCT (P2): Expansion and Re-configuration up to 2.9M TEUs [R1.5bn]

• CTCT: Expansion up to 1.0M TEUs and conversion to RTGs [R4.3bn]

• Ngqura: Greenfields port and terminal development. 800K TEUs, 2-berth, deep water CT [R8bn]

• SLD IOT: Expansion up to 60mpta. Transnet investment is R8.1bn, TPT’s investment is [R1.2bn]

• RCB DBT: Partial refurbishment programme, limited by terminal viability [R800m]

• PE Bulk: Refurbishment of manganese plant to 4.2mtpa. [R600m]

Page 12: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

• The R 1.9 billion development of Pier 1 has boosted

the container capacity in Durban by a further 720,000

TEUs.

• The existing facility has been completely repaved

and, unlike at DCT (which features one of the largest

straddle carrier operations in the world), TPT has

introduced a 22 RTG system at Pier 1.

• Landside operations also include a Rail Terminal,

featuring three parallel rail tracks and 2 Rail Mounted

Gantry Cranes (RMGs).

• The depth alongside the quay is presently 12.6m, in

the future this may be deepened to 16m.

• Terminal Capacity (720kTEUs)

• 2 berths

• 6 super-post panamax STS cranes

• 18 RTGs + 4 relocated from CTCT

• 2 RMGs

• Navis N4 and Camco Autogate

Before,

2004

Current

Page 13: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

• The Port of Ngqura is the first new commercial

port to be developed in South Africa since

Richards Bay.

• The new container terminal at Ngqura

commenced operations in October 2009

• The port is capable of serving post-Panamax

dry and liquid bulkers and the new generation

mega-max class container ships.

• The port is ideally situated to serve as a

transhipment facility for traffic from the East,

South America & West African markets.

• Terminal Capacity (800kTEUs)

• 2 deepwater berths

• 6 mega-max STS cranes

• 22 RTGs

• 2 RMGs

• Navis N4 and Camco Autogate AFTER: 2010

Ngqura Container

Terminal

BEFORE:

Coega River mouth

Nov-2002

Page 14: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

Increase DCT capacity to 2.9 million TEUs

Re-position service facilities to create additional

stacking areas

Construct new workshops and parking facilities

Total cost R 1.5bn.

Before,

2006

After,

Current

New Truck Staging

Page 15: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

Open Stack Storage Area C&D –Nov 09 Open Stack Storage Area C&D –Aug 10 Open Stack Storage Area C&D – Sep 10

Conveyor J03 Refurb, before Conveyor M02 Refurb, after Conveyor L02 & F02 Refurb, after

Open Stack Storage Area C&D –Nov 09

Tippler Refurbishment – Mar 08 Tippler Refurbishment – May 08 IMG MAN Boom Replacement - May 09

Page 16: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

BEF

OR

E A

FTER

Reclaimer Slew Reclaimer MCC

New Control Room

Rebuilt Reclaimer A

Old Control Room

Page 17: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

Roadways Rehabilitation and Environmental Cleanup

BEF

OR

E A

FTER

Gravel roads

Operator cabin – charger car

Page 18: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

TABLE OF CONTENTS

• BRICS

• Transnet State Owned Company Limited

• Market Demand Strategy

• Infrastructure Development – next 10 years

Source of picture: www.newstimeafrica.com

• Infrastructure Development – last 10 years

Page 19: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

19 DCT Reconfiguration Study 2011

DCT Pier 1

DCT Pier 2

Salisbury Island

Navy Base

PORT OF NGQURA DURBAN MPT TERMINALS – POINT RORO DURBAN CONTAINERS - CURRENT LAYOUT

Page 20: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

20 DCT Reconfiguration Study 2011

Pier 1 with new Salisbury Island infill and deep-water

berths Total cost: R 6.3b

Pier 2 with deepened berths 203-205 and new

tandem cranes Total cost: R 5.6b

Consolidated Salisbury Island Navy

Base

Interim upgrade of Pier 1 + 2 Rail

Terminals

PORT OF NGQURA DURBAN MPT TERMINALS – POINT RORO DURBAN CONTAINERS - FUTURE LAYOUT - 2019

Page 21: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

21 DCT Reconfiguration Study 2011

Infill between Pier 1 and Pier 2. Durban Container Terminal

reconfigured to RMG operation

New rail terminals and back-of-port

facilities

DURBAN CONTAINERS – LONG TERM POTENTIAL LAYOUT

Page 22: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

2

2

Port of Durban

Isipingo

Sapref Refinery

Old Durban Airport

Toyota Factory

N2 Freeway

Mondi

Umlazi

Page 23: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

2

3

Port of Durban

Container Terminals

New Dig-Out Port

Automotive Terminal

Liquid Bulk Terminal

Breakwater and Entrance Channel

Page 24: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

AFTER: 2010 Ngqura Container Terminal

BEFORE: Coega River mouth Nov-2002

Futuristic Expansion Options

current: 2013 Ngqura Container Terminal

NGQURA CONTAINER TERMINAL - EVOLUTION OVER 10 YEARS

Page 25: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

25

NGQURA CONTAINER TERMINAL - Future Expansion Plans

Page 26: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

26

NGQURA CONTAINER TERMINAL – 2020

Page 27: TRANSNET PORT TERMINALS Paper and... · • BRICS • Transnet State ... - FUTURE LAYOUT - 2019 . DCT Reconfiguration Study 2011 21 Infill between Pier 1 and Pier 2. Durban Container

27