TRANSPORT AND HARBOURS
DEPARTMENT
PERFORMANCE REPORT FOR THE YEAR 2014
Transport and Harbours Department has a fleet of eight (8) Vessels inclusive of 2 Motor Barges.The 2 new Chinese vessels – M.V. Kanawan and M.V. Sabanto operated the Parika – Supenaam Ferry Service assisted by the M.V. Malali which also plied the Wakenaam Service.
The Bartica Ferry Service was operated by the M.V. Makouria, while the M.B. Sandaka plied the Leguan Service.
The M.V. Kimbia and M.V Lady Northcote operated the North West District services to Kumaka and Port Kaituma respectively, while the Berbice Ferry Service was serviced by the M.B. Bonasika.
PARTICULA
RS
NUMBERS/
TONS
INCREAS
E
PERCENTA
GE%2014 2013
PASSENGERS
362,860
331,352
31,508 10
VEHICLES 62,08
8
58,50
2
3,586 7
CARGO (tons)
145,307
125,600
19,707
16
COMPARISON OF TOTAL PASSENGERS,VEHICLES ANDCARGO TRANSPORTED IN 2014 AND 2013
PARTICULARS
REVENUE
DIFFERENCE $
PERCENTAGE
%2014($M)
2013($M)
PASSENGERS
103,975,606
89,540,080
14,435,526
17
VEHICLES
213,588,550
227,122,020
(13,533,470
)
(6)
CARGO
305,396,238
283,304,112
22,092,126
8
MISCELLANEOUS
71,538,353
79,496,147
(7,957,794)
(10)
TOTAL
694,498,747
679,462,359
15,036,388
3
COMPARISON OF REVENUE FOR PASSENGERS, VEHICLES AND
CARGO TRANSPORTED IN 2014 AND 2013
SERVICE
PASSENGERS
#
VEHICLES
#
CARGOTONS
SUPENAAM
205,993
43,284
108,532
BARTICA
19,429
7,118
12,445
LEGUAN
83,424
11,605
14,011
NORTHWEST
4,892
81
10,312
BERBICE
49,122
-
7
TOTAL
362,860
62,088
145,307
TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED
PER SERVICE FOR 2014
REVENUE AND EXPENDITURE
YEARS REVENUE EXPENDITURE DEFICIT
2014 694,498,747 701,850,997 7,352,250
2013 679,462,359 806,984,512 127,522,153
DIFFERENCE
15,036,388Increase
105,133,515
Decrease
-
MONTHLY AVERAGE FINANCIAL BREAKDOWN
Revenue $54,000,000 Major Expenditure
Fuel and Lubricant 46,000,000
Wages and Salaries 40,000,000
Maintenance of Vessels/ Stellings 9,000,000
Utilities 3,000,000
Toiletries/ Stationeries 3,500,000 $101,500,000
Surplus /Deficit ($47,500,000)
In the year 2014, the Department received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel to the tune of $33.3M per month. However, the total expenditure for fuel and lubricant is $46.0M.
Therefore the shortfall of $13.0M was funded by the Departments current revenue and assistance from the Maritime Administration Department.
VESSELS
AMOUNT CONSUMED
Gallons
EXPENDITURE
$
M.V. SABANTO 4,242 3,452,988
M.V. KANAWAN 4,191 3,411,474
M.V. MALALI 1,574 1,281,236
M.V. KIMBIA 1,360 1,107,040
M.V. MAKOURIA 1,050 854,700
M.V. LADY N/COTE 930 757,020
M.B. SANDAKA 659 536,426
M.L. SETTER 182 148,148
TOTAL 14,188 11,549,032.
WEEKLY AVERAGE FUEL CONSUMPTION PER VESSEL
As can be seen above the average fuel consumption per week is 14,188 gallons with a total cost of $11.5M, the average monthly fuel consumption is therefore 56,752 gallons (that is 14,188 * 4) with a corresponding expenditure of $46M (that is $11.5M * 4).
During the year 2014, the total Capital allotment to Transport and Harbours Department was $483.0M.
This amount had catered for the dry-docking of three (3) vessels, Acquisition of Spares and the Rehabilitation of a few Stellings as follows:-
M.V. Malali – Allotment $120.0MThe M.V. Malali which plies the Parika/Supenaam/Wakenaam route was docked at E.C. Vieira Dockyard for the period September 1 to October 9, 2014 at a cost of $118.0M.
Extensive works were carried out to the hull, superstructure, underwater fittings and machineries/equipment.
VESSELS/SHIPS
M.V. Malali docked at E.C. Vieira Dockyard
M.V. Kanawan and M.V. Sabanto – Allotment $50.0M
These two (2) vessels which ply the Parika/Supenaam route are scheduled to be docked this year to the tune of $25.0M each.
Critical areas to be addressed include the hull, where anodes would be installed, doors to be serviced, under water fittings to be checked and serviced. These vessels will be docked at E.C. Vieira Dockyard.
M.V. Barima The M.V. Barima which was slated to be docked in
2013 was docked in year 2014 at a total cost of $103,771,450. Due to the deplorable dock gate at Mazaruni the docking could not have materialized in 2013.
The Gate has since been rehabilitated and the M.V. Barima is currently ongoing dry-docking there.
Upon completion of her docking exercise she is slated to replace the M.V. Lady Northcote on the Georgetown North West district service. This should take effect by the first quarter in 2015 since additional works need to be addressed such as the winch and generator.
ROLL OVER DOCKING TO 2014
M.V. Barima docked at Mazaruni Dockyard
M.V. Makouria
The M.V. Makouria underwent dry-docking at the E.C.Vieira Dockyard during the period February 20 to March 21, 2014 at a cost of $135.0M. Works were carried out to the hull and underwater fittings, superstructure, machineries and equipment.
M.V. Makouria docked at E.C. Vieira Dockyard
Storage Bond – Allotment $15 million.
The construction of a Storage Bond to store spares for the vessels and ships. Presently the spares are stored in two (2) containers.
Acquisition of Spares – Allotment $200 million.
The spares were acquired for maintenance repairs of vessels and ships totalling $204 million.
Storage Bond – Allotment $15.0M
A total of $15,000,000 was allotted for the construction of a Storage Bond to house spares for the vessels and ships. The spares are presently being stored in 2 – 20ft containers and this usually pose difficulties when trying to retrieve parts/components.
Rehabilitation of the Transport and Harbours Department Head Office at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved.
In addition, the building was enhanced with cubicles, new desks and other office furniture.
Other Achievements for the
year 2014
1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo river making it possible for the vessels to traverse freely.The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction.Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., 11.00 a.m. and 4.00 p.m.
2.The Mazaruni Dock gate was rehabilitated for $17.0M
Improved Ferry Service in 2014
YEARS REVENUE EXPENDITURE DEFICIT
2014 679,394,114 701,850,997 22,456,883
2013 679,462,359 806,984,512 127,522,153
DIFFERENCE 68,245Decrease
105,133,515Decrease
-
Revenue and Expenditure
PARTICULARS
YEAR
INCREASE
PERCENTAGE
%
2014 2013
PASSENGERS 351,023 331,352 19,671 6
VEHICLES 58,138 58,502 -364 (1)
CARGO 138,573 125,600 12,973 10
TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED
FOR 2014 AND 2013
PARTICULARS
REVENUE
INCREASE
($)
PERCENTAGE
%2014($M)
2013($M)
PASSENGERS
98,427,352
89,540,080
8,887,272
10
VEHICLES
208,948,334
227,122,020
-
18,173,686
(8)
CARGO
301,121,679
283,304,112
17,817,567
6
MISCELLANEOUS
79,466,148
79,496,147
29,999
0.04
TOTAL
687,963,513
679,462,359
8,501,154
1
COMPARISON OF TOTALREVENUE FOR 2013 AND 2014
PARIKA
LEGUAN
WAKENAAM
SUPENAAM
STELLINGS –ALLOTTMENT $62.0M
Parika
Rehabilitation works are ongoing at Parika Stelling at a total cost of $31.6M. Works slated to be effected include repairs to the fender/mooring system, cluster piles, changing of dilapidated
Leguan
Works to the tune of $10,000,000 were executed at Leguan Stelling where fender/mooring systems were put in place, replacing of dilapidated decking, beams and piles.
Wakenaam
A total of $6,000,000 was spent on Wakenaam Stelling where fender/mooring system was being put in place. Changing of decking and beams also the passenger accommodation was addressed.
Supenaam
Repairs were effected to the mooring system and catwalk at the roll on / roll off facility, the fender/mooring system for the side loading and rails along the driveway. These works were done at a cost of $10,000,000.
HEAD OFFICE – INTERIOR
The Transport and Harbours Department Head Office was renovated at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved. In addition, the building was enhanced with cubicles, new desks and other office furniture.
OTHER ACHIEVEMENTS
1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo River making it possible for the vessels to traverse freely. The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction.
Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., 11.00 a.m. and 4.00 p.m.
IMPROVED FERRY SERVICES
2.The Mazaruni Dock Gate was rehabilitated at a cost of $17.0M.
3.The Department also received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel.
There were two (2) major incidents in 2014 as listed hereunder:1. On April 9, 2014 while lorry # GKK 9159 was disembarking the M.V. Kanawan which was berth alongside the Supenaam Stelling, the vessel sheared away about 6-8 feet from the stelling causing both chains and wire ropes to snap resulting in the said lorry falling overboard. This matter is presently engaging the attention of the Ministry of Legal Affairs; hence we are awaiting advice on the way forward.2. On November 17, 2014 while the M.V. Sabanto was en route to Supenaam Stelling there was restricted visibility, hence the Captain and look outs lost all sense of direction and position,
INCIDENTS
but the Captain failed to drop anchor and wait for the weather to improve. Nevertheless, the vessel continued to travel at an unsafe speed, relative to the condition of restricted visibility, the Captain then gave the wrong helm order thereby causing the vessel to run hard aground onto the south-western side of the Wakenaam Island in the Essequibo River. As a consequence, the Captain has since been dismissed from the Department’s service and the Helmsman and all the look outs were suspended from duty, without pay, for one month each.
MV Kanawan A Laden
Truck fell off the rear Gangway door at Supenaam Stelling.
The ferry ran aground on Wakenaam Island
MV Sabanto
Shortage of marine officers Limited human resources to conduct maintenance
works. Inadequate Equipment, vehicles and machines for
maintenance operation. Container used as storage facility for spare parts. Limited funds for Dry Docking of Vessels/Ships
and rehabilitation works of buildings/facilities. An aging fleet of vessel with obsolete
machineries.
CHALLENGES FACED IN 2014
Docking and Rehabilitation of the M.V. Kimbia and M.B. Sandaka
Acquisition of Spares for Vessels and Ships General rehabilitation to the Goods Wharf Additional rehabilitation of Bartica Stelling Construction of Passenger accommodation at Parika
Stelling Rehabilitation of the Central Workshop and Construction of Living Quarters at Supenaam The department plans to acquire a new Ocean going
ferry to operate the Georgetown/North West route and To restore the Berbice River Service
PLANS FOR THE YEAR 2015
THANK YOU