Upload
phamque
View
216
Download
0
Embed Size (px)
Citation preview
TRANSPORTATION M&SFOR THE DTS
PROVIDING END-TO-END FORCEPROJECTION ANALYSIS
TRANSPORTATION M&SFOR THE DTS
PROVIDING END-TO-END FORCEPROJECTION ANALYSIS
R. KEITH SEAMANSTRANSCOM TCJ5
3 JUNE 1999
R. KEITH SEAMANSTRANSCOM TCJ5
3 JUNE 1999
Briefing to:The Modeling and Simulation Community
Briefing to:The Modeling and Simulation Community
REPORT DOCUMENTATION PAGE Form Approved OMB No.0704-0188
Public reporting burder for this collection of information is estibated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completingand reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burder to Department of Defense, WashingtonHeadquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision oflaw, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)03-06-1999
2. REPORT TYPEBriefing
3. DATES COVERED (FROM - TO)xx-xx-1999 to xx-xx-1999
4. TITLE AND SUBTITLETransportation M&S for the DTS Providing End-to-End Force Projection AnalysisUnclassified
5a. CONTRACT NUMBER5b. GRANT NUMBER5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S)Seaman, R. K. ;
5d. PROJECT NUMBER5e. TASK NUMBER5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME AND ADDRESSSTRANSCOM TCJ5xxxxx, xxxxxxx
8. PERFORMING ORGANIZATION REPORTNUMBER
9. SPONSORING/MONITORING AGENCY NAME AND ADDRESSUnited States Department of DefenseDefense Modeling and Simulation Office1901 N. Beauregard St., Suite 500Alexandria, VA22311-1705
10. SPONSOR/MONITOR'S ACRONYM(S)11. SPONSOR/MONITOR'S REPORTNUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENTAPUBLIC RELEASE,13. SUPPLEMENTARY NOTES14. ABSTRACTMOBILITY MODELING AND MOBILITY MODELING AND SIMULATION OVERVIEW SIMULATION OVERVIEW ? M&SANALYSIS M&S ANALYSIS ? MOBILITY REQUIREMENTS STUDY 2005 MOBILITY REQUIREMENTS STUDY 2005 ? M&SDEVELOPMENT M&S DEVELOPMENT ? END-TO-END FORCE PROJECTION MODELING END-TO-END FORCE PROJECTIONMODELING ? M&S MANAGEMENT FOR THE DTS M&S MANAGEMENT FOR THE DTS ? USTRANSCOM M&S MASTER PLANUSTRANSCOM M&S MASTER PLAN ? M&S FUTURE INITIATIVES M&S FUTURE INITIATIVES ? ACTD?S ACTD?S ? ALP ?JSIMS ? JWARS ? TPFDD-IN-AN-HOUR ? ALP ? JSIMS ? JWARS ? TPFDD-IN-AN-HOUR15. SUBJECT TERMS16. SECURITY CLASSIFICATION OF: 17. LIMITATION
OF ABSTRACTPublic Release
18.NUMBEROF PAGES29
19. NAME OF RESPONSIBLE PERSONFenster, [email protected]
a. REPORTUnclassified
b. ABSTRACTUnclassified
c. THIS PAGEUnclassified
19b. TELEPHONE NUMBERInternational Area CodeArea Code Telephone Number703767-9007DSN427-9007
Standard Form 298 (Rev. 8-98)Prescribed by ANSI Std Z39.18
MOBILITY MODELING ANDMOBILITY MODELING ANDSIMULATION OVERVIEWSIMULATION OVERVIEW
•• M&S ANALYSISM&S ANALYSIS•• MOBILITY REQUIREMENTS STUDY 2005MOBILITY REQUIREMENTS STUDY 2005
•• M&S DEVELOPMENTM&S DEVELOPMENT•• END-TO-END FORCE PROJECTION MODELINGEND-TO-END FORCE PROJECTION MODELING
•• M&S MANAGEMENT FOR THE DTSM&S MANAGEMENT FOR THE DTS•• USTRANSCOM M&S MASTER PLANUSTRANSCOM M&S MASTER PLAN
•• M&S FUTURE INITIATIVESM&S FUTURE INITIATIVES•• ACTD’S ACTD’S … ALP … JSIMS … JWARS … TPFDD-IN-AN-HOUR… ALP … JSIMS … JWARS … TPFDD-IN-AN-HOUR
KEY RESPONSIBILITIESKEY RESPONSIBILITIES
MILITARY TRAFFICMILITARY TRAFFICMANAGEMENT COMMANDMANAGEMENT COMMAND
AIR MOBILITY AIR MOBILITY COMMAND COMMAND
MILITARY SEALIFT MILITARY SEALIFT COMMAND COMMAND
Single Manager for the Defense Transportation SystemSingle Manager for the Defense Transportation System
•• Aeromedical Aeromedical Regulating Regulating•• Air Refueling Air Refueling•• Joint Operational Joint Operational Support Airlift Support Airlift Scheduling Scheduling
•• Transportation Working Transportation Working Capitol Fund Capitol Fund
•• Defense Courier Service Defense Courier Service
UNITED STATES TRANSPORTATION COMMANDUNITED STATES TRANSPORTATION COMMANDDIRECTORATE OF PLANS AND POLICYDIRECTORATE OF PLANS AND POLICY
(ISSUES)(ISSUES)
“GETTING TO THE FIGHT. . .“GETTING TO THE FIGHT. . .7 Procurement7 Procurement Modernization Modernization
rastructurerastructure Route BasingRoute BasingAAD AttacksD Attacks
N:Future AnalysisN:Future Analysisnn vs vs ActualActualiningining
eater Airliftater Airlifthnologyhnology
FDD AnalysisFDD Analysis
MOBILITY MODELING ANDMOBILITY MODELING ANDSIMULATION REQUIREMENTSSIMULATION REQUIREMENTS
•• PROGRAMMATIC ANALYSISPROGRAMMATIC ANALYSIS•• MRS-05 … QDRMRS-05 … QDR
•• DELIBERATE PLANNINGDELIBERATE PLANNING•• REFINEMENT CONFERENCEREFINEMENT CONFERENCE
•• EXERCISESEXERCISES•• USFK EXEVAL99 … TURBO CHALLENGES … AGILE LIONUSFK EXEVAL99 … TURBO CHALLENGES … AGILE LION
•• WARGAMESWARGAMES•• FOCUSED LOGISTICS WARGAME (FLOW) … PW … GEIVFOCUSED LOGISTICS WARGAME (FLOW) … PW … GEIV
•• EXECUTION ANALYSISEXECUTION ANALYSIS•• MCC ANALYSIS SUPPORT (DESERT STORM LIKE)MCC ANALYSIS SUPPORT (DESERT STORM LIKE)
TRANSPORTATION ANALYSISTRANSPORTATION ANALYSIS
TIME
TIME
REQUIREMENT
DELIVERYRISK
AIRLIFTSEALIFTPREPOINFRASTRUCTURE
CARGO
REQUIREMENTS BASED
REQUIREMENT
CAPABILITY
REDUCE REQUIREMETSDELAY REQUIREMENTS
CARGO
CAPABILITY BASED
JFASTJFAST
AMP
A M PCONUS - STRATEGIC - THEATER
MULTIPLE OPERATIONS
THEATER(S)THEATER(S)STRATEGICSTRATEGIC
CONUSCONUS
1994 ...PART OF GTN FUTURE OPERATIONS CAPABILITY
FORCE PROJECTION BUSINESSFORCE PROJECTION BUSINESSPROVIDING END-TO-END ANALYSISPROVIDING END-TO-END ANALYSIS
1991 … DOD LACKS TOOLS FOR “END-TO-END” MOBILITY MODELING
PROACTIVEPROACTIVE PREDICTIVEPREDICTIVE TRANSPORTATIO TRANSPORTATIOREQUIREMENTSREQUIREMENTS
TARGET-TPEDIT
CONUSCONUS
INTRA-INTRA-THEATERTHEATERJRSO&IJRSO&I
MODEL INTEGRATION OVERVIEWMODEL INTEGRATION OVERVIEWAMP / FPMAMP / FPM
REQUIREMENTSREQUIREMENTS
POEPOE
INS T AL L AT IONINS T AL L AT ION
ICODES / ALMICODES / ALM
PORTSIMPORTSIM
TRANSCAPTRANSCAP
PODPOD
COMBATCOMBATMODELMODEL
CONUS
ELIST
ICODES / ALMICODES / ALM
PORTSIMPORTSIMCITMCITM
TPFDDTPFDDX-TPFDDX-TPFDD
OCONUSELIST
ALYSISALYSISLANNINGLANNING
TRAINING TRAINING EXECUTIONEXECUTION
STRATEGICSTRATEGIC
JFAST
MIDAS
FOXHOL EFOXHOL E
PBD 870
TRANSPORTATION ANALYSIS,TRANSPORTATION ANALYSIS,MODELING & SIMULATIONMODELING & SIMULATION
TAMSTAMSTAMS
ROUNDTABLEVISION
DOD
Modeling
and Simulation
Master Plann19961996
TRANSPORTATION ANALYSIS, MODELING & SIMULATIONTRANSPORTATION ANALYSIS, MODELING & SIMULATION
“As-Is” System Data Collection“As-Is” System Data Collection
ORIGINORIGIN POEPOE PODPOD FOXHOLEFOXHOLEPREDEPLOYPREDEPLOY
MASSMASSMASS
GDASGDASGDAS
FDEFDE
SEASTRATSEASTRATSEASTRAT
FPMFPMFPM
TARGETTARGETTARGET STAFLO STAFLO STAFLO
MIDAS MIDAS MIDAS
JFASTJFASTJFAST
FIND IT / FLOW ITFIND IT / FLOW ITFIND IT / FLOW IT
AMCACAADCSLOGFORSCOMFORT LEEJOINT STAFFMSC MTMCOSD PA&EUSTRANSCOM
BRACEBRACEBRACE
PORTSIM PORTSIM PORTSIM
AMPAMPAMP
FORCEFLO FORCEFLO FORCEFLO
MIMI-/MADCAPMIMI-MIMI-//MADCAPMADCAP
BRACEBRACEBRACE
PORTSIM PORTSIM PORTSIM TRANSCAP TRANSCAP TRANSCAP
FORCEFLO-E FORCEFLO-E FORCEFLO-E
STRADS STRADS STRADS
CONUS ELIST CONUS ELIST CONUS ELIST
SMARTBRIDGE SMARTBRIDGE SMARTBRIDGE
TRANSNET TRANSNET TRANSNET
SMARTBRIDGE SMARTBRIDGE SMARTBRIDGE
ELIST ELIST ELIST
SUMMITS SUMMITS SUMMITS
DAMMS-MPM DAMMS-MPM DAMMS-MPM
TRANSPORTATION ANALYSIS, MODELING & SIMULATION
DEVELOP END-TO-END ALTERNATIVE
WAR GAMINGWAR GAMINGGENERAL MODEL REQUIREMENTS
EXISTING MODELS EXISTING MODELSEXISTING MODELS
ALTERNATIVES FOR COMMON MODEL SUITEALTERNATIVES FOR COMMON MODEL SUITE
ORIGIN TO POEORIGIN TO POE
PREDEPLOYMENTPREDEPLOYMENT
POE to PODPOE to POD
POD TO FOXHOLEPOD TO FOXHOLE
SEAPORTSEAPORTAERIAL PORTAERIAL PORT
UNFILLED REQUIREMENTSUNFILLED REQUIREMENTS
GENERAL MODEL REQUIREMENTS
FEASIBILITYFEASIBILITYPROGRAMMATICPROGRAMMATICGENERAL MODEL REQUIREMENTS
DOD
Modeling
and Simulation
Master Plan
USTC Business RulesUSTC Business Rules
USTC Strategic PlanUSTC Strategic Plan
JWARSJWARS
JSIMSJSIMS
GTNGTNTAMSTAMS
VV&AVV&A
SecuritySecurity
Data Standards & Data Standards & QualityQuality
Advanced Technology InitiativesAdvanced Technology InitiativesDOD MSMPDOD MSMP
HLAHLA
TCC Requirements & CapabilitiesTCC Requirements & Capabilities
TAFIMTAFIM
JTAJTA
DII COEDII COESHADESHADE
USTC M&S DRIVERSUSTC M&S DRIVERS
OSD StudiesOSD Studies
ExercisesExercisesWargamesWargames
MSMP DEVELOPMENTMSMP DEVELOPMENT APPROACH APPROACH
ROCESS
RODUCT
Goalsandatesission
ValuesVision
StrategicIssues
ResourcingPlan
(CRP, POM)
lan forhe Plan
SWOTAnalysis
Initiatives Metrics
FormulateStrategy
ReassessImplement
Stakeholder&
MissionAnalysis
We Are
Here
CURRENT ENVIRONMENTCURRENT ENVIRONMENTTAMS MODELS
ELIST
CONUSELIST
MIDAS
AMC Models MASS, AMSIM,
BRACE, CAMPS
SEASTRATSTRADS
Execution Exercise
GT
N
MTMC Models PORTSIM, ICODES,
TRANSCAP,TARGET
Single, Focused M&S Vision for the DTS: Single, Focused M&S Vision for the DTS: single M&S environment of interoperable, collaborative models and execution systems capable single M&S environment of interoperable, collaborative models and execution systems capable
of providing accurate and consistent answers at the required breadth and depth of the DTS domain.”of providing accurate and consistent answers at the required breadth and depth of the DTS domain.”
Distributed Agent Environment
M&S AGENT ARCHITECTURE
● Flexible Plug-in Environment– No Hard Interfaces to Maintain (4 Agents in lieu of 6 Interfaces)
– Knowledge Base (KB) provides Rules to Translate b/w Global Agent Modeland Domain Models
● Agent Behaviors– Intelligent Data Retrieval, Mediation, Aggregation
– Remote Invocation of Models (Setup, Run, Return Results)
KB
KB KB
KBPORTSIM
Agent
JWARSAgent
GTNAgent
JFASTAgent
AGENT COMMS(CORBA)
NATIVE PROTOCOLS
AGENT
Execution Exercise
GT
N
SEASTRATSTRADS
MTMC
PORTSIM
BRINGING IT ALL TOGETHERBRINGING IT ALL TOGETHERTAMS Models
ALM
PORTSIM
BRACEExecution
Exercise
AMCModels
AMP 2000
GT
N
S SINGLE MANAGER OF THE DTS, CINCTRANS CHARGED WITH INTEGRATINS SINGLE MANAGER OF THE DTS, CINCTRANS CHARGED WITH INTEGRATINDTS OPERATIONS, PROCEDURES, AND PROCESSESDTS OPERATIONS, PROCEDURES, AND PROCESSES
FUTURE DTS ENVIRONMENT
•• FOCUSED ON FORT TOFOCUSED ON FORT TOFOXHOLEFOXHOLE
•• RESPONSIVE ANDRESPONSIVE ANDFLEXIBLEFLEXIBLE
•• USE BEST BUSINESSUSE BEST BUSINESSPRACTICESPRACTICES
CRISIS CRISIS RESPONSERESPONSE
JOINT OPERATIONS PLANNINGJOINT OPERATIONS PLANNING
GLOBALGLOBAL ENGAGEMENT ENGAGEMENT 2 MTWS 2 MTWS
FOCUSEDFOCUSED LOGISTICSLOGISTICS
JOINT VISION 2010JOINT VISION 2010
• Advanced Logistics Project➤ Push the limits of technology➤ Cause a fundamental change
in the way we do business
• Advanced Logistics Project➤ Push the limits of technology➤ Cause a fundamental change
in the way we do business
* Key USTRANSCOM Role
Joint Health ServicesSupport
Joint Health ServicesJoint Health ServicesSupportSupport
InformationFusion *
InformationInformationFusion *Fusion *
Joint Deployment & Rapid
Distribution *Joint Deployment & RapidJoint Deployment & Rapid
Distribution Distribution **
MultinationalLogistics
MultinationalMultinationalLogisticsLogistics
Agile InfrastructureAgile InfrastructureAgile Infrastructure
Joint Theater LogisticsCommand & Control
Joint Theater LogisticsJoint Theater LogisticsCommand & ControlCommand & Control
TENETS OF FOCUSED LOGISTICSTENETS OF FOCUSED LOGISTICS
GLOBAL VIEW OFTRANSPORTATION
GlobalInformationExchange
GlobalAwareness
DynamicPlanning &Execution
AT2000 VISION:AT2000 VISION:TRANSPORTATION COP (TCOP)TRANSPORTATION COP (TCOP)
ransportation Capability Mgr. Transportation Performance Ins
Weather Overlay at Installationeployment Performance Monitor
Planning the pipeline
• Collaboratively analyze tradeoffs ofmultiple Logistics COAs
• Globally optimize• Executable detail
• Detect plan deviation• Identify affected plan components• Notify key players• Execute IAW Plan• Manage flow• Create plan sentinels
• Redirected flow• Locally optimal fixes• Done in time to matter
Develop Plan Monitor Execution Replan
– Managing the pipeline – Visibility into the process
Overarching issue: Logistical control
VISIONARY CONCEPTVISIONARY CONCEPT
J3 J4
We couldn’t shipon time
TRANSCOM
DLA
Service &DLA Depots
Services
Units
We need bottledwater, spare
tires...
The port’sdamaged
Ops Log
4,000
3,5 00
3 ,000
2,5 00
2 ,000
1,5 00
1 ,000
5 00
0
Dry
Ca
rgo
Se
ali
ft
(Tho
usan
ds o
f Sh
ort
Tons
)
C+30C+45
C+75 C+120 C+215 3/10/91
C+0 8/7/90
MRC 1 MRC 2 Air War Ground War
Operation Desert Shield/Storm
Days
20 0 1Re qui reme nt
Du al M RC s
Carg o E nroute
Re tr ograde
IN-STORAGEIN-STORAGE IN-PROCESSIN-PROCESS IN-TRANSITIN-TRANSIT IN-THEATERIN-THEATER
Joint Logistics Advanced ConceptTechnology Demonstration (JL-ACTD)
• Develop Joint Logistics DecisionSupport Tools
–Common User Query–Access to all Data Sources–Transparent Applications and Services–Any User/Any Box
• Implement a Flexible ExperimentalEnvironment for Assessing TechnologyImpact on Logistics OperationalCapability
• Work Trade-Offs, Users DeriveRequirements
DISN Backbone(ATM SIPRnet and NIPRnet)
GCSS
UsersUsers
Joint DecisionJoint DecisionSupport ToolsSupport Tools
GTN, JTAV,JPAV, ...
Visualization, Query,Execution Monitor, Plan,...
AF, Army, Navy, DLA,Marines, TRANSCOM,
CINCsDataData
CommercialData SourcesGoalsGoals
LogisticsAnchor Desk(LAD) Phase
I
Joint DecisionSupport Tools
Phase II
Real-TimeFocusedLogisticsPhase III
FY 96 - 97 FY 98 - 99 FY 00 - 02
JWARSJWARS MISSION
• JOINT STAFF• SERVICES• CINCs• OSD• JTFs• Other DoD org’s• Industry
• DEVELOP STATE-OF-THE-ART CLOSED-FORM SIMULATION ANALYSIS TOODEVELOP STATE-OF-THE-ART CLOSED-FORM SIMULATION ANALYSIS TOO
•• JOINT, CAMPAIGN-LEVEL WARFARE JOINT, CAMPAIGN-LEVEL WARFARE•• REPRESENT UNIQUE JOINT FUNCTIONS & PROCESSES REPRESENT UNIQUE JOINT FUNCTIONS & PROCESSES•• ADDRESS JOINT DOCTRINE ADDRESS JOINT DOCTRINE•• MODEL FUTURE WARFARE MODEL FUTURE WARFARE
1.
2.
3.
4.
Planning and executionDeliberate planning
Crisis action planningForce assessment
System effectiveness and trade offanalysisConcept and doctrine developmentand assessment
JSIMS TRAINING ENVIRONMENT
TailorableComposableEfficient
MultipleSides &Factions
TrainingAudience
C4I systems- GTN CSDB 1Q FY99- GTN Rel. 5 FY01
ExerciseControl
JSIMS
A joint, distributed, synthetic battlespace for all DoD players
TPFDD IN AN HOUR
AN ENABLER FOR A
. . . More ResponsiveMore Responsive
JointJoint Deployment Deployment
Process Process
SHIFT
M R E OIL
FORCE PROJECTIONFORCE PROJECTIONFUTUREFUTURE
RE-DEPLOYRE-DEPLOY
• TREND ANALYSIS...PREDICTIVE ANALYSIS…TPFDD HRTREND ANALYSIS...PREDICTIVE ANALYSIS…TPFDD HR
•• VISIBILITY OF ASSETS AND REQUIREMENTS VISIBILITY OF ASSETS AND REQUIREMENTS
•• COLLABORATIVE PLAN & EXECUTE COLLABORATIVE PLAN & EXECUTE
•• INFLUENCE DECISIONS & REDUCE UNCERTAINTY INFLUENCE DECISIONS & REDUCE UNCERTAINTY
OPERATIONAL OUTPUT
SHIFTSHIFT
DEPLOYDEPLOY
DTS 2010 . . . on the wayDTS 2010 . . . on the wayDTS 2010 . . . on the way
TRANSPORTATION ANALYSIS, MODELING &TRANSPORTATION ANALYSIS, MODELING &SIMULATIONSIMULATION
SYSTEM RECOMMENDATIONSSYSTEM RECOMMENDATIONS
GRATIONSTEMS
CAMPSCE MASS
STASTSIMGETNSCAPT (CONUS)T (OCONUS)
CAMPS/CAMPS/MASSMASS PORTSIMPORTSIM
INSTALLATIONINSTALLATION
POEsPOEs PODsPODs
THEATERTHEATER
AMPAMP
TARGETTARGET
TAATAA ELIST ELISTHomeHome
Station Station
TRANSCAP
GTN Future Operations
ELIST ELIST
= MIGRATION SYSTEMS= SUPPORTING SYSTEMS
POEPOE
JFAST JFAST
PORTSIMPORTSIM
PODPOD
MIDASMIDAS
BRACEBRACE BRACEBRACE