29
PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS FOR TREE REMOVAL SERVICES OM‐20‐039 BID OPENING: Thursday, January 16, 2020 at 2:00 p.m. CONTRACTOR MUST HAVE A CLASS “C‐61” AND “D‐49” LICENSE LOC No. 1 January 9, 2020

TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

PUBLIC WORKS DEPARTMENT 

SPECIAL PROVISIONS FOR 

TREE REMOVAL SERVICES OM‐20‐039 

BID OPENING:  Thursday, January 16, 2020 at 2:00 p.m. 

CONTRACTOR MUST HAVE A CLASS “C‐61” AND “D‐49” LICENSE 

LOC No. 1January 9, 2020

Page 2: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

  

 

TableofContentsDIVISION I – GENERAL PROVISIONS .............................................................................................................. 1 

SECTION 1 – GENERAL ................................................................................................................................... 1 

1‐1.01  TERMS AND DEFINITIONS ............................................................................................................. 1 

1‐1.02  GENERAL DESCRIPTION OF WORK ................................................................................................ 1 

1‐1.03 SPECIFICATIONS ............................................................................................................................. 1 

SECTION 2 – BIDDING ................................................................................................................................... 4 

2‐1.01  GENERAL ....................................................................................................................................... 4 

2‐1.02  BID PROTEST ................................................................................................................................. 4 

SECTION 3 – CONTRACT AWARD AND EXECUTION ...................................................................................... 5 

3‐1.01  CONTRACT AWARD ....................................................................................................................... 5 

3‐1.02  CONTRACT EXECUTION ................................................................................................................. 5 

3‐1.03   CONTRACT TERM ............................................................................................................................. 5 

3‐1.04   TERMINATION FOR CONVIENCE ...................................................................................................... 5 

3‐1.05   CONTRACTOR QUALIFICATIONS ................................................................................................... 5 

SECTION 4 – SCOPE OF WORK ...................................................................................................................... 6 

4‐1.01   BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES ................................. 6 

SECTION 5 – CONTROL OF WORK ................................................................................................................. 7 

5‐1.01  CITY REPRESENTATIVES ................................................................................................................. 7 

5‐1.02  QUALIFICATIONS ........................................................................................................................... 7 

5‐1.03  RESPONSIBILITIES .......................................................................................................................... 8 

5‐1.04  SCOPE OF WORK ......................................................................................................................... 12 

SECTION 6 – BLANK ..................................................................................................................................... 14 

SECTION 7 – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ...................................................... 15 

7‐1.01  PUBLIC CONVENIENCE ................................................................................................................ 15 

7‐1.02  PUBLIC SAFETY ............................................................................................................................ 15 

SECTION 8 – BLANK ..................................................................................................................................... 16 

SECTION 9 – PAYMENT ............................................................................................................................... 17 

9‐1.01  PAYMENT .................................................................................................................................... 17 

9‐1.02  PAYMENTS WITHHELD ................................................................................................................ 17 

DIVISION II – GENERAL CONSTRUCTION ..................................................................................................... 18 

SECTION 10 – GENERAL............................................................................................................................... 18 

10‐1.01  STANDARDS OF PERFORMANCE ............................................................................................. 18 

10‐1.02  WORKMANSHIP ...................................................................................................................... 18 

LOC No. 1 January 9, 2020

Page 3: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

  

10‐1.03  SUBMITTALS AND INSPECTIONS ............................................................................................. 19 

10‐1.04  MEETINGS ............................................................................................................................... 19 

10‐1.05  QUANTITIES ............................................................................................................................. 20 

SECTION 11 – BLANK ................................................................................................................................... 21 

SECTION 12 – TEMPORARY TRAFFIC CONTROL .......................................................................................... 22 

12‐1.01 MAINTAINING TRAFFIC .............................................................................................................. 22 

12‐1.02 TRAFFIC CONTROL SYSTEM FOR LANE AND ROAD CLOSURE .................................................... 24 

SECTION 13 – BLANK ................................................................................................................................... 26 

SECTION 14 – BLANK ................................................................................................................................... 26 

 

 

 

LOC No. 1 January 9, 2020

Page 4: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  1 

 

SPECIAL PROVISIONS FOR 

TREE REMOVAL SERVICES PROJECT NO. OM‐20‐039 

 

DIVISION I – GENERAL PROVISIONS 

 

SECTION 1 – GENERAL  

1‐1.01  TERMS AND DEFINITIONS 

Wherever  in  the  S p e c i a l   P r o v i s i o n s ,   N o t i c e   t o   C o n t r a c t o r s , P r o p o s a l ,  C o n t r a c t ,   o r   o t h e r   c o n t r a c t   d o c um e n t s   t h e   following  terms  are  used;  the intent and meaning shall be interpreted as follows: 

City or Owner ‐   City of Stockton 

Director ‐   Director of Public Works, City of Stockton 

Standard Specifications ‐   City  of  Stockton,  Standard  Plans  and  Specifications,  and  any amendments or revisions thereto (Revised 9/27/16) 

Caltrans Specifications ‐   State of California, Department of Transportation, 2015 Standard Plans  and  Specifications  and  any  amendments  or  revisions thereto.  

Department ‐   Department of Public Works, City of Stockton 

City Representative ‐   Project Manager, City of Stockton, acting either directly or through properly authorized Project Manager agents and consultants 

MUTCD ‐   Latest  edition  of  California Manual  on  Uniform  Traffic  Control Devices (MUTCD), and any amendments and revisions thereto 

 

1‐1.02  GENERAL DESCRIPTION OF WORK  

The work described herein is for tree and stump removal, including disposal, throughout the  City  of  Stockton.    Contractor  shall  provide  all  necessary  labor,  tools,  equipment, materials and incidentals, to complete the work and to properly dispose of all materials generated. Work  locations may  include,  but not be  limited  to,  residential  front  yards, “park way strips” between the sidewalk and curb, landscaped street right of way and tree wells.  

 

1‐1.03 SPECIFICATIONS 

 

LOC No. 1 January 9, 2020

Page 5: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  2 

 

All work  shall be done  in accordance with  the City of Stockton, Department of Public Works, Standard Specifications and Plans,  incorporated herein,  insofar as  the same may apply and  in accordance with these Special Provisions and bid documents.  To the extent the Department of Transportation Standard Specifications implement the STATE CONTRACT ACT they shall not be applicable since the City of Stockton is not subject to said act.   

In  case  of  conflict  or  discrepancy  between  any  of  the  Contract  Documents,  the  order  of documents listed below shall be the order of precedence, with the first item listed having the highest precedence. 

a. Contract Change Order b. Contract c. Project Special Provisions d. Project Plans e. City’s Standard Specifications f. City’s Standard Drawings g. Revised Caltrans Standard Specifications h. Caltrans Standard Specifications i. Revised Caltrans Standard Plans j. Supplemental Project Information 

With regards to discrepancies or conflicts between written dimensions given on drawings and the scaled measurements, the written dimensions shall govern. 

With  regards  to  discrepancies  or  conflicts  between  large‐scale  drawings  and  small‐scale drawings, the larger scale shall govern. 

With regards to discrepancies or conflicts between detailed drawings and referenced standard drawings or plans, the detailed drawings shall govern. 

In  the  event  where  provisions  of  codes,  safety  orders,  contract  documents,  referenced manufacturer’s  specifications  or  industry  standards  are  in  conflict,  the  more  restrictive  and higher quality shall govern. 

Should  it  appear  that  the  work  to  be  done  or  any  of  the  matters  relative  thereto  are  not sufficiently detailed or explained in these specifications, the special provisions, or the plans, the Contractor shall apply to the City Representative in writing for such further explanations as may be necessary  and  shall  conform  to  them as  part  of  the  contract. All  responses  from  the City Representative shall be in writing. In the event of any doubt or question arising respecting the true meaning of these specifications, the special provisions or the plans, reference shall be made to the City Representative, whose decision thereon shall be final. 

The  Contractor  shall  examine  carefully  the  site  of  the work  and  the  plans  and  specifications therefore.  He/She  shall  investigate  and  satisfy  himself/herself  as  to  conditions  to  be encountered, the character, obstacles to be encountered, the work to be performed, materials to be furnished, and as to the requirements of the bid, plans and specifications of the contract.  

 

 

LOC No. 1 January 9, 2020

Page 6: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  3 

 

 

   

LOC No. 1 January 9, 2020

Page 7: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  4 

 

SECTION 2 – BIDDING  

 

2‐1.01  GENERAL 

The bidder's attention is directed to the "Notice to Contractors" for the date, time and location of  the  mandatory  pre‐bid  meeting,  if  applicable.    Refer  to  the  City  of  Stockton’s  Bid  Flash webpage:  http://www.stocktongov.com/services/business/bidflash/default.html 

The  bidder's  attention  is  directed  to  the  provisions  in  Section  2,  "Bidding,"  of  the  Standard Specifications and these special provisions for the requirements and conditions which the bidder must observe in the preparation for the submission of the bid. 

In conformance with Public Contract Code Section 7106, a Non‐collusion Affidavit is included in the Proposal. Signing the Proposal shall also constitute signature of the Non‐collusion Affidavit. 

The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national  origin,  or  sex  in  the  performance  of  this  contract.    The  contractor  shall  carry  out applicable requirements of Title 49 CFR (Code of Federal Regulations) part 26 in the award and administration  of  US  DOT  assisted  contracts.    Failure  by  the  contractor  to  carry  out  these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate.  Each subcontract signed by the bidder must include this assurance. 

 

2‐1.02  BID PROTEST 

In case of Bid protests, attention is directed to the provisions in Section 2‐1.51, “Bid Protests” of the Standard Specifications.  The party filing the protest must have submitted a bid for the work.  A subcontractor of a bidder may not submit a bid protest.    A copy of bid protests is to be sent to the following address: 

 Attention: Mitch Jackson 

City of Stockton Public Works Department 

22 E. Weber Avenue, Room 301 Stockton, CA  95202 

 

 

 

   

LOC No. 1 January 9, 2020

Page 8: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  5 

 

SECTION 3 – CONTRACT AWARD AND EXECUTION 

 

3‐1.01  CONTRACT AWARD  

The bidder's attention is directed to the provisions in Section 3, " Contract Award and Execution," of the Standard Specifications and these special provisions for the requirements and conditions concerning award and execution of contract. 

Bid protests are  to be delivered  to  the  following address: Department of Public Works, 22 E. Weber Avenue, Room 301, Stockton, CA 95202, Attn: Mitch Jackson.   The award of the contract, if it be awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed. 

3‐1.02  CONTRACT EXECUTION 

The contract shall be executed by the successful bidder and shall be returned to the Agency so that it is received within 10 days, not including Saturdays, Sundays and legal holidays, after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty. The executed contract documents shall be delivered to:   

City of Stockton Public Works Department 

Attn: Mitch Jackson 22 E. Weber Avenue, Room 301 

Stockton, CA 95202 

 3‐1.03   CONTRACT TERM  

The contract term will be through December 31, 2020. 

 

3‐1.04   TERMINATION FOR CONVIENCE  

City  may  terminate  the  contract  at  any  time  by  mailing  notice  to  Contractor  at  the contractor’s address as noted in the contract.  Contractor shall be paid for that portion of goods provided / services provided when notice is received. 

 

3‐1.05   CONTRACTOR QUALIFICATIONS    

Contractor acknowledges it is an independent contractor and shall not for any purpose be deemed to be an employee, agent, or other representative of the City.   Contractor shall not assign, sublet, transfer or otherwise substitute its interest in this work, or any of its obligations, without the prior written consent of the City. 

LOC No. 1 January 9, 2020

Page 9: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  6 

 

 

SECTION 4 – SCOPE OF WORK 

 

4‐1.01   BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES  

Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to Proceed and be diligently performed until competed. 

 

Unless otherwise approved by the City representative, the contractor shall be required to perform entire tree and stump removals at an average pace of six (6) to ten (10) removals per day. 

 

Liquidated damages:  With each pay application, the average number of trees removed will be calculated, and the difference between the actual average number of removals per day for the pay period, and the minimum average of six (6) removals per day, times the number of days for the pay period will be calculated.  The City may collect liquidated damages at a rate equal to the average cost to remove one tree (based on the total base bid  price  divided by  the  total  number of  trees  in  the base bid)  times  the  total  of  the difference between the actual average removal count and the minimum required average removal count.  Total liquidated damages may be withheld from each pay application at the discretion of the City representative.  

 

Full  compensation  for any costs  required  to comply with  the provisions  in  this  section shall be considered to be included in the prices paid for the various contract items of work and no additional compensation will be allowed, therefore.  

   

LOC No. 1 January 9, 2020

Page 10: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  7 

 

SECTION 5 – CONTROL OF WORK  

 

5‐1.01  CITY REPRESENTATIVES  

Representative(s)  from  the  Public  Works  Department  will  manage/administer  this contract and inspect the Contractor's work.  All work shall be subject to approval by the City representative. The primary point of contact will be the City Project Manager, Mitch Jackson, phone 209‐937‐8283, or email [email protected].  

5‐1.02  QUALIFICATIONS  

5‐1.02.1  Minimum Age Requirement:  

 

All employees of the Contractor must be a minimum of 18 years of age. 

 

5‐1.02.2  Conflict of Interest:   

 

The  Contractor  shall  not  employ  any  person  who  is  an  employee  of  the  City  if  the employment of that person would create a conflict of interest. 

 

5‐1.02.3  Experience:   

 

It is the intent to call for the highest level of quality in tree services compatible with the International Society of Arboriculture Standards and Practices and modern  techniques accepted by the industry.  All tree removal services shall be performed by experienced and qualified person(s) who are directly employed and supervised by the Contractor. Such Contractor shall have at least two (2) years of relevant experience in tree removals similar in size to those for which these Special Provisions apply.  

 

5‐1.02.4  Licensing:  

 

Contractor shall possess a valid and proper State Contractor’s License Classification C‐61 Limited Specialty, D‐49 Tree Service License. 

 

LOC No. 1 January 9, 2020

Page 11: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  8 

 

Contractor shall possess a City of Stockton Business License before being allowed to start work  and must maintain  a  City  of  Stockton  Business  License  throughout  the  contract period. 

5‐1.03  RESPONSIBILITIES  

The Contractor shall appoint a Project Manager who shall be responsible for the quality and performance of the work and an alternate(s) who shall act for the Contractor when the Project Manager is absent.  The names of these persons shall be designated in writing to  the City.   As used  in  this  solicitation,  the  term “Project Manager”  shall  include  the alternate as specified above.  The Project Manager, or his/her designee, should generally be available during normal working hours to meet with the City Representative to discuss any  problem  areas.    Contractor  shall  provide  the  City  Representative  with  contact information for both the Project Manager and alternate.  The Project Manager shall have a  telephone/pager  to  permit  timely  contact  by  the  City.    The  Project  Manager  must respond to a call/page within 30 minutes. 

 

Contractor  shall  provide  at  their  own  risk,  all  labor,  materials,  supervision,  tools, equipment,  insurance,  storage,  transportation,  hauling,  dumping,  proper  protection, traffic control and all other items needed, or as directed to perform the work described in these special provisions. 

 

Contractor shall have a designated supervisor at the work site that has the authority to respond to the City Representative and/or any citizens about work details or priorities.  The  supervisor  shall  be  able  to  accurately  and  effectively  communicate  any  essential information. 

 

Contractor shall provide supervision of all work crews at all times while performing work under  this  contract.    Contractor  shall  provide  supervision  to  assure  that  tasks  are performed to the standards set forth herein.  Contractor is solely responsible for the day‐to‐day supervision and control of Contractor’s employees.   

 

Contractor  shall  employ  a  sufficient  number  of  competent  and  skilled  staff  to  ensure performance  of  the  work  described.    The  Contractor  shall  provide  management  and technical supervision through competent supervisors as required to implement modern methods and any newly developed procedures.  Contractor shall be responsible for the skills, methods, and actions of Contractor's employees and for all work.   

The City shall, throughout the life of the contract, have the right of reasonable rejection and/or approval of staff assigned to the work by the contractor.  If the City representative rejects  one  of  Contractor's  staff,  the  Contractor  must  provide  replacement  staff 

LOC No. 1 January 9, 2020

Page 12: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  9 

 

satisfactory to the City at no additional cost to the City.    If, in the opinion of the City, any Contractor employee who is incompetent, disorderly, refuses to perform in accordance with  the  contract  specifications,  threatens  or  uses  abusive  language  while  at  a  work area/site, or is otherwise unsatisfactory, shall be removed immediately from work under this contract upon request of the City. 

 

Persons not employees of the Contractor (i.e., spouse, children, brother, sister, friends, etc.)  shall  not be allowed within  the  immediate work area during  the performance of services under this contract. 

 

5‐1.03.1  Damage to Improvements and Protection of Property  

 

The contractor, in the course of performing the specified work, shall be responsible to report to the City Representative any trees which appear to be in a hazardous condition or state. 

 

Should any portion of the work list be unclear, Contractor shall immediately contact the City Representative for clarification. 

 

Contractor shall be held responsible for the preservation and protection of all public and private  property  and  improvements  adjacent  to  the work  area  and  shall  exercise  due caution to avoid and prevent any damage to adjacent property and/or  improvements. Should any direct or indirect damage or injury result to any public or private property or to  any person(s)  encountered  in  the  course of work on  account  of  any  act,  omission, neglect, or misconduct in the execution of the work, or as a consequence of non‐execution thereof on the part of the Contractor or any of their employees or agent, such property or person shall be restored and made whole at the expense of the contractor, and subject to approval by the City Representative.  

Where personal property may be affected by Contractor's operations that the Contractor cannot  effectively  protect,  Contractor  shall  notify  the  potentially  affected  property owner(s)  prior  to  the  operations  so  that  steps  can  be  taken  to  protect  the  personal property.  Contractor shall notify City within 24 hours of any damage to any City or private amenities/improvements/property caused by Contractor. 

 

Contractor shall take all reasonable measures to prevent accidental spills of fuel or oil for Contractor's equipment. In the event of such spill, immediately remove all spilled material,  properly  dispose  of  the  spilled  material  and  any  material  used  in  clean‐up/absorption of the spilled material, and, if necessary, notify the proper authorities in accordance with applicable law. 

LOC No. 1 January 9, 2020

Page 13: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  10 

 

 

5‐1.03.2  Inventory of Tools, Equipment, and Materials  

 

Contractor shall have adequate inventory of tools, equipment and materials used in the performance  of  this  contract.    Contractor  shall  provide  all  supplies  necessary  to accomplish the required services. 

 

5‐1.03.3  Disposal of Material 

 

Contractor shall legally dispose of all waste material generated. Contractor shall provide a monthly report of the amount in tons of material disposed and where the material was disposed. 

 

5‐1.03.4  Safety 

 

Contractor  shall  be  solely  responsible  for  the  safety  and  welfare  of  all  Contractors' personnel performing work under this contract as well as the general public.  Contractor is  solely  responsible  for  advising  and  educating  all  personnel  to  the  health  hazards associated with this work prior to personnel commencing work under this contract. 

 

All work shall be performed with the utmost concern for safety of both the public and the workers.  Where necessary, contractor shall barricade or temporarily close to the public those  areas  that  are  being  serviced  and  the  contractor  shall  be  responsible  for  any necessary traffic control  in compliance with City and/or CalTrans standards, subject  to review and approval by the City Traffic Engineer or other City representative. 

 

5‐1.03.5  Illness and Injury Prevention Program: 

 

Contractor shall have an Illness and Injury Prevention Program.  Contractor shall submit a copy of the Illness and Injury Prevention Program manual with the initial project schedule. 

 

5‐1.03.6  Harassment Policy:  

 

Contractor  shall  have  a  written  policy  that  at  a  minimum  prohibits  harassment  and discrimination  in  employment  on  the  basis  of  race,  religion,  color,  national  origin, ancestry,  disability,  marital  status,  pregnancy,  medical  condition,  gender,  sexual 

LOC No. 1 January 9, 2020

Page 14: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  11 

 

orientation, political affiliation, age, or any other category or attribute as consistent with state  or  federal  law.    The  prohibition  applies  to  all  officers  and  employees  of  the Contractor  and  their  interaction  with  City  personnel  and  the  members  of  the  public encountered  during  the  course  of  Contractor's  work.    Contractor's  policy  shall  at  a minimum be comparable to the City of Stockton City Manager Administrative Directive HR‐15  Discrimination  and  Harassment  Policy  attached  to  the  “Notice  Inviting  Bids, Instructions  to  Bidders,  Special  Provisions”  document  as  Exhibit  ‘B’.    Contractor  shall submit a copy of their policy with their bid. 

 

The  policy  shall  apply  to  all  aspects,  including,  but  not  limited  to,  hiring,  placement, promotion, disciplinary action,  layoff,  recall,  transfer,  leave of absence, compensation, and training. 

 

All allegations of harassment shall be  investigated promptly by  the Contractor.    If  it  is determined that harassment has occurred, Contractor is responsible to ensure remedial action  is  taken.    Such  action  may  include  disciplinary  actions  up  to  and  including termination.  In addition, under applicable law, individual supervisors and employees may be subject to personal liability and/or punitive damages in any litigation arising as a result of such conduct. 

 

Contractor  is responsible and shall ensure that any of Contractor's staff who has been determined to have retaliated against or participated  in  retaliating against any person who has brought forth, in good faith, a complaint of harassment, or any employee who retaliates against any person who participates in an investigation of any such complaint is  disciplined,  up  to  and  including  termination.    In  addition,  under  applicable  law, individual supervisors and employees may be subject to personal liability and/or punitive damages in any litigation arising as a result of such conduct. 

 

5‐1.03.7  Found Items 

 

Contractor shall ensure that all  items of possible personal or monetary value found by Contractor/Contractor's employees are turned in to the City representative. 

 

5‐1.03.8  Key Control 

 

Contractor shall ensure all keys and security codes issued to Contractor are not lost or misplaced and are not used by unauthorized persons.  No keys issued to Contractor shall be duplicated.  Contractor shall have a written key control program available to the City upon request. 

LOC No. 1 January 9, 2020

Page 15: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  12 

 

 

5‐1.04  SCOPE OF WORK  

Work will generally consist of tree and stump removal services in various locations within the City of Stockton.  It is expected that the Contractor will provide the highest level of quality  in  tree  services  compatible  with  the  International  Society  of  Arboriculture Standards and Practices and modern techniques accepted by the Society. 

 

5‐1.04.1 Hours and Days of Work  

   

All work using equipment powered by an internal combustion engine, including, but not limited to, chain saws, blowers, chippers, and any other heavy equipment, is expected to be performed between the hours of 8:00 a.m. and 4:00 p.m. 

 

Should the Contractor choose to work on a Saturday, Sunday, or on a holiday recognized by  the  labor  unions,  and  that  work  requires  inspection  or  supervision  by  the  City  of Stockton (the City) and/or the Tree Supervisor/City Representative, the Contractor shall reimburse the actual costs of inspection and supervision and/or other overhead expenses which are directly chargeable to the contract.   Should such work be undertaken at the request of the City, reimbursement will not be required. 

 

5‐1.04.2  Removal Notice and Tree Removals  

   

  The property owner for each tree removal location shall receive at least five (5) working days written notice prior to tree removal.  It shall be the responsibility of the contractor to provide such notice.   Trees  shall be  removed  in  their entirety,  including stump and stump grinding. 

 

Stump shall be ground to a minimum depth of 18” or as deep as required to completely remove the entire stump, whichever is deeper. 

 

Roots within 18” of the stump shall be removed in their entirety. 

 

Trees shall be progressively cut down rather than felled. 

 

The  contractor  shall  have  all  locations  surveyed  for  underground  utilities  (USA  North Underground Survey, 1‐800‐227‐2600) prior to removal. 

LOC No. 1 January 9, 2020

Page 16: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  13 

 

 

All surface roots within three (3) feet of the sidewalk shall be removed. 

 

Contractor shall protect the adjacent lawn areas.  Contractor will be responsible for the repair of any  ruts or other damage  caused by his  actions during  the execution of  this contract. 

 

The void created during the tree removal process shall be backfilled the same day the tree is removed.  Contractor shall provide proper precautions to ensure public safety until all work is completed at each tree location. 

 

50% sandy loam and ground wood chips from the tree and stump removal shall be used to backfill the void leaving a two (2) to three (3) inch mound to allow for settling.  All extra grindings shall become the property of the contractor whom shall be responsible for its proper disposal. 

 

5‐1.04.3 Site Cleanup  

 

The  contractor  shall  leave  the  work  area  raked  and  swept  clean  and  in  an  orderly condition  before  moving  to  the  next  work  area.  Site  cleanup  shall  be  completed immediately after each tree and stump removal has been completed.  All logs, branches, twigs, wood chips, leaves, wood dust or any other plant materials or any other materials generated during the job shall be removed from the work area before leaving.  All subject to the satisfaction of the City representative. 

 

LOC No. 1 January 9, 2020

Page 17: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  14 

 

 

SECTION 6 – BLANK 

   

LOC No. 1 January 9, 2020

Page 18: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  15 

 

 

SECTION 7 – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC  

7‐1.01  PUBLIC CONVENIENCE 

Contractor’s  attention  is  directed  to  Section  12‐1.02,  “Maintaining  Traffic”  of  these  Special Provisions. 

The Contractor shall notify San Joaquin Regional Transit District (SJRTD) (dispatcher (209) 948‐0642) a minimum of five (5) working days prior beginning Work.  Contractor shall coordinate with SJRTD if any bus stops and bus routes are affected. 

Full compensation for conforming to the provisions in this section shall be considered as included in prices paid for the various contract items of work involved, and no additional compensation will be allowed therefore. 

7‐1.02  PUBLIC SAFETY 

The Contractor’s attention is directed to Section 12‐1.02, “Maintaining Traffic” of these Special Provisions.  Nothing in the specifications voids the Contractor’s public safety responsibilities. 

All safety devices, their maintenance, and use shall conform to the latest requirements of OSHA and  shall  conform  to  the  applicable  provisions  of  Part  6  "Temporary  Traffic  Control",  latest MUTCD California Supplement,  the current edition of the “Manual on Uniform Traffic Control Devices (MUTCD)” and the latest “Work Area Traffic Control Handbook (WATCH)”.  It shall be the complete responsibility of the Contractor to protect persons from injury and to avoid property damage.' Adequate barricades,  construction  signs,  flashers,  and other  such  safety devices,  as required, shall be placed and maintained during the progress of the construction work, until the project is completed. Whenever required, flagmen shall be provided to control traffic.  

The Contractor shall provide for the proper routing of vehicles, bicyclists, and pedestrians in a manner that will hold congestion and delay of such traffic to practicable minimum by furnishing, installing,  and  maintaining  all  necessary  temporary  signs,  barricades,  and  other  devices  and facilities,  as  approved  by  the  City  Traffic  Engineer  or  the  City  Representative.  As  the  work progresses,  the Contractor  shall  relocate,  such devices and  facilities as necessary  to maintain proper routing. The Contractor shall maintain Americans with Disabilities Act (ADA) compliance through the work site (or approved alternate route) at all times during all phases of construction.  

Full compensation for furnishing, installing, moving, and removing of all necessary traffic control devices  including,  but  not  limited  to,  signing,  striping,  barricades,  arrow  boards,  CMS,  and flagging  shall  be  included  in  the  contract  prices  for  “Traffic  Control”  and  no  additional compensation  will  be  allowed  therefore.  Section  12‐1.04,  "Payment,”  of  the  Caltrans Specifications is deleted. 

 

   

LOC No. 1 January 9, 2020

Page 19: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  16 

 

 

SECTION 8 – BLANK   

 

   

LOC No. 1 January 9, 2020

Page 20: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  17 

 

SECTION 9 – PAYMENT 

9‐1.01  PAYMENT    

Payment requests shall be submitted monthly.  Contract work done for the month will be paid for in arrears.  Invoices for the month’s service will be approved for payment once all  required reports are received.   Once an  invoice  is approved  for payment, Accounts Payable typically issues a check within 30 days.  

 

  With the monthly billing Contractor shall provide monthly reports as detailed in Section 10‐1.03 “Submittals and Inspections”. 

 

  Invoices submitted without all reports will not be processed for payment until all reports are received. 

 

  The  City  reserves  the  right  to  pay  only  on  a  prorated  basis  for  actual  tree  services completed for the month. 

 

  Work not performed will be deducted from Contractor's invoice according to Section 9‐1.02 “Payments Withheld”. 

9‐1.02  PAYMENTS WITHHELD    

Payment may be withheld to such extent as may be necessary to protect the City from loss including, but not limited to, the following reasons: 

 

A. Defective work. B. Work not performed. C. Incomplete/partially completed work. D. Not submitting required reports. E. Contractor caused damage to property that has not been repaired. F. Failure of  the Contractor  to make payments  to  subcontractors or  suppliers  for 

material and labor.  

  If part or all of Contractor's monthly payment must be withheld due to defective work, work not performed and/or incomplete work, failure to submit required reports, and/or failure of the Contractor to make payments to subcontractors or suppliers for material and labor, in addition to any deduction for non‐performance, an additional $250.00 will be deducted to offset City costs to process the reduction. 

 

LOC No. 1 January 9, 2020

Page 21: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  18 

 

DIVISION II – GENERAL CONSTRUCTION 

 

SECTION 10 – GENERAL 

 

10‐1.01  STANDARDS OF PERFORMANCE  

All other portions of these special provisions notwithstanding, it is intent of these special provisions that, at a minimum, the Contractor adhere to them to the satisfaction of the Public Works Director or Designee(s).  It is the intent to call for the highest level of quality in tree services compatible with the International Society of Arboriculture Standards and Practices and modern techniques accepted by the industry. 

 

Contractor shall have adequate equipment and employ adequate staff to accomplish the work specified. All work shall be performed with the utmost concern for safety of both the workers and the public. If requested by the City representative, the Contractor shall submit  project  references  with  contact  information  as  well  as  a  list  of  projects demonstrating relevant experience. Relevant experience shall include, but not be limited to, having performed similar tree services to those as described herein.  Each employee of the Contractor shall wear a uniform that has been approved by the City Representative which clearly identifies the Contractor's company and the employee. Such uniform shall be consistent for all workers and shall be worn at all times while performing work as per this contract document. Said uniform shall be kept in a neat and orderly manner. 

 

Any  vehicles  used  by  the  Contractor  or  those  persons  representing  the  Contractor's company, shall be in proper working order and in a good state of repair, and shall clearly present the Contractor's company name, address, and telephone number of local office. 

 

10‐1.02  WORKMANSHIP  

Contractor  shall  perform  work  to  the  satisfaction  of  the  Public  Works  Director  or Designee(s).    The  Contractor  shall  cooperate  with  the  Public  Works  Director  or Designee(s) to enable determination of contract compliance.  If any work does not meet the standards specified, the Contractor will be responsible for correcting such deficiencies within five (5) working days after notification or as directed by the Public Works Director or  Designee(s).    Corrections  shall  be  at  no  additional  cost  to  the  City  of  Stockton.    If necessary, Contractor is expected to use additional personnel for corrections.  There shall be no delay of regular maintenance to complete corrections. 

 

LOC No. 1 January 9, 2020

Page 22: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  19 

 

10‐1.02.1  Quality Control 

 

Contractor shall have a quality control program and shall submit a copy of the program with the initial project schedule. 

 

10‐1.03  SUBMITTALS AND INSPECTIONS  

Within five (5) working days of receiving a Notice to Proceed from the City of Stockton, the contractor shall provide a schedule to the City representative indicating the proposed date  for  the  start  of work  and  the proposed  starting  location.    Contractor will  not be allowed to commence work until a work schedule is submitted.  Should Contractor wish to later modify this schedule, a written request must be submitted to and approved by the City Representative prior to the revised schedule becoming effective. 

 

The Public Works Representative will conduct regular inspections of Contractor's work. Monthly,  the  Public  Works  Representative  shall  meet  with  Contractor  to  evaluate Contractor's  services.  During  such  meetings,  the  Contractor's  past  billings  may  be reviewed for compliance with the contract. 

 

Contractor shall provide the Public Works Representative the following reports attached to the monthly progress billings: 

 

A) Report of any problems encountered.  

B) Waste disposal report submitted electronically in an Excel spreadsheet or other comparable program that is compatible with City software. Report shall  include the amount of material, type of material and where material was disposed and shall include copies of the disposal tickets/receipts. 

 

C) Local Employment Ordinance Report  

10‐1.04  MEETINGS    

Upon award of the contract and before initial start of work, the Contractor shall contact the City Project Manager at (209) 937‐8283 for a pre‐job meeting. 

 

  At least once (1) each month, Contractor shall meet with the City Project Manager.  The purpose of the meeting is to review the status of the tree removals, conformance of the 

LOC No. 1 January 9, 2020

Page 23: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  20 

 

work  to  the  specifications,  contractor’s  work  schedule,  locations  that  need  special attention or correction, and any difficulties contractor may be experiencing.  Failure to be available to meet with the Tree Supervisor on a monthly basis will constitute a breach of contract.  During this meeting, Contractor is expected to report any and all hazardous or potentially hazardous conditions that may exist or that pose a potential threat to public health or safety.  Said reporting shall be done even if correction of the condition is not within the scope of service required of the Contractor. 

10‐1.05  QUANTITIES  

The following estimate of the quantities of work to be done annually and materials to be furnished are 

approximate only and are intended as a basis for the comparison of bids. The City does not expressly or 

by implications agree that the actual amount of work will correspond therewith, but reserves the right 

to increase or decrease the amount of any class or portion of the work without increase or decrease in 

the unit price bid or to omit portions of the work that may be deemed necessary or expedient by the 

Engineer. Actual quantity of the work will depend upon the project budget and other considerations and 

constraints.  

Item Description Unit Qty Unit price

Total Price

 

1 Tree with Tree Stump Removal (">" = trunk diameter at breast height (dbh) that is greater than

13" to 16" dbh 10    

2   >16" to 20" dbh 70    

 3

 >20" to 24" dbh 60

   

 

4  

>24" to 28" dbh 30    

 5

 >28" to 30" dbh 15

   

 6

 >30" to 32" dbh 6

   

 7

 >32" to 34" dbh 4

   

 8

I

>34" dbh 2    

 9

 >35" dbh 2

   

 10

 >36"dbh 1

   

 11

 >37" to 38" dbh 1

   

LOC No. 1 January 9, 2020

Page 24: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  21 

 

    Total (Items 1 through 11)

Bid Form to be completed separately.  

 

SECTION 11 – BLANK 

 

   

LOC No. 1 January 9, 2020

Page 25: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  22 

 

 

SECTION 12 – TEMPORARY TRAFFIC CONTROL 

 

12‐1.01 MAINTAINING TRAFFIC 

Attention is directed to Sections 7‐1.03, "Public Convenience,” 7‐1.04, "Public Safety,” and 12, "Temporary Traffic Control,” of the Caltrans Specifications, 10‐1.01, "Standards of Performance,” of these Special Provisions. Nothing in these Special Provisions shall be construed as relieving the Contractor from the responsibilities specified in these sections. 

The Contractor shall furnish, and maintain in good working order, all barricades, arrow boards, CMS, and flashers, and provide flaggers as necessary to protect pedestrians and vehicular traffic.  

The Contractor shall furnish and maintain all barricades, arrow boards, CMS, flashers, and any detour  signs  twenty‐four  (24)  hours  a  day,  including  covering  or  removing  signs  during  non‐construction hours. 

The  Contractor  shall  provide  adequate  and  continuous  ingress  and  egress  for  all  adjacent properties, except  for  the  limited period of  time  it  is necessary  to perform work at a specific property.  The  Contractor  shall  diligently  prosecute  all  work  directly  impacting  businesses  to completion. The Contractor shall coordinate limited closures with tenants or owners, as required by these Special Provisions, and as directed by the Engineer. 

The  "Traffic  Control  Plan"  shall  conform  to  the  typical  traffic  control  details  included  in  the requirements of Section 12‐1.02, "Traffic Control System for Lane and Road Closure,” of these Special  Provisions.  The  Temporary  Traffic  Control  Plan  shall  include,  but  not  be  limited  to, detailed requirements for the following: 

Traffic control devices, including signs and markings. 

Construction detour  routes, phasing and/or staging of both  the  roadway and sidewalk areas. 

Employee, Customer, and Business/Delivery access to adjacent property. 

Emergency vehicles access. 

Bus, refuse collection, and mail delivery access. 

Any parking zones to be removed on a temporary basis. 

Any temporary "No Parking" zones. 

Pedestrian and bicyclist access. 

The “Temporary Traffic Control Plan” shall consider the impacts of changes in traffic volumes and capacities related to the construction activities, and their impact on vehicular and bicycle traffic and pedestrian operations, on roadway pavements, including provisions to restore construction‐damaged pavements. 

 

Traffic Lane and Sidewalk Closures 

Lanes and  sidewalks may be closed only as  indicated  in  this  section,  "Maintaining Traffic,” of these Special Provisions. Except for work required under Sections 7‐1.03, “Public Convenience” 

LOC No. 1 January 9, 2020

Page 26: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  23 

 

and 7‐1.04, “Public Safety” of Caltrans Specifications, work that interferes with public traffic shall be performed only as indicated. Traffic lane and sidewalk closures shall conform to the following requirements: 

Lane closure, a maximum of one lane in each direction of travel and not more than twelve (12) feet wide, shall be permitted only between the hours of 9 a.m. and 3:30 p.m. Any other  lane closure shall be approved by the City Representative. 

Standard  working  hours  shall  be  8  a.m.  to  4  p.m.  Any  extended  working  hours  require  the approval of the City Representative. 

Personal  vehicles  of  the  Contractor's  employees  shall  not  be  parked  on  the  traveled way  or shoulders, including any section closed to public traffic. 

Adequate ingress and egress shall be maintained throughout the project limits for fire, police, and  other  emergency  vehicles.  The  Contractor  shall  provide  adequate  ingress  and  egress  for residences, property owners, and abutting business owners to their respective properties except when performing work at their specific locations. 

Also, the Contractor shall provide adequate signing, barricades and flashers or portable flashing beacons,  flaggers,  and  other  equipment  and  personnel  necessary  to  adequately  control  and direct traffic in a safe manner. The Contractor shall maintain all barricades, flashers and detour signs twenty‐four (24) hours a day, including covering signs during non‐construction hours. The Contractor  shall  also  provide  the  City  with  the  names  and  telephone  numbers  of  three  (3) representatives available at all times. 

Whenever Contractor's vehicles or equipment are parked within six (6) feet of a traffic lane, the area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked vehicles or equipment and along the edge of the traffic lane at twenty‐five (25) foot intervals to a point not less than twenty‐five (25) feet past the last vehicle or piece of equipment. A minimum of nine (9) cones or portable delineators shall be used for the taper. A W20‐1 (Road Work Ahead) sign shall be mounted on a portable sign stand with flags. The sign shall be placed where directed by the Engineer.  

Except as otherwise allowed by the City Representative, ”long term” and temporary closures shall be removed and the full width of the traveled way shall be open for use by public traffic when construction  operations  are  not  actively  in  progress  during  the working  period  or  successive working periods. 

The Contractor shall provide for pedestrian and wheelchair access to at least one (1) intersection corner  within  each  block  and  the  abutting  sidewalk  facilities  along  each  block,  at  all  times. Simultaneous closure of both intersection corners to pedestrian traffic within the same block is not allowed. 

The  Contractor  shall  maintain  at  least  one  (1)  north/south  crosswalk  and  one  (1)  east/west crosswalk open to pedestrian and wheelchair access, where it exists, at each intersection at all times. 

Attention is directed to Part 6 of the California MUTCD. Nothing in these Special Provisions shall be construed as relieving the Contractor from his responsibility as provided in Part 6 of California MUTCD. 

LOC No. 1 January 9, 2020

Page 27: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  24 

 

Full  compensation  for  furnishing,  installing,  moving,  removing,  and  all  the  necessary  traffic control devices including, but not limited to, the necessary signs, striping, barricades, and flagging shall be included in the contract prices paid for the various items of work of the bid schedule, and no additional compensation will be allowed therefore. 

Maintaining Pedestrian Access 

Means of passage of pedestrian traffic around and through the work area shall be provided at all times. Path of travel shall comply with Americans with Disabilities Act (ADA) regulations. 

The Contractor shall cause the least possible disruption to the affected properties and restore suitable pedestrian access immediately following completion of the active work in progress. 

At  least one  (1)  continuous ADA accessible walkway along one  (1)  side of  the  street  shall  be available at all  times. At  locations where work  is actively  in progress,  the pedestrian walkway within a single block may temporarily be closed at one (1) end of the block along one (1) side of the street. Pedestrians shall be rerouted to the walkway on the opposite side of the street. 

Minor deviations from the requirements of this section, which do not significantly change the cost of the work, may be permitted upon the written request of the Contractor if, in the opinion of  the City Representative, public  traffic will be better served and the work expedited. These deviations  shall  not  be  adopted  by  the  Contractor  until  the  Engineer  has  approved  them  in writing. All other modifications will be made by contract change order.  

Full  compensation  for  furnishing  a  temporary  traffic  control  plan,  furnishing,  installing, maintaining, and removing all components of the required traffic control system, traffic lane and sidewalk closures, temporary pavement delineation, maintaining driveway and pedestrian traffic, and for maintaining traffic as specified in the plans and these Special Provisions, and as directed by the Engineer, shall be included in the contract prices for “Traffic Control” and no additional compensation will be allowed therefore. 

12‐1.02 TRAFFIC CONTROL SYSTEM FOR LANE AND ROAD CLOSURE 

A traffic control system shall consist of closing traffic  lanes and ramps  in accordance with the provisions  of  Section  12,  "Temporary  Traffic  Control,”  of  the  Caltrans  Specifications,  the provisions under "Public Safety,” "Maintaining Traffic,” and "Construction Area Signs" elsewhere in these Special Provisions. 

The provisions in this section will not relieve the Contractor from the responsibility to provide additional devices or take the measures that may be necessary to comply with the provisions in Section 7‐1.04, "Public Safety,” of the Caltrans Specifications and these Special Provisions. 

Traffic  shall  be  controlled  with  stationary  type  lane  closures.  The  Contractor's  attention  is directed to the provisions in section 81‐3, "Pavement Markers,” of the Caltrans Specifications. If any  component  in  the  traffic  control  system  is  displaced or  ceases  to operate or  function  as specified,  from any cause, during  the progress of  the work,  the Contractor  shall  immediately repair the component to its original condition or replace the component and shall restore the component to its original location. 

When  lane  closures  are  made  for  work  periods  only,  at  the  end  of  each  work  period,  all components  of  the  traffic  control  system,  except  portable  delineators  placed  along  open 

LOC No. 1 January 9, 2020

Page 28: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  25 

 

trenches or excavation adjacent to the traveled way shall be removed from the traveled way and shoulder. If the Contractor so elects, the components may be stored at selected central locations, approved by the Engineer, within the limits of the highway right‐of‐way. 

Each vehicle used to place, maintain, and remove components of a traffic control system shall be equipped with a Type II flashing arrow sign, which shall be in operation when the vehicle is being used  for  placing,  maintaining,  or  removing  the  components.  Vehicles  equipped  with  Type  II flashing  arrow  signs not  involved  in placing, maintaining,  or  removing  the  components when operated within a stationary type lane closure shall only display the caution display mode. The sign shall be controllable by the operator of the vehicle while the vehicle is in motion. The flashing arrow sign shown on the plans shall not be used on the vehicles which are doing the placing, maintaining, and removing of components of a traffic control system, and shall be in place before a lane closure requiring its use is completed.  

Section 12‐1.04, ”Payment” of the Caltrans Specifications is amended as follows: "The Contractor shall pay fully the cost of furnishing all flaggers,  including transporting flaggers, to provide for passage of public traffic." 

Attention is directed to Part 6, “Temporary Traffic Control,” of the California MUTCD. 

Nothing  in  these  Special  Provisions  shall  be  construed  as  relieving  the  Contractor  from  his responsibility as provided in Part 6 of California MUTCD. 

Full  compensation  for  furnishing  all  labor  (including  flagging  costs),  materials,  signs,  arrow boards,  CMS,  tools,  equipment,  and  incidentals,  and  for  doing  all  the  work  involved  in  lane closures, including placing, removing, storing, maintaining, moving to new locations, replacing, and  disposing  of  the  components  of  the  traffic  control  system  as  specified  in  the  Caltrans Specifications and these Special Provisions and as directed by the Engineer, shall be included in the contract “Traffic Control”, and no additional compensation will be allowed therefore. 

The  adjustment  provisions  in  Section  4‐1.05A,  "Changes  and  Extra  Work  ‐  General,”  of  the Standard  Specifications  shall  not  apply  to  the  item  of  traffic  control  system.  Adjustments  in compensation for traffic control system will be made only for an increased or decreased traffic control system required by changes ordered by the Engineer and will be made on the basis of the cost of the increased or decreased traffic control necessary. The adjustment will be made on a force account basis as provided in Section 9‐1.04, "Force Account,” of the Caltrans Specifications for increased work and estimated on the same basis in the case of decreased work. 

Traffic control system required by work which is classed as extra work, as provided in Section 4‐1.05, ”Changes and Extra Work,” of the Caltrans Specifications, will be paid for as a part of the extra work.  

 

 

   

LOC No. 1 January 9, 2020

Page 29: TREE REMOVAL SERVICES - Stockton Tree Removal Non Emerg… · Tree and stump removal work shall begin no later than ten (10) working days after the date indicated on the Notice to

 

  26 

 

 

SECTION 13 – BLANK 

SECTION 14 – BLANK  

 

 

LOC No. 1 January 9, 2020