STEEL AUTHORITY OF INDIA LIMITED
DURGAPUR STEEL PLANT
RE-BUILDING OF COKE OVEN BATTERY NO. 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN & COMPENSATOR
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 2/24
DSP
REBUILDING OF COB # 2TECHNICAL SPECIFICATION
FOR
INTERPLANT PIPELINE GAS MAIN &
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 3/24
DSP
REBUILDING OF COB # 2TECHNICAL SPECIFICATION
FOR INTERPLANT PIPELINE GAS MAIN &
COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
PACKAGE NO. : COB2/EXPN/SM-47
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN & COMPENSATOR
T.S. NO. MEC/TS/11/9172/COB2/EXPN/SM-47
MECON LIMITEDRANCHI-834002
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 4/24
DSP
REBUILDING OF COB # 2TECHNICAL SPECIFICATION
FOR INTERPLANT PIPELINE GAS MAIN &
COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
C O N T E N T S
Chapter Description Page No./No. of Sheets
- Revision Status Amendment -Record Sheet 1 Sheet
01. Technical Specifications Summary 1 Sheets
02. Special Instructions to Tenderer 4 Sheets
03. Technical Specification 8 Sheets
ANNEXURES:
i) ANNEXURE –IFormat for Quotation (Technical)
3 Sheets
ii) ANNEXURE –IIFormat For Inspection Call Letter
1 Sheet
iii) ANNEXURE III 1 Sh t
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 5/24
DSP
REBUILDING OF COB # 2TECHNICAL SPECIFICATION
FOR INTERPLANT PIPELINE GAS MAIN &
COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
REVISION STATUS AMENDMENT - RECORD SHEET
Rev. No.
Date Sheet Amended Description Remarks
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 6/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
01 TECHNICAL SPECIFICATION SUMMARY SHEET
01.1 Technical specification No. : MEC/TS/9172/COB2/EXPN/SM-47
01.2 Package No. : COB2/EXPN/SM-47
01.3 Item No.s : 1. COB2/EXPN/SM-47/01, 2. COB2/EXPN/SM-47/02
3. COB2/EXPN/SM-47/034. COB2/EXPN/SM-47/045. COB2/EXPN/SM-47/056. COB2/EXPN/SM-47/06, 07, 087. COB2/EXPN/SM-47/09
8. COB2/EXPN/SM-47/10, 119. COB2/EXPN/SM-47/1210. COB2/EXPN/SM-47/13
01.4 Item description : 01. BF Gas Pipeline02. Saddle support03. Roller Support04. Single Disc Compensator
05 Condensate Seal Pot
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 7/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
2.1 General:This chapter shall be read in conjunction with General Conditions of Contract.
2.1.1 The supply items shall meet the requirements stipulated in the technical specificationsand drawings and standard method of manufacture.
2.1.2 Use of inferior materials, which can impair the quality and mechanical properties, is notallowed.
02.01.3 Depending on the performance of manufacture, purchaser reserves the right tocancel the order or increase or decrease the quantity ordered at the same
price/rate without any financial implications on the purchaser’s part or anycompensation to the supplier.
2.1.4 The tenderer shall submit the quotations (technical part) exactly as per theenclosed ‘Format for quotation’ given in Annexure –IA (I) any deviations proposedby the tenderer shall be listed in that format only. NO ADDITIONAL WRITE-UPOR DIFFERENT FORMAT WILL BE ACCEPTED.
2 1 5 Th t d h ll f i h 3 t f d i /d t / t l li bl l
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 8/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
The following information / documents are to be submitted by the Tenderer along with theoffer:
- Make
- Type & Standards with Grade
- Material of construction
- Nominal sizes with length in metre
- Weight in kg per running metre
- OD and thickness in mm
- Leaflets / catalogues
- Standards being followed for design, dimensions, material, manufacture &testing of offered items
- Quality assurance plan as per Annexure-III
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 9/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
- All measuring instruments, templates, gauges, jigs & fixtures includingspecial ones to be made by the supplier as per specific requirement of theinspectors.
- All secretarial assistance for preparation of inspection report & related
documents.
2.4.5 Notice period:
Two weeks from the receipt of inspection notice at the purchaser’s office.
02.04.6 Supplier’s obligation:
The inspection of materials at manufacturer’s works and despatch of materials
does not relieve the supplier of his obligation to replace/rectify free of cost FORDSP site basis, those materials which are found defective due to badworkmanship or bad quality of materials at the time of final inspection at plant siteor during agreed warrantee/guarantee period.
02.05 Match Marking
The sub-assemblies / parts shall be properly match marked before dismantling for
ki d d t h M f t f f d i ti t it h ll
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 10/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
End protectors to be used on bevelled ends shall be securely and tightly attached withbelt or wire.
02.08 Weights:
The tenderer shall study the specification, specification drawings (views, detailsand bill of quantities therein) to appreciate the full scope of supply involved. Incases, where items like, packing material, asbestos rope, wood, etc. are includedin the bill of materials but not included in the total wt. of steel items indicated;tenderer shall include them also in their scope of supply. Additional claims anddisputes on this account would not be entertained after placement of order.All fasteners like nuts, bolts, washers, gaskets, etc., shall be supplied 10% extrain addition to the actual quantity required.
02.09 Documents/Drawings to be furnished by the successful tenderer .
The list of documents/drawings to be furnished by the successful tenderer is givenbelow: -
Sl.No.
Category of Drawing / Documents Status
1 M f t i /G l t d i YES / NA
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 11/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
03.01 Scope of Work and Supply:
The Tenderer’s scope of work and supply shall include, but not limited to, the following.
03.01.1 The scope of work of the Tenderer shall cover manufacture, shop testing, shoppainting, packing and supply of pipes for interplant Gas mains. This shall includepipes, supports, valves, equipment & fittings as per Annexure-A of TechnicalSpecification.
3.1.2 The items covered under the Tenderer’s scope for Inter-Plant Gas Mainsare as under:
Fabricated Items:• BF Gas Pipeline• Saddle support• Roller Support• Single Disc Compensator • Condensate Seal Pot
Brought Out Items:
• ERW Pi & Fitti
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 12/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
ii) Bidders confirmation as per Annexure-II (1 sheet)
iii) QAP duly filled in as per Annexure-III (2 sheet).
iv) Implementation schedule in form of bar chart to match thedelivery schedule.
03.01.9 Documents to be furnished by the successful Tenderer:
For approval
i. Detail fabrication drawings in adequate copies as detailedin
Clause 02.02.ii. QAP duly filled in.iii. Test & Warranty certificate for each item offered.iv. Test / Inspection reports, as applicable.
For reference / information
i) Catalogues / sketches of brought out items
ii) C ti l f b ht t it li bl
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 13/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
contractor and the Purchaser nor shall release the Contractor from any of hisobligations and liabilities under the contract.
03.02.01. 7 Metric system shall be followed and English shall be the language of all
communication.
03.02.01. 8 The Tenderer shall clearly indicate the items, if any, excluded from his scope of work & supply, failing which it will be deemed that the scope of work & supplyshall be in conformity with the requirements of this specification.
03.02.01. 9 Pipes made of steel produced by acidic Bessemer process shall not beacceptable.
03.02.01.10 Test reports shall be supplied for all mandatory tests as per the applicablematerial specifications. Test reports shall also be furnished for any supplementarytests as specified by the Purchaser.
03.02.01.11 Material test certificates (Physical properties, chemical composition & heattreatment reports) shall be furnished for pipes.
03.02.01.12 ERW pipes (as applicable) shall not have any circumferential seam joint in a
d l th
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 14/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
03.02.02.8 When welding gas pipelines additional welding at the root of joint shall bedone by any suitable method.
03.03 Dimensions of Links and tolerances:
03.03.1 Following tolerances are allowed:
A. For the length of links
i. + 3mm for the length upto 1000 mmii. + 0.5% for the length over 1000 mm but not more than 10 mm for
each complete 10 metre. .
B. For deflection of the cylinder gradient from the straight lines:
i. 0.12% of the link length but not more than 15 mm for links withlengths over 10 m when checking by stretched cord.
C. For difference in diameter of butt-welded ends of links - not more than 2 mm.
Tolerance on diameters of shells shall be within + 5 mm and ellipticity shall be
ithi th t li it
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 15/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
a) Tests by compressed air with application of soap solution over all joints of links of the gas pipes.
b) Checking by chalk-kerosene test of the joints/ links of the gas pipelines.
03.04.7 Tests by the compressed air are carried out under excess pressure.P test = 0.65 Kgf/Cm2 (gauge).
03.04.8 For kerosene testing all joints are covered firstly with chalk. When chalk is driedup, the inner surfaces of the joints are abundantly covered with kerosene.
Dark greasy spots on the outer surfaces indicate leaks. Examination of joints is
carried out 12 hours after applying kerosene.
03.04.9 All defective sections of joints found during above tests shall be cut out and re-welded. Caulking or welding over the defective weld is not allowed. After repairing, such details are to be subjected to repeated tests.
03.05 Mechanical Testing of welded joints (if applicable)
03 05 1 Th i f h i l t ti i th t l f th t th d
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 16/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
03.06.1 On the inner surfaces of the link ends of the gas pipelines, the following shall bepainted with white weather proof paint:“Item number and drawing number according to the manufacturing drawings.”
03.06.2 Outer surface of the gas pipeline shall be thoroughly cleaned and painted. Thepainting of all pipelines will be done as per IPSS 1-06 -016 088. Two coats of primer as per IS: 2074 -1992 will be applied on thoroughly cleaned and drysurface. The thickness of dry film coating will not be less than 30µ / each coating.
03.07 Shipment:
Gas pipeline links, supports, valves & all bought out items during transportation
shall be protected from damage.
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 17/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
SL.NO.
DRAWING
DESCRIPTIONOF PIPE, OD
X THK(mm x mm)
(m)
UNITWEIGHT(Kg/m)
TOTALWEIGHT
(Kg)
1.IS:3589
FabricatedPIPE Ø 1420 x10 Thk.
140 347.86 48700.4COB2/EXPN/SM-47/01
To be fabricated
from platesconforming toIS:2062 Gr A;ERW Black(BEWEL ENDS)
2. IS:1239,Part 1ERW PIPEØ115 x 5.4Thk.
8 14.5 116COB2/EXPN/SM-47/06
Bought Out Item
3. IS:1239,Part 1
ERW PIPE
Ø89.5 x 4.8Thk.
12 8.36 100.32COB2/EXPN/SM-47/07 Bought Out Item
4. IS:1239,Part 1ERW PIPEØ34.2 x 3.2Thk.
100 2.5 250COB2/EXPN/SM-47/08
Bought Out Item
5. IS:1239,Part 2900 ELBOWØ34.2 x 3.2Thk.
10 --- ---COB2/EXPN/SM-47/09
Bought Out Item
6
FUNNEL, DN
260 DN 100 1COB2/EXPN/
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 18/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
1.DRG.No.MEC/TS/9172/COB2/EXPN
/SM-47/001
DN1400SADDLE
SUPPORT3 100 300 COB2/EXPN/
SM-47/02
FABRICATEDFROM PLATESCONFORMINGTOIS; 2062, Gr A
2DRG.No.MEC/TS/9172/COB2/EXPN
/SM-47/002
DN1400ROLLER
SUPPORT7 100 700 COB2/EXPN/
SM-47/03
FABRICATEDFROM PLATESCONFORMINGTOIS; 2062, Gr A
C. VALVES
SL.NO.
STANDARD/DRAWING/
SPECIFICATIONDESCRIPTION
QUANTITYIn (No)
WEIGHT IN KGITEM No. REMARKSUNIT
WEIGHTTOTAL
WEIGHT
1.IS:14846,
Body CI Gr. FG 200SS Trim
DN 100 - GATEVALVE For BF
Gas Service ,Rising Stem,Flanged End
Connection withcompanion
flanges, nuts, bolts and gaskets
2 50 100COB2/EXPN/SM-47/10
Bought Out Item
DN 25 CS
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 19/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
Annexure – ISheet 1 of 3
FORMAT FOR QUOTATION
Technical Part Only
1. Enquiry No. : dated
2. Offer No. : dated
1. We agree to supply the items indicated hereinafter in sheet-2 of theannexure as per delivery schedule indicated. We agree to all clausesindicated in the technical specification no. .....………………………………………… and reference drawings listed in thespecification including details of inspection excepting those mentionedunder deviation/exclusions hereunder.
2. We confirm that commercial part of the tender has been submittedseparately.
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 20/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
Annexure – ISheet 2 of 3
Scope of Supply and delivery schedule
Sl. No
ItemDescription
Qty.quotedfor
UnitWt.
TotalWt.
Drg. Nos.
Offer of sample
Delivery 1st
lot (Qty. to be indicatedin no. of days fromsample
approval)
Monthlyrate of supply
Totaldelivery
period
Remarks
1 2 3 4 5 6 7 8 9 10 11
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 21/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
Vendor Confirmation
Bid / offer without this confirmation sheet duly signed & with company seal shall be treated asincomplete offer and shall not be considered for technical / commercial evaluation.
Sl.No(A)
Description(B)
Confirmation(C)
Alternative proposal byVendor
(D)
1. Dimensions as per certifiedmanufacturing/ approved vendor drawings
2. Material composition as per Annexure- A
3. Inspection as per Cl. No. 02.04
4. Delivery period as per Cl. No. 01.8
5. QAP (Quality Assurance Plan) Annexure-III
6. Part order acceptance as per Cl. No.02.01.8
7 T i i f d h i d d
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 22/24
DSP
REBUILDING OF COB # 2
TECHNICAL SPECIFICATIONFOR
INTERPLANT PIPELINE GAS MAIN &COMPENSATOR
PACKAGE NO. : COB2/EXPN/SM-47
Annexure - IISheet 1 of 1
FORMAT FOR INSPECTION CALL LETTER
PROJECT: REBUILDING OF C.O. BATTERY NO. 2, DURGAPUR STEEL PLANT
SL.NO.
DESCRIPTION DETAILS
1 A/T or Purchase Order No.
2 Description of the item/ items with
identification mark/ Sl. No.3 Specification no. of the item/items
4 Drawing No. of the item/ items
5 Type of the inspection:- Stage/Sample/ Final
6 Quantity ordered/offered/balance (Nos. &Weight)
7 Proposed date of Inspection
8 l f i ( i h ll dd d
Annexure - III
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 23/24
Annexure III
FORM NO. 11.20(DQM) F-9 Rev. 0
PURCHASER --
QUALITY ASSURANCE PLANFOR
MECHANICAL EQUIPMENT
PROJECTREBUILDING OF COKE OVEN BATTERY NO. 2DURGAPUR STEEL PLANT
ORDER No. & DT. -- PACKAGE No. COB2/EXPN/SM-47
MANUFACTURER
PACKAGE NAMEREPLACEMENT OF LEAN GAS HEADER DN1400 ON COKE SIDE OF COB NO. 2
ORDER No. & DATE TS No. MEC/TS/11/9172/COB2/EXPN/SM-47
INSTRUCTIONS FOR FILLING UP: CODES FOR EXTENT OF INSPECTION, TESTS, TEST CERTIFICATES & DOCUMENTS :
1. QAP shall be submitted for each of the equipment separately with break-up of assembly /
sub-assembly & part / component or for group of equipment having the same specification.
2. Use numerical codes as indicated for extent of inspection & tests and submission of test
certificates & documents. Additional codes & description for extent of inspection & tests may be added as applicable for the plant & equipment.
3. Separate identification number with quantity for equipment shall be indicated wherever
equipment having same specifications belonging to different facilities is grouped together.
4. Weight in tonnes (T) must be indicated under column 5 for each item. Estimated weights may
be indicated wherever actual weights are not available.
CODE DESCRIPTION
1. Visual (Welding, etc.)
2 . Dime nsiona l3. Assembly ,Fitment &
Alignment4. Physical Test (sample)5. Chemical Test (sample)6. Ult rasonic Test7. Magnetic Particle Test8. Radiography Test9. Dye Penetration Test10. Metallographic Exam.11. Welder’s Qualification &
weld procedure Test12. Approval of Test and Repair
procedure13. Heat Treatment14. Pressure Test15. Leakage Test16. Balancing
CODE DESCRIPTION
17. Vibration Test18. Amplitude Test19. Sponge Test20. Dust / Water Ingress Test21. Friction Factor Test22. Adhesion Test23. Performance Test /
Characteristic curve24. No Load / Free Running Test25. Load / Overload Test26. Measurement of speeds27. Acoustical Test28. Geometrical Accuracy29. Repeatability & Positioning
Accuracy30. Proving Test31. Surface preparation32. Hardness Test33. Spark Test for Lining
CODE DESCRIPTION
34. Calibration35. Safety Device Test36. Ease of Maintenance37. Pouring witness38. Load/Deflection test of springs39. Sample
DOCUMENTSD1. Approved GA drawingsD2. Information and other
reference drg. / stampeddrgs. released for mfg.
D3. Relevant cataloguesD4. Bill of matl. / Item NoD5. Identification Relevant
catalogues ,Match mark details
D6. Line / Layout diagram
D7.
D8.
D9.
D10.D11.D12.
D13.
D14.
D15.
Approved Erection proceduresUn priced sub P. O. with
specification andamendments, if any.Calibration Certificates of all measuring Instrumentsand gaugesGuarantee CertificateHeat CurvePhysical & chemical testcertificateIBR / Other Statutoryagencies CompliancecertificateManufacturer’s TestCertificates for boughtout itemsInternal Inspection Report
by Contractor
ABBREVIATIONS USED :
MECON : MECON LIMITEDMFR : MANUFACTURER
E Q U I P M E N T D E T A I L S I N S P E C T I O N AND T E S T S
Test Certificates &documents to be
submitted toMecon /DSP
Acceptance CriteriaStandards/IS/ BS/
ASME/ Norms andDocuments
Remarks/sampling planSl.
No.
Description (withequipmentheading,place of use & brief specifications)
Item No.
QuantityManufactur er’s Name& address
ExpectedScheduleof FinalInspn.
Raw Material and in processstage inspection
Final Inspection / Test by
No./M T MFR DSP MECON MFR DSP MECON
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1.1 Fabricated
Pipe
COB2/EXPN/
SM-47/01
140m
As per TS
1, 2, 3, 4, 5,11
- -1, 2, 9,14, 15,28, 31
1, 2,3, 9,14 ,15
1, 2, 9,14,15,28, 31
D1,D2,D4,D5,D9, D10, 4, 5
D1,D2 &As per RelevantStandardCodes
1. D.P Test 10%2. Control Assemblywith Match Mark 100%
2.2
Saddlesupport
COB2/EXPN/
SM-47/02
3 No.sAs
per TS
1, 2, 3 ,4,5,11 - -1, 2, 3,
9,28,31
1, 2,3, 9
1, 2, 3,9 D1, D2, D4,D5, D9, D10,D12, D15
D1,D2 &As per RelevantStandardCodes
100%
For MANUFACTURE (Stamp & Signature) For MECON (Stamp & Signature)
QAP No. MEC/ 9172/ COB2/EXPN/SM-47/01SHEET 1 OF 2
REV. - O
1 2 3 4 5 1 2 3 D1 D2 D4 As per TS &
8/3/2019 TS- Package SM -47
http://slidepdf.com/reader/full/ts-package-sm-47 24/24
3.Roller
Support
COB2/EXPN/
SM-47/03
7 No.sAs
per TS
1, 2, 3, 4, 5,11
- -1, 2, 3,
9,28,31
1, 2,3, 9
1, 2, 3,9
D1,D2, D4,D5, D9, D10,D12, D15
As per TS &Certified Mfg.Drg. 100%
4.Single Disc
Compensator
COB2/EXPN/
SM-47/04
2 No.sAs
per TS
1, 2, 3, 4, 5,11
- -
1, 2,3,9, 14,15, 28,
31
1, 2,3, 9,14 ,
15,28
1, 2, 9,14,15,28, 31
D1,D4,D5,D9, D10, D10,D12, D15
As per TS Drg.& RelevantStandard Codes 100%
5.Condensate
Seal Pot
COB2/EXPN/
SM-47/05
1 No.s
As
per TS
1, 2, 3,11 - -
1, 2, 3,9, 14 ,
15,28,31
1, 2,3, 9,
14 ,15,28
1, 2, 3,9, 14 ,
15,28,31
D1,D2, D4,D5, D9, D10,
D12, D14,D15
As per TS &Certified Mfg.
Drg. 100%
6.
FLEXIBLEMETALLIC
HOSE
COB2/EXPN/
SM-47/13
1 No.sAs
per TS
1, 2, 3 - -1, 2, 3,9, 14 &
15
1, 2,3,9,14, 15
1, 2, 3,9, 14 &15
D2, D4, D5,D8,D9, D10,D12, D14,D15
As per RelevantStandardCodes /D8/D14/D15
100%
7. ERW Pipes(Bought Out)
COB2/EXPN/
SM-47/06,07,08
-8m- 12m
-100m
As per TS
1, 2, 4, 5, 11
- -1, 2,14,
15
1, 2,14,15,31
1, 2, 9,14,15,31
D2, D4, D5,D8,D9, D10,D12, D14,D15
As per RelevantStandardCodes /D8/D14/D15
100%
8. 90o ElbowCOB2/EXPN/
SM-47/09
10 No.sAs
per TS
1, 2, 4, 5, 11
- -1, 2,14,
15
1, 2,14,15,31
1, 2, 9,14,15,31
D2, D4, D5,D8,D9, D10,D12, D14,D15
As per RelevantStandardCodes /D8/D14/D15
100%
9. Valves
COB2/EXPN/
SM-47/10,
11
6 No.sAs
per TS
1, 2, 3 - -
1, 2, 3,9, 14 ,15,28,
31
1, 2,3, 9,14,
15,28,31
1, 2, 3,9, 14 ,15,28,
31
D2, D3,D4,D5,D8, D9,D10, D12,D14,D15
As per RelevantStandardCodes /D8/D14/D15
100%
10.
Funnel
COB2/EXPN/
SM-47/12
1 No.s
As
per TS
1, 2, 3,11 - -1, 2, 3,9, 14 &
15
1, 2,3, 9,
14 &15
1, 2, 3,9, 14 &
15
D1,D2,D4,D5,D9, D10, 4, 5
As per TS &Certified Mfg.
Drg.100%
For MANUFACTURE (Stamp & Signature) For MECON (Stamp & Signature)
QAP No. MEC/ 9172/ COB2/EXPN/SM-47/01SHEET 2 OF 2
REV. - O