8
TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, [email protected] , WG3 acting chair ABSTRACT: This contributions presents discussion points for the Joint TSG-C/A meeting in Tampa regarding Mobile Terminated eCSFB requiring hard handoff via the MSC. This contribution supersedes A30-20101012-024r1 TSGA WG3 chair e1xCSFB MT HHO discussion points.ppt. RECOMMENDATION: Approve for presentation at the Joint TSG-C/A meeting. Motorola grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Motorola is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution. This document has been prepared by the Motorola to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Motorola. Motorola specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Motorola other than provided in the copyright statement above.

TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, [email protected], WG3 acting [email protected] ABSTRACT: This contributions

Embed Size (px)

Citation preview

Page 1: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

• TSG-A WG3• TITLE: TSG-A.3 Discussion Point• SOURCE:• Scott Marin, [email protected], WG3 acting chair• ABSTRACT: This contributions presents discussion points for the Joint TSG-C/A

meeting in Tampa regarding Mobile Terminated eCSFB requiring hard handoff via the MSC.

• This contribution supersedes A30-20101012-024r1 TSGA WG3 chair e1xCSFB MT HHO discussion points.ppt.

• RECOMMENDATION: Approve for presentation at the Joint TSG-C/A meeting.

Motorola grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Motorola is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution.

This document has been prepared by the Motorola to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Motorola. Motorola specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Motorola other than provided in the copyright statement above.

Page 2: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

MT eCSFB call delivery with CPN

Options proposed for Calling Party Number Presentation (CPNP). Note: Calling Party Number (CPN), Calling Party Information (CPI), and Calling Party Number Presentation mean the same thing the following contributions:

• Ericsson, -- CPN shown while on LTE, call accepted/rejected, requires General Page Message (GPM), CPN, Signal sent before Page Response on LTE (three options).

– A30-20101025-010r0 [E] eCSFB Call termination.doc• Huawei – CPN delivered on LTE and shown when UE is in LTE. Bundling not used.

– A30-20101025-013r0-HW LTE-1xRTT eCSFB MT Call procedure.doc • CTC/ZTE/QC – CPN transmitted when UE is in LTE, but presented to UE after

moving 1x Traffic Channel (TCH). Bundles UHDM+AWI.– A30-20100913-015r1_CTC_QC_ZTE_e1xCSFB MT call with call accepted for standalone

IWS(UHDM+AWI).doc • ALU/Mot/QC/KDDI/NEC/Hitachi – CPN forwarded in the HO messages to the target

1xBS. Bundling not used.– A30-20101025-005r0 ALU Mot QC KDDI NEC Hit eCSFB MT Call flow procedure IWS-1xBS

with HO.doc

TSG-A is considering standardizing one or more solutions.

Page 3: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

MT eCSFB call delivery with CPN -- Ericsson

• Figures x.x.2 and x.x.3 from A30-20101025-010r0 [E] eCSFB Call termination.doc

• .

1 x BS MSCMS /UE

a

time

b

c

Standalone IWS

g

h

i

jAssignment Complete

Handoff Requiredk

l

r

s

eNB MME

HO Request

HO Request Ack

Handoff Command

m

no

p

q

t

u

Handoff Commenced

v

T7

Handoff complete

Clear Command

Clear complete

w

Connectx

y

AWI (CPI)

-

Assignment Request (CPI)

TS 23.272 Figure B.2.3a.4-1 Steps 1-5

T 3113

MS/UE is EUTRAN attached and registers with the MSC The UE indicates that it supports enhanced 1xCSFB.

TS 23.272 Figure B.2.3a.4-1 Steps 6-9

MS/UE performs Extended Service Request.

A21-1x air Interface signalling message

GCSNA (Page Response Message)

TS 23.272 Figure B.2.3a.4-1 Steps 10-15a

A21-1x air Interface signalling message

GCSNA (UHDM)

Complete L3 Info Paging Response

Paging Request

Paging Request (CPI)

T 3113 f

TS 23.272 Figure B.2.3a.4-1 Steps 16MS acquires 1x traffic channel over 1x radio

1x Handoff Complete Message

T306

T315

1x Alert With Information Message (CPI)

1x Connect Order

See section discussing the three possible options d

MS /UE time

IWS/BS orStandalone

IWSeNB MME

GCSNA( FNM (Calling Party Number, Signal ) )

GCSNA ( GPM )

A21-1x air Interface signalling message

A21-1x air Interface signalling message

Option 1

GCSNA (GPM, FNM)

A21-1x air Interface signalling message

Option 2

GCSNA [CPN, Signal](GPM)

A21-1x air Interface signalling message

Option 3

c

d

c

c

Page 4: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

MT eCSFB call delivery with CPN --

Huawei• 1st Figure from A30-

20101025-013r0-HW LTE-1xRTT eCSFB MT Call procedure.doc

Tunneled Messaging

1x BS MSCMS/UE

a

time

b

c

IWS

Paging Request

T3113

Paging Request

Complete L3 Info:Paging Response

d

T3113

e

f

g

Assignment Request

Assignment Complete

T301

Handoff Required

h

i

Connect Order

o

p

MME

GCSNA: GPM

Handoff RequestHandoff

Request Ack

Handoff Command

j

k

l

m

n

q

r

Handoff Commenced

s

T7 T11

1x Radio interface procedures to acquire 1x traffic channel

1x Handoff Complete message

Handoff complete

Clear Command

Clear complete

t

T9

T306

T315

MS/UE performs Extended Service Request procedure in E-UTRAN as specified in 3GPP TS

23.272

S102:A21-1x air interface signalling message(GCSNA:GPM)

GCSNA: Page Response S102:A21-1x air interface signalling message(GCSNA:PRM)

GCSNA: CPN S102:A21-1x air interface signalling message(GCSNA:CPN)

GCSNA: Connect S102:A21-1x air interface signalling message(GCSNA:Connect)

GCSNA: UHDM S102:A21-1x air interface signalling message(GCSNA:UHDM)

u

E-UTRAN releases S1 UE context and EPS bearer is suspended as specified in 3GPP TS 23.272

Page 5: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

• Fig x.x.-1 from A30-20100913-015r1_CTC_QC_ZTE_e1xCSFB MT call with call accepted for standalone IWS(UHDM+AWI).doc

UE/MS eNB MSC1xBSIWSMME

MS/UE performs Extended Service Request procedure in E-UTRAN as specified in 3GPP TS 23.272

GCSNA (Paging Response)

Assignment Request

GCSNA (UHDM+AlertWithInfo)

HandoffRequestAck

Paging Request

Paging Request

S102: A21-1x air interface signaling GCSNA (GPM)

Complete L3 Info:Paging Response

Assignment Complete

Handoff Required

Handoff Request

HandoffCommand

1x Handoff Complete

HandoffComplete

HandoffCommenced

1x traffic channel acquire

ClearCommand

ClearComplete

Connect

ConnectOrder

T3113

T10

T7 T11

T9

T306

T315

T301

a

time

b

c

d

e

f

g

h

i

o

p

j

k

l

m

n

q

r

s

t

S102: A21-1x air interface signaling

S102: A21-1x air interface signaling

E-UTRAN releases S1 Context and EPS bear is suspended as specified in 3GPP

TS 23.272

u

T3113

T303

MT eCSFB call delivery with CPN –

CTC, ZTE, QC

Page 6: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

• Figure xx from A30-20100913-029BR2 eCSFB MT Call flow procedure IWS-1xBS with HO.doc

• KDDI, NEC, Hitachi have co-signed A30-20101025-005r0, which updates to 29Br2.

Target BS MSCMS/UE

a

time

b

c

IWS-1xBS

Paging Request

Complete L3 Info:Paging Response

dT3113

e

f

g

Assignment Complete

T301

Handoff Required (CPI)

h

i

p

q

eNB MME

GCSN: GPM

GCSNA: Page Response message

HO Request (CPI) Handoff

Request Ack

Handoff Command

j

k

l

m

o

r

s

Handoff Commenced

GCSNA (UHDM)

t

T7 T11

1x Radio interface procedures to acquire 1x traffic channel

1x Handoff Complete message

Handoff Complete

Clear Command

Clear Complete

u

T9T306

T315

S102: A21-1x air interface signalling message

(GCSNA: GPM)

S102: A21-1x air interface signalling message

(GCSNA: Page Response message)

A21-1x air interface signalling message

MS/UE is E-UTRAN attached and registers with the MSC. The UE indicates that it supports e1xCSFB.

Connect

1x Connect Order

1x Alert With Information Message (CPI)

v

E-UTRAN releases S1 UE context and EPS bear is suspended as shown in 3GPP TS 23.272

n

T303

T10

Assignment Request (CPI)

UE performs Extended Service Request procedure as shown in 3GPP TS 23.272

w

MT eCSFB call delivery with CPN –

ALU, QC, Mot, KDDI, NEC,

Hitachi

Page 7: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

Target 1xBS

MSCMS/UE

a

bc

IWS-source1xBS

Paging Request

T3113

Paging Request

Complete L3 Info:Paging Response

d

T3113

e

f

gAssignment Request (CPI)

Assignment Complete

T301

Handoff Required (CPI)

h

i

o

p

MME

GCSNA (GPM)

GCSNA (Page Response message)

HO Request (CPI)Handoff

Request Ack

Handoff Command

j

k

l

m

n

q

r

Handoff Commenced

GCSNA (UHDM + 1xAWI (CPI))

s

T7

T11

1x Radio interface procedures to acquire 1x traffic channel

1x Handoff Complete message

Handoff complete

Clear Command

Clear complete t

T9

T306

T315

A21-1x air interface signalling message

A21-1x air interface signalling message

A21-1x air interface signalling message

MS/UE is E-UTRAN attached and registers with the MSC. The UE indicates that it supports e1xCSFB.

Connect

1x Connect Order

1x Alert With Information Message (CPI)uv

AWI (CPI)ZTE

ALU,QC, Mot, KDDI, NEC, Hit

CTC,ZTE,QC

GCSNA(1x Alert With Information Message (CPI))Huawei**

w

Ericsson*

GCSNA(Feature Notification Message (CPI))

Notes: * Step v still occurs in Ericsson scheme leading to “double alerting” ** Step v does not occur in the Huawei, ZTE schemes

MS/ UE does ESR. MME does tunnel redirection as in TS 3GPP 23.272

ALU,QC, Mot, KDDI, NEC, Hit

MT eCSFB call delivery with CPN –

Non functional

composite of proposals

This figure is not a call

flow. It is for ease in

undertanding key

differences between the

options

Page 8: TSG-A WG3 TITLE: TSG-A.3 Discussion Point SOURCE: Scott Marin, s.marin@motorola.com, WG3 acting chairs.marin@motorola.com ABSTRACT: This contributions

Summary of Potential Impacts to TSG-C for MT eCSFB w/HHO

• Ericsson proposals – C.S0097 might be affected, but can present CPN and signal to

user when UE is in LTE

• Huawei proposals – C.S0097 affected but can present CPN when UE is in LTE– No bundling

• CTC/ZTE/QC sends AWI with UHDM in bundled GCSNA.– C.S0097 impact and bundles

• ALU/QC/Mot/KDDI/NEC/HIT CPI in Handoff messages. – supports C.S0097-0 v1.0 (a.k.a. GCSNA 1.0)– No UE impact. No Bundling.