53
s TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 1 SMG#29 P-99-432 TSG_CN report to SMG#29 Harald Dettner Chairman TSG_CN/ETSI SMG3 Miami, Florida, June 1999 Document Status report in P-99-431 Status report in P-99-431

TSG CN report to SMG#29 · Hannu Hietalahti, Nokia Mark Fenton, Ericsson-N2A Steffen Habermann CAMEL N2B ... that lives on in 3GPP Section 7 of 04.08 04.08 ch. 7 23.xx L3 Stage 2

  • Upload
    lamkhue

  • View
    218

  • Download
    4

Embed Size (px)

Citation preview

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 1

SMG#29 P-99-432

TSG_CN report to SMG#29

Harald DettnerChairman TSG_CN/ETSI SMG3

Miami, Florida, June 1999

Document

Status r

eport i

n P-99-431

Status r

eport i

n P-99-431

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 2

SMG#29 P-99-432

Organisation of TSG_CN

Mark FentonGPRS drafting groupad-hoc activity

N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -

N2ASteffen Habermann CAMEL

N2BYun-Chao Hu MAP, etc..

N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil

N3Norbert Klehn, Siemens Achim Brand, Alcatel -

SS Ad-hocSteffen Habermann,T-Mobil - -

CNHarald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 3

SMG#29 P-99-432

Support Arrangements (1)

• Support arrangements are at present not sufficient

• Respective consequences for the quality of CN work output

• 3 new colleagues for MCC for CN support committed, rampup from July onward

In total 4 colleagues for CN & working groups support areplanned

• Thanks to all those whole currently have to replace missing colleaguesrespectively fill gaps

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 4

SMG#29 P-99-432

Planned Support Arrangements (2)

• CN Plenary Franco Settimo FS è NN1(at present)

• N1 (Iu-If) none, temp. Subst. NN2

• N2 Franco Settimo tbc• N2A (CAMEL) Istvan Kocsi IK è NN3• N2B (MAP, etc) Franco Settimo tbc

• N3 (IW) none NN1

• SS_ad-hoc Istvan Kocsi? IK è NN3

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 5

SMG#29 P-99-432

TSG_CN Meeting Schedule

• Various meetings are scheduled(see status report preview)

• CN Plenaries joint/linked with SA Plenaries.

• High density of working group meetingsno common view onmore meetings vs more offline work/less meetingscurrent amount 4-6 weeks period seems acceptedcompromise.

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 6

SMG#29 P-99-432

TSG_CN Co-Operation with ETSI/SMG3

• Almost all activities are joint meeting activities– ETSI/SPS3continues relation with TSG_CN for CAMEL3

• Pure SMG3 issue identified so far:Supplementary service interworkingGSM/PLMN to ETSI ISDN– affected specifications 09.12, 09.14 remain in SMG3

• HO, cell selection under investigation.

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 7

SMG#29 P-99-432

TSG_CN Common Issues Working Methods - Guidance welcome

• Amount of “identical” CRs against different versions– maintenance old versions: R’96, ’97, ‘98, R’99– not all “shadow CRs” produced yet by CN working groups

• R’99 WI’s only in 20+ series specs– to be confirmed by SMG#

• Approval misalignmentWP ---------> SMG3 ------->SMG-PlenaryWG---------> TSG_CN

– Consequences of approval/non-approval here and there.

• Does SMG# want to approve 20+series CRs beforeSMG#31

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 8

SMG#29 P-99-432

TSG_CN#4Amount of approved CR’s

WI # CRsASCI 4CAMEL 39“03.03” 7CCBS 2MSP Ph1 1MNP 6GPRS 103SAT 1TEI 12

WI # CRs04.08 split 4PCS Harm. 8SoLSA 5EDGE/NSS 3NITZ 1LCS ???

TOTAL ≈≈ 200 CRs

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 9

SMG#29 P-99-432

TSG_CN N1 Work Items ( )

• N1 is working on:– Multimedia Call CS and PO– Multicall– Classmark separation RAN vs CN– GSM-UMTS Interworking– Bearer Capabilities for UMTS– Turbo-Charger– L3 message segmentation

QoS Control for Packet services– EDGE (NSS Part, higher CS’ed data rates in the core network),

almost complete– NITZ enhancements (DST), completed

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 10

SMG#29 P-99-432

TSG_CN N1Status (1)

• 04.08 split RR -- MM/CC/SM-- completed --

CONTENTS CURRENTLOCATION

Release 99 SPECNUMBER

FUTURE EVOLUTION

Skeleton 04.08 for list ofreferences

04.08 04.08 Can be deleted whenreferences from outside

04.08 are updated

RR part of 04.08 04.08 ch. 3, 8,9,10

04.xx GSM RAN specification thatlives on in ETSI

CN part of 04.08 04.08 ch.4,5,6,8,9,10

24.xx Common CN specificationthat lives on in 3GPP

Section 7 of 04.08 04.08 ch. 7 23.xx L3 Stage 2 for 3GPP

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 11

SMG#29 P-99-432

TSG_CN N1Status (2)

• 03.22 split under consideration

• Location Services (LCS)– joint activity with T1P1.5 LSC to meet SMG#29

• GPRS– high amount of corrective CRs

• Work start on– Multimedia and Multicall, Removal of LLC

UMTS CC / SM, Common GTPHandover, cell selection

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 12

SMG#29 P-99-432

TSG_CN N2Work Items (1 )

• Pre-Paging– continued after feasibility assessment

usage of Pre-paging for OR purposedeferred for >R’99

• Out-of-Band Transcoder Control (report delayed)• Super charger

– FS almost completed / not approved,specification work will probably continue.

• Turbo-Charger– handed over to N1

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 13

SMG#29 P-99-432

TSG_CN N2Work Items (2 )

• GLR– FS completed/approved, no specification work started

(see separate slide)

• Security,– new Authentication parameter structure

length of security parameters causes concerns to transport layersMAP/TCAP/SCCP, GTPVLR/HLR functionality changes not yet analysed

– non-CAMEL ISTDeletion not endorsed by S3=> S3 to clarify on e.g. non-CAMEL IST for GPRS?.

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 14

SMG#29 P-99-432

TSG_CN StatusWorking Group N2 (CAMEL, MAP)

• CAMELPh3 tight scheduleWG N2A tailored for CAMEL only

– Principles for CAMEL GPRS interaction / non call related trafficidentified/endorsed

• CAMEL Ph2– Several corrective/stabilising CRs– MSC-Address handling correction/clarification to Ph2

accompanied with health warning to CAMEL Ph1

• CAMEL support for GPRS PSTN/ISDN interconnectservices. --> >R’99

• SSN issue on CAP almost completedtransition strategy for GSM outstanding for R’96/R’97

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 15

SMG#29 P-99-432

TSG_CN / Other issuesGLR (1)

• Work item on GLR was created intention:1st Feasibility report2.nd Specification work depending on (1)

• GLR was discussed in length within N2B and N2 andfinally in CN Plenary#4 and Feasibility report approved.

• Dispute on step2 on Specification Work for GLR:– 4 companies supported specification work– also opposition against specification within TSG_CN– CN#4 decision:

GLR not specified within TSG_CN, it is up to regional interestedparties to continue elaboration of specification material andpropose it at later point for inclusion in 3G specifications.

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 16

SMG#29 P-99-432

TSG_CN / Other issuesGLR (2)

• To learn: Clear scope of WI essential (FS or specs or both)

• Questions / Problems:– voting was proposed to resolve issue– If voting would have to be done, where? SA / SA2 / or CN?

Architectural issue / Management issueVoting requires 30 days alerting time.

– Sufficient rules to not accept a work item even if 4 sponsors exist?

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 17

SMG#29 P-99-432

TSG_CN N3 Work Items (1)

• Circuit switched data streamlining for GSM R’99– SMG1 work reviewed, CRs after SMG1 stage1 CRs approval

Pseudo WI

• EDGE / higher data-rates in CN– several CRs produced

• FAX 3WI’s– Real-time ITU-T T.38 based– Real-time based on n-t Fax 03.46– Study on provision of Fax services in GSM and UMTS

(T2 driver)

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 18

SMG#29 P-99-432

TSG_CN N3 Work Items (2)

• An asynch-to-synch HDLC service in GSM and UMTS

• Circuit switched Bearers in UMTS– WI to be created on S1 initiative

• Parameters for Bearer- and Tele-services for PIAFSservices– WI not yet approved, need to be clarified

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 19

SMG#29 P-99-432

TSG_CN StatusWorking Group SS-ad-hoc

• Group created to relieve N2-B (CAMEL) and work onprevious R’99 SS Work items– 1st meeting 4-7 May’99 (Vienna)

• CNAP– no support from anywhere, proposed for WI-deletion

SS-Interworking GSM-PLMN to ETSI ISDN remains inSMG3

• GSM 09.12 / 09.14 remain in SMG3– (no common ISDN platform identified)– 09.13 (ISDN SS-ASE - MAP Interworking) in 3GPP (CCBS)

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 20

SMG#29 P-99-432

TSG_CN SS-ad hoc Work Items ( )

• USSD Enhancementsunclear requirements (difference to MMI-Mode of USSD?)

• Follow Me– Stage2 with UIC sufficient degree of security available– GSM or UMTS WI?

• MSP Ph1– completed 06/99

• MSP Ph2– CAMEL Ph3 involved (SS per profile)

==> CAMEL Ph3 requirements check ongoing

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 21

SMG#29 P-99-432

TSG_CNSummary

• MCC Support Arrangements for TSG_CNcurrently bad but

future looks positive

• Detailed work on Rel’99 started

• Scope UMTS release ‘99 in stabilisation processalignment with other groups ongoing

END

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 22

SMG#29 P-99-432

SMG#29 decisions needed

• Endorse proposed handling of WI’s– deletion of euro-CNAP– Follow ME in SMG or 3GPP?

• Guidance on Working methods (slide 7)• SMG-SPAN co-operation on CAMEL

– Approval of CAMEL Ph2 Delta specs on ETSI IN CS-1tdocs ....

– Grant Mandate for joint SMG/SPAN meeting for resolution of PEcomments; voting version not again for SMG# approval

• Approval of CR’s

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 23

SMG#29 P-99-432

TSG_CN Common Issues Working Methods - Guidance welcome

• Amount of “identical” CRs against different versions– maintenance old versions: R’96, ’97, ‘98, R’99– not all “shadow CRs” produced yet by CN working groups

R’99 WI’s only in 20+ series specs– to be confirmed by SMG#

• Approval misalignmentWP ---------> SMG3 ------->SMG-PlenaryWG---------> TSG_CN

– Consequences of approval/non-approval here and there.

• No 20+series CRs presented to SMG#, onlycomplete spec goes to SMG#31

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 24

SMG#29 P-99-432

Approval of Specifications (1)CAMEL (SMG3 ---- SPAN)

• Grant Mandate for joint SMG/SPAN meeting for resolutionof PE comments; voting version not again for SMG#approval

Title: Draft DEN/SPS-03053-1 V0.5.1 (1999-03-15)Intelligent Network (IN);IN Capability Set 1 (CS1) extension;Intelligent Network Application Protocol (INAP);Customised Applications for Mobile network EnhancedLogic (CAMEL) Phase 2; Part 1:Protocol specification

Tdoc SMG P99-

Title: Draft DEN/SPS-03053-2 V0.5.0 (1999-03-15)Intelligent Network (IN);IN Capability Set 1 (CS1) extension;Intelligent Network Application Protocol (INAP);Customised Applications for Mobile network Enhanced Logic (CAMEL) Phase 2;Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification

Tdoc SMG P99-

• SMG#29 to approve:

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 25

SMG#29 P-99-432

Approval of Specifications (2)LCS

• Specifications can be found in

P-99-443P-99-444P-99-445P-99-446P-99-447

• CRs can be found in P-99-465 ... 476• all approved by SMG3

• Presentation during T1P1 slot (agenda item ??)

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 26

SMG#29 P-99-432

CRs onASCI

Work item: ASCI Tdoc P-99-451

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 NP-99163 03.03 A029 R96 5.1.0 Correction of VGC/VBC reference Fs29 NP-99250 03.03 A030 R97 6.1.0 Correction of VGC/VBC reference AS29 NP-99251 03.03 A031 R98 7.0.0 Correction of VGC/VBC reference AS29 N1-99167 04.68 A009 2 R96 5.2.0 Coding of Call Reference IE FS29 N1-99168 04.69 A007 2 R96 5.2.0 Coding of Call Reference IE Fs29 3C99-469 09.02 A206 R97 6.3.0 Use of E-interface Ds29 N2-99227 09.02 A209 R98 7.0.0 Use of E interface A

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 27

SMG#29 P-99-432

CRs onCall Deflection

Work item: Call Deflection Tdoc P 99-452

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 N2-99577 03.16 A030 R98 7.0.0 Introduction of TIF-CSI for Call Deflection B

S29 N2-99578 09.02 A228 R98 7.0.0 Introduction of TIF-CSI for Call Deflection B

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 28

SMG#29 P-99-432

CRs onCAMEL Phase1

Work item: CAMEL Phase1 tdoc P-99-453

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 NP-99244 03.78 A107 R96 5.7.0 Health warning on MSC address in Initial DP D

s29 N2-99640 09.78 A073 R96 5.6.0 Interworking with Q.1218 and ETSI Core INAP F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 29

SMG#29 P-99-432

CRs onCAMEL Phase2

Work item: CAMEL Phase2 tdoc P-99-454

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 N2-99649 03.16 A032 1 R97 6.3.0 Miss ing SS-CSI in description of CAMEL Subscription F

s29 N2-99498 03.18 A047 R97 6.3.0 Notification of call forwarding to the gsmSCF F

s29 N2-99589 03.18 A048 R98 7.0.0 Notification of call forwarding to the gsmSCF A

s29 N2-99217 03.78 A070 1 R97 6.3.0 Inclusion of Subscriber Activity Information Flow A

s29 3C99-275 03.78 A074 R97 6.3.0 Inclusion of Alerting Pattern in Provide Roaming Number (PRN)Information Flow..

F

s29 N2-99225 03.78 A075 1 R97 6.3.0 Dia lled Number S tring Format F

s29 N2-99244 03.78 A076 2 R97 6.3.0 Handling of AC/ACR in DP Busy, DP No Answer and DP RouteSe lect

F

s29 3C99-480 03.78 A083 R97 6.3.0 Inclusion of Activity Tes t IF be tween gsmSCF & gsmSRF andgsmSCF and assis tSSF

F

s29 N2-99238 03.78 A084 1 R97 6.3.0 Correction of USSD Information flows F

s29 N2-99343 03.78 A085 2 R97 6.3.0 Various corrections F

s29 N2-99223 03.78 A092 R97 6.3.0 Correction of CAMEL Phase inte rworking with Call Forwarding F

s29 N2-99255 03.78 A093 R97 6.3.0 Renaming of Call Active Variable F

s29 N2-99310 03.78 A099 R97 6.3.0 Reporting of O/T_Abandon DP when calle r clears duringO/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R.

F

s29 N2-99338 03.78 A100 1 R97 6.3.0 Clarification on the scope of CAMEL Capability Handlingparameter

F

s29 N2-99458 03.78 A102 R97 6.3.0 Refining trigger crite ria a t DP2, due to the introduction of NorthAmerican Equal Access

F

S29 N2-99576 03.78 A103 R97 6.3.0 Introduction of MSISDN Parameters in Process Uns tructured F

s29 N2-99646 03.78 A104 3 R97 6.3.0 MSC address in Initia l DP F

s29 N2-99630 03.78 A105 R97 6.3.0 Correction of gsmSDL; re turn to idle a fte r ACR F

s29 N2-99638 03.78 A106 2 R97 6.3.0 Notification of call forwarding to the gsmSCF F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 30

SMG#29 P-99-432

CRs onCAMEL Phase2 cont.

s29 N2-99590 03.79 A011 1 R97 6.0.0 Notification of call forwarding to the gsmSCF Fs29 N2-99591 03.79 A012 R98 7.0.0 Notification of call forwarding to the gsmSCF A

s29 N2-99569 03.82 A004 2 R97 6.0.0 Modifications to ca ll forwarding due to CAMEL Phase 2 D

s29 3C99-479 09.02 A207 R97 6.3.0 Clarification in ASN.1 encoding of O-CSI and T-CSI. F

s29 N2-99233 09.02 A211 R98 7.0.0 Clarification in ASN.1 encoding of O-CSI and T-CSI As29 N2-99270 09.02 A213 1 R97 6.3.0 Introduction of MSISDN in USSD operation Cs29 N2-99269 09.02 A215 R98 7.0.0 Introduction of MSISDN in USSD operation Cs29 N2-99643 09.02 A235 1 R97 6.3.0 Modification of the O-CSI ASN1 structure FS29 N2-99650 09.02 A237 1 R98 7.0.0 Modification of the O-CSI ASN.1 structure A

s29 N2-99239 09.78 A042 3 R97 6.3.0 SCCP Fs29 3C99-407 09.78 A055 R97 6.3.0 Corrections Fs29 3C99-481 09.78 A057 R97 6.3.0 Inclusion of Activity Tes t IF between gsmSCF & gsmSRF and

gsmSCF and assis tSSFF

s29 N2-99344 09.78 A058 3 R97 6.3.0 Various corrections Fs29 N2-99334 09.78 A065 R97 6.3.0 Removal of redundant reference D

s29 N2-99593 09.78 A068 1 R97 6.3.0 Notification of call forwarding to the gsmSCF Fs29 N2-99647 09.78 A070 1 R97 6.3.0 MSC address in the Initia lDP opera tion Fs29 N2-99639 09.78 A072 1 R97 6.3.0 Interworking with Q.1218 and ETSI Core INAP F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 31

SMG#29 P-99-432

CRs onCCBS

Work item: CCBS tdoc P-99-455

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CAs29 N1-99164 04.08 A507 1 R97 6.3.0 Clarification to CCBS T334 timer F

s29 N2-99249 09.02 A203 1 R97 6.3.0 Adding of MAP_DELIMITER_req to the S ta tus report opera tion F

s29 N2-99250 09.02 A212 R98 7.0.0 Adding of MAP_DELIMITER_req to the S ta tus report opera tion A

WI SPEC CR PH REV VERS SUBJECT CAT NEW_VER STC_DOCCCBS 04.08 A507 R97 1 6.3.0 Clarification to CCBS T334 timer F 6.4.0 N1-99164

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 32

SMG#29 P-99-432

CRs onCTS

Work item: CTS tdoc P-99-xxx

SMG# TDOC SPEC CR REV PHAS VERS SUBJECT CATS29 N1-99078 04.56 A001 R98 7.0.0 Inclusion of parameters in the Attachment Accept Procedure FS29 N1-99169 04.56 A002 1 R98 7.0.0 Clarification to the Re-attach procedure Fs29 N1-99313 04.56 A003 R98 7,0,0 Inclusion of a L1 header to the Immediate Assignment Fs29 N1-99314 04.56 A004 R98 7,0,0 Addition of a new message providing RR parameters to the MS Fs29 N1-99315 04.56 A005 R98 7,0,0 Clarification of the Frequency hopping definition procedure Fs29 N1-99316 04.56 A006 R98 7,0,0 Replacement of the Alive Check Request message by a Paging Fs29 N1-99317 04.56 A007 R98 7,0,0 Clarification to the use of hopping or non-hopping CTSARCH Fs29 N1-99318 04.56 A008 R98 7,0,0 Clarification to the use of the status field F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 33

SMG#29 P-99-432

CRs onEDGE / NSS

Work item: EDGE/NSS tdoc P-99-xxxx

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 N1-99178 04.08 A371 2 R99 6.1.1 BCIE modifications due to EDGE Bs29 N1-99592 03.60 A116 2 R99 6.3.1 Tunnelling of Non-GSM Messages BS29 N1-99593 04.64 A070 2 R99 6.3.0 Tunnelling of non-GSM Messages BS29 N1-99594 09.18 A028 1 R99 6.3.0 Gs Interface Changes to Support Tunnelling of non-GSM

MessagesB

Tdoc P-99-xxxxx

WI SPEC CR PH REV VERS SUBJECT CAT NEW_VER STC_DOCEDGE 07.03 tbd R99 0 6.0.0 Introduction of EDGE B tbd N3-99-063

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 34

SMG#29 P-99-432

CRs onGPRS

Work item: GPRS tdoc P-99-456

SMG# TDoc SPEC CR REV PHASE

VERS SUBJECT CAT

s29 N2-99620 03.07 A006 1 R97 6.1.0 GPRS restoration procedures F

s29 N2-99254 03.15 A007 1 R97 6.0.0 Corrections to text to introduce barring of SMS calls for GPRS F

s29 N1-99354 03.20 A011 4 R97 6.0.1 Correction of the handling of the Ciphering Key Sequence Number(CKSN)

F

s29 N1-99269 03.22 A031 1 R97 6.1.0 Correction to delayed PLMN selection Fs29 N1-99573 03.22 A032 2 R97 6.1.0 PLMN Selection for GPRS mobiles F

s29 N1-99454 03.60 A107 2 R97 6.3.1 Improving the user data loss less inter SGSN RA update Fs29 N1-99268 03.60 A112 2 R97 6.3.1 correction of the handling of cksn in the attach procedure Fs29 N1-99181 03.60 A114 R97 6.2.0 Selection Mode consistency between 09.60 and 03.60 Fs29 N1-99369 03.60 A115 1 R98 6.3.1 Clarification to the PDP-type PPP Bs29 N1-99466 03.60 A117 R97 6.3.1 SGSN Failure Fs29 N1-99442 03.60 A118 1 R97 6.3.1 Information storage Fs29 N1-99443 03.60 A119 1 R97 6.3.1 Clarification of the null routeing area Fs29 N1-99572 03.60 A120 2 R97 6.3.1 Circuit Switched and Packet Switched priority handling Fs29 N1-99596 03.60 A130 R97 6.3.1 MSISDN in GGSN Fs29 N1-99598 03.60 A132 R97 6.3.1 Mean throughput classes F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 35

SMG#29 P-99-432

CRs onGPRS cont.

s29 N1-99475 04.07 A024 R97 6.3.0 Inter SGSN RA Update F

s29 N1-99271 04.08 A461 3 R97 6.3.0 Usage of the combined routing area update procedure FS29 N1-99184 04.08 A467 2 R97 6.3.0 Multiple ATTACH REQUEST attempts and GMM-common

procedures: abnormal cases on the network sideF

S29 N1-99182 04.08 A469 2 R97 6.3.0 Network Initiated Detach with ReAttach Fs29 N1-99356 04.08 A476 2 R97 6.3.0 P-TMSI is introduced in the Paging request messages and in the

Mobile identity IE.F

s29 N1-99457 04.08 A481 1 R97 6.3.0 Improving the user data loss less inter SGSN RA update FS29 N1-99034 04.08 A505 R97 6.3.0 ‘GPRS services not allowed’ cause in the ATTACH REJECT

(combined case).F

s29 N1-99212 04.08 A509 1 R97 6.3.0 SM-STATUS msg. Response to unknown msg type Fs29 N1-99226 04.08 A511 2 R97 6.3.0 Cleaning up on text in general, and especially on attempt counters,

PDP access IE length, MS network capability IE and MS identity IElength

F

s29 N1-99471 04.08 A515 4 R97 6.3.0 Correction to the handling of subscribed QoS values Fs29 N1-99245 04.08 A517 2 R97 6.3.0 Correction of the handling of the Ciphering Key Sequence Number

(CKSN)F

s29 N1-99258 04.08 A519 3 R97 6.3.0 Correction of the SM message collision with equal TI to an activePDP context

F

s29 N1-99247 04.08 A523 2 R97 6.3.0 Ready Timer handling in suspend state Fs29 N1-99054 04.08 A525 R97 6.3.0 Deactivation of READY timer Fs29 N1-99207 04.08 A527 1 R97 6.3.0 Description of cause codes in network initiated detach Fs29 N1-99465 04.08 A553 1 R97 6.3.0 Clarification of release procedure upon PDP context deactivation Fs29 N1-99464 04.08 A555 2 R97 6.3.0 New DEREGISTERED 'suspended' state F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 36

SMG#29 P-99-432

CRs onGPRS cont.

s29 N1-99211 04.08 A573 1 R97 6.3.0 Completion of error handling for session management Fs29 N1-99262 04.08 A577 2 R97 6.3.0 Subsequent GMM substate and attach attempt counter Fs29 N1-99096 04.08 A581 R97 6.3.0 Usage of GMM cause codes Fs29 N1-99588 04.08 A582 5 R97 6.3.0 MS Radio Access Capability IE Fs29 N1-99493 04.08 A583 4 R97 6.3.0 Old P-TMSI/TLLI handling Fs29 N1-99609 04.08 A584 3 R98 7.0.0 MS Radio Access Capability IE Fs29 N1-99556 04.08 A585 5 R97 6.3.0 GMM-MM co-ordination in the case of combined GMM specific

proceduresF

s29 N1-99452 04.08 A587 2 R97 6.3.0 Gs interface failure Fs29 N1-99254 04.08 A629 1 R97 6.3.0 ‘GPRS services and non-GPRS services not allowed’: the behaviour

of the MS.F

s29 N1-99260 04.08 A631 1 R97 6.3.0 Maximum length of Access point name and Protocol configurationoptions IEs

F

s29 N1-99261 04.08 A633 1 R97 6.3.0 Clash between READY time deactivation and Force to StandbyProcedure

F

s29 N1-99238 04.08 A635 R97 6.3.0 GMM Mobile station identity Fs29 N1-99478 04.08 A637 3 R97 6.3.0 Initial synchronisation after READY timer negotiation Fs29 N1-99559 04.08 A639 2 R97 6.3.0 Usage of GMM update status U2 Fs29 N1-99231 04.08 A645 R97 6.3.0 Conditional IE GPRS CKSN in Authentication and ciphering

procedureF

s29 N1-99257 04.08 A647 R97 6.3.0 Correction of the SM message collision cases through PDP address Fs29 N1-99480 04.08 A651 4 R97 6.3.0 Paging with IMSI Fs29 N1-99463 04.08 A653 2 R97 6.3.0 Reactivation of PDP contexts Fs29 N1-99265 04.08 A655 R97 6.3.0 Correcting mistakes introduced via CR's 385, 415, 425,441 in v6.3.0

editing update.F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 37

SMG#29 P-99-432

CRs onGPRS cont.

s29 N1-99211 04.08 A573 1 R97 6.3.0 Completion of error handling for session management Fs29 N1-99262 04.08 A577 2 R97 6.3.0 Subsequent GMM substate and attach attempt counter Fs29 N1-99096 04.08 A581 R97 6.3.0 Usage of GMM cause codes Fs29 N1-99588 04.08 A582 5 R97 6.3.0 MS Radio Access Capability IE Fs29 N1-99493 04.08 A583 4 R97 6.3.0 Old P-TMSI/TLLI handling Fs29 N1-99609 04.08 A584 3 R98 7.0.0 MS Radio Access Capability IE Fs29 N1-99556 04.08 A585 5 R97 6.3.0 GMM-MM co-ordination in the case of combined GMM specific

proceduresF

s29 N1-99452 04.08 A587 2 R97 6.3.0 Gs interface failure Fs29 N1-99254 04.08 A629 1 R97 6.3.0 ‘GPRS services and non-GPRS services not allowed’: the behaviour

of the MS.F

s29 N1-99260 04.08 A631 1 R97 6.3.0 Maximum length of Access point name and Protocol configurationoptions IEs

F

s29 N1-99261 04.08 A633 1 R97 6.3.0 Clash between READY time deactivation and Force to StandbyProcedure

F

s29 N1-99238 04.08 A635 R97 6.3.0 GMM Mobile station identity Fs29 N1-99478 04.08 A637 3 R97 6.3.0 Initial synchronisation after READY timer negotiation Fs29 N1-99559 04.08 A639 2 R97 6.3.0 Usage of GMM update status U2 Fs29 N1-99231 04.08 A645 R97 6.3.0 Conditional IE GPRS CKSN in Authentication and ciphering

procedureF

s29 N1-99257 04.08 A647 R97 6.3.0 Correction of the SM message collision cases through PDP address Fs29 N1-99480 04.08 A651 4 R97 6.3.0 Paging with IMSI Fs29 N1-99463 04.08 A653 2 R97 6.3.0 Reactivation of PDP contexts Fs29 N1-99265 04.08 A655 R97 6.3.0 Correcting mistakes introduced via CR's 385, 415, 425,441 in v6.3.0

editing update.F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 38

SMG#29 P-99-432

CRs onGPRS cont.

S29 N1-99355 04.08 A657 1 R97 6.3.0 Editorials, and correcting the A&C REQUEST plus INFORMATIONmessages

F

S29 N1-99230 04.08 A659 R97 6.3.0 MS reachable timer Fs29 N1-99476 04.08 A665 R97 6.3.0 Correction of PDP type Fs29 N1-99419 04.08 A669 R97 6.3.0 Conditional IE Errors Fs29 N1-99606 04.08 A673 4 R97 6.3.0 Change of network operation mode Fs29 N1-99453 04.08 A675 R97 6.3.0 Abnormal case in the MS when changing cell while trying to attach Fs29 N1-99429 04.08 A677 R97 6.3.0 Definition of the PDP address IE Fs29 N1-99430 04.08 A679 R97 6.3.0 Deactivation of PDP contexts in case of GPRS detach Fs29 N1-99553 04.08 A681 1 R97 6.3.0 Improved SM messages error handling for non-semantically

mandatory IE errorsF

s29 N1-99438 04.08 A683 R97 6.3.0 Usage of cause code #10 implicitly detached Fs29 N1-99574 04.08 A685 1 R97 6.3.0 TMSI requested by the MSC trough the Gs interface F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 39

SMG#29 P-99-432

CRs onGPRS cont.

S29 N1-99141 04.64 A051 1 R97 6.3.0 GSM 04.64 CR A051r1 Signalling SAPI Information Field Length Fs29 N1-99455 04.64 A054 2 R97 6.3.0 Improving the user data loss less inter SGSN RA update Fs29 N1-99172 04.64 A055 1 R97 6.3.0 Discarding outstanding LL-DATA-REQ in the case of LLC re-

establishmentF

s29 N1-99404 04.64 A057 R97 6.3.0 Number of retransmissions Fs29 N1-99460 04.64 A058 2 R97 6.3.0 Frame reject procedures Fs29 N1-99434 04.64 A059 2 R97 6.3.0 XID collision corrections Fs29 N1-99413 04.64 A061 R97 6.3.0 Differentiating between layer3 and LLC initiated procedures Fs29 N1-99459 04.64 A064 2 R97 6.3.0 Procedure for use of the poll bit and introduction of timer TN1-99201 Fs29 N1-99490 04.64 A067 R97 6.3.0 Correction of the behaviour of LLC in Standby state Fs29 N1-99557 04.64 A068 1 R97 6.3.0 Discarding too long U and UI frames F

s29 N1-99456 04.65 A038 1 R97 6.3.0 Improving the user data loss less inter SGSN RA update Fs29 N1-99462 04.65 A039 1 R97 6.3.0 XID collision corrections F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 40

SMG#29 P-99-432

CRs onGPRS cont.

s29 N2-99560 09.02 A230 R97 6.3.0 Correction to the Purge MS "Detailed procedure in the HLR" Fs29 N2-99628 09.02 A231 R98 7.0.0 Correction to the Purge MS "Detailed procedure in the HLR" F

s29 N2-99259 09.10 A009 R97 6.0.1 GPRS Reject causes F

S29 N1-99176 09.18 A024 1 R97 6.3.0 Clarification of the null RA and other corrections Fs29 N1-99558 09.18 A026 1 R97 6.3.0 TMSI requested by the MSC trough the Gs interface F

s29 N2-99668 09.60 A047 2 R97 6.3.0 Replacing the V(R) transfer mechanism with the N-PDU number.transfer mechanism in routeing area update

F

s29 3C99-493 09.60 A052 R98 7.0.0 Clarification of amibiguous/superflous information Fs29 3C99-494 09.60 A053 R97 6.3.0 Timer handling in GTP Fs29 3C99-495 09.60 A054 R98 7.0.0 Timer handling in GTP As29 N2-99253 09.60 A055 1 R98 7.0.0 Codepoint for PDP type OSP:IHOSS Bs29 N2-99513 09.60 A056 2 R97 6.3.0 Mandatory SGSN Context Acknowledge message Fs29 N2-99621 09.60 A057 1 R97 6.3.0 Mandatory info in MM Context IE Fs29 N2-99623 09.60 A058 1 R97 6.3.0 APN to be transferred in the PDP context at inter SGSN RA update Fs29 N2-99625 09.60 A059 1 R97 6.3.0 Consistency on implemented CRs from SMG#28 Fs29 N2-99629 09.60 A061 1 R97 6.3.0 Removal of changes in PDP context establishment and restoration Fs29 N2-99660 09.60 A062 R98 7.0.0 Removal of changes in PDP context establishment and restoration As29 N2-99622 09.60 A063 R98 7.0.0 Mandatory info in MM Context IE As29 N2-99624 09.60 A064 R98 7.0.0 APN to be transferred in the PDP context at inter SGSN RA update As29 N2-99626 09.60 A065 R98 7.0.0 Consistency on implemented CRs from SMG#28 As29 N2-99669 09.60 A066 R98 7.0.0 Replacing the V(R) transfer mechanism with the N-PDU number

transfer mechanism in routeing area updateA

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 41

SMG#29 P-99-432

CRs onGPRS cont.

s29 N2-99627 09.60 A067 R98 7.0.0 Mandatory SGSN context acknowledgement AS29 NP-99225 09.60 A068 R97 6.3.0 MSISDN in the Create PDP Context Request CS29 NP-99226 09.60 A069 R98 7.0.0 MSISDN in the Create PDP Context Request A

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 42

SMG#29 P-99-432

CRs onInternet hosted octet stream

Work item: GPRS / Internet Hosted Octet Stream tdoc P-99-xxxxCN-tdoc: NP99-211

TDOC SPEC CR REV PHAS VERS SUBJECT CATN1-99321 04.08 A701 R98 7.0.0 GPRS Internet Hosted Octet Stream Service (IHOSS) B

Work item: GPRS / PDP Type – Unstructured Octet Stream (UOS) tdoc P-99-xxxxxCN-tdoc: NP99-214

STC_DOC SPEC CR RE PHA VERS SUBJECT CATN1-99322 03.60 A104 1 R98 6.3.1 Octet Stream Protocol and Internet-Hosted Octet Stream Service F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 43

SMG#29 P-99-432

CRs onMNP

Work item: MNP tdoc P-99-458

SMG#

Tdoc SPEC CR REV PHASE

VERS SUBJECT CAT WORKITEM

s29 N2-99282 03.66 A001 1 R98 7.0.0 Alignment be tween 03.66 Part 1 and Part 4description of call related functionality

F MNP

s29 N2-99283 03.66 A002 1 R98 7.0.0 Editoria l cla rifications and a lignments D MNPs29 N2-99284 03.66 A003 1 R98 7.0.0 Routeing conventions in a portability Clus ter F MNPs29 N2-99671 03.66 A004 1 R98 7.0.0 Adding of MNP-indicator to the SRI ack F MNPs29 N2-99672 03.66 A005 R98 7.0.0 Correction on Number Portability F MNP

s29 N2-99677 09.02 A204 3 R98 7.0.0 Adding of MNP-indicator to the SRI ack A MNP

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 44

SMG#29 P-99-432

CRs onMSP

Work item: MSP tdoc P-99-459

SMG# _TDOC SPEC CR REV PHASE VERS SUBJECT CATs29 N SS-99006 03.97 A002 R98 7.0.0 CR to GSM 03.97 A002 Removal of references to Fs29 N SS-99007 03.97 A003 R98 7.0.0 Correction of handling for Call Deflection Fs29 N SS-99035 03.97 A004 7 R98 7.0.0 Re-organisation of specification D

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 45

SMG#29 P-99-432

CRs onPCS Harmonisation

Work item: PCS1900 Harmonisation tdoc P-99-460

_TDOC SPEC CR REV PHASE

VERS SUBJECT CAT WORKITEM

N1-99547 03.03 A020 1 Correction to the MNC length PCS Harmo.N2b99514 03.03 A025 R98 7.0.0 Harmonisation of the MNC-length, correction of CR A019r1 F PCS-Harmo.

N2b99583 09.02 A229 R97 6.3.0 Removal of 3-digit MNCs F PCS Harmo.N2b99515 09.02 A218 R98 7.0.0 Introduction of 3-digit MNC correction A PCS Harmo.

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CAT WORKITEM

s29 N2-99585 09.02 A216 1 R98 7.0.0 Adding the support of ANSI SCCP which is requiredin North America (World Zone 1)

C PCS1900 Harm.

s29 N2-99228 09.02 A210 R98 7.0.0 New subscription options for call forwarding F PCS1900 Harm.

SMG#

TDoc SPEC

CR REV PHASE

VERS SUBJECT CAT WORKITEM

S29 N2b99521 09.78 A066 R97 6.3.0 Imports from MAP F TEI/PCS Harmo.....

S29 N2b99520 09.02 A223 R97 6.3.0 Export of NAEA-CIC F PCS Harmo.

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 46

SMG#29 P-99-432

CRs onSIM-Application Toolkit

Work item: SIM Application Toolkit (SAT) tdoc P-99-xxxxCN-tdoc: NP99-212

_TDOC SPEC CR REV PHASE VERS SUBJECT CATN1-99163 03.22 A030 3 R97 6.1.0 EFIMSI changes via Data Download or SIM Toolkit applications B

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 47

SMG#29 P-99-432

CRs onSoLSA

Work item: SoLSA tdoc P-99-461

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 N1-99570 04.08 A419 4 R98 6.2.0 Transfer of the LSA Information to the MS BS29 N1-99610 04.08 A546 2 R98 7.0.1 Inclusion of SoLSA capability indication in Classmark IEs BS29 N1-99604 04.08 A687 R99 7.0.0 Transfer of the LSA Information to the MS Bs29 N2-99548 09.02 A227 R98 7.0.0 Clarification to text to identify how the LSA data relevant in the

current VPLMN can be determinedD

Tdoc P-99-xxxx

_TDOC SPEC CR REV PHASE

VERS SUBJECT CAT WORKITEM

N1-99549 03.03. A021 LS + CR 'Definition of escape PLMN code' SoLSA

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 48

SMG#29 P-99-432

CRs onSSN - reallocation

Issue: 03.03 SSN value re-allocation and fault corrections tdoc P-99-462

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATs29 NP99-222 03.03 A027 1 R98 7.0.0 SSN reallocation for CAP, gsmSCF, SIWF, GGSN, SGSN,

SMLC and GMLCA

s29 NP99-223 03.03 A026 1 R97 6.2.0 SSN reallocation for CAP, gsmSCF, SIWF, GGSN, SGSN,SMLC and GMLC

As29 NP99-224 03.03 A028 1 R96 5.11.0 SSN reallocation for CAP, gsmSCF, SIWF, GGSN, SGSN,

SMLC and GMLCF

The CR against R’96 was not approved a discussion on transition technique instead started. R’96 and R’97might be affected.

• Other documents on SSN handling inP-99-433,P-99-434P-99-439

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 49

SMG#29 P-99-432

CRs onTE&I

Work item: TEI tdoc P-99-463

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATS29 N1-99361 04.07 A023 1 R97 6.2.1 Inconsistency in definition of comprehension required IEs FS29 N1-99554 04.07 A025 R98 7.0.0 Inconsistency in definition of comprehension required IEs FS29 N1-99360 04.08 A571 1 R97 6.3.0 Inconsistency in definition of comprehension required IEs FS29 NP-99103 04.08 A591 R98 7.0.1 Inconsistency in definition of comprehension required IEs Fs29 3C99-468 09.02 A205 R97 6.3.0 Alignment with 04.80 Fs29 N2-99517 09.02 A220 R96 5.12.0 VBS data Ds29 N2-99518 09.02 A221 R97 6.3.0 VBS data As29 N2-99519 09.02 A222 R98 7.0.0 VBS data As29 N2-99461 09.02 A224 1 R98 7.0.0 Introduction of Data Missing error to the Resume Call Handling FS29 N2-99583 09.02 A229 R97 6.3.0 Removal of 3-digit MNCs Fs29 3C99-667 09.02 A233 R97 6.3.0 Corrections of mapping from MAP service to TC service Fs29 N2-99676 09.02 A234 R98 7.0.0 Corrections of mapping from MAP service to TC service AS29 N2-99521 09.78 A066 R97 6.3.0 Imports from MAP F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 50

SMG#29 P-99-432

CRs onUUS

Work item: UUS tdoc P-99-464

SMG#

TDoc SPEC CR REV PHASE

VERS SUBJECT CATs29 3C99-206 09.02 A186 3 R98 7.0.0 Introduction of UUS se rvice to Resume Call Handling B

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 51

SMG#29 P-99-432

CRs on MiscellaneousTransfer WP-D SMG4 --> SMG3

CRs presented by N3 on GPRS and miscellaneous: tdoc P-99-505

S4-98p614 CR to 07.60 GPRS for PDP type Internet Hosted Octet Stream Service (IHOSS) (R ’98)

S4-98p615 CR to 09.61 GPRS for PDP type Internet Hosted Octet Stream Service (IHOSS) (R ’98)

S4-98p619 CR to 07.60 for PPP type PDP (R ’98)

S4-98p621 CR to 09.61 for PPP type PDP (R ’98)

T2-99254 CR to 07.60 v6.2.1 (release '97) to remove AT commands WI:GPRS, CAT: D

T2-99255 CR to 07.60 (release '97) to correct an error in the +CGAUTO command WI: GPRS, CAT: F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 52

SMG#29 P-99-432

CRs on04.08 split.

Work item: 04.08-Split (AS - NAS specific part for R’99 – UMTS) tdoc P-99-CN-tdoc: NP99-220

_TDOC SPEC CR REV PHASE VERS SUBJECT CATN1-99302 04.08 A567 1 R99 7.0.1 Split of 04.08 in RR and CN parts FN1-99303 04.08 A611 1 R99 7.0.1 Split of 04.08 in RR and CN parts FN1-99304 04.08 A613 1 R99 7.0.1 Split of 04.08 in RR and CN parts FN1-99305 04.08 A515 1 R99 7.0.1 Split of 04.08 in RR and CN parts (Section 7, “L3 stage2”) F

s

TSG_CN/SMG3 report to SMG#29 [email protected] 20.06.1999, slide 53

SMG#29 P-99-432

Miscellaneous

• WI-Managementactivity assessment can be found at the end of the report