Welcome To The Presentation About the Progress of Implementing IE Tolls & Techniques & An Overview On The Factory KPIs
Presented ByTURAG TEAM
Implementation Status On Production Module
Capacity Study & Hourly Production and capacity trend chartPrepare video library of process improvementInsuring Nonstop Feeding Without Any Supply chain Problem In Pilot LineMaintaining Productivity & Efficiency Tracker
Continued…………
Initiate complete thread cutting by sewing operatorsEnd table QC Team Will Not Use The Cutter For Thread CuttingSummery Of End line & Finishing Inspection(DHU Report)
Prepare Defect Library
Some Difficulties To Implement On Production Module
Initiate Complete Thread Cutting By Sewing Operator• Reason Behind Uncut Thread Is Operators
And Production Staffs Mind is not Set to Clear Excess Thread In Every Process By Operator As They Think It Will Reduce Needle Down Time, Need Proper Training. It Will Take Some Time To Implement.
• We initiate individual trimmer for each operation.
• Yet There Is No Compressor Facilities Installed To Utilize Auto Thread Cutting Option In Sewing Machine.
Implementation Status Of HR Module
Agree And Share Vision In The Factory
Update Job Description Of HR And Welfare
Implement Exit Interview For Factory
Implement Induction System In Factory
Continued……
Implement Buddy System In Pilot LineImplement And Communicate Easy Leave Policy In FactoryDevelop Workers Job Description
Use 5 Why Technique And Find Out The Root Cause
Some Difficulties To Implement On Production Module
Agree And Share Vision In The Factory• Yet There Is No Shared Vision Selected
Finally.• Will implement Soon By Selection Vision
Catchphrase
Lets Take A Glance At Pilot Line Performance Status
Month wise comparison of Average SMV & Efficiency In Pilot Line
July’13 August’13 September’13 October’13 November’13 December’130
10
20
30
40
50
60
17.32
31.45
26.53 25.81
16.1318.22
33.80
26.50
21.40
32.1036.59
49.85
Av-er-age SMVLinear (Av-erage SMV)
Brief Summary of Method Improvement
Collar surfacing with mark by operator(Remove one helper)
Cuff rib surfacing with mark by operator(Remove one helper)
Placket mark process improvement
Share the Video Library:
Month wise Quality Improvement comparison(Pilot line)
September’13 October’13 November’13 December’13 0
5
10
15
20
25
30
16.66
10.088.84
6.55
24.1525.5
17.15
12.96
DHU (Pilot Line)
Linear (DHU (Pilot Line) )
DHU (Fin-ishing)
Linear (DHU (Fin-ishing) )
Introduce Defect Library
Total Factory Summary (Last 7 Month)
Style Criticality Trends To Get Downward
June July August September October November December10
10.5
11
11.5
12
12.5
13
13.5
12.87
12.30
12.7813.03
13.33
12.74
11.23
Average SMV
Average SMVLinear (Av-erage SMV)
Highest Critical
Average Working Hour Trends To Get Upward
June July August September October November December9.50
10.00
10.50
11.00
11.50
12.00
11.40
10.70
10.98
11.6011.76 11.84
10.58
Average working hour
Average working hourLinear (Aver-age working hour)
Order Quantity Trends To get High In Volume
June July August September October November December0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
3.18 3.21
4.474.28
3.11
3.543.15
Average style change per line
Average style change per line
Average Efficiency Trends To Get Higher
June July August September October November December0
5
10
15
20
25
30
35
40
45
50
33.28
39.27
33.6730.68
34.3737.27
44.14
Average Eff.(%)
Aver-age Eff.(%)Linear (Aver-age Eff.(%))
Average Productivity Trends To Get Higher
June July August September October November December0
0.5
1
1.5
2
2.5
3
3.5
2.38
3.03
2.07
1.73
2.7
2.24
3.27Average Productivity
Average Produc-tivityLinear (Average Produc-tivity)
Average Target Achievement Trends To Get Higher
June July August September October November December0
10
20
30
40
50
60
70
80
90
68.14
76.5571.31
65.2668.8
81.74 84.4
Average Target Ach.(%)
Average Target Ach.(%)
Linear (Average Target Ach.(%))
Average Manpower Utilization% Trends To Get Higher
June July August September October November December94
95
96
97
98
99
100
101
96.17
99.03
99.86 99.73 99.84 99.77 99.72
Average Manpower Utilization(%)
Average Manpower Utilization(%)
Linear (Average Manpower Utilization(%) )
Unnecessary Manpower Trends To Get Downward
June July August September October November December46
48
50
52
54
56
58
60
62
6462
60
58
5556
5253
Manpower per line
Man-power per line
Cut To Ship Loss Trends To Gets Higher
June July August September October November December6%
8%
10%
8%
9%
8%
9%
8% 8%
9%
Cut to Ship Ratio
Cut to Ship RatioLinear (Cut to Ship Ra-tio)
Air Percentage Trends To Get Lower
June July August September October November December0%
5%
10%
15%
20%
25%
7%
20%
14%
12%
7%
2%0%
AIR%
AIR%
Linear (AIR%)
Earning Trends Get Higher By Reducing Air Ship Qty
June July August September October November December $-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$254,434
$569,445
$182,220
$249,167
$59,867 $60,868
$7,393
AIR SHIP QTY
AIR SHIP QTY
Linear (AIR SHIP QTY)
Factory Turnover Trends To Get Lower
September 13 October 13 November 13 December 130.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
8.00%
4.89%
6.15%
7.06%
3.20%
Factory Turnover
ActualLinear (Actual)
Operator Turnover Trends To get Upward & Helper Turnover Trends To Get Downward
September 13 October 13 November 13 December 130.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
67.35%
74.79%
59.35%
38.89%32.65%
25.21%
37.40%
61.11% Helper Turnover
Linear (Helper Turnover)
Operator Turnover
Linear (Opera-tor Turnover)
Why Working Hours Trends To GetHigher
Weak Supply Chain
Improper Time & Action Plan
Low Quality Input
Lack Of Inter Department Cooperation
Responsible Department For Non Productive Time(June)
Textile28%
Cutting28%
Merchandising19%
Printing21%
Maintenance3%
TextileCuttingMerchandisingPrintingMaintenance
Responsible Department For Non Productive Time(July)
Textile12% Cutting
6%
Merchandising35%
Printing36%
Maintenance7%
Sample1%
Quality1%
Mechanical1%
TextileCuttingMerchandisingPrintingMaintenanceSampleQualityMechanical
Responsible Department For Non Productive Time(August)
Textile59%
Cutting17%
Merchandising21%
Maintenance3%
TextileCuttingMerchandisingPrintingMaintenance
Responsible Department For Non Productive Time(September)
Textile24%
Cutting15%
Merchandising27%
Printing13%
Maintenance10%
Sample3%
Quality4%
Technical3%
TextileCuttingMerchandisingPrintingMaintenanceSampleQualityTechnical
Responsible Department For Non Productive Time(October)
Textile14%
Cutting7%
Merchandising63%
Printing12%
Maintenance3%
Quality2%
TextileCuttingMerchandisingPrintingMaintenanceQuality
Responsible Department For Non Productive Time(November)
Textile5% Cutting
3%
Merchandising46%
Printing5%
Maintenance21%
Sample2%
Quality11%
Production5%
Technical2%
TextileCuttingMerchandisingPrintingMaintenanceSampleQualityProductionTechnical
Responsible Department For Non Productive Time(December)
Textile33%
Cutting3%
Merchandising38%
Printing9%
Maintenance8%
Quality5%
Technical3%
TextileCuttingMerchandisingPrintingMaintenanceSampleQualityProductionTechnical
A Question May Arise That Why Garments Production Is Not Responsible For Non Productive Time?
The Answer Is, Yes They Are But Their
Non Productive Time Occurrences Are Negligible.
Fabric Balance Trends To Get Downward
June July August September October NovemberDecember
-5%
0%
5%
10%
15%
20%
25%
20%
-1%
12%
0%
7%
10%
2%
Fabric Balance Percentage
Fabric Balance Percent-ageLinear (Fabric Balance Per-centage)
Input Balance Trends To Get Higher
June July August September October November December
-4%
-2%
0%
2%
4%
6%
8%
10%
12%
14%
1%
-1%
11%12%
-3%
7%
3%
Input Balance Percentage
WIP Per-centageLinear (WIP Percent-age)
Output Balance Trends To Get Lower
June July August September October November December
-15%
-10%
-5%
0%
5%
10%
15%
4%
10%
-10%
3%
-6%
3%2%
Output Balance %
Output Balance%Linear (Output Balance%)
Packing Balance Trends To Get Lower
June July August September October November December
-30%
-20%
-10%
0%
10%
20%
30%
40%
50%
60%
12%
53%
-9%
21%
12%
-17%
13%
Packing Balance %
Packing Balance %
Any Question?