40
Tutorial 6: Bin type walls with tierod Deep Excavation LLC DeepEX 2015 – Advanced course 1

Tutorial 6: Excavation outside of two walls connected with a tieback

  • Upload
    theta

  • View
    45

  • Download
    0

Embed Size (px)

DESCRIPTION

Tutorial 6: Excavation outside of two walls connected with a tieback. Deep Excavation LLC. DeepXcav 2011 – Advanced course. 1. INTRODUCTION . - PowerPoint PPT Presentation

Citation preview

Page 1: Tutorial 6: Excavation outside of two walls connected with a tieback

Tutorial 6: Bin type walls with tierod

Deep Excavation LLCDeepEX 2015 – Advanced course 1

Page 2: Tutorial 6: Excavation outside of two walls connected with a tieback

DeepEX is a software program for braced excavations in soils with 2D limit-equilibrium and non-linear analysis

methods, and structural verification of all elements (with AISC, ASD, Eurocodes).

It offers the ability to analyze walls with multiple braces (tiebacks) in multilayered soils.

The non-linear analysis considers elastoplastic behavior for the whole soil-wall-support system.

The program also offers the ability to perform traditional limit-equilibrium analyses.

The graphical interface is completely interactive and the input is simplified to a great extend.

The program utilizes archives of wall types, structural and soil materials, ground anchors etc.

The analysis can be performed in either an utlimate state or at a service state (allowable design, LRFD, or Eurocode 7

design approach methods).

The program offers the ability to automatically set all critical settings according to the desired design methodology.

Corso Paratie, Milano 30 settembre 2009

INTRODUCTION

DeepEX 2015 – Advanced course 2

Page 3: Tutorial 6: Excavation outside of two walls connected with a tieback

Program layout

Wall selection

Project tree view

Design section list(right click)

General input tabsFile menu (click)

Model stages (right click options similar to

excel)Command prompt (enter coordinates)

Press to perform calculations.

Instruction box

Model space (left or right click on any item)

Mouse is over item Units

DeepEX 2015 – Advanced course

3D Model (Frames)

View and other

Page 4: Tutorial 6: Excavation outside of two walls connected with a tieback

Enter basic project information1. Select this button

2. Define the project name etc.

3. Press OK

DeepEX 2015 – Advanced course

Page 5: Tutorial 6: Excavation outside of two walls connected with a tieback

Move model elevations1. Select this button

2. Set new reference elevation to 100 ft

3. Check All boreholes (this moves all soil

layers)

4. Press OK

Page 6: Tutorial 6: Excavation outside of two walls connected with a tieback

1. Add a 2nd wall2. Double click on right wall3. Change dimensions3.1 Change xwall= 60ftDepth L= 45ft

Page 7: Tutorial 6: Excavation outside of two walls connected with a tieback

Define basic model limits (top, bottom, left, right)

1. Select this button

2. Set Top= 130ftBottom= 40ft

Left= -60ftRight= 120ft

3. Press OKDeepEX 2015 – Advanced course

Page 8: Tutorial 6: Excavation outside of two walls connected with a tieback

Modify soil types (database of soils)1. Select this button.

Or

Expand the Soils Tree and Double click on FOptions: Right click or press Delete

Note: In DeepEX you can use any soil type in more than one borehole. For example the F soil can be used in boring 1 or boring 2 etc.

You can use any Boring on any design section. Thus changing any property of the F soil will affect all the excavation Design Sections where F is used!

Boring with F soil

Page 9: Tutorial 6: Excavation outside of two walls connected with a tieback

Soil type data form

Available soil types

Add new, copy, delete, paste soil

DensityStrength

Short soil name, description and color.

Soil type & initial clay behavior

Test data for estimating soil properties

DeepEX 2015 – Advanced course

Page 10: Tutorial 6: Excavation outside of two walls connected with a tieback

Soil type continuedSoil properties: GeneralSoil name: F (this appears in the boring)Description: Detailed soil description.Soil type: Sand gt= 125 kcf : Total unit weightgdry= 120 kcf : Dry unit weight (above water table)c‘= 0 : Effective cohesionF’= 30 degrees : Effective friction angle

v= 0.35 Poisson’s ratio

Kx = Horizontal permeabilityKz = Vertical permeability

Parameters only for claysSu = Undrained shear strengthFcv= Constant volume shearing angleFpeak= Peak shearing angle

DeepEX 2015 – Advanced course

Page 11: Tutorial 6: Excavation outside of two walls connected with a tieback

Soil properties (Resistance and Elastic)

KoNC = At rest lateral earth pressure coefficient for normally consolidated state.

Enter elasticity values as shown before. Click on > buttons for more options.

DeepEX 2015 – Advanced course

Page 12: Tutorial 6: Excavation outside of two walls connected with a tieback

Soil S1Soil properties: Change S1A. GeneralSoil name: S1 (this appears in the boring)Description: Sand Detailed soil description.Soil type: Sand gt =125 pcf : Total unit weightgdry= 120 pcf: Dry unitc‘ 0: Effective cohesionF’ = 36 degrees : Effective friction angleV = 0.35 Poisson’s ratio

C. Elasto-plasticE = 500 ksfrEur = 3

D. BondUltimate bond = 30 psi

Press OK

Page 13: Tutorial 6: Excavation outside of two walls connected with a tieback

Edit Borings (soil layers)To edit the soil layers double click on the model boring.

The borings can also be edited from:

a) Edit Borings Button.

Or from the:

b) Tree View – Stratigraphy – boreholes

Double click here (or right click) with the mouse.

DeepEX 2015 – Advanced course

Page 14: Tutorial 6: Excavation outside of two walls connected with a tieback

Enter Soil LayersTo edit the soil layers click on the blue button and enter the top of layer elevation.

For this example type 90 here:

Then select soil type S1 here:

DeepEX 2015 – Advanced course

Press OK

Page 15: Tutorial 6: Excavation outside of two walls connected with a tieback

DeepEX 2015 – Advanced course

Page 16: Tutorial 6: Excavation outside of two walls connected with a tieback

Double click on wall

DeepEX 2015 – Advanced course

Page 17: Tutorial 6: Excavation outside of two walls connected with a tieback

2. Select edit section data, to change wall properties

1. Change wall depth to 45ft

DeepEX 2015 – Advanced course

Number of nodes controls the divisions

along the wall in a limit-equilibrium analysis.

(Suggested 200 min, or set so that small

intervals (0.25 ft) are generated)

Page 18: Tutorial 6: Excavation outside of two walls connected with a tieback

Change wall section AZ 19 sheet pile

1. Change wall type

2. Select AZ-19 section

3. Select A50 steel(fy= 50 ksi)

4. Select OK

DeepEX 2015 – Advanced course

Page 19: Tutorial 6: Excavation outside of two walls connected with a tieback

Wall using AZ-19 wall section

Select OK

DeepEX 2015 – Advanced course

Page 20: Tutorial 6: Excavation outside of two walls connected with a tieback

Add a new stage (Model Tab)

Or right click (to add a stage, similar to Excel)

DeepEX 2015 – Advanced course

Page 21: Tutorial 6: Excavation outside of two walls connected with a tieback

Stage 1 change external elevations to El. 90

Stage 1

DeepEX 2015 – Advanced course

Page 22: Tutorial 6: Excavation outside of two walls connected with a tieback

Add Stage 2: Add a strut at El. +92

Right click and add stage 2

DeepEX 2015 – Advanced course

Page 23: Tutorial 6: Excavation outside of two walls connected with a tieback

Select tool to add a tieback

Note: After selecting the “Draw ground anchor button” the program tells you to select/enter the 1st tieback point at the wall (x z)

DeepEX 2015 – Advanced course

Page 24: Tutorial 6: Excavation outside of two walls connected with a tieback

Add tieback with mouse1. Select 1st point on left wall (we will modify the coordinates later)

2. Select 2nd point on right wall when wall highlights

Page 25: Tutorial 6: Excavation outside of two walls connected with a tieback

Edit tieback properties (support options)1. Change dimensions z= 92 ft (elevation)Horizontal spacing to 5ft (length is determined by program)

Select OK

DeepEX 2015 – Advanced course

Page 26: Tutorial 6: Excavation outside of two walls connected with a tieback

Edit tierod section to #18 bar – 80ksi• Select solid bar• Change grade to 80• Select #18 bar• Specify one bar per

tierod• Dfix does not play a

role

Page 27: Tutorial 6: Excavation outside of two walls connected with a tieback

DeepEX 2015 – Advanced course

Page 28: Tutorial 6: Excavation outside of two walls connected with a tieback

Add a surcharge on the center surface. Select this tool button.

DeepEX 2015 – Advanced course

Page 29: Tutorial 6: Excavation outside of two walls connected with a tieback

Add surcharge with mouse

2. Select 2nd point

1. Select 1nd point on left

DeepEX 2015 – Advanced course

Page 30: Tutorial 6: Excavation outside of two walls connected with a tieback

Modify surcharge

1. Change coordinates X1= -22 X2= -2

2. Change surchargeqz1= 0.6 ksf qz2= 0.6 ksf

Point 1 is on the left sidePoint 2 is on the right side

3. Select OK

DeepEX 2015 – Advanced course

Wall index refers to which wall the load is

applied: 0 = left wall, 1= right wall, -1 all walls

Page 31: Tutorial 6: Excavation outside of two walls connected with a tieback

Add stage 3: Excavate to El. 80ft left and right side

Right click and add stage 3

DeepEX 2015 – Advanced course

Page 32: Tutorial 6: Excavation outside of two walls connected with a tieback

On stage 3: Go to Analysis tab

1. Change analysis mode to “Limit Equilibrium and Beam Elastoplastic Foundations”

DeepEX 2015 – Advanced course

In this mode, DeepEX first performs a limit-equilibrium analysis and stores the conventional wall embedment safety factors. Then, DeepEX runs the elastoplastic solution (non-linear) and stores wall moments, shears, displacements and other parameters from the non-linear analysis.

Page 33: Tutorial 6: Excavation outside of two walls connected with a tieback

No wall friction to be used• Wall friction (wall to soil) is ignored because walls are not expected to

experience vertical movement (Analysis tab)

Page 34: Tutorial 6: Excavation outside of two walls connected with a tieback

Select US structural codes (Design Tab)1. Select US allowable settings from Design tab

DeepEX 2015 – Advanced course

Page 35: Tutorial 6: Excavation outside of two walls connected with a tieback

1. Concrete code and Steel Code(1.6 is safety on Ultimate cap)

2. Clay behavior

3. Water pressure analysis

4. Driving pressures Ka = Active without wall friction5. Resisting pressures Kp/1.5 = Passive divided by 1.56. Table displays assumptions for both limit-equilibrium and non-

linear analysis

Review Assumptions (Yellow table Stage 2)

DeepEX 2015 – Advanced course

Page 36: Tutorial 6: Excavation outside of two walls connected with a tieback

Analyze the model (current design section)

DeepEX 2015 – Advanced course

Analyzes all design sections

Page 37: Tutorial 6: Excavation outside of two walls connected with a tieback

Summary table (all Design sections)

DeepEX 2015 – Advanced course

Page 38: Tutorial 6: Excavation outside of two walls connected with a tieback

Summary table (Selected design section all stages)

Note: You may select another design section or another wall (when a 2nd wall is used) Press EXIT

DeepEX 2015 – Advanced course

Page 39: Tutorial 6: Excavation outside of two walls connected with a tieback

Results Tab (for viewing results on model screen)

Wall embedment and other safety factors

Wall moment, shear, axial, displacement.Support reaction R.

Display wall capacity (moment and shear), Stress ratios(ratios <1 OK)

Display stresses and pressures on walls.

Display soil mass stresses (when water flownet analysis is performed)

Click on Min-Max to display min and max values.Show ENV= Show result envelope (this design section)

Tables and diagrams

DeepEX 2015 – Advanced course

Page 40: Tutorial 6: Excavation outside of two walls connected with a tieback

Results on model