31
TUBULAR ELECTRICAL & INSTRUMENTATION (PTY) LTD C O M P A N Y P R O F I L E Compiled by: TUBULAR ELECTRICAL & INSTRUMENTATION (PTY) LTD. Cert. No 332492 HO

TUUBUULLAAR EEELLE CCTTRRIICALL && INNSS TTRRUUMMENNT ... · TUUBUULLAAR EEELLE CCTTRRIICALL && INNSS TTRRUUMMENNT TAATIIOONN ((PPTTYY)) ... Safety within Tubular Electrical ... The

Embed Size (px)

Citation preview

TTUUBBUULLAARR EELLEECCTTRRIICCAALL &&

IINNSSTTRRUUMMEENNTTAATTIIOONN ((PPTTYY)) LLTTDD

CC OO MM PP AA NN YY PP RR OO FF II LL EE

Compiled by: TUBULAR ELECTRICAL & INSTRUMENTATION (PTY) LTD.

Cert. No 332492 HO

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

WITBANK OFFICE JOHANNESBURG OFFICE PO Box 222 16B Melodie Street PO Box 75647 8 Hawley Road

WITBANK Klarinet Industrial Area Gardenview Bedfordview 1035 WITBANK 2047 2008

Website: www.tubular.co.za E-Mail: [email protected] Tel: (013) 690 2335/6/7/8 Tel: 0861 TUBULAR Fax: (013) 656 2408 Fax: (011) 450-2150

WITBANK PREMISES

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

FOCUS

To add value to our client’s business operation by improving productivity and reducing

costs, achieving the timeous and cost effective completion of their projects, whilst

maintaining Tubular Electrical & Instrumentation (Pty) Ltd stringent Safety and

Quality Control requirements.

Such is our confidence in our ability to deliver beyond our client’s expectations that we

are willing to negotiate remuneration whereby we are rewarded against guaranteed and

measurable service delivery.

Let us be of service to you, the client.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

INDEX

1. INTRODUCTION

2. SCOPE OF SERVICES

3. TUBULAR HOLDINGS (PTY) LTD –

GROUP PROFILE & PHILOSOPHY

4. QUALITY ASSURANCE

5. HUMAN RESOURCES

6. SAFETY MANAGEMENT

7. CURRENT & COMPLETED PROJECTS

8. COMPANY INFORMATION

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

1. INTRODUCTION

Tubular Electrical & Instrumentation (Pty) Ltd is a subsidiary of Tubular Holdings

(Pty) Ltd. Tubular Electrical & Instrumentation (Pty) Ltd has been established with the

intention of providing an Engineering and Construction service to the industry in the

Electrical & Instrumentation fields. Our target markets are the medium to heavy

construction in the Mining, Petrochem and Industrial sectors.

Tubular Electrical & Instrumentation (Pty) Ltd will complement Tubular Technical

Construction (Pty) Ltd and their respective experienced teams that have worked

together for the last 20 years creating a track record second to none.

Tubular Holdings Group will be able to tackle a total project from top of concrete

foundations to commissioning, i.e. Supply, Fabrication and Erection / Installation of

Structural Steel, Platework, Piping, Erection / Installation of Mechanical Equipment,

Supply and Erection / Installation of Electrics and Instrumentation.

Our current operations are primarily located in South Africa but we are structured and

geared to deliver our comprehensive range of services throughout Sub-Saharan Africa.

We apply the strategy of thinking globally but acting locally. This has proven to be an

essential practice, particularly when working in less sophisticated markets and less

than hospitable conditions.

Our mission is to deploy resources with the necessary skills to reshape and redefine

the parameters of the services that we provide. Our stance is to be proactive,

innovative and strive for the continuous improvement. This enables us to find new

ways of adding value to our client and boost staff productivity and morale.

We understand and are motivated by the reality that if we help our client win, we win.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

2. SCOPE OF SERVICES Tubular Electrical & Instrumentation (Pty) Ltd services the medium to heavy Mining,

Industrial, Manufacturing and Petrochemical Construction Industries both locally and

internationally.

The company specialises in:

- Supply, Installation and Commissioning of Electrical & Instrumentation Services

to the client’s requirements and specifications.

- Planning, Management & Execution of complete turnkey Electrical &

Instrumentation Projects.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

3. TUBULAR HOLDINGS (PTY) LTD

GROUP PROFILE & PHILOSOPHY

Tubular Holdings (Pty) Ltd is one of the largest and most respected privately owned

construction company’s in South Africa.

The group is engaged in the Construction, Engineering & Manufacturing sectors. Its

main source of income is derived from Construction, Manufacturing and related

operations in South Africa and adjacent countries.

The board of Tubular Holdings (Pty) Ltd provides direction on group objectives,

strategies and key appointments. Management and markets are focused by dividing

the group into activity related divisions which, in turn, are decentralised into

autonomous companies.

Training programmes, and a policy of promoting from within, have resulted in top

calibre management and highly motivated teams with strong loyalties. The benefits are

apparent in the many long – standing business relationships which exists and the

commitment of personnel to quality service.

The group demonstrates a practical concern for its customers and employees, as well

as for the well being of all the people of South Africa.

An emphasis on sustainable growth, to be attained through quality improvements,

human resource development and expansion in the defined areas of activity, augment

well for the groups continued prosperity.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TUBULAR HOLDINGS (PTY) LTD

Tubular Electrical & Instrumentation (Pty) Ltd - Supply, Installation & Commissioning of Electrical &

Instrumentation

Tubular Technical Construction (Pty) Ltd - Structural Steel, Platework, Piping Fabrication and Installation,

Erection of Mechanical Equipment, Planning and Execution of turnaround project.

Tubular Structural Engineering (Pty) Ltd Structural Steel and Platework Fabrication.

Tubular Construction Projects (Pty) Ltd - Steelwork, Piping, Mechanical, Electrical and Instrumentation

Installation related to Power Stations.

Tubular Plant Hire (Pty) Ltd - Hiring of Equipment, Plant and Transport.

Tubular Properties (Pty) Ltd

- Property Development and Administration.

Tubular Construções Technicas (Pty) Ltd (Angola)

- Steelwork, Piping Fabrication, Installation & Erection of Mechanical Equipment in Angola.

Tubular Metalo – Mecanica de Moçambique (Pty) Ltd - Steelwork, Piping Fabrication, Installation & Erection of

Mechanical Equipment in Mozambique.

Tubutech Zambia (Pty) Ltd - Steelwork, Piping Fabrication, Installation & Erection of

Mechanical Equipment in Zambia

TU

BU

LA

R H

OL

DIN

GS

(P

TY

) L

TD

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

4. QUALITY ASSURANCE &

QUALITY CONTROL

Tubular Electrical & Instrumentation (Pty) Ltd maintains a Quality Management

System in accordance to ISO 9001 / 2000.

Tubular Electrical & Instrumentation (Pty) Ltd management are committed to the

Quality Management Principles for leading and operating the organisation aimed at

continually improving performance by focussing on the requirements and needs of its

customers and all other role players. Furthermore, we expect to achieve our

accreditation for ISO 9001 / 2000 before the end of 2005.

All employees are entrusted with the responsibility for quality. Their skills are

developed through training and reinforced to maximize the potential synergy which

exists between them.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

5. HUMAN RESOURCES

1. INTRODUCTION

Tubular has a track record of sound industrial relations of which we are justifiably proud.

Prevailing labour legislation forms the basis of our operating procedures and policies. However, we view legislation as our minimum operating standard and have developed and implemented procedures and policies specifically geared towards ensuring harmonious work relationships which, in turn, contributes to the completion of major projects on time, within budgeted costs and with the least amount of disruption.

2. LEGISLATION

Tubular operates within the Electrical Contractors Association and the National Industrial Council for the Iron, Steel, Engineering and Metallurgical Industry. The Main Agreement with regards to wages and related substantial conditions of employment for our hourly paid employees, the basic conditions of Employment Act, OHS Act (Safety and Health) and the Labour Relations Act. Periodically, we enter into specific agreements (i.e. recruitment) with local organisations, such as social compact groups and local community structures in order to ensure that certain needs of labour in the geographical areas in which we operate are accommodated. Tubular, on an ongoing basis, participates in industry-wide contractor forums, i.e. SEIFSA, MEI, CEA, ECA etc. in order to keep abreast of industry developments.

3. TRADE UNIONS

Tubular is an active member of SEIFSA and ECA, and therefore supports bargaining at national level with all member trade unions.

4. TRAINING AND DEVELOPMENT 4.1 The Company is committed to the training and development of Human

Resources at all levels by investing in time and money. 4.2 Tubular supports the principle of upliftment of skills and multi-skilling of its

employees. Upgrading and upliftment of skills will form an integral part of our work/manpower utilisation on a planned and ongoing basis.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

4.3 Our philosophy is that the success of the Company depends on the quality of its people.

Upgrading of Category 2 and 3 employees to Category 4 semi-skilled

levels:

Upgrading of Category 1 labourers to Category 2 and 3 positions (mechanical, piping and rigging disciplines will be targeted in this respect).

5. AFFIRMATIVE ACTION

5.1 Special attention is paid to select candidates for training and advanced management courses to fulfil and meet the Affirmative Action Programme.

5.2 Assessments take into account their potential as their qualifications.

5.3 Tubular supports the notion that contractors should have a social

responsibility towards general upgrading of skills of local in the area where the project is located.

6. EMPLOYMENT EQUITY

6.1 As a designated employer, Tubular Electrical & Instrumentation (Pty) Ltd complies with the Employment Equity Plan (EEP). The company supports the blue print of action plans for hiring, training, developing, supporting and retaining members of AA groups with the goal of transforming the organisational structure to be more representative of the demographics of South Africa.

6.2 Tubular Electrical & Instrumentation (Pty) Ltd operates within the ambits

of the Electrical Contractors Association (ECA) Metal Industries Bargaining Council (MEIBC) which is guided by the Steel Engineering Industries Federation of South Africa (SEIFSA), the Main Agreement with regard to wages and related conditions of employment for hourly paid employees, the Basic Conditions of Employment (BCE), the Occupational Health and Safety Act (OHSACT) and the Labour Relations Act (LRA)

7. PARTICIPATE MANAGEMENT

7.1 Tubular Electrical & Instrumentation (Pty) Ltd promotes consultation meetings consisting of elected employee representatives and management to communicate all requirements on employments, safety and production issues.

8. Tubular Electrical & Instrumentation (Pty) Ltd is committed to promote team

work towards the goal of improving work relationships / conditions and therefore Quality of work.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

6. SAFETY MANAGEMENT 1. Safety within Tubular Electrical & Instrumentation (Pty) Ltd enjoys the highest

priority.

2. The company is committed to show its sincerity and interest in total control by

being willing to pay, in time or money, whatever the cost to prevent incidents

which results in physical harm or damages to property.

We actively seek not to meet recognised safety guidelines and regulations but to

exceed them.

3. The Occupational Health and Safety Act 85 of 1993 complies.

4. Administration

Tubular Electrical & Instrumentation (Pty) Ltd ensures that the following procedures are in place and systems operational on each construction site: 4.1 Appointments of responsible and subordinate persons 4.2 Appointment of Safety Representatives and First Aiders 4.3 Recording of incidents 4.4 Implementation of registers for special items 4.5 Recording of Safety meetings, etc. in terms of legislations and good

practice.

5. Site Management

5.1 Every Site Manager is motivated to achieve the highest safety standards through the reporting and evaluation process, action plans are formulated to achieve a zero accident rating.

6. TSTI System (Total System Task Instruction)

Tubular Electrical & Instrumentation (Pty) Ltd have adopted the TSTI System (Total Safety Task Instruction) as our grass roots safety programme.

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

7. CURRENT & COMPLETED PROJECTS

CONFEDERATION CUP Jhb/Pretoria May 09 – Jul 09

Supply, Erection, Installation and Testing of Electrical and Instrumentation Equipment

Engineers: Gigajoule/Aggreko

R 3 100 000.00 (3 Months)

AMANDELBULT A-FRAME

Amandelbult May 09 – Aug 09

The Supply and Installation of Electrical and Instrumentation at Amandelbult A-Frame Stockpile Project

Engineers: Vhumbanani Projects (Pty) Ltd.

R 9 800 000.00 (3 Months)

ZONDAGSFONTEIN COLLIERY

Witbank Apr 09 – Jan 10

The construction of the MV and LV reticulation for Zondagsfontein Colliery.

Engineers: Venn + Milford Incorporated (Pty) Ltd.

R 52 000 000.00 (10 Months)

ASA METALS (PTY) LTD

Burgersfort Jan 09 – Sep 09

Low Voltage Electrical and Instrumentation Installation for the A3 & A4 Furnaces for the A3 & A4 Smelter Expansion Project.

Engineers: Tenova Pyromet (Pty) Ltd.

R 47 000 000.00 (10 Months)

AUSENCO BATEMAN JOINT VENTURE (ABJV)

Zambia Aug 07 – Mar 08

Electrical and Instrumentation Installation for the Equinox Lumwana Copper Project

Engineers: Bateman (Pty) Ltd.

R 114 000 000.00 (7 Months)

ANGLO PLATINUM (PTY) LTD

Rustenburg Sept 09 – Oct 09

Electrical and Instrumentation Installation for the Mortimer Smelter Mud Guns Project Engineers: EHL Consulting Engineers (Pty) Ltd

R 1 750 000.00 (6 Weeks)

Potgietersrust May 07 – Oct 07

Electrical and Instrumentation Installation for PP Rust 600 KTPM Concentrator Project

Engineers: Vhumbanani Projects (Pty) Ltd

R 94 000 000.00 (6 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

Mortimer Jan 07 – Jun 07 Zwartklip Nov 07 – Dec 07

Electrical and Instrumentation Installation for Mortimer Main Consumer Substation Upgrade

Engineers: EHL Consulting Engineers (Pty) Ltd Electrical and Instrumentation Installation for Fraser Pump House

Engineers: EHL Consulting Engineers (Pty) Ltd

R 2 500 000.00 (5 Months)

R 1 200 000.00 (1.5 Months)

METUBA ENGINEERING & CONSTRUCTION (PTY) LTD

Buffelspoort Nov 06 – Jul 07

Electrical and Instrumentation Installation for Bokamosa Project

Engineers: Metix (Pty) Ltd.

R 36, 300 000.00 (8 Months)

INTERNATIONAL FERRO METALS SOUTH AFRICA (PTY) LTD

Mooinooi Aug 06 – Mar 07

The supply, installation and commissioning of 400 000 MTPY Pelletising & Sintering Plant – Control & Instrumentation Erection

Engineers: Bateman (Pty) Ltd.

R 13 000 000.00 (5 Months)

Mooinooi Aug 06 – Mar 07

The supply, installation and commissioning of 400 000 MTPY Pelletising & Sintering Plant – Installation and Erection of Electrical Equipment

Engineers: Bateman (Pty) Ltd.

R 22 000,000.00 (7 Months)

HOLCIM (SOUTH AFRICA) (PTY) LTD.

Dudfield Plant Feb 08 – Jul 08

The supply, installation and commissioning of Holcim Roodepoort Mill 8

Engineers: EPC Engineering & Projects Company Ltd

R 44 500 000.00 (9 Months)

Dudfield Plant Oct 06 – Jan 07

The supply, installation and commissioning of The Aumund Conveyors.

Engineers: TWP Consulting (Pty) Ltd

R 6 300,000.00 (10 Months)

Dudfield Plant Jan 06 – Oct 06

The supply, installation and commissioning of Mill No. 2 Upgrade.

Engineers: Holcim SA (Pty) Ltd

R 7 700,000.00 (3 Months)

HERNIC FERROCHROME

Brits Oct 05 - Current

Small Works Contract for the Furnace and Sinter Plants

R 14 200,000.00 (On Going)

Brits Jul 07

Furnace Number 1 Shutdown

R 320,000.00 (1 Week)

Brits Nov 07

Electrical and Instrumentation Installation for Hernic Mills

Engineers: Hernic Ferrochrome (Pty) Ltd

R2 300 000.00 (1 Month)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

PAST PROJECTS

ANGLO VAAL Hartebeestfontein GM

The design, supply and installation of two crushing, screening and sorting plants at No. 7 Shaft

R 5 100,000.00 (5 Months)

ANGLO PLATINUM / JCI / AMPLATS Mortimer

The Mortimer Concentrator - Union Section

R 3 630,000.00 (5 Months)

Potgietersrust

The supply and installation of the Concentrator Expansion Project

Engineers: - EHL Consulting Engineers

R 3 000,000.00 (4 Months)

Union Section

The Electrical Installation, Testing and Commissioning for the 4B and 4South Declines Barrel Extension at Union Section – Declines

Engineers: - EHL Consulting Engineers

R 8 020,000.00 (12 Months)

Waterval UG2 Section

Early Electrical & Instrumentation Installations for the Waterval Concentrator Retrofit Project.

Engineers: - Hatch Africa

R 4 000,000.00 (5 Months)

Union Section

The Electrical and Instrumentation Installation at Union Section for the Refrigeration Plant Upgrade Project.

Engineers: - I Control

R 2 200,000.00 (3 Months)

Waterval UG2 Section

The Electrical and Instrumentation Installation, for Waterval UG2 Section, Interim Waste Removal Plant Project.

Engineers: - RSV Consulting Engineers

R 2 100,000.00 (2 Months)

Union Section

The Electrical Installation for No. 4 South and 4 B Declines.

Engineers: - EHL Consulting Engineers

R 18 400,000.00 (18 Months)

Mortimer

The Electrical and Instrumentation Installation for Slag Flotation Project

Engineers: - HATCH AFRICA / EHL Consulting Engineers

R 3 000,000.00 (2 Months)

Waterval Apr 02 – June 02

The Electrical and Instrumentation installation and commissioning at Waterval for Reagents Plant Upgrade.

Engineers: - EHL Consulting Engineers

R 2 500,000.00 (2 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

Mortimer Jan 02 – March 03

Mortimer Expansion Project. 230 KTPM UG2 Concentrator Plant. Electrical and Instrumentation Installation

Engineers: - I CONTROL

R 21 890,000.00 (15 Months)

GOLD FIELDS OF S.A.

Libanon GM

The design and construction of a crushing and screening plant

R 1 730,000.00 (2 Months)

Northam Plats

The installation of racking and cabling for "BMR" Smelter and Concentrator Plants

R 3 814,000.00 (9 Months)

ANGLO AMERICAN President Brandt GM

H.T. and L.T. electrical reticulation for the materials handling and U/G reticulation at No. 5 Shaft

R 2 460,000.00 (3 Months)

Venetia

Recovery / Sorthouse - Supply and installation and architectural work

R 9 125,000.00 (7 Months)

Namdeb, Namibia

The supply and installation of a Floating Treatment Plant and the Wellfields Piping and pumping facility

R 4 100,000.00 (4 Months)

MONDI KRAFT

Richards Bay

The supply and installation for the Phase 1 Mill Rebuild at Felixton.

R 3 000,000.00 (4 Months)

Piet Retief

The supply and installation for the Phase 1 and 2 Mill Rebuild at Piet Retief.

R 6 000,000.00 (6 Months)

LONRHO Eastern Plats

Beneficiation Plant

R 6 710,000.00 (4 Months)

Eastern Plats

B Stream Plant

R 2 570,000.00 (3 Months)

Western Plats

New Smelter Plant and CCH Plant

R 5 090,000.00 (6 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

PHOSPHATE DEV. CORP LTD Phalaborwa

The supply and installation of a complete Slimes Handling Pump Station (TTPS No.4)

R 4 163,000.00 (4 Months)

Phalaborwa

The supply and installation of No. 8 Drier

R 2 480,000.00 (3 Months)

RICHARDS BAY MINERALS / GENMIN Richards Bay

Upgrading of the Zircon Plant

R 4 560,000.00 (4 Months)

Richards Bay

Area 901 Cone Settler and Clarifier

R 2 024,000.00 (2 Months)

Richards Bay

Upgrading of the MSP Plant

R 1 850,000.00 (3 Months)

Richards Bay

Uprating of Module D for the MSP Project

R 1 725,000.00 (5 Months)

Richards Bay

Uprating of Module E for the MSP Project

R 1 950,000.00 (6 Months)

Richards Bay

Furnace rebuild on Furnaces 1,2 and 4

R 1 400,000.00 (3 Months)

IMS PROJECTS Alusaf, Richards Bay

Green Anode Paste Plant

R 9 459,976.00 (7 Months)

Alusaf, Richards Bay

Bath Recycling Shop and Fluorinated Product Handling

R 2 452,548.00 (5 Months)

CIMENTOS DE MOZAMBIQUE

Maputo

The Electrical and Instrumentation upgrade and rehabilitation of the Cement Plant in Maputo

R 15 302,327.00 (10 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

SAMANCOR Witbank

Granulation Plant

R 2 200,000.00 (2 Months)

Witbank

Palletising & Pellet Handling Plant

R 7 500,000.00 (7 Months)

Witbank

Furnace 5 Rebuild

R 2 700,000.00 (2 Months)

Witbank

Small Works Contracts

R 2 300,000.00 (12 Months)

HATCH AFRICA Richards Bay

Upgrade of Pond 'A'

R 7 000,000.00 (6 Months)

Zimbabwe

Furnace Rebuild at Hartley Mine

R 1 000,000.00 (2 Months)

DE BEERS Venetia

Sundry Works Contract Recovery and Sorthouse Buildings

R 4 600,000.00 (5 Months)

Jwaneng, Botswana

In-Pit Crusher

R 4 000,000.00 (4 Months)

Jwaneng

Conveyor Extensions

R 600,000.00 (2 Months)

Koffiefontein

New Scrubbing and Screening Plant

R 2 300,000.00 (5 Months)

FCB – FRANCE

Maputo

Green Anode Paste Plant

R 16 000,000.00 (2 Months)

Maputo

Bath Recycling Plant

R 4 500,000.00 (4 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

SNC LAVALIN – EMS / MURRAY & ROBERTS/ ALPROM

Maputo / Richards Bay

Potline Electrical and Automation System at Mozal

R 11 000,000.00 (2 Months)

Maputo

Potline Electrical for Racking & Lighting at Mozal

R 15 000,000.00 (12 Months)

Mozambique

Supply and installation and commissioning Rough Electrical Installation at Mozal for the Mozal Expansion Project. Engineers: - SNC LAVALIN – Murray & Roberts

R 16 000,000.00 (8 Months)

Mozambique

Supply and installation and commissioning of the Main E&I Installation at Mozal for the Mozal Expansion Project. Engineers :- SNC LAVALIN – Murray & Roberts

R 13 100,000.00 (10 Months)

PORTNET

Richards Bay

Phase 1 & 4 Washwater

R 10 000,000.00 (12 Months)

I H M

Richards Bay

Primary Wet Plant - Hillendale Mine

R 8 500,000.00 (7 Months)

ANGLO COAL

Bank Colliery

The Electrical & Instrumentation Installation for Block 10 & Wren Plant at Bank Colliery.

Engineers: - Semane Electrical Consultants (Pty) Ltd

R 2 300,000.00 (2 Months)

Bank Colliery

The Electrical installation and commissioning for the 5 Seam Plant at Bank Colliery.

Engineers: - Semane Electrical Consultants (Pty) Ltd

R 2 950,000.00 (6 Months)

WESTERN AREA PLACER DOME JOINT VENTURE

South Deep Jan 2004 – March 2004

The Electrical installation and commissioning of the Surface Conveyors at Twin Shafts South Deep Project.

Engineers: - Hatch Africa

R 7 500,000.00 (8 Months)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

South Deep Nov 2003 – June 2004

The Electrical & Instrumentation installation and commissioning of Surface Refrigeration & BAC Plant Electrical at Twin Shafts South Deep Project.

Engineers: - Hatch Africa

R 3 200,000.00 (3 Months)

SCAW METALS

Scaw Metals Nov 2003 – Jul 2004

The Electrical Installation for the Main Sub Mill Scaw Eskom Upgrade at Scaw Metals.

Engineers: - Semane Electrical Consultants (Pty) Ltd

R 2 400,000.00 (9 Months)

HERNIC FERROCHROME

Hernic Ferrochrome March 2005 – Aug 2005

The Electrical and Instrumentation Installation for the F4PS2 Project at Hernic Ferrochrome.

Engineers: - Metix (Pty) Ltd

R 20 600,000.00 (6 Months)

Hernic Ferrochrome July 2004

The Electrical Installation of 1600m 7,2KV 70mm2 XLPE 3 Core Cable at Hernic Ferrochrome.

Engineers: - Hernic Ferrochrome (Pty) Ltd

R 400,000.00 (2 Weeks)

RAND REFINERY LIMITED

Rand Refinery July 2004 – Sep 2004

The Electrical Installation for the Work Substation Upgrade at Rand Refinery Limited.

Engineers: - PN Electrical Consultants cc

R 1 650,000.00 (10 Weeks)

IMPALA PLATINUM LIMITED

Impala July 2004 – Sep 2004

The Electrical and Instrumentation Stripping out and Installation for the West Side Crusher at Impala Platinum Limited.

Engineers: - Hiprom

R 1 600,000.00 (3 Months)

AFRICAN RAINBOW MINERALS Dwaarsrivier July 2004 – Sep 2004

The Electrical and Instrumentation Installation for the Dwaarsrivier High Rate Clarifier.

Engineers: - TWP

R 400,000.00 (1 Month)

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

TTUUBBUULLAARR EELLEECCTTRRIICCAALL && IINNSSTTRRUUMMEENNTTAATTIIOONN

THE CONSTRUCTION PROFESSIONALS

8. COMPANY INFORMATION

REGISTERED NAME

Tubular Electrical and Instrumentation (Pty) Ltd

REGISTRATION NO.

2005/034475/07

VAT REGISTRATION NO.

4630223545

LOCATION AND POSTAL ADDRESS

8 Hawley Road, Bedfordview 2007 PO Box 75647, Gardenview, 2047

TELEPHONE NO.

011 553-2000

FAX NO.

011 458-4683

EMAIL ADDRESS

[email protected]

CONTACT PERSONS

Eddie Nunes

Managing Director 083 271 3700

Anna Lawrie

PA/Secretary 083 348 1207

Paulo Fonseca

Proposals 072 730 7384