85
i TWELFTH FIVE YEAR PLAN (2018-2023) Thimphu Thromde

TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

i

TWELFTH FIVE YEAR PLAN

(2018-2023)

Thimphu Thromde

Page 2: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

ii

Page 3: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

iii

Twelfth Five Year Plan Document

© Copyright Gross National Happiness Commission (2019)

Published by: Gross National Happiness Commission, Royal Government of Bhutan.

ISBN: 978-99936-55-04-6

ISBN: 978-99936-55-05-3

Page 4: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

iv

“Looking ahead, we have a new five-year plan, and a great number of

responsibilities of national importance before us. We must work together in order

to build an extraordinary, strong, secure, and peaceful future for Bhutan.”

His Majesty The Druk Gyalpo

111th National Day, Samtse, 17th December, 2018

Page 5: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

v

PRIME MINISTER 2nd February, 2019

FOREWARD

The 12th Five Year Plan (FYP) commences amid numerous auspicious occasions that hold special

significance for all Bhutanese. Our Nation celebrated the 12th year of glorious reign of His Majesty

The Druk Gyalpo and 111 years of the institution of Monarchy and nation building. The nation

continues to enjoy the blessings of Yabjey-Damba, His Majesty The Fourth Druk Gyalpo. It

witnessed the 22nd year of tireless service by His Holiness the 70th Je Khenpo for the wellbeing

of the country and its people. The Nation’s Son, His Royal Highness The Gyalsey Jigme Namgyel

Wangchuck continues to be a source of unbounded joy for all Bhutanese citizens. The Third

Parliamentary election was successfully held with increased people’s participation in the electoral

process. That the Election Commission of Bhutan and Bhutan Broadcasting Service were

conferred well-deserved high awards by His Majesty The Druk Gyalpo reflects their eminent role

in the success of the elections. In addition, Bhutan will be graduating from the list of Least Developed Countries (LDC) by 2023.

Meeting the eligibility criteria for graduation is a testament of the hard work of the people of

Bhutan with the support of key development partners. Even though Bhutan has fulfilled the two

required indicators for graduation, the fact that we are yet to cross the threshold for economic

vulnerability is a source of concern. It is a reminder of the work that remains to address the last

mile challenge of development and ensure continued progress towards creating an inclusive and

prosperous Gross National Happiness (GNH) state. The 12th FYP will be Bhutan’s last five year

plan as an LDC. At this critical stage in our development history, Bhutan looks to the

continued support of all its development partners to implement the 12th FYP. It is also a call to

all public servants, the private sector, civil society organisations and citizens to work together to

achieve the noble aspirations of the 12th FYP and live up to the trust bestowed on each one of us

by His Majesty The Druk Gyalpo.

With the objective of Just, Harmonious and Sustainable Society through enhanced

Decentralisation, the 12th FYP and its 17 national key result areas are drawn from the timeless

vision and wisdom emanating from the Golden Throne. Reflecting Bhutan’s status as an active

member of the global community, it also takes into consideration the Sustainable Development

Goals and other regional and international commitments. The Plan has been shaped by extensive

consultations held over a period of two years with wide ranging groups of stakeholders. The

outcome is a 12th FYP that is a National Development Plan reflecting the aspirations and concerns

of the people of Bhutan. Pledges of elected Government as well as selected pledges of the other

three political parties have been incorporated into the Plan following rigorous assessment. Lessons

learnt from 11th FYP have also proved useful in changing how we plan and implement better.

Page 6: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

vi

The 12th FYP formulation, execution and implementation are underpinned by the principles of

coordination, consolidation and collaboration to achieve greater gains. True to the objective

of enhancing decentralisation, resources have been doubled for LGs in the 12th FYP

compared to 11th FYP resulting in an equal share of capital resources as the Central

Agencies. The Division of Responsibilities Framework has also been revised to provide greater

decentralisation of roles, functions and authority to the local governments. Another new

feature of the 12th FYP is the Government’s flagship programmes that aims to address issues

of national priority. The programme areas have been chosen to ensure that critical issues such as

youth unemployment, water security and poverty reduction are addressed in a coherent manner

within a five year period.

Unlike past plan periods, the 12th FYP period commences from 1st November, 2018 and will

end on 31st October, 2023 in order to align with the Government’s tenure. Implementation

will be rigorously monitored through the government performance management system to ensure

that results are achieved. Progress will be reviewed during the annual and mid-term reviews to

ensure that corrective measures and mid-course corrections are made in a timely manner.

The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the

part of the over 54,000 public servants across the country. It sets out an ambitious agenda and will

be the biggest plan implemented thus far with an outlay of Nu. 310 billion, an increase of nearly

38 percent over the 11th FYP. An inclusive plan has been formulated, adequate resources

mobilised with qualified public servants to implement the activities. All required causes and

conditions are in place to ensure that what has been planned can be delivered. I take this

opportunity to call upon all Bhutanese as well as our development partners, civil society

organisations, political parties, private sector and other stakeholders to work together to build a

strong, secure and peaceful future for our nation.

TASHI DELEK.

(DR. LOTAY TSHERING)

CHAIRPERSONOF THE GNH COMMISSION

Page 7: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

vii

Table of Contents

1. BACKGROUND .......................................................................................................................................... 1

2. THROMDE MAP ............................................................................................................................................. 1

3. THROMDE AT A GLANCE .............................................................................................................................. 2

4. KEY STRATEGIES ................................................................................................................................... 6

5. RESOURCE ALLOCATION FORMULA (RAF) THROMDES .................................................................................. 7

6. RATIONALE AND EXPENDITURE OBJECTIVES OF CAPITAL GRANTS ALLOCATED UNDER EACH CRITERIA AND

SUB-CRITERIA OF RAF ............................................................................................................................................ 8

7. RESOURCE ALLOCATION (CAPITAL GRANTS SHARE) OF THROMDE .............................................................. 12

8. LOCAL GOVERNMENT KEY RESULT AREAS (LGKRAS) AT A GLANCE .............................................................. 12

9. LGKRA 1: GAINFUL EMPLOYMENT CREATED AND LOCAL ECONOMY ENHANCED (2 KPIS) ............................ 13

9.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 14

14.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 16

15. LGKRA 2: LIVABILITY, SAFETY AND SUSTAINABILITY OF HUMAN SETTLEMENTS IMPROVED (18 KPIS) ......... 18

10.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 22

10.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 24

11 LGKRA 3: TRANSPARENT, EFFECTIVE AND EFFICIENT PUBLIC SERVICE DELIVERY ENHANCED (3 KPIS) .......... 31

11.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 32

11.1 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 34

12 LGKRA 4: QUALITY OF EDUCATION & SKILLS IMPROVED (8 KPIS) ................................................................ 36

12.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 38

12.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 40

13. LGKRA 5: HEALTH AND NUTRITION OF THROMDE RESIDENTS ENHANCED (6KPIS) ...................................... 45

13.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 47

13.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 49

14. LGKRA 6: CULTURE & TRADITIONS PRESERVED AND PROMOTED (6 KPIS) .......................... 52

14.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 54

14.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 55

15. LGKRA 7: CARBON NEUTRAL, CLIMATE AND DISASTER RESILIENT DEVELOPMENT ENHANCED (4 KPIS) ....... 57

15.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 58

15.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 60

16. LGKRA 8: GENDER EQUALITY PROMOTED, WOMEN AND GIRLS EMPOWERED (6KPIS) ................................ 62

16.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 64

16.2 PROGRAM OUTPUT MATRIX.............................................................................................................................. 66

Page 8: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

viii

17. LGKRA 9: DEMOCRACY & DECENTRALIZATION STRENGTHENED (4 KPIS) ..................................................... 68

17.1 PROGRAMME SUMMARY AND STRATEGIES ........................................................................................................... 70

17.2 PROGRAMME OUTPUT MATRIX ......................................................................................................................... 72

18. PROGRAMME MONITORING AND EVALUATION PLAN ................................................................ 74

19. COLLABORATING AGENCIES AND REQUIREMENTS ...................................................................................... 75

20. COMMON MINIMUM INFRASTRUCTURES ................................................................................................... 77

Page 9: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

1

1. Background

Thimphu Thromde is the capital City of Bhutan. It has seven Demkhongs with a total area of 26

square kilometers. As per the Population and Housing Census of Bhutan 2017 (PHCB 2017) the total

population of Thimphu Thromde is 114,551 which is about 15.6 percent of the total national

population. This number excludes the 2535 numbers of non-Bhutanese/tourists recorded on the

census day in Thimphu. The total urban population of Bhutan is 274,316 (PHCB 2017) and

Thimphu Thromde alone contributes 41.8% to the total national urban population. Thimphu City

is spread in the valley on either side of the Wangchu River.

2. Thromde Map

S e r b i t h a n g

B a b e s a

S i m t o k h a

L u n g t e n p h u

C h a n g B a n g

C i t y C o r e

L a n g j o p h a k a

H e j o J o n g s h i n a

T a b

D e c h e n c h o l i n g

Page 10: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

2

3. Thromde at a glance Indicators Status Source of Data/Remarks

Mean Annual Household Income 100000-150000

Poverty Rate 0.4% PAR 2017

Employment rate 93.6% (i.e. unemployment rate for urban

Thimphu is 6.4%) PHCB 2017

Male 94.9% (i.e. unemployment rate for

Thimphu urban area is Male – 5.1%) PHCB 2017

Female 91.4% (i.e. unemployment rate for

Thimphu urban area is Female – 8.6%) PHCB 2017

Total resident population 114551 (Excluding 2535 Non-

Bhutanese/Tourists PHCB 2017 (Average HH

size is 4.2) Male 58996

Female 55555

Total number of buildings 6190 (Updated in the system as of Dec.

2018)

Revenue Management

System, ICT

Area (sq. km) 26 Sq.Km TSP

Forest Cover (%) 30% Greens areas (This include E1, E2,

E3, E4, G1 and G2 precincts) SEA for TSP

Number of Hospital

1. JDWNRH,

2. Lungtenphu RBA,

3. IBF Hospital

4. NITM

5. DANTAK Health Post (Babesa) Ministry of Health

Number of Basic Health Units Grade I 1. Dechencholing BHU I

Number of Basic Health Units Grade II 1. RBP Health Dispensary

Number of Out Reach Clinics

1. CHD-JDWNRH (1. Babesa Zero

point, 2. Babesa Primary School,

3. Serbithang, 4. DANTAK

Canteen, Babesa)

Ministry of Health

Number of Satellite clinics

1. Changjiji

2. Hejo

3. Motithang

Ministry of Health

Number of nurses

472 in JDWNRH and 4 in Thimphu

Dzongkhag (excluded Gidakom

Hospital)

Ministry of Health Number of HA

34 in JDWNRH and 25 in Thimphu

Dzongkhag (Excluded Gidakom

Hospital)

Number of Doctors

171 including 72 specialists in

JDWNRH and one Doctor in

Dechencholing BHU I (Excluded

Gidakom Hospital)

Number of buildings/houses with safe &

24X7 drinking water supply 4529 metered buildings/houses Administrative Data/ID

Number of functional Water Supply

Schemes

1. Motithang WTP

2. Junghzhina WTP

3. Dechencholing WTP

Thromde Administrative

Data

Page 11: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

3

Indicators Status Source of Data/Remarks

4. Megaypang WTP

5. Ground water scheme in

Changbangdu

6. Dodeyna Central Water Supply

Scheme (DCWSS) – Will be

commissioned February 23

2019

Number of households with PF toilets

24226 HHs (Out of 25408 HHs

surveyed, 24226 HHs have toilets with

some kind of flush system)

PHCB, 2017

Enrolment rate 96.9 % (Percentage of children aged 6-

12 currently attending School/Institute) PHCB 2017

Extended Classrooms Nil TEO Office

ECCD Centre

1. Community ECCD – 3

2. Workplace ECCD – 2

3. Private ECCD - 21

TEO Office

Primary schools 5 (Govt.) + 8 (Pvt.) = 13

11th MTR Document, TEO

Office

Lower secondary schools 5 (Govt.) + (No Pvt.) = 5

Middle secondary schools 6 (Govt.) + 2 (Pvt.) = 8

Higher secondary schools 3 (Govt.) + 5 (Pvt.) = 8

Autonomous School

9 (YHS, Lungtenzampa MSS, Jigme

Losel PS, Jigme Namgyal LSS,

Motithang HSS, Dechencholing HSS,

Babesa MSS, Changangkha MSS and

Rinchen Kuenphen PS)

Number of Students 18413 (Govt.) + 5392 (Pvt.) = 23805

TEO Office Male 8956 (Govt.) + 2629 (Pvt.) = 11585

Female 9457 (Govt.) + 2763 (Pvt.) = 12220

Number of Non-Formal Education

(NFE)Centers 21 (PLC, BLC) + 2 (CLC) = 23

Annual Education Statistics,

2018, TEO Office

Number of teachers 892 (Govt.) + 363 (Pvt.) = 1255

TEO Office Male 243 (Govt.) + 156 (Pvt.) = 399

Female 649 (Govt.) + 207 (Pvt.) = 856

Number of students per teacher (Student

Teacher Ratio)

97% (calculated as Number of Schools

with STR less than or equal to 24)

Annual Education Statistics

2018, Teo Office

Number of NFE Learners 287 (BLC Learners-200 + PLC Learners-

65 = CLC - 22)

Male 2

Female 285

No of NFE instructors 25

Male 3

Female 22

Number of Constituency 7 Administrative Data

Number of female TT members 2

Number of Bridges

20 (Dechencholing, Dechen Zam,

Heydrong bridge, Near EoI,

Lungtenzampa, Fly over bridge,

Changjiji bridge, 3 in Olakha, Babesa

Zero, Bridge leading Debsi and 2 Shhing

Thromde administrative data

Page 12: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

4

Indicators Status Source of Data/Remarks

Zams, 1 at Jungzhina, 1 at Semtokha, 1

at RTC junction, 1 at NITM)

Kilometers of footpath 47

Kilometers of urban roads 270

Kilometers of cycling lanes 1Km along Doebum Lam

Number of Common service ducts

1. Express way – 6.2 KM

2. Langjuphakha – 237m

3. Sunday market – 327 m

4. Changzamtog – 936 m

5. Jangchub Lam – 343 m

6. Changangkha – 347 m

7. RICB Colony – 379 m

8. DPH (Changzamtog) till

Motithang – 3.8 KM

Road & Bridge Section, ID

Number of parking spaces 4 wheelers – 2479, 2 wheelers - 139 Thromde administrative

Data

Number of Local Area Plan 14 UPD

Number of government owned

lhakhangs/temples

8 (Changangkha, Norzin temple, Dolma

Lhakhang, Changjiji, Bab Lhakhang,

Tandin Nye, Dechenphodrang, Mitrhup

Lhakhang at Hejo,

Thromde administrative

Data

Number of community owned lhakhangs

/temples

Samarzingkha Lhakhang, Jungzhina

Lhakhang

Thromde administrative

Data

Number of privately owned lhakhangs

/temples

2 (Near CFM Zangdopelri and 1 at

Changzamtog)

Thromde administrative

Data

Number of chortens 40 11th FYP MTR report

Sports facilities by types

Archery Range

15 (2 in Changlingmethang, above YHS

School, Motithang, 2 in Hejo, 2 in

Dechencholing, 3in Changbangdu, RTC,

Olakha, Near Truck Parking (Debsi

bridge), Semtokha)

Thromde administrative

Data

Open Gym Area

10 (Dechencholing, Taba, 2 in

Sangaygang, YDF, Chubachu, 2 on way

to Kuenselphodrang, YHS synthetic

ground), Babesa, Coronation park

Thromde administrative

Data

MP Halls YDF hall and Babena Sports Centre Administrative Data

Football grounds

3 (Changlingmethang, Chagjiji and

Serbithang (pvt.), futsal in

Changlingmethang and Babesa (Pvt)

Thromde administrative

Data

Basketball Courts

Swimming Pool Complex,

Changlingmethang Stadium, Olakha

Children Park, Dechencholing Park,

IMTRAT, Lungtenphu (Pvt), Thimphu

Primary School (pvt.)

Thromde administrative

Data

Children’s Parks

1. Clock Tower

2. Motithang Ozone Park

3. Centenary Park

4. Thai Pavilion Park

Thromde administrative

Data

Page 13: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

5

Indicators Status Source of Data/Remarks

5. Eco Park at YDF

6. Tarayana Park

7. Olakha Park

8. Dechencholing Park

9. Babena Park

10. Ludrong Park

11. Taba park

12. Botanical Garden

13. Changjiji Park

14. BCCI park

Number of Bus stops

1. Motithang

2. Opposite to Jojo’s Building

3. 2 Near Chubachu School

4. Babesa below IT park

5. Changjiji

6. 4 along express way

Annual Information Bulletin

2018, MoWHS

Number of city buses Fleet Size -48 (2017) Kuensel Online

Number of Bus/ Taxi terminal 4 Thromde administrative

Data

Bus Terminal 1+1 (Lungtenzampa bus terminal and

City Bus Terminal)

Thromde administrative

Data

Taxi Terminal 2 (Changlingmethang and Near Bus

Terminal)

Thromde administrative

Data

Number of EV vehicles 19 (Registered as of June 2018 for

Thimphu)

Statistical Yearbook of

Bhutan 2018

Number of EV charging stations 1 (Near JDWNRH)

Number of Public libraries 2 (National Library and JDW Public

Library)

Number of vegetable markets 3 (CFM, Hejo and Changbangdu)

Page 14: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

6

4. Key Strategies

In the 12th FYP, key strategies are

1. Develop and improve critical infrastructures and ensure standards and quality;

2. Strengthen human resource capacity and ensure its effective and efficient management;

3. Promote and strengthen entrepreneurship and enterprises of all types;

4. Identify and strengthen critical capacity and skills and ensure its effective and efficient

management and utilization;

5. Identify land in collaboration with National Land Commission during the plan preparation

phase to develop/facilitate development of infrastructure for

business/enterprises/industries/service centers and for other social development;

6. Identify issues, opportunities and mitigating interventions related to cross-cutting issues and

themes such as gender, climate change, environment, disaster, poverty, population and

vulnerable and disabled people etc. during plan and strategy formulation;

7. Tap incentives and various sectoral support available in various policies such as EDP, Fiscal

Incentives Policy, Thromde Finance Policy, CSMI Policy etc. for local development and

economic/business growth;

8. Increase contracting and outsourcing of works and services and ensure quality and value for

money;

9. Explore different revenue sources to become self-sustaining;

10. Ensure that the mandatory indicators related to corruption reduction namely, work integrity &

leadership culture index, corruption, transparency & accountability index, and administrative

sanction against public officials as KPIs in the Annual Performance Agreement in addition to

ensuring that the measures to reduce corruption are strengthened and implemented.

Page 15: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

7

5. Resource Allocation formula (RAF) Thromdes

Criteria Sub-criteria Description/Indicator

1. Population

(15%)

Population (10%)

Number of resident populations of the Thromde (PHCB,

2017)

Population density (5%)

Inverse

Number of resident populations per area (sq.km) of Thromde

(PHCB, 2017 & Thromde Administrations)

2. GNH Index

(10%)

GNH Index (10%)

Inverse

Level of happiness and general wellbeing of the population in

the Thromde (GNH Survey Report, 2015)

3. Health (30%)

Unreliable water supply

(20%)

Number of households without access to reliable water

(unavailability of water at least during the critical time 5AM-

8AM, 11AM-2 PM and 5PM-9PM and adequate for washing

and cooking) in the Thromde (PHCB 2017)

Unhygienic sanitation

(10%)

Number of households without access to improved sanitation

facilities (households without pour flush, ventilated improved

pit, pit latrine with slab and composting toilet) in the

Thromde (PHCB 2017)

4. Education

(15%)

Students performance

(15%)

Inverse

Pass percentage (40%) of students in class X in BCSE (Pupil

Performance Report, 2018, BCSEA) in Thromde

5. Culture (5%)

Cultural participation

(5%)

Inverse

Average number of days of participation in socio-cultural

activities in the Thromde (GNH Survey Report, 2015)

6. Environment

(15%)

Air pollution (5%)

Number of people discontented with air pollution in the

Thromde (PHCB, 2017)

Waste disposal and litter

(10%)

Number of people affected by inadequate waste disposal sites

or littering in the Thromde (PHCB, 2017)

7. Safety (10%)

Crime and violence (3%)

Number of people discontented with crime and violence in

the Thromde (PHCB, 2017)

Traffic congestion (5%)

Number of cars per population in the Thromde leading to

traffic congestion (PHCB, 2017 & RSTA Administrative

Data)

Page 16: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

8

6. Rationale and expenditure objectives of capital grants allocated under

each criteria and sub-criteria of RAF

Sl. No. Criteria Weightage (%) Amount

(Nu. in million)

1. Population 15 962.59

2. GNH Index 10 209.57

3. Health 30 1991.47

4. Education 15 370.52

5. Culture 5 153.11

6. Environment 15 595.90

7. Safety 10 353.28

4636.44

Figure 1: Allocation based on RAF criteria and weightage for Thromde

1. Population is the first criteria used for resource allocation for Thromde ‘A’s, and is measured

by two sub-criteria; 1. Number of resident populations, and 2. Population density. The grant

allocated under sub-criteria 1 and 2 for Thimphu Thromde are Nu.720.04 million and

Nu.242.55 respectively.

Under sub-criteria 1, larger the number of resident populations in the Thromde, more resource

is allocated. Allocation of grant under this sub-criterion offers the best possible equal per

capita resource allocation, in an objective and transparent manner, which correlates to

developmental issues and needs faced by the resident population. The grant is allocated to

encourage and direct Thromdes to invest in priority interventions to develop and improve urban

962.59

209.57

1991.47

370.52

153.11

595.9

353.28

Allocation for Thromde (Nu. in Million)

Population (15%)

GNH Index (10%)

Health (30%)

Education (15%)

Culture (5%)

Environment (15%)

Safety (10%)

Page 17: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

9

infrastructure, amenities and facilities, which are also disaster-resilient. It is also to improve

quality, speed and effectiveness of public service delivery and addressing citizens’ grievances,

encourage industries, reduce urban poverty, create urban employment, and make urban

settlements clean, beautiful and livable.

Sub-criteria 2 is unique and is calculated as ‘inverse of population density’, whereby Thromdes

with higher population density receive lesser resource. The rationale behind this being that,

generally the cost of providing utility services declines as population density increases due to

economies of scale. For example, denser settlements which is due to human settlement in every

available space in the Thromde, has the potential for large scale production and low-cost

distribution thereby bringing about greater economies of scale. Infrastructure is spread over

shorter distances per unit of output, thereby requiring lower maintenance costs and preventing

loss of resources (such as water and electricity) as well as lowering both unit production and

distribution costs. Grant allocation under this sub-criterion is to encourage and direct the

Thromdes to invest in achieving inclusivity, connectedness and cost-effective provision of

infrastructure, facilities and utility services benefiting majority of the urban population.

2. GNH index which reflects the level of happiness and general wellbeing of the urban population

from the lens of nine domain is the second criteria used for resource allocation for Thromde

‘A’s. The grant allocation under GNH Index for Thimphu Thromde is Nu.209.57 million.

Inverse of GNH Index is used for resource allocation, whereby less happier Thromdes receive

more resource.

The grant is allocated to encourage and direct Thromde to invest in priority interventions to

enhance conducive conditions and provide holistic development support to improve well-being

and happiness of the people. Focus will particularly be on less happy people such as women,

widowed, divorced or separated people, less educated, unemployed people especially youth

and disabled, and in improving psychological well-being (anger, frustration, spirituality),

community vitality (belonging), and cultural diversity (Driglam Namzha), which have suffered

significant reduction in sufficiency in the Thromde. Provision of awareness, education,

innovative activities and other urban support like child-care creches, ECCDs, non-formal

education, etc. are priorities requiring attention.

Page 18: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

10

3. Health is the third criteria for resource allocation and is measured by two sub-criteria namely;

1. Number of households without access to reliable water for drinking, washing and cooking,

and 2. Number of households without access to improved sanitation facilities, in the Thromde

area.

The grant allocation under sub-criteria 1 for Thimphu Thromde is Nu. 1332.36 million, which

is the highest allocation compared to other sub-criteria, reflecting severity of drinking water

issues in Thromde. Grant allocation under sub-criteria 2 is Nu. 659.11 million, which is to

encourage and direct Thromde to invest in priority interventions to provide 24x7 safe drinking

water for all within 12 FYP, reliable water for washing and sanitation, and quality drainage,

sewerage and waste management system.

Thromdes experiencing more unreliable water supply and more unhygienic sanitation will

receive more resource.

4. Education is the fourth criteria for Thromde resource allocation and is measured by sub-

criteria, Students’ Performance in class X in BCSE’. The grants allocation under this sub-

criterion for Thimphu Thromde is Nu.370.52 million. The inverse of education criteria is used,

which means more resource is allocated to Thromdes with lower students’ performance.

The grant is allocated to encourage and direct Thromde to invest in priority interventions to

enhance and achieve education access and quality, professional development of teachers,

improve school infrastructure and services particularly required toilet ratio for boys and girls,

promote school agriculture, enhance student’s performance, learning outcomes, and prepare

students for job market. Focus will also be given to support out-of-school children in the

Thromde to ensure their school attendance and completion.

5. Culture is the fifth criteria used for resource allocation and is measured by sub-criteria:

Average number of days of participation in socio-cultural activities in the Thromde, and grant

allocation for Thimphu Thromde under this criterion is Nu. 153.11 million. The inverse of

criteria is used, which means more resource is allocated to Thromdes with lower average

number of days of participation in social-cultural activities.

Page 19: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

11

Cultural preservation, promotion and participation by people in cultural activities are important

aspects of our unique identity and social fabric influencing community vitality. The grant is

allocated to encourage and direct Thromde to invest in priority interventions, especially

preservation and promotion of any intangible culture and tradition in the Thromde. Cultural

practices, traditions and values that may get diluted or lost need to be preserved and promoted

through documentation, awareness and education on folk songs and stories, dances and local

festivals, our unique identity and features of settlements, and social, family and neighbor

cohesion. Important interventions would also be to improve psychological well-being

(spirituality), community vitality (belonging) and cultural diversity (Driglam Namzha), which

have suffered significant reduction in sufficiency so far in the Thromdes. Volunteerism,

participation in socio-environment, cultural activities and programs will also be promoted to

foster a healthy, responsible and vibrant community.

6. Environment is the sixth criteria used for resource allocation, and is measured by two sub-

criteria, namely: 1. Number of people affected by inadequate waste disposal sites or littering

in the Thromde, and 2. Number of people discontented with air pollution in the Thromde. The

grant allocation under sub-criteria 1 and 2 for Thimphu Thromde is Nu. 198.73 million and

Nu.397.17 million respectively. Higher the number of people affected by waste and litter and

higher the number of people discontented with air pollution, higher the resource allocation to

Thromdes.

An increase in population and urbanization in Thromde brings about increase in construction

activities, number of vehicles, waste generation and pollution of air, land and water. The grant

is allocated to encourage and direct Thromde to invest in priority interventions to institute

proper waste disposal and management system. In particular it will promote waste segregation,

reduction, reusing, recycling, eco-friendly construction and make towns and settlements green,

clean and beautiful through awareness and education.

7. Safety is the seventh and last criteria for Thromdes’ resource allocation, and is measured by

two sub-criteria, namely: 1. Number of people discontented with crime and violence in

Thromde; and 2. Congestion (Number of cars per population) in Thromde. The grants

allocation under sub-criteria 1 and 2 for Thimphu Thromde is Nu.198.47 million and Nu.154.81

Page 20: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

12

million respectively. Thromdes receive more resource allocation for more urban crime and

violence, and more numbers of cars per population.

As the population grows and modernizes, and urbanization sets in the Thromdes, there are

increasing social, economic and livability problems. The grant is allocated to encourage and

direct Thromde to invest in priority interventions to develop and improve community

infrastructure, recreational and entertainment facilities, and conduct educational activities and

volunteerism to reduce and deter crime and violence. Focus will also be need to place on

promoting and developing efficient and good public transport system, managing traffic and car

congestion, designating appropriate vehicle parking spaces, and roads, pedestrian and bi-

cycling trails.

7. Resource Allocation (Capital Grants share) of Thromde

Sl.

No Thromde

Capital Grant Share (Nu. in Million) Total

RAF CMI

1 Thimphu 4,636.44 30 4,666.44

8. Local Government Key Result Areas (LGKRAs) at a Glance

1. LGKRA 1: Gainful employment created and local economy enhanced

2. LGKRA 2: Livability, safety and sustainability of human settlements improved

3. LGKRA 3: Transparent, effective and efficient public service delivery enhanced

4. LGKRA 4: Quality of education & skills improved

5. LGKRA 5: Health and nutrition of Thromde residents enhanced

6. LGKRA 6: Culture and traditions preserved and promoted

7. LGKRA 7: Carbon neutral, climate and disaster resilient development enhanced

8. LGKRA 8: Democracy and decentralization strengthened

9. LGKRA 9: Gender equality promoted, women and girls empowered

Page 21: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

13

9. LGKRA 1: Gainful employment created and local economy enhanced (2 KPIs)

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

1. Macroeconomic

stability ensured

2. Economic

diversity and

productivity

enhanced

3. Poverty

eradicated and

inequality reduced

10. Gender

equality promoted

and women and

girls empowered

11. Productive and

gainful

employment

created

CSMIs

established

and

supported

(non-farm)

This indicator measures creation of

non-farm CSMIs through PSL and

others related to manufacturing and

service firms like clothing & textiles,

handicrafts, furniture, minerals, hotels,

restaurants, IT & electronic, cobbler &

salon, dry cleaning, tourism, etc. The

number of CSMIs created to be

distinguished by CSMIs created 1)

solely by Thromde's plan

interventions, 2) through partnership

of Thromde and central agencies and

private entities

Nos NA 558 Administrati

ve Data,

Thromde

Administrative

record/Record

maintained by

Regional Trade

Office

90 new

CSMIs, 18

new

Enterprises

and

Businesses

and 450

Businesses

and

Enterprises

supported

Jobs created

(non- farm)

This indicator measures jobs created

within the Thromde. A job is defined

as a profession or a work earning cash

or payment. The number of jobs

created to be distinguished by 1) jobs

created solely by Thromde's plan

interventions, 2) jobs created through

partnership of Thromde & central

agencies and 3) jobs created by private

entities with support/facilitation from

Thromde.

Nos NA 950 Administrati

ve Data,

Thromde

LFS Report/ Annual

Statistical

Handbook/Administ

rative data

Page 22: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

14

9.1 Programme Summary and Strategies

Programme Title: Employment generation and Local Economy enhancement program,

Objective: To enhance local economy and create gainful employment

Collaborating Agency/ies: MoEA/MoLHR/MoAF/MoF/MoIC/TCB

Programmme Strategies:

The Labour Force Survey 2016 recorded urban areas in Bhutan with higher proportion of the

population (aged 15-64 years) as compared to rural areas. Thimphu Thromde has 41.8 percent of

the total national urban population. Unemployment is one of the most important cross-cutting

issues faced by the Thromde currently, with 3,229 (PHCB-2017) unemployed people residing in

Thimphu Thromde alone. Thromde has a big and shared-responsibility in facilitating jobs creation,

in order to enhance local economy and resolving the issue of unemployment.

Given the issues, potential and opportunities of economic growth, job creation and income

generation, Thromde will:

1. Form Thromde Business/Economic Development Committee with representatives from

Thromde, Bhutan Chamber of Commerce and Industry (BCCI), Ministry of Labor and

Human Resources (MoLHR), Regional Immigration office, Regional Trade office,

Regional Revenue and Customs office and business community and other relevant

stakeholders. The committee shall:

a. Prepare local economic growth and job creation strategy and plan.

b. Facilitate and collaborate with relevant stakeholders to seek information on number of

new job seekers in addition to the current number of unemployed.

c. Study background information of job seekers such as skills and qualification that they

possess, age, gender, their area of interests and any business ideas and plans that they

may have.

d. Accordingly, job seekers will be trained in relevant entrepreneurship skills in the

12FYP in collaboration with MoLHR and BCCI. Furthermore, job seekers with viable

business ideas will be mentored and supported and facilitated for funds. Trainings on

self-employment through entrepreneurship will be provided.

2. Prepare Local Area Plans (LAP) for development by providing basic municipal services

and facilities such as road, water, waste management services, waste water management to

Page 23: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

15

encourage landowners and investors in developing CSMIs: manufacturing and service

sectors.

3. Thromde will generate revenue once the CSMIs are functional and help in achieving

Thromde self-sustainability.

4. Explore new revenue sources and outsource municipal services (waste, parking fee, public

toilet maintenance) in order to create jobs for Bhutanese workers.

5. Initiate development of tourism infrastructure and other facilities within the thromde

jurisdiction.

Page 24: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

16

14.2 Programme Output Matrix

Programme output indicators and targets

Sl. No. Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1.

Gainful

employment

created and

local

economy

enhanced

Functional and

Productive

CSMIs

established

45

Number of new CSMIs (non-farm) Nos 15 NA 90

No. of new enterprises and

businesses supported and

strengthened

Nos 15 NA 18

No. of existing enterprises and

businesses supported and

strengthened

Nos 15 NA 450

Gainful Jobs

created 55

Thromde Business

Council/Committee formed Date 10 NA 2018-2019

Local job creation strategy and

plan in place Date 15 NA 2018-2019

No. of new entrepreneurs/ job

seekers trained on market relevant

skills

Nos 15 NA (2017) 180

Number of jobs created Nos

15 NA (2017) 950

Projected Annual Target

Sl.

No Indicators

Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 Number of new CSMIs (non-farm) 15 15 20 20 20

2 No. of new enterprises and businesses supported

and strengthened 2 4 4 4 4

3 No. of existing enterprises and businesses

supported and strengthened 50 100 100 100 100

4 Thromde Business Council/Committee formed 2019

5 Local job creation strategy and plan in place 2019

6 No. of new entrepreneurs/ job seekers trained on

market relevant skills 20

40 40 40 40

7 Number of jobs created 150 200 200 200 200

Page 25: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

17

Program Activity and Outlay

Sl.No Output Activity Activity Location Indicative Plan

Outlay (Nu in

million)

Remarks

1

1. Functional and Productive CSMIs

established

2. Gainful Jobs created

Training and awareness

programs

0.2

Infrastructure Development 15.44

Grand Total 15.64

Major sub-activities

1 Construction of vegetable sheds Within Thromde 15.44

Total 15.44

Note: Major sub activities under LGKRAs includes activities costing Nu 5 million and above per activity in the Thromde. In

addition, those activities costing less than 5 million are maintained with the respective LGs themselves.

Page 26: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

18

15. LGKRA 2: Livability, Safety and Sustainability of Human Settlements Improved (18 KPIs)

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

2. Economic

diversity and

productivity

enhanced

3. Poverty

eradicated and

inequality reduced

9. Infrastructure,

communication

and public

services improved

10.Gender

equality promoted,

women and girls

empowered

15. Livability,

safety and

sustainability of

human settlements

improved

17. Sustainable

water ensured

Area of vehicle

parking [public]

to total Thromde

area

This indicator measures percentage

of area developed as public parking

space to total area of Thromde. It will

be calculated based on the standard

size of each parking space multiplied

by number of parking spaces

% 0.12 (2017) C-0.17 Administrative

data, Thromde

Administrative

records

Standard

parking

size is

5*2.5 (12.5

m2)

Proper taxi and

bus bays in place

This indicator measures taxis and bus

bays with proper blacktopped, with or

without sheds and standard size/shape

including one bus terminal

Nos 6 (2017) C-20 Administrative

data, Thromde

Administrative

records

Bus

terminal in

Semtokha

Roads without

potholes and

without running

water

This indicator measures proportion of

length of blacktopped urban roads

without potholes and without running

water over it

% 60(2017) C-90 Administrative

data, Thromde

Administrative

records

Proper

traffic/safety

signage and

facilities for

urban road and

pedestrian

footpath

This indicator measures the number

of new proper traffic/safety signage

facilities by types such as, traffic

signs, speed breakers, under

passes/overheard bridges, crash

barrier within Thromde. These are

carried out in coordination with

RSTA and RBP traffic

Nos NA NT-40 Administrative

data, Thromde

Administrative

records

Procureme-

nt of road

marking

machines

also

included

under this

Initiatives taken

to maintain green

areas

This indicator measures the number

of initiatives taken to maintain the

green areas through plantation, urban

landscaping, developing buffer zone

and micro gardening, parks and

recreational areas, maintaining urban

environmental precincts, etc.

Nos

14 parks,

Environment

precincts (E1,

E2, E3, E4, G1,

G2)- >30%

(SEA-TSP,

2017)

NT-4 Administrative

Record

Administrative

Record

Street light

coverage to total

Thromde area

This indicator measures the number

of street lights lamps installed Nos 4476 C-6500

Administrative

data, Thromde

Administrative

records

Page 27: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

19

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

Length of proper

footpath

(construction)

This indicator measures length of

proper footpath including the off-

street footpath and common service

duct footpath

Km 47 KM (2017) C-67 Administrative

data, Thromde

Administrative

records

5 Km CS

Duct

Length of

footpath

maintained

This indicator measures length of

proper footpath maintained.

(Maintained meaning usable)

Km 47(2017) C-57 Administrative

data, Thromde

Administrative

records

Initiatives to

reduce annual

crimes

This indicator measures the number

of initiatives by Thromde to reduce

annual crimes. Initiatives such as

Installation of CCTVs, Street lights,

awareness programs, recreational

facilities, managing bars and

drayangs, working closely with law

enforcement and regulatory agencies

etc.

Nos 4 (2017) C-6 Administrative

data, Thromde

Administrative

records

Solid waste

disposed to

landfill

This indicator measures total amount

of waste disposed to landfill reduced

through source segregation and

recycling initiatives such as waste

plazas/waste drop in center and other

related initiatives. This will depend

on the number of HHs increased and

more composting/recycling

initiatives under taken

MT/

day.

40 (2017-

Based on 6190

No. of

buildings)

10 Administrative

data, Thromde

Administrative

records

0.0065MT/

Day/

Building

Waste Recycled

per day

This indicator measures proportion

of waste recycled from total waste

[household, clinical and hazardous

waste] produced through use of

modern as well as natural/

environmental technology and

methods such as composting /home

composting/Green road initiatives/

Greener way initiatives, etc.

MT/

day 24 30

Administrative

data, Thromde

Administrative

records

Page 28: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

20

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

Buildings

connected to

integrated

waste/sewer

management

infrastructure and

collection system

This indicator measures percentage of

buildings connected or connections

points provided to integrated waste

and sewer management infrastructure

as per technical feasibility. Thromde

also provide connection provisions to

vacant plots which will have to

considered as well. This indicator can

also measure reduction of nos. of raw

sewer and household waste water

going or spilling directly into the

river, streams and any other water

bodies

Nos 28 (2017)

C= 80

Administrative

data, Thromde

Administrative

records

Fecal sludge

treatment

plant

construction

included

under this

KPI

Public transport

services with

facilities for

senior citizens,

women, children

and differently-

abled people.

This indicator measures proportion of

public transport buses with seats

reserved for senior citizens, women,

children and differently abled people.

% 15 50 Administrative

Record.

Administrative

Record.

Thromde to

direct the

city bus

service

provider

Ridership in

public transport

(Bus)

This indicator measures the

percentage of urban population using

public transport (bus) and Thromde to

carry out the initiatives to increase the

ridership through construction of

proper bus stops, missing links, bus

bays and procurement of city buses,

etc.

% 12 C- >50 Administrative

data, Thromde

Administrative

records

Daily users

over total

population

Number of smart

city initiatives

This indicator measures smart city

initiatives taken up such as promoting

tourism and other living attractions,

promoting efficient use of water and

energy, reducing demand side of

services and resources, energy and

Nos 3 (2017) NT=3

C=6

Administrative

data, Thromde

Administrative

records

CCTVs,

BRTS,

AMR, Smart

Street

lighting,

pilot

Page 29: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

21

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

waste disposal, car sharing,

guaranteed ride to home by public

transport (BRTS), free Wi-Fi, CCTV

coverage, online information on city

bus services, using technology to

provide efficient and equal services

etc.

Pedestrian

light, etc.

New public

infrastructure

with disabled

friendly facilities

This indicator measures number of

infrastructures by types with disabled

friendly facilities such as ramp, SEN

blocks, separate toilet for disabled,

proper footpath, lift (if affordable), if

lift is not affordable service centers

can be on the ground floor etc.

Nos 1 (ramp) NT - 3 Administrative

data, Thromde

Administrative

records

City Hall

and 2

public

toilets

Thromde current

expenditure met

through Internal

revenue

The indicator measures the

proportion of current expenditure met

from internal revenue by increasing

annual revenue generated through

various initiatives

% 80(2016) 100 Administrative

data, Thromde

Administrative

records

Initiatives to

reduce vehicle

congestion

This indicator measures number of

initiatives by types such as

decongestion pricing, proper traffic

regulation, alternate

roads/diversions/bridges, traffic

signs, intelligent transport (BRTS),

pedestrianization etc.

Nos 5 (2017) NT-2 Administrative

data, Thromde

Administrative

records

Lungten

Zampa

Bridge &

Ring road/

Norzin

Lam

Pedestriani

zation/rede

velopment

Page 30: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

22

10.1Programme Summary and Strategies

Programme Title: Programme for enhancing livability, safety and sustainability of human

settlements.

Objective: To improve livability, safety and sustainability of human settlements

Collaborating Agency/ies: MoWHS/Private/Business Community/Bhutan Post

Programme Strategies:

Thromde is facing a lot of challenges in keeping the city clean and green. Currently, Thromde

generates solid waste of 40 MT (2017) per day, witnessing an increase of 4 MT from 2010 to

2017. Increasing number of improper dumping of waste is a major challenge faced by the

Thromde. This will be addressed through the following:

1. Introducing waste segregation at source (Bio-degradable and Non-degradable) through

awareness programmes.

2. Outsourcing waste management and upgrading and activating scrap dealers and initiating

various composting mechanisms and waste drop off centers.

3. Instituting a system of cleaning one’s own surrounding once a week, through close

collaboration and monitoring by respective Demkhong Tshogpas and Building Inspectors

(Private and Government Buildings).

4. Monitoring of illegal dumping of waste by installing CCTV cameras.

Thimphu region alone has 31,218 vehicles (2017), a growth from 24,578 vehicles in 2013 (RSTA).

This has resulted in emerging issues of traffic congestion, while at the same time public transport

ridership is only 12 percent. In order to address this, the Thromde will:

i. In collaboration with Bhutan Post and City Bus Service providers train city-bus drivers

and conductors on improving professionalism/right attitude and monitor their

performance.

ii. Collaborate with Bhutan Postal Corporation and make public transport (city bus) service

attractive and reliable and carry out initiatives to increase public transport ridership and

discourage private vehicle usage.

iii. Develop maps, signs and information boards on the public transport systems.

iv. Construct additional multi-storied parking to ease traffic congestion.

Page 31: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

23

v. Install traffic signage and zebra crossing and introduce pothole policing and reporting

mechanisms in every constituency

Thromde has met 57 percent of their recurrent expenditure from internal revenue. In order to

increase annual revenue, Thromde will:

i. Develop service centers and encourage setting up of CSMIs. Institute minimum fees

collection from these CSMIs and businesses once these are functional and fully

operational.

ii. Provide hand holding support (fast-track clearances and approvals) and facilitate

training to aspiring and potential entrepreneurs.

iii. Identify parking spaces and introduce parking fees in extended Thromde areas

Page 32: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

24

10.2Programme Output Matrix

Programme output indicators and targets

Sl.No Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1 Livability, safety

and sustainability

of human

settlements

improved

Functional

infrastructure/

facilities

developed

90 Number of vehicle parking [public]

spaces created in Thromde area

including MLCPs

Nos 3 2479

(4 wheelers)

NT-1000

Proper taxi and bus bays in place Nos 2.5 6 NT - 14

Initiatives to reduce vehicle

congestion

Nos 3 5 NT=2

Approved Local Area Plans with

proper blacktopped roads and

drainage

Nos 4 7 NT – 7

C-14

Purchase of ortho (satellite) image

Nos 2.5 0 NT-1

Neighborhood Nodes implemented

including library and community

hall

Nos 2.5 ?? 1 Neighborhood

node and 1

Community Hall

Construction of new urban roads KM 3 270 NT-12

Roads without potholes and without

running water

% 3 60 C-90

Pothole policing and reporting

mechanisms developed

Date 3 NA 2020

Proper traffic/safety signage and

facilities on the road

% 3 NA NT - 40

Initiatives to maintain green

area/public space

% 3 NT-4 4 initiatives

Recreational amenities

Nos 4 14

parks/recreational

C-22 including

parks,

landscaping &

Page 33: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

25

Sl.No Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

space and 4

cinemas

water front

development

and cinemas

Total street light coverage within

Thromde areas (Total Lamps)

Nos 4 4476 (2017) C-6500

Length of new proper footpath

constructed including off street

Km 4 47 KM NT 20

C - 67

Length of footpath maintained Km 4 47 (2017) NT – 57

Common service duct constructed Km 3 12.5 NT-5

Initiatives to reduce annual crimes Nos 4 4 C- 6

Amount of solid waste disposed to

landfill per day

MT 4 40 10

Purchase of garbage trucks and

weighing bridges

Nos 3 23 NT- 24 + (2

weigh bridges)

Amount of Waste Recycled per day MT 4 24 30

Infrastructure with disabled friendly

facilities

Nos 4.5 1 (Ramp) NT-3

Buildings provided with connection

points to integrated waste/sewer

management infrastructure and

collection system

% 3.5 28 C-80

Fecal sludge treatment plant

constructed

Nos 2.5 0 1

Proportion of public transport buses

with seats reserved for senior

citizens, women, children and

differently abled people.

% 2.5 15 50

Ridership in public transport (City

Bus)

% 3 12 >50

Page 34: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

26

Sl.No Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

Initiatives to increase ridership in

Public Transport

Nos 3.5 NA 2

HHs. living without proper

dwelling

Nos 3 NA 0

Number of smart city initiatives Nos 2 3 NT – 3

C - 6

2 Internal

revenue of

Thromde

increased

9

Annual Revenue Generated

In

Milli-

on

5 90 200

Thromde current expenditure met

through Internal revenue

% 4 80 100

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 Number of vehicle parking [public]

spaces created in Thromde area 0 500 150 150 200

2 Proper taxi and bus bays in place 3 3 4 4

3 Initiatives to reduce vehicle congestion 1 (Lungtenzampa

Bridge -1st Phase)

1 (Ring road or Nrozin

Lam pedestrianization

& (Lungtenzampa

Bridge-2nd Phase)

(Lungtenzampa

Bridge-2nd Phase

and completion)

4

Approved Local Area Plans with proper

blacktopped roads and drainage including

implementation of AAP and

Neighborhood nodes with community

halls and library

- 1 2 2 2

5 Purchase of ortho (satellite) image - 1 - - -

6 Construction of new urban roads 3 4 3 1 1

7 Roads without potholes and without

running water C-60 C-70 C -80 C -85 C-90

8 Pothole policing and reporting

mechanisms developed - - 2020 -

Page 35: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

27

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

9 Proper traffic/safety signage and facilities

on the road NT-10 NT-10 NT-10 NT-10

10 Number of initiatives to maintain Green

area/public space -

1 1 1 1

11

Number of recreational amenities

(Baseline includes 14 parks and 4

cinemas)

- 1 recreational park 1 recreational park 1 recreational park 1 recreational

park

12 Street light coverage to total Thromde

area (Total Lamps) 405 405 405 405 404 (C-6500)

13 Length of new proper footpath

constructed including off street 4 4 4 4 4

14 Length of footpath maintained 47 49 52 55 57

15 Common Service duct constructed - 2 1 1 1

16 Initiatives to reduce annual crimes C-4 C-5 C-5 C-6 C-6

17 Amount of solid waste disposed to

landfill per day 40 30 20 15 10

18 Purchase of garbage trucks and weighing

bridge -

6+2 weighing

bridge 6 6 6

19 Amount of Waste Recycled per day 24 26 28 29 30

20 Infrastructure with disabled friendly

facilities 1 1 1

21

Buildings provided with connection

points to integrated waste/sewer

management infrastructure and collection

system

C-35 C-50 C-60 C-70 C-80

22 Fecal sludge treatment plant constructed - - 1 - -

23

Proportion of public transport buses with

seats reserved for senior citizens, women,

children and differently abled people.

C-20 C-25 C-35 C_45 C-50

24 Ridership in public transport (Bus) C-12 C-12 C-30 C-40 C-50

25 Initiatives to increase ridership in city bus - 1 1

26 HHs living without proper dwelling - Phase I Phase II Phase II -

27 Number of smart city initiatives - 1 - 1 1

28 Annual Revenue Generated 150 200 200 200 200

Page 36: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

28

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

29 Thromde current expenditure met through

Internal revenue 100 100 100 100 100

Program Activity and Outlay

Sl.No Output Activity Activity

Location

Indicative

Plan Outlay

(Nu in million)

Remarks

1 Functional

Infrastructure/facilities

developed

Infrastructure Development

Within Thromde

3175.33

Training & Awareness programs

0.57

Grand Total

3175.90

Major sub-activities

1

Reconstruction of Lungtenzampa bridge (200

meters) Lungtenzampa 592

1st Phase – Drawing and

Design and other ground

works

2nd Phase - Construction

2 Hejo-Samtenling LAP and Jungzhina -Pamtsho

LAP North 400

3 Construction of common service ducts

Norzin Lam and

other areas 70

(plus, 30M from CMI)

4 Construction of footpath Within Thromde 45

5 Street lights Within Thromde 60

6 New sewerage lines Within Thromde 30

7 Fecal Sludge Treatment Plant Within Thromde 20

8 Construction of bus stops Within Thromde 16 For taxi/bus base also to

be used from this

9 BRTS infrastructure Within Thromde 170

10 Purchase of garbage trucks and weighing bridge - 75

2 Nos weighing bridge

and 24 Nos garbage

trucks

11 Improvement and resurfacing of urban roads Within Thromde 100

Page 37: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

29

Sl.No Output Activity Activity

Location

Indicative

Plan Outlay

(Nu in million)

Remarks

12 Construction of new urban roads Within Thromde 70

13 Redevelopment of Norzin Lam Norzin Lam 200

14 Implementation of Dechencholing Area Action

Plan (AAP) Dechencholing 50

15 Construction of underpasses and overhead

bridges Within Thromde 50

5 Nos

16 Construction of Inter-Bus Terminal at Semtokha Semtokha 207 Nu 207M for Land

compensation

17 Purchase of Road Marking Machine Within Thromde 5

18 Implementation of Neighborhood Nodes

including library and community hall Within Thromde 50

19 Water-front Development/landscaping Plan Within Thromde 6

20 Comprehensive Property Inventory (CPI) Within Thromde 65

21 Construction of parks Within Thromde 12

22 Plantation and beautification Within Thromde 45

23 Waste management Within Thromde 20

24 Landfill site management Memelhakha 10

25 Installation of CCTVs Within Thromde 10

26 Construction of Low-income housing Within Thromde 21

Phase I (Drawing &

design) Phase II

(Construction)

27 Asian Development Bank Project

Construction of 12 MLD WTTP

Babesa, Thim-

Throm

300.109

(@69.4)

RGoB Contribution 15%

28 BUBP II – World Bank Project

Infrastructure Development works at Taba LAP

under Additional Financing

Taba, Thim-

Throm 96.200

Fund Balances as of

December 2018

Page 38: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

30

Sl.No Output Activity Activity

Location

Indicative

Plan Outlay

(Nu in million)

Remarks

Central water supply from Dodeyna-Taba (AF)

Thimphu

Thromde 81.748

10 MLD water treatment Plant at Taba (AF) Taba 65.945

1MLD sewer treatment plant at Taba (AF)

Taba, Thim-

Throm 36.986

Infrastructure development works for Hejo-

Samtenling Package X Hejo-Samtenling 123.256

Infrastructure development works for Jungzhina-

Pamtsho Package XI

Jungzhina

Pamtsho 67.488

Total 3158.00

Page 39: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

31

11 LGKRA 3: Transparent, effective and efficient public service delivery enhanced (3 KPIs)

NKRA KPI Description Unit Baseline Target Data source Data collection

methodology Remarks

2. Economic

diversity and

productivity

enhanced

9. Infrastructure,

communication

and public

services

improved

13. Democracy

&decentralizatio

n strengthened

14. Corruption

reduced

16. Justice

services and

institution

strengthened

Proportion of

services

delivered as per

TAT

This indicator measures

percentage of commonly

availed services and G2C

services

delivered as per TAT/SOP

% 90 100

Administrativ

e data,

Thromde

Administrative

records

Infrastructures

and Service

Delivery

Standards with

SOPs for

Thromde public

services

developed and

operationalized

This indicator measures the

infrastructure development

and the timeline by which

Service Delivery Standards

with Standard Operating

Procedures for Thromde

public services developed and

operationalized

Date (2017)

2019-

2020

(SOP)

Administrativ

e Data,

Thromde

Administrative

record

Infrastructure

include City Hall

construction,

review of TSP,

JDWPL services

and developing

online systems

Civil servant

positions not

filled

This indicator measures

number of staff positions

approved but not filled

excluding doctors, nurses and

teachers. Thromde to meet

this target either through

regular recruitments. contract

or project tied recruitments

Nos 3 (2017) 0

Administrativ

e data,

Thromde

Administrative

records

Urban Planner,

Legal Officer,

ICT Officer (1

shortage than

approved)

Page 40: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

32

11.1Programme Summary and Strategies

Program title: Transparent, effective and efficient public service delivery

Objective: To provide transparent, effective and efficient public services

Collaborating Agency/ies: Gewogs/MoHCA, DLG

Programme Strategies:

The GNH Survey 2015 pointed out that people’s perception on government’s performance has

declined significantly, mainly in terms of reducing the gap between rich and poor, creating

jobs and fighting corruption

While government has come up with over 200 G2C services, people still resort to traditional

practice of filling up papers and formalities due to limited awareness on the availability of

services through online platforms. Furthermore, there are just over 10-15 G2C services

available at Thromde level, thus calling forth to increase the number of services delivered

through online avenues. This will not only reduce turn-around-time but will also benefit

citizens availing the public services.

Against this back drop, Government Performance Management System (GPMS) is initiated by

government to hold agencies accountable. The whole-of-government approach system is being

implemented to strengthen planning, implementation, monitoring and evaluation at various

levels of government. In the 12th FYP, focus will be on strengthening initiatives that will

enhance decentralization; taking efficient and effective public services delivery closer to the

people. There will also be an increased focus on reducing corruption, and increasing

responsibility and accountability in the local governments. Collaborative strategies will also

be adopted to enhance electricity and mobile coverage and its reliability.

The Thromde in the 12FYP will focus on:

a. Periodic renewal of ISO90021:2015 certification for Quality Management System

(QMS). The scope of QMS will be increased by adding all municipal services for

certification and certification in turn will take care of service delivery standards,

standard operating procedure and turn-around-time for most commonly availed

municipal services.

b. Construct City Hall and deliver all public services from one location efficiently

Page 41: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

33

c. Develop and mainstream grievance redressal mechanism through increased

involvement and engagement of residents. The redressal systems will use both

office based and technology based systems for complaint registration and follow

up (IT or mobile technology).

d. Focus will be given to improve and strengthen capacity and professionalism of the

frontline service provider in the customer service division and other staffs under

the administrations.

e. Conduct awareness and advocacy on availability of online public services through

G2C and other municipal services which can be availed manually. Priority shall be

given to making all manual services available through online platforms.

f. Explore and develop mobile apps to deliver basic municipal services like paying of

water bills, sewerage charges, and etc. Encourage the use of mobile apps and

mobile phones in discharging and sharing real time information such as getting

directions on parking availability, waste disposal, road blocks and traffic diversion,

city social/entertainment events, free wi-fi locations, etc. for transparent, efficient

and effective service delivery.

Page 42: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

34

11.1 Programme Output Matrix

Programme output indicators and targets

Sl. No. Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1

Transparent,

effective and

efficient public

service delivery

enhanced

Public

service

delivery

improved

100

Proportion of services delivered as per TAT % 10 90 100

Service Delivery Standards with SOPs for

Thromde public services developed and

operationalized

Date 10 NA 2019

Annual Performance Agreement Score % 10 92.87 (2017) >95

ISO certified services Nos 10 NA 5

Civil Positions not filled Nos 10 3 (2017) 0

Construction of City Hall Nos 20 0 1

Review of TSP Date 10 NA 2020

Development of MIS Date 10 NA 2020

Development of online building approval

system

Date 10 NA 2021

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 Proportion of services delivered as per TAT C-90 C-95 C-97 C-100 C-100

2 Service Delivery Standards with SOPs for

Thromde public services developed and

operationalized

2019-2020 - - -

3 Annual Performance Agreement Score >95 >95 >95 >95 >95

4 ISO certified certificates - - 1 2 2

5 Civil Servant Positions not filled - 2 1 0 0

6 Construction of City Hall - 1st Phase 2nd Phase 2nd Phase Completion

7 Review of TSP - - 2020 - -

8 Development of MIS - - 2020 - -

9 Development of online building approval

system

- - - 2021 -

Page 43: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

35

Programme Activity and Outlay

Sl.No Output Activity Activity

Location

Indicative Plan

Outlay (Nu in

million)

Remarks

1 1. Service Delivery enhanced

2. Corruption reduced

Infrastructure development 365.00

2 Training & Skills development 0.20

Grand Total 365.20

Major sub-activities

1

Construction of City Hall Changangkha 300.00

1st Phase – Drawing

and Design and other

ground works and

initiate construction

2nd Phase -

Construction

2 Review of TSP

For Thromde

Office

10.00

3 Development if MIS 30.00

4

Development of online building approval

system 6.00

5

Purchase of computers, furniture, office

equipment 8

6 Development of online municipal services 5

7 JDWPL Chubachu 6

Total 365.00

Page 44: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

36

12 LGKRA 4: Quality of Education & Skills improved (8 KPIs)

NKRA KPI Description Unit

Baseline

(Baseline

Year)

Target Data

source

Data collection

methodology Remarks

3. Poverty

eradicated and

inequality

reduced

7. Quality of

education and

skills

improved

10.Gender

equality

promoted,

women and

girls

empowered

11. Productive

and gainful

employment

created

Out of school

students aged 6-12

including Special

Needs

This indicator measures

numbers of Out of school

students aged 6-12 including

Special Needs. Expected to

achieved through construction

of additional academic blocks

in Schools

Nos

254

(PHCB

2017 –

Never

attended)

0 Administra

tive Data

Annual Education

Stats/Records

maintained by TEO

Office

Will be based

on education

statistics of

MoE or based

on enrollment

rate into PP

Specific subject

teachers

This indicator measures number

of specific subject teachers’

shortages in STEM, English

and Dzongkha in the Thromde

Nos 64 0 Administra

tive data

Annual Education

Stats/Records

maintained by TEO

Office

Students scoring at

least 60% in each

STEM subjects,

Dzongkha and

English in BCSE

examination by

gender

This indicator measures

students scoring above 60% in

STEM subjects [Science, IT

and Mathematics], Dzongkha

and English in BCSE

examination.

% 95 96 Administra

tive data,

Records maintained

by TEO

Office/Schools

Students scoring at

least 60 % in

English, Dzongkha,

math and Science in

VI by gender

The indicator measures the

percentage of students who

score at least 60 percent in

English, Dzongkha, Math and

Science

% 90 95 Administra

tive data

Records maintained

by TEO

Office/Schools

Enrolment Rate for

ECCD by gender

The indicator measures the

participation of 3-5 years old

children in ECCD out of total

resident 3-5 years old. The

enrolment rate is expected to

increase through construction of

new ECCDs

% 90 95 Administra

tive data

Records maintained

by TEO

Office/Schools

At least 2

community

ECCDs to be

constructed in 5

years

Page 45: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

37

NKRA KPI Description Unit

Baseline

(Baseline

Year)

Target Data

source

Data collection

methodology Remarks

NFE completion rate

by gender

The indicator will measure

completion rate of NFE

learners.

% M/F 100 M/F 100 Administra

tive data

Records maintained

by TEO

Office/Schools

Number of schools

with vocational

clubs and sport

facilities

This indicator measures

percentage of schools with

vocational clubs such as

cultural, agriculture,

horticulture, arts and crafts,

literary, democracy, science and

technology, culinary etc. It also

measures the development of

sport facilities and other site

development works in Schools

Nos 10 19 Administra

tive data

Records maintained

by TEO

Office/Schools

Sport facilities

include

development of

football, field,

MPH, site

development

works etc.

Schools meeting

class size targets

The indicator measures

percentage of schools with class

size of 24 in primary and 30 in

secondary schools. This is

expected to achieve through

construction various academic,

administrative and other

relevant blocks in Schools

% 53 (2017) 100

Annual

Education

Stats/Thro

mde

Education

Stats

Records maintained

by TEO

Office/Schools

Page 46: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

38

12.1 Programme Summary and Strategies

Programme Title: Quality education and skills enhancement

Objective: To improve quality of education & skills

Collaborating Agency/ies: MoE/BCSEA/MoLHR (Technical Training Institute)/RCSC

Programme Strategies:

In order to improve learning outcomes, quality of education, develop behavioural and life skills,

prepare for jobs, Thromde will

i. Equip libraries with relevant books and online resource materials for references, self-learning

and online education.

ii. Regularly assess student’s strengths, weaknesses, performance and individual student’s

learning needs for feedback and all round improvement especially focusing on improving

those who are poor performers and slow learners.

iii. Provide life skills through social interactions, creative activities and educational trips for peer

learning to adapt to and to manage real life complexities and challenges. For that strengthen

existing club activities and introduce additional extracurricular clubs such as health, fine arts,

music, culinary, technology etc in the schools to make education more fun, and to learn

additional life and social skills.

iv. Create awareness to parents on their responsibility for child’s development and avoid putting

undue pressure on the child to excel academically. Awareness programme to also target

parents and encourage them to contribute in school activities such as minor maintenance,

greening of schools etc.

v. Strengthen parents and teachers collaboration to discuss and agree on some of the pertinent

issues and wellbeing of the students through regular review meetings and discuss best way

forward.

vi. Initiate programmes to improve competencies such as effective communication, problem

solving, cognition, critical thinking, creativity, value education complemented by life

guidance and career mentorship to prepare students for the future life and jobs.

vii. Strengthen professional development (PD) programmes for teachers by preparing and

implementing PD plan for teachers in schools for execution, monitoring and review for

enhancing teacher’s competency and each child’s development.

Page 47: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

39

Thromde will implement WASH and Menstrual Hygiene Management facilitates in schools by

i. Conducting survey to assess the current status of water quality and quantity. If water source

is a problem, explore alternate solutions for water supply such as rainwater harvesting;

ii. Providing assistance for design of water supply schemes and support construction of water

supply systems or seek assistance for technical design from Department of Public Health

iii. Constructing water treatment units/plants to ensure quality water supply.

iv. Building capacity of health coordinators and water caretakers on how to operate and

maintain water and sanitation facilities and equip them with minor tools

v. Constructing toilets as per national standards for secondary schools which is 1 for every 25

girls and 1 for every 40 boys.

vi. Ensuring availability of sanitary pads to girl students on a regular basis and proper sanitary

pad disposal facilities

Page 48: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

40

12.2 Programme Output Matrix

Programme output indicators and targets

Sl.

No.

Outcome Output Weight Output Indicator Unit Weight Baseline Plan

Target

1 Quality of

education & skills

improved

Quality of

primary and

secondary

education

improved

40 Out of school students aged 6-12 including

Special Needs Nos 5

254 (PHCB

2017 – Never

attended)

0

Shortage of specific subject teachers Nos 5 64 0

Students scoring above 60% in STEM

subjects, Dzongkha and English in BCSE

examination by gender

% 5.5 95 96

Enrolment Rate for ECCD by gender Nos 5 90 95

Number of ECCD constructed Nos 4 3 (Com. ECCD) At least 2

NFE completion rate by gender Nos 5 NA 100

Students performance in Class VI by

gender % 5 90 95

Number of schools with vocational clubs

and sport facilities Nos 5.5 10 19

2 Quality of

education & skills

improved

Functional

infrastructure/f

acilities

developed

60 Primary schools meeting class size targets % 15 53 100

Secondary schools meeting class size

targets

% 15 53 100

Schools with access to safely managed

WASH (Water, Sanitation and Hygiene)

facilities

% 5 NA 100

No. of schools with ideal student computer

ratio (1:30 for primary and 1:10 for

secondary schools)

Nos 5 NA 10

Schools (100%) with sufficient water

supply for drinking

% 5 NA 100

Schools with national standards (1 toilet

for every 25 girls, 1 toilet for every 40

boys) toilet facilities

% 5 NA 100

Schools with sanitary pad disposal

facilities

% 10 NA 100

Page 49: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

41

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 Out of school students aged 6-12 including

Special Needs 250 200 150 100 0

2 Shortage of specific subject teachers 50 40 30 20 0

3

Students scoring above 60% in STEM

subjects, Dzongkha and English in BCSE

examination by gender

95 95 96 96 96

4 Enrolment Rate for ECCD by gender 90 91 92 93 95

5 Number of ECCD constructed 1 1

6 NFE completion rate by gender 100 100 100 100 100

7 Students performance in Class VI by gender 90 91 92 93 95

8 Proportion of schools with vocational clubs

and sport facilities 12 13 14 15 19

9 Primary schools meeting class size targets 53 60 70 80 100

10 Secondary schools meeting class size targets 53 60 70 80 100

11

Schools with access to safely managed

WASH (Water, Sanitation and Hygiene)

facilities

90 93 95 97 100

12

No. of schools with ideal student computer

ratio (1:30 for primary and 1:10 for

secondary schools)

C-4 C-6 C-7 C-8 C-10

13 Schools (100%) with sufficient water supply

for drinking 90 93 95 97 100

14

Schools with national standards (1 toilet for

every 25 girls, 1 toilet for every 40 boys)

toilet facilities

90 93 95 97 100

15 Schools with sanitary pad disposal facilities 90 93 95 97 100

Page 50: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

42

Program Activity and Outlay

Output Activity Activity Location Indicative Plan Outlay

(Nu in million) Remarks

1. Quality primary and

secondary education improved

2. Functional

infrastructure/facilities

developed

Infrastructure Development All Schools 787.00

Development of Thromde Education Management

System 6.00

Grant total 793.00

Major Sub-activities

Construction of Integrated Classroom block with

furnishes complete and construction of temporary

classroom blocks Changzamtog MSS

60.00

Construction of Day MPH with site development

works 7.00

Site development works 5.00

Turfing of Football ground

Loselling MSS

20.00

Construction of Day MPH with site development

works 7.00

Construction of Integrated Classroom block with

furnishes complete Lungtenzampa

MSS

48.00

Construction of MPH hall with furnishes complete 15.00

Turfing of Football ground Zilukha MSS 20.00

Construction of Principals Quarter

Changrigphel LSS

6.00

Construction of Day MPH with site development

works 7.00

Construction of Integrated Classroom block with

furnishes complete Jigme Namgyal PS 48.00

Construction of 12 classroom block with furnishes

complete Lungtenphu LSS 25.00

Page 51: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

43

Construction of Day MPH with site development

works Taba LSS 7.00

Construction of 12 classroom block with furnishes

complete Zilnon Namgyeling

LSS

25.00

Construction of MPH hall with furnishes complete 15.00

Construction of Principals Quarter

Babesa PS

6.00

Construction of 12 classroom block with furnishes

complete 25.00

Construction of Day MPH with site development

works 7.00

Construction of drainage network and site

development works 6.00

Construction of Principals Quarter

Jigme Losel PS

6.00

Construction of 12 classroom block with furnishes

complete 25.00

Construction of Day MPH with site development

works 7.00

Construction of Day MPH with site development

works Jungzhina PS 7.00

Construction of Day MPH with site development

works

Kuensel Phodrang

PS 7.00

Construction of 12 classroom block with furnishes

complete

Rinchen Kuenphen

PS 25.00

Construction of Integrated Classroom block with

furnishes complete Dechencholing

new School

(Dangrina)

48.00

Construction of Principals Quarter 6.00

Construction of Integrated Classroom block with

furnishes complete

Yangchenphu HSS

48.00

Construction of 12 classroom block with furnishes

complete 25.00

Construction of MPH hall with furnishes complete 15.00

Construction of 12 classroom block with furnishes

complete Babesa HSS 25.00

Page 52: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

44

Turfing of Football ground 20.00

Construction of Principals Quarter Motithang HSS

6.00

Turfing of Football ground 20.00

Turfing of Football ground Changangkha MSS 20.00

Construction of walls in various schools 18.00

Site development works in Thimphu Thromde

schools 24.50

Construction of 2 Nos ECCDs Within Thromde 6.00

Total 717.5

Page 53: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

45

13. LGKRA 5: Health and nutrition of Thromde residents enhanced (6KPIs)

NKRA KPI Description Unit

Baseline

(Baseline

Year)

Target Data

Source

Data collection

methodology Remarks

3. Poverty

eradicated

and

inequality

reduced

8. Food and

Nutrition

security

ensured

10.Gender

equality

promoted,

women and

girls

empowered

14. Healthy

and caring

society

enhanced

17.

Sustainable

water

ensured

Households with

access to 24*7 safe

drinking water

supply

This indicator measures percentage

of households with safe (Treated

water) and 24X7 water supply

(i.e.135 LPCD) till the meter point

% 30 (2017) 100

Administra

tive data,

Thromde

Administrative

records

Commercial entities

with 24*7 safe water

supply

This indicator measures percentage

of commercial entities such as

industries, automobile workshops,

restaurants, hotels, etc. with Safe &

Clean (Treated water) and 24X7

drinking water supply (i.e.135

LPCD)

% 80 (2017) 100

Administra

tive data,

Thromde

Administrative

records

Workshop

areas, Core

areas and

Hotels

Disable/Gender

friendly public

toilets

This indicator measures the number

of disable/gender friendly public

toilets constructed

Nos 10 C-15 Administra

tive records

Administrative

data, Thromde

Out of 15, 2

will be disable

friendly

Initiatives to reduce

incidence of drug

and substance abuse

cases

This indicator measures initiatives

such as education/ awareness

programs (parent teachers meeting

in Schools), frequent inspection in

entertainment centers, creating and

maintaining recreational areas,

developing jogging/ cycling track,

open gym, sport complexes, etc. to

reduce incidences of drug and

substance abuse cases

Nos NA 10

Administra

tive Data,

Thromde

Administrative

record

2 initiatives

per year

Implement National

policy and strategic

framework to

Reduce Harmful

Use of Alcohol

(2015-2020)

This indicator measures

implementation of the Thromde’s

responsibilities mandated by the

policy

% NA 100

Administra

tive Data,

Thromde

Administrative

record

Page 54: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

46

NKRA KPI Description Unit

Baseline

(Baseline

Year)

Target Data

Source

Data collection

methodology Remarks

Implement Suicide

Prevention Action

Plan

This indicator measures

implementation of the Thromde’s

responsibilities mandated by the

Action Plan

% NA 100

Administra

tive Data,

Thromde

Administrative

record

Page 55: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

47

13.1Programme Summary and Strategies

Programme Title: Quality Health enhancement

Objective: To improve community health and water security

Collaborating Agency/ies: MoH/MoWHS

Programme Strategies

According to GNH Survey 2015, 2.46 percent of the population suffer from severe psychological

distress and about 8.99 percent of population suffer from some form of distress which mainly leads

to suicides and alcoholism. The Thromde will plan and implement the Suicide Prevention Action

Plan, particularly responsibilities assigned to the Thromde. The Thromde’s Suicide Prevention

Response Team (DSPRT), with technical support from relevant central agencies, will plan and

implement suicide prevention awareness and interventions action plan in the Thromde, as well as

identify causes driving people to commit suicide.

Similarly, Thromde with support from health committee will address the issue of incidences of

alcohol deaths through implementation of the National Policy and Strategic Framework to Reduce

Harmful Use of Alcohol (2015-2020), particularly responsibilities assigned to the Thromde, such

as formation of Alcohol Harm Reduction Committee at Thromde level. Accordingly, public

education and awareness on alcohol policies and harmful use of alcohol will be taken up in

collaboration with community health workers and religious figures, targeting both sellers and

consumers.

Currently, only 80 percent of commercial entities and 30 percent of households have access to

safe, clean and reliable drinking water (24x7). With increase in housing construction in the

thromde area, more people are expected to reside within the Thromde, thus there will be increased

demand for provision of safe and clean drinking water to every household within the Thromde

vicinity. In order to provide 24x7, clean and safe drinking water, Thromde will:

Construct additional reservoirs and ensure that every building is provided with municipal

water connections ensuring reliable water supply and wherever necessary storage tanks are

installed by all households.

Ensure strict monitoring on water breakdowns, leakages, illegal tapping, and initiate

digitization of water networks to monitor water supply

Page 56: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

48

Promote user responsibility on water management through awareness and formation of

Water User Association in every constituency.

Procure adequate water tankers to supply water during emergencies, should there be

problem with the main supply line.

Page 57: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

49

13.2 Programme Output Matrix

Programme output indicators and targets

Sl.

No.

Outcome Output Weight Output Indicator Unit Weight Baseline Plan

Target

1

Health of

Thromde

residents

enhanced

Clean and Safe Drinking

water supply ensured

34 Households with access to 24*7

clean, safe drinking water supply

till the meter point (i.e. 135 LPCD)

% 12 30 100

Households with access to at least

10 hours clean, safe drinking water

supply (i.e. 56.25 LPCD)

% 10 40 100

Commercial entities with 24*7

clean safe water supply (i.e. 135

LPCD)

% 12 80 100

Gender/ disable friendly

public toilets constructed

22 Number of gender friendly public

toilets

Nos 10 10 C-15

Number of differently- abled

public toilets

Nos 12 0 NT -2

Initiatives taken to reduce

incidence of drug and

substance abuse cases

26

Initiatives to reduce incidences of

drug and substance abuse cases

Nos 10 NA 10

Intra/Inter Thromde Sporting

events

Nos 8 NA 10

Bicycle and jogging tracks

KMs 8 1

Doebum

Lam)

10

Strategy for Harmful Use of

Alcohol and National

Suicide Prevention Action

Plan implemented

18 Implement National policy and

strategic framework to Reduce

Harmful Use of Alcohol (2015-

2020)

% 9 NA 100

Implement National Suicide

Prevention Action Plan (2015-

2018)

% 9 NA 100

Page 58: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

50

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1

Households with access to 24*7 clean,

safe drinking water supply (i.e. 135

LPCD)

C-45 C -55 C-70 C-80 C-100

2

Households with access to at least 10

hours clean, safe drinking water supply

(i.e. 56.25 LPCD)

C-45 C- 60 C-70 C-90 C-100

3 Commercial entities with 24*7 clean

safe water supply (i.e. 135 LPCD) C-85 C- 90 C - 95 C - 97 C - 100

4 Number of gender friendly public

toilets 1 1 2 1

5 Number of differently- abled public

toilets - 1 0 1 -

6 Initiatives to reduce incidences of drug

and substance abuse cases 2 2 2 2 2

7 Intra/Inter Thromde Sporting events 2 2 2 2 2

8 Construction of bicycle and jogging

tracks - 3 3 2 2

9

Implement National policy and

strategic framework to Reduce

Harmful Use of Alcohol (2015-2020)

50 100 100 100 100

10 Implement National Suicide

Prevention Action Plan (2015-2018) 50 70 80 90 100

Page 59: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

51

Program Activity and Outlay

Sl.No Output Activity Activity Location Indicative Plan

Outlay (Nu in

million)

Remarks

1 1- Clean and Safe Drinking water supply

ensured

2-Gender/ disable friendly public toilets

constructed

Functional Infrastructure

development

Within Thromde

and Periphery 123.00

2 Strategy for Harmful Use of Alcohol and

National Suicide Prevention Action Plan

implemented

Awareness and capacity

development

0.30

Grand Total 123.30

Major sub-activities

1 Construction of bicycle and

jogging tracks

Within Thromde

and Periphery

11.00

2 Water supply system, network

and WTP (3 Nos) Within Thromde 97.00

Construction of public toilets Within Thromde 15.00

Total 123.00

Page 60: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

52

14. LGKRA 6: Culture & Traditions preserved and promoted (6 KPIs)

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology

Remarks

2. Economic

diversity and

productivity

enhanced

4. Culture &

Traditions

preserved

and

promoted

11.

Productive

and gainful

employment

created

15.

Livability,

safety and

sustainabilit

y of human

settlements

improved

Zhungdra and

Boedra

Competition in

Thromde level

This indicator measures

number of participants in

Zhungdra and Boedra

Competition organized by

Thromde excluding

competition in schools

Nos NA 30

Administra

tive Data,

Thromde

Administrative

record

Among Constituency,

at least 2 competitions

in 5 years

Activities

undertaken

through

community

volunteers

(Without cash and

kind)

The indicator describes the

number of volunteer activities

taken up such as waste

management engaging Midey

Tshogpas and community

Nos NA 5

Administra

tive Data,

Thromde

Administrative

record 5-time cleaning

campaign, 1 per year

Initiatives to

promote

Dzongkha

This indicator measures

number of initiatives such as

writing and speaking

competition, drama, sign

boards, Tshogde minutes in

Dzongkha, Office memo and

presentations in Dzongkha

etc.

Nos NA 3

Administra

tive Data,

Thromde

Administrative

record

Initiatives to

promote Driglam

Namzha

The indicator measures the

number of training programs,

awareness, events, TV

Programs, media, etc. to

promote Driglam Namzha

Nos NA 2

Administra

tive Data,

Thromde

Administrative

record It includes Driglam

namzha training for

Thromde staffs,

Promote Tangible

Cultural heritage

This indicator measures

number of tangible heritage

maintained/renovated/

Constructed

Nos 1 5

Administra

tive Data,

Thromde

Administrative

record

Changangkha/Dolma

Lhakhang/Memorial

Chorten and Chortens

Page 61: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

53

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology

Remarks

Initiatives to

safeguard and

promote

indigenous sport

This indicator measures the

number of programs and

clubs established in Schools

to promote and preserve

indigenous sports like

Archery and Khuru, etc. or

supported/sponsored by

Thromde for its promotion

Nos NA 2

Administra

tive Data,

Thromde

Support for the

promotion of

indigenous sports

Page 62: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

54

14.1 Programme Summary and Strategies

Programme Title: Programme to develop culture and tradition

Objective: To promote and preserve culture and traditions

Collaborating Agency/ies: MoHCA/DDC/ Dratshang Lhentshog

Programme Strategies:

As per the GNH Survey Report, 2015, the proportion of urban people who consider themselves

‘very’ spiritual has declined substantially from 50.4 percent to 44.5 percent. People only spent an

average number of 9.7 days on social and cultural activities. The percentage of people who opined

that Driglam Namzha is ‘getting weaker’ increased from 19.7% in 2010 to 38.9% in 2015. People’s

perception on the decline in government performance in preserving and promoting intangible

culture had also worsened considerably in 2015 as compared to 2010. The GNH Survey 2015 also

reported a very low score of 7.12 in historical knowledge. Against this backdrop, the programme

on culture and tradition is aimed to explore means and ways to preserve, promote and document

our culture and tradition, indigenous knowledge, arts and crafts, and etc.

In addition to the conventional strategies to preserve and promote culture, Thromde will

particularly promote intangible culture through the following:

i. Conduct constituency wise Boedra and Zhungdra competition to promote traditional

songs and dances

ii. Conduct and promote community cleaning campaigns to foster community vitality

Thromde will promote Driglam Namzha and Dzongkha by;

a. Creating community training of trainers on Driglam Namzha for mass community

sensitization.

b. Providing mass education and awareness on Driglam Namzha to the community

especially during public and community meetings and gatherings

c. Training all Thromde staff in Driglam Namzha.

d. Training relevant Thromde staff on Dzongkha Unicode

e. Installing sign-boards written in Dzongkha.

Page 63: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

55

14.2Programme Output Matrix

Programme output indicators and targets Sl.

No.

Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1

Culture & Traditions

preserved and

promoted

Intangible

Cultural

preserved and

promoted

50 Participants in Zhungdra and

Boedra Competition in

Thromde level competition

Nos 13 NA 30

Activities undertaken

through community

volunteers (Without cash

and kind)

Nos 10 NA 5

Initiatives to promote

Dzongkha

Nos 15 NA 3

Initiatives to promote

Driglam Namzha

Nos 12 NA 2

2 Tangible Cultural

Heritage

preserved and

promoted

50 No. of new religious

infrastructure developed

Nos 15 NA 2

No. of religious

infrastructure renovated

Nos 20 NA 2

Initiatives to safeguard and

promote indigenous sport

Nos 15 NA 2

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1

Participants in Zhungdra and Boedra

Competition in Thromde level

competition

- - C-15 - C-30

2

Activities undertaken through

community volunteers (Without cash

and kind)

1 1 1 1 1

3 Initiatives to promote Dzongkha 1 1 1

4 Initiatives to promote Driglam Namzha 1 1

Page 64: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

56

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

5 No. of new religious infrastructure

developed 1

6 No. of religious infrastructure

renovated 1 2 1 1

7 Initiatives to safeguard and promote

indigenous sport 1 1

Programme Activity and Outlay

Sl.No Output Activity Activity

Location

Indicative

Plan Outlay

(Nu in

million)

Remarks

1 Intangible Cultural preserved and

promoted

Tangible Cultural Heritage preserved

and promoted

Conduct awareness and competition

program

0.50

2 Infrastructure Development

40.00

Grand total 40.50

Major sub-activities

1 Development of Changangkha Lhakhang 20.00 Renovations

2 Construction of Dolma Lhakhang at Thai

Pavilion

20.00 New construction

Total 40.00

Page 65: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

57

15. LGKRA 7: Carbon neutral, climate and disaster resilient development enhanced (4 KPIs)

NKRA KPI Description Unit Baseline Target Data source Collection

methodology Remarks

5. Healthy

ecosystem

services

maintained

6. Carbon

neutral,

climate and

disaster

resilient

development

enhanced

9.

Infrastructure,

communicatio

n and public

services

improved

3. Poverty

eradicated and

inequality

reduced

Critical

public

infrastructure

(schools,

hospitals and

roads)

climate/disast

er resilient

and disaster

preparedness

of Thromde

The indicator measures all critical

public infrastructures (schools,

hospitals/BHUs and roads) are

climate and disaster proofed by

ensuring all climate and disaster

resilient engineering components,

safeguards and standards, quality

and strength and also the safe

disposal of hazardous wastes. This

also measures the disaster

preparedness of Thromde through

proper system like EOC

established and SAR and hydrants

in place

Nos NA 30 Administrative

Data, Thromde

Administrative

record

All Thromde

infrastructure

and safe

Length of

proper storm

water

drainage and

flood

protection

walls

This indicator measures length of

storm water drainage

maintained/constructed to reduce

flooding and water logging. It also

measures the length of flood

protection walls constructed

Km 10 NT-5 Administrative

Data, Thromde

Administrative

record

Initiatives to

reduce air

pollution

This indicator measures number of

initiatives to reduce air pollution Nos NA 2

Administrative

Data, Thromde

Administrative

record

No open

burning,

procurement

of water

sprinkler

Promote

energy

efficient/gree

n buildings

This indicator measures number of

initiatives to promote energy

efficient/green buildings

Nos NA 2 Administrative

Data, Thromde

Administrative

record

City Hall,

LED street

lighting/Solar

street lighting

Page 66: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

58

15.1 Programme Summary and Strategies

Programme Title: Carbon neutral, climate and disaster resilient development

Objective: To strengthen Carbon neutral, climate and disaster resilient development

Collaborating Agency/ies: Gewogs/NEC/MoAF

Programme Strategies

Climate change and disaster has been a cross cutting issue in all aspects of development. Efforts

and measures are put in place to mainstream the issue into development agenda. Our development

agenda is guided by our own philosophy of Gross National Happiness and Vision 2020, the

international sustainable development goals, and other regional goals, which emphasizes on

environmental conservation, combating climate change and its effect, developing disaster resilient

infrastructure, and reducing carbon footprints.

Primary environmental pressures on urban environment arise from:

• Pollution- land, air, water and noise

• Increasing solid waste production and safe and sustainable disposal challenges

• Safe and sustainable waste water management and treatment

• Lack of good drainage systems to address increasing flooding incidents especially

during monsoons

The Thromde experiences one of the heaviest rains in the country often resulting in flooding and

water logging in the town areas. This calls for need of proper storm-water drains, flood mitigation

structures and river training. The need for disaster resilient infrastructure, especially from earth

quake is high considering Bhutan’s location in the seismically active zone. Therefore, this

programme is aimed at fostering a culture of community social responsibility among individuals

and communities in the preservation and conservation of our environment and in contributing

towards the nation’s commitment to remain carbon neutral.

The Thromde will focus on the following strategies:

a. Assess and explore mitigation measures pertaining to low emission in priority sectors like

waste management, transport, residential building, industries and etc. Measures like energy

efficient transport system, energy efficient buildings and appliances, use of renewable

Page 67: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

59

energy and waste and waste water management will be explored and implemented

accordingly.

b. Energy efficiency will be promoted by installing energy efficient street lights (LED),

replacing inefficient lights with efficient ones, encouraging households to use LEDs and

exploring solar energy as a power alternative.

c. Initiate and support green transportation by encouraging residents to buy electric and

hybrid vehicles (EV/HV)for which supporting services like EV charging station will be

installed in the Thromde.

d. Enhance engineering capacity as well as collaboration with relevant central agencies to

improve technology and quality of climate-proof and disaster-resilient drawings, design

and construction of related infrastructures. Institute systems to monitor and enforce

compliance to safety features in construction of structures for human occupancy.

e. Solar Water Heating may be mandated for typologies such as hotels; for others may be

incentivized with various means in collaboration with relevant central agencies such as

Ministry of Works and Human Settlement (MoWHS), Department of Renewable Energy

(DRE), etc.

f. Thromde disaster-contingency plan with robust mechanism for information sourcing and

sharing will be developed and capacity built for disaster preparedness, response and

rehabilitation.

g. Awareness, monitoring and enforcement systems will be strengthened to ensure that

disaster resilient and adaptation standards and quality is incorporated and adhered to in any

development works and infrastructure constructions by both private and government

entities.

Page 68: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

60

15.2 Programme Output Matrix

Programme Output indicators and targets Sl.No Outcome Output Weight Output Indicator Unit Weight Baseline Plan

Target

1

Carbon neutral, climate

and disaster resilient

development enhanced

Disaster

management

and adaptive

capacity

improved

100

No. of climate/disaster resilient

infrastructure

Nos 15 NA 30

Length of proper storm water drainage

constructed/maintained Km 15 NA 5

Construction of flood protection walls Km 15 NA 1

Initiatives to reduce air pollution Nos 15 NA 2

Initiatives to promote energy

efficient/green buildings

Nos 10 NA 2

Construction of fire hydrant (fire water

pipe line) and tanks

15

Procurement of EOC and SAR

equipment including training

Date 15 Few

numbers

2019-

2020

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-

2019

FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 No. of climate/disaster proofed infrastructure 5 5 10 10

2 Length of proper storm water drainage

constructed/maintained

0.05 1 1.94 1 1

3 Construction of flood protection walls - - 0.5 0.5

4 Initiatives to reduce air pollution 1 1

5 Initiatives to promote energy efficient/green

buildings

1 1

6 Procurement of EOC and SAR equipment

including training

- 1

7 Construction of fire hydrants (fire water pipe

line)

- Phase I - Feasibility

study/design/drawing,

etc.

Phase II –

Laying of pipes

Phase II –

Laying of pipes

(spill over)

Page 69: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

61

Program Activity and Outlay

Sl.No Output Activity Activity

Location

Indicative Plan

Outlay (Nu in

Million)

Remarks

1 Disaster management and

adaptive capacity improved Training & Skills development 0.00

2 Infrastructure development Within Thromde 122.00

Grand Total 122.00

Major sub activities

1 Construction/maintenance of storm water

drainage 30.00

1 Construction of fire hydrant and tanks

(Laying of fire water pipeline) Within Thromde 10.00

2 Construction of flood protection walls

(UNEP Project) Within Thromde 65.00

3 Establishment of Thromde Emergency

Operating Centre (TEO) and SAR

equipment

Within Thromde

office 17.00

Total 122.00

Page 70: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

62

16. LGKRA 8: Gender equality promoted, women and girls empowered (6KPIs)

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology Remarks

1. Macroeconomic

stability ensured

3. Poverty

eradicated and

inequality reduced

5. Healthy

ecosystem services

maintained

6. Carbon neutral,

climate and disaster

resilient

development

enhanced

9. Infrastructure,

communication and

public services

improved

NFE learners by

gender

This indicator measures

percentage of female NFE

learners against total NFE

learners

% 74 (2016) 80 Administra

tive Data

Record

maintained by

Schools

Women

representatives in

user groups, self-

help groups, local

committees and

cooperative

This indicator measures

percentage of women

representatives in user groups,

self-help groups and local

committees/groups

% NA 50

Administra

tive Data

Record

maintained

Thromde

Midey

Tshogpas/

City

Council

Government

employees

(parents) with

access to functional

day care crèches

This indicator measures

proportion of eligible Thromde

employees (parents) with access

to functional day care crèches

% NA 100 Administra

tive Data

Record

maintained

Thromde

Number of girls in

leadership position

in schools

This indicator measures number

of girls in leadership position in

schools in various extra-co-

curricular activities, clubs,

groups, etc.

Nos

340

(2017)

400 Administra

tive Data

Record

maintained

Thromde

Women availing

skills/entrepreneurs

hip trainings

This indicator measures

percentage of female availing

skills/entrepreneurship trainings

for productive livelihood,

economic and income

enhancement

% NA 20 Administra

tive Data

Record

maintained by

MoLHR

Data

maintained

by MoLHR

Page 71: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

63

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology Remarks

Women, men and

children covered by

sensitization/aware

ness programs on

elimination of

Violence Against

Women, VAM and

VAC

This indicator measures

percentage of women, men and

children (Thromde population)

covered by sensitization/

awareness programs on

elimination of VAW, VAM and

VAC disaggregated by women,

men and children covered

% NA 60 Administra

tive Data

Record

maintained at

NCWC/RENE

W

Data

maintained

by

NCWC/RE

NEW

Page 72: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

64

16.1 Programme Summary and Strategies

Programme Title: Programme to promote gender equality and empowering women and girls.

Objective: To promote gender equality and empower women and girls

Collaborating Agency/ies: NCWC/MoE

Programme Strategies:

o The GNH Survey 2015 observes that in Bhutan, women are less happy than men. However,

it was also noted that women’s GNH increased faster than men from 2010-2015 reducing

gender inequality. Disparity is the largest in the education and good governance domains

and overall, but people in rural areas enjoy higher sufficiency in political participation,

donation, community relationships, ecological issues and safety indicators as compared to

those in urban areas.

o Women are poorly represented in decision-making positions both in the parliament and

civil service. Only 8.5 percent of women were elected in the National Assembly elections

in 2008 and 2013. However, for the National Council election in 2013, there were no

women elected. In 2012, women only accounted for 36 percent of the entire civil service

workforce out of which only 6 percent held executive positions.

o While notable success has been made in terms of ending all types of discrimination against

women and girls, there is still poor representation of women in decision-making and other

development agenda. On the positive note, Thimphu Thromde has two women

representative members (council members) in Thromde’s highest decision making body;

Thromde Tshogde which is at par with the male counterpart. The programme shall explore

ways and means to incentivize women and girls to participate in local forums. The school

going girls shall be the priority for advocacy, awareness and campaigns pertaining to the

same.

o At the national level, unemployment rate is higher for women than their male counterparts

(F-3.1% & M-1.8%, LFS 2015) and for Thimphu Thromde it is 6.4 percent (male-5.1%

and Female-8.6%). Employment opportunities for women in the country have largely been

in the agriculture sector, where productivity and earnings are low. However, in the

Thromdes, employment opportunities with higher returns for labor exist outside agriculture

sector for both men and women such as CSMIs.

Page 73: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

65

Considering the importance placed on promoting gender equality and empowering women and

girls, the Thromde shall focus on the following key strategies:

a. Focus on periodic sensitization and media advocacy program on the importance of

gender equality and rights so as to empower women which will also encourage women

participation in all kind of electoral/election programs.

b. Collaborate with relevant agencies to conduct gender related research particularly on

participation in the decision making, entrepreneurship and violence against women

(VAW), gender related aspects of health, teenage pregnancy, etc.

c. Thromde will make available information on employment opportunities or any form of

skills development training (entrepreneurships, leadership training and public

speaking).

d. Thromde will also promote ideas such as women cooperatives, self-help groups, etc.

among women as a means of uplifting women out of poverty and easing their financial

difficulties.

Page 74: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

66

16.2 Program Output Matrix

Programme output indicators and targets

Sl.

No.

Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1 Gender

equality

promoted,

women and

girls

empowered

Mechanisms for

participation of

women/children

in decision

making process

improved

100 Women NFE learners % 15 74 (2016) 80

Women representatives in user

groups, self-help groups, local

committees and cooperative

% 15 NA 50

Eligible Thromde employees with

access to functional day care

crèches

% 15 NA 100

Number of girls in leadership

position in schools Nos 25

340 (2017) 400

Women availing

skills/entrepreneurship trainings % 15 NA 20

Women, men and children covered

by sensitization/awareness programs

on elimination of Violence Against

Women, VAM and VAC

% 15 NA 60

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 NFE learners by gender

75 76 78

74 80

2

Women representatives in user groups,

self-help groups, local committees and

cooperative

- C-20 C-30 C-40 C-50

3 Eligible Thromde employees with

access to functional day care crèches 100 100 100 100 100

4 Number of girls in leadership position

in schools 340 350 360 380 400

5 Women availing

skills/entrepreneurship trainings C-5 C-10 C-15 C-20

Page 75: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

67

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

6

Women, men and children covered by

sensitization/awareness programs on

elimination of Violence Against

Women, VAM and VAC

C-20 C-30 C-40 C-50 C-60

Program Activity and Outlay

Sl.No Output Activity Activity Location Indicative Plan

Outlay (Nu in

million)

Remarks

1 Mechanisms for participation of

women/children in decision making

process improved

Awareness and

training programs

Thromde area 0.40 Training of Midey

Tshogpas on VAC, VAM

and VAW

Grant Total 0.40

Page 76: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

68

17. LGKRA 9: Democracy & Decentralization strengthened (4 KPIs)

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology Remarks

2. Economic

diversity and

productivity

enhanced

10. Gender

equality

promoted,

women and

girls

empowered

12. Corruption

reduced

13.

Democracy

and

decentralizatio

n strengthened

16. Justice

services and

institution

strengthened

Zomdu

attendance by

gender

This indicator measures percentage

of resident people (voting age) by

gender attending (annually) in

formal meetings conducted by

Thromde namely for 1) Agenda

setting for submission to Thromde

Tshogde & Parliament 2)

Consultation on plans, budget &

annual performance targets for

Thromde & Local Area Plan

development 3) Consultation on

Thromde bye-laws & national

policies

% NA

30

Administra

tive Data

Administrative

record

Constituency

wise

Number of

functional local

user groups,

self-help groups

& local

committees

This indicator measures number of

groups and committees such as

Midey Tshogpas

Nos

NA

(2016) 7 Administra

tive Data

Administrative

record

1 in each

constituency

Grievances

registered with

Thromde

resolved

This indicator measures percentage

of total grievances received/

recorded resolved or attended to

% NA 100 Administra

tive Data

Administrative

record

Road/Waste/

Sewer/Tenan

cy/Land

Page 77: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

69

NKRA KPI Description Unit Baseline Target Data

source

Collection

methodology Remarks

Community

score card tool

implemented

This indicator measures

community's satisfaction on

Thromde's service delivery using

Community Report Card Tool at

least once a year which assess the

quality and effectiveness of public

services such as public transport,

roads, water and sanitation,

education etc. and other aspects

from the user's (people's)

perspectives.

Nos NA 4 Administra

tive Data Survey

Score card tool

technique

conducted 4

times

Page 78: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

70

17.1 Programme Summary and Strategies

Programme Title: Democracy & decentralization

Objective: To strengthen democracy & decentralization

Collaborating Agency/ies: Gewogs/MoHCA, DLG/ECB

Programme strategies

During the local government elections held in 2016 in the four thromdes (Thimphu, Phuentsholing,

Samdrup Jongkhar and Gelephu) and 205 Gewogs, a total of 3,391 candidates contested for

various Local Government offices. Out of this, a total of 1,439 candidates were elected;

comprising 164 women and 1,275 men.

Seven women and 13 men were elected to the 20 Thromde Tshogpa posts, and two women and ten

men were elected to the Thromde Ngotshabs posts. Female representation and participation in the

Thromde election have been considerably low. In the 12th FYP, LG’s share of resources has

doubled and therefore strengthening implementation capacity at the LG level is critical.

Thus, to address these issues, Thromde will undertake the following strategies;

a. Framework for interactions at the community level will be developed to make the process

more inclusive (especially women and youth groups) and people-centric. Local

communities will be mobilized and organized and opportunities created for meaningful

dialogue between community representatives and the executives on Thromde development,

to develop local action plans, share experiences and feedback, and problems.

b. Collaborate with Department of Local Governance to enforce and implement Community

Engagement Guideline to conduct transparent, inclusive, accountable and effective

zomdues and effectively implement the resolutions of the zomdues.

c. Ensure timely update and information sharing on Thromde plans and budget, annual

expenditure and progress, bye-laws, policy formulation, and any other critical public

information on the public notice board, Thromde website and portals.

d. Collaborate with central agencies to ensure adequate and rational deployment of human

resources in Thromde and strengthen their capacity in planning and management of

increasing development and expenditure responsibilities at the local level

Page 79: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

71

e. Promote awareness and understanding of the local communities and citizens on LG Act,

other rules, guidelines and manuals in place. Also ensure faster and effective redressal of

developmental and social issues and attend the grievances faced by the citizens and inform

citizens on the actions taken.

f. Ensure enforcement and compliance to provisions of LG Act and other rules, guidelines

and manuals to enhance citizen’s participation and ownership in Thromde development.

g. Form more community user groups, committees and cooperatives (similar to community

monitoring and assessment committee-CMAC, currently being piloted in dzongkhags) to

strengthen local democracy, community monitoring, enhance citizen’s participation and

engagement in planning, decision-making and management of Thromde development and

economic growth. Women and disabled-people participation and representation in these

groups and zomdues will also be ensured to be able to fully capture the development needs

of the community.

Page 80: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

72

17.2 Programme Output Matrix

Programme output indicators and targets

Sl.

No.

Outcome Output Weight Output Indicator Unit Weight Baseline Plan Target

1 Democracy &

decentralization

strengthened

Create

enabling

environment

100

Zomdu attendance by gender % 15 30

Number of zomdues/public

forum on local development

plan in a year

Nos 20 3 (2016) 10

Number of functional local

user groups, self-help groups,

local committees and

cooperative

Nos 15 NA (2016) 7

Grievances registered with

Thromde resolved or attended % 25 NA 100

Community score card tool

implemented

Annual

Score 25 NA 4

Projected Annual Target

Sl.No Indicators Projected Annual Target

FY 2018-2019 FY 2019-2020 FY 2020-2021 FY 2021-2022 FY 2022-2023

1 Zomdu attendance by gender 25 30

2 Number of zomdues/public forum on

local development plan in a year 2 2 2 2 2

3

Number of functional local user groups,

self-help groups, local committees and

cooperative

-

- 2 2

3

4 Grievances registered with Thromde

resolved or attended to

- - C-50 C-70 C-90

5 Community score card tool implemented - 1 1 1 1

Page 81: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

73

Program Activity and Outlay

Sl.No Output Activity Activity Location Indicative Plan

Outlay (Nu in

million)

Remarks

1

Create enabling environment

Awareness & Education

programs Within Thromde 0.50

2 Training & Capacity

development Within Thromde 0.00

Grant Total 0.50

Page 82: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

74

18. Programme Monitoring and Evaluation Plan

Keeping in mind the importance of institutional efficiency and good governance, the 12th Five

Year Plan shall be monitored using the Government Performance Management System (GPMS)

with an objective to enhance accountability, transparency, and efficient utilization of resources.

Particularly, through the Annual Performance Agreements (APA); a record of understanding

signed between the Prime Minister and the Thrompon that provide a summary of the most

important objectives, actions and activities that the Thromde expect to achieve in a financial year.

It entails performance indicators and targets that will be reviewed quarterly, bi-annually and

annually by the National Technical Committee (NTC) to measure the degree of progress made in

implementing the annual activities. This will ensure that any issues affecting the implementation

of annual planned activities are identified and addressed within the approved timeline.

Additionally, the 12th Plan will also be monitored using the Multi Year Rolling Budget System

(MYRB) of Department of National Budget, and the Public Expenditure Management System

(PEMS) of Department of Public Accounts, Ministry of Finance. These systems have been

integrated with the GPMS to enhance/ strengthen sharing of planning, budgeting and expenditure

information for planning and monitoring purposes.

The Gross National Happiness Commission shall also conduct Quarterly and Mid-Term Review

(MTR) of the 12th FYP and mid-course correction of the plan will be undertaken as necessary. The

results of the 12th FYP will be evaluated by GNHC at the end of the plan. Evaluation of specific

programmes/projects can be evaluated by agencies concerned, local governments and GNHC as

guided by the National Evaluation Policy.

The LGs shall also be responsible for monitoring the activities within the scope of their mandate;

it shall be the responsibility of the Thromde to undertake overall monitoring of the activities within

its jurisdiction and compile and provide annual update on the plan activities and KPIs related to

the Thromdes. Similarly, Thromdes will be responsible for monitoring the plans and programmes

of the respective Thromdes and subsequent reporting to the GNHC.

The 12th FYP shall actively promote social accountability and therefore, encourage citizen

monitoring of the development plans happening within their community to ensure greater

accountability and results of development programmes. The Thromdes will also form Community

user’s groups, and Community Monitoring and Assessment Committees (CMAC) in a democratic

Page 83: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

75

manner to ensure citizen’s participation and engagement in planning, decision-making and

management of local development and economic growth.

19. Collaborating Agencies and Requirements

KPI which need strong/critical

central support Agencies

Specific support and interventions

required from central agencies

CSMIs established (non-farm) MoEA, RMA

a) Support to start-ups & CSMIs

establishment in order to expedite

operationalization of industries/ enterprises

b) Access to finance

c) Support in skills development on

entrepreneurship, value chain & supply

chain

d) Branding and Marketing of products and

services

Jobs created (non-farm) MoEA, MoLHR

a) Access to finance, b) Pitching business

ideas for sourcing support, c) Support in

specific training for local entrepreneurs and

job seekers

Tourist arrival by bed nights TCB

a) Support upgradation of local hotels

through provision of standards, certification

and fiscal incentives, b) Marketing local

products and destinations

Incidence of drugs, substance

abuse, suicides, alcohol deaths

MoH, BNCA, DoT, RBP

& CSOs

a) support provision of helpline services, b)

provide psychotherapist & trained

counsellors through Dzongkhag health

sector to address issues in Thromde area

when in need

Households with access to 24*7

safe drinking water

MoWHS, MoH, GNHC a) Support to provide design, technology &

products for safe drinking water, and b)

support technical expertise to

construct/install bigger, modern and

integrated networks, reservoir and

distribution system c) Water flagship

program fund to come through

a) Students scoring at least 60% in

each STEM subject including

Dzongkha and English in BCSE

(X) by gender,

b) Students scoring at least 60%

each in English, Dzongkha, math

and Science in Class VI by gender

MoE

a) Support provision of subject-specific

teachers as per approved staffing pattern,

and b) training of teachers on critical and

highly specialized skills

Page 84: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

76

KPI which need strong/critical

central support Agencies

Specific support and interventions

required from central agencies

Waste recycled & waste disposal NEC, MoWHS, Thimphu

Dzongkhag, MoF

a) Support provision of ideas & technology

to recover waste & valuable raw materials,

b) how to recycle, c) how to manage residual

waste, d) what to do & where to sell

products of recycled waste, & e) how to

construct environment friendly & leachate

proof disposal sites

a) Initiatives to reduce vehicle

congestion

b) Ridership in public transport

(Bus

MoIC/Bhutan Post a) Support provision of technical expertise

to implement Bus Rapid Transport system

and infrastructures/facilities for Thimphu,

b) support provision of technical expertise

to plan and implement Intelligent Transport

system for Thimphu c) provide technical

support to develop and introduce proper

public transport system

Commonly availed services

delivered as per TAT

PSGRD, Office of PM &

Cabinet

a) Support to simplify and enhance service

delivery, and bring on board more services

currently provided manually through online

platforms, and b) train personnel mandated

to manage one window services

Civil servant position not filled RCSC & respective

Central agencies

Support to provide civil servants as per the

approved staffing pattern

a) Zomdu attendance by gender,

b) Grievances registered with

Thromde resolved

DLG, MoHCA Support to a) train LGs, and b) provide

oversight and enforcement of LG Act, rules

and regulations periodically to ensuring

people’s participation in decision-making

and grievances submitted, and follow up on

the Zomdu resolutions in terms of actions &

implementation

Community score card tool

implemented GNHC

Support to a) train planning officers, and b)

provide oversight and monitoring of

Community score card implementation &

follow up on improvement of LGs’ service

delivery as per the report results

Critical public infrastructure

(schools, hospitals and roads)

climate/disaster proofed MoWHS, DDM

(MoHCA), BPC, BT and

other service providers

a) Support training of engineers on

climate/disaster proofing engineering &

designing, and b) provide technology &

products to promote climate/proofed

infrastructures, buildings and houses c)

Collaboration with Thromde (BPC and

other service providers)

Page 85: TWELFTH FIVE YEAR PLAN...The 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It

77

KPI which need strong/critical

central support Agencies

Specific support and interventions

required from central agencies

Women entrepreneurship skills

development MoEA, MoLHR, NGOs

a) Provide trainers and expertise for

entrepreneurship training, business idea

development, access to resources (finance,

land and ancillary support) and regulatory

clearances in order to expedite

operationalization of their business

enterprises

20. Common Minimum Infrastructures

Sl. No. Activity Plan Outlay (Nu. in Million)

1 Common Service Duct 30.00 Total 30.00