3
888.293.2121 [email protected] myerstest.com 21 Washington Ave Scarborough, ME 04074 Type B Air Meter Operating Manual Note: Please refer to ASTM C231 and AASHTO T152 for complete and detailed test protocol. The following instruc- tions are intended as a guide for general operation. Note: Type B air meters are not to be used for concrete with lightweight or porous aggregate 1. Wet the meter bowl and fill the bowl in 3 equal layers. After each layer is poured, use a tamping rod to tamp the concrete 25 times, penetrating 1” into the previous layer. After tamping, hit the sides of the bucket 10-15 times with a standard 1lb rubber mallet. 2. Strike off with a metal strike off bar, clean the contact sur- face and dampen the rubber gasket on the air meter lid. 3. Clamp on cover securely and insure both petcocks are open, and that the bleeder valve cap is tightened. 4. Using the bulb syringe, inject water through one petcock until all the air is expelled (water ejected) through the opposite petcock. Do not tilt meter. Leave the petcocks open. 5. Using the built in pump, pump air into the meter until the dial on the gauge hits the calibrated initial pressure line. 6. Tap the gauge or wait a few seconds for the gauge hand to stabilize, then pump additional air or bleed off as necessary using the bleeder valve cap. 7. Close both petcocks, then press down on the needle valve lever to release pressurized air into the base. Tap the gauge, while holding the lever down for a few seconds until the gauge dial stabilizes. 8. Read the air content on the gauge and subtract the aggre- gate correction factor (see ASTM C231) 9. Carefully open petcocks to release air pressure, then re- move the lid. Immediately clean and flush the bucket, lid, and petcock openings with clean water to keep your meter cleaner longer. Operating Instructions: CA-0500 ACM-6 H-2786P

Type B Air Meter Operating Manual - Myers Associates, Inc.reset the gauge pointer. Remove bezel ring, gauge lens, and gasket. 10. Once gauge hand reads 5.0%, additional tests can be

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

  • [email protected]

    myerstest.com

    21 Washington AveScarborough, ME 04074

    Type B Air Meter Operating Manual

    Note: Please refer to ASTM C231 and AASHTO T152 for complete and detailed test protocol. The following instruc-tions are intended as a guide for general operation. Note: Type B air meters are not to be used for concrete with lightweight or porous aggregate

    1. Wet the meter bowl and fill the bowl in 3 equal layers. After each layer is poured, use a tamping rod to tamp the concrete 25 times, penetrating 1” into the previous layer. After tamping, hit the sides of the bucket 10-15 times with a standard 1lb rubber mallet.2. Strike off with a metal strike off bar, clean the contact sur-face and dampen the rubber gasket on the air meter lid. 3. Clamp on cover securely and insure both petcocks are open, and that the bleeder valve cap is tightened.4. Using the bulb syringe, inject water through one petcock until all the air is expelled (water ejected) through the opposite petcock. Do not tilt meter. Leave the petcocks open.5. Using the built in pump, pump air into the meter until the dial on the gauge hits the calibrated initial pressure line.6. Tap the gauge or wait a few seconds for the gauge hand to stabilize, then pump additional air or bleed off as necessary using the bleeder valve cap.7. Close both petcocks, then press down on the needle valve lever to release pressurized air into the base. Tap the gauge, while holding the lever down for a few seconds until the gauge dial stabilizes.8. Read the air content on the gauge and subtract the aggre-gate correction factor (see ASTM C231)9. Carefully open petcocks to release air pressure, then re-move the lid. Immediately clean and flush the bucket, lid, and petcock openings with clean water to keep your meter cleaner longer.

    Operating Instructions:

    CA-0500

    ACM-6

    H-2786P

  • [email protected]

    myerstest.com

    21 Washington AveScarborough, ME 04074

    Calibration Instructions:1. Fill the base with water (room temperature).2. Thread the short piece of straight tubing into the threaded petcock opening under the cover. Clamp the cover onto the base with the tube extending down into the water.3. Using the syringe, add water to the base through the threaded petcock until all air is expelled through the opposite petcock.4. Pump air pressure to beyond the initial pressure line and wait a few seconds while the gauge hand stabilizes. Then add or release air as needed until the gauge hand is stabilized at the initial pressure line.5. Close both petcocks and quickly press the needle valvelever. Using your finger, tap the gauge lightly while holding down the lever until the gauge hand reads zero. (Follow specification protocol if two or more tests show a variation greater than 0.1% from zero).

    6. Screw on the curved tube into the threaded petcock. Carefully fill the calibration vessel full by pressing on the needle valve lever and controlling the flow with the petcock lever. 7. Open the free petcock to release air pressure. Allow water from the tube to run back into the base by opening the other petcock (there should be 5% air in the base).8. While both petcocks are open, follow the procedure from step 4 to pressurize the meter to the initial pressure line. Close the petcocks and quickly press the needle valve lever. Stabilize the gauge hand. (The gauge should read 5.0%).9. If two or more tests indicate more than 0.1% variation, reset the gauge pointer. Remove bezel ring, gauge lens, and gasket. 10. Once gauge hand reads 5.0%, additional tests can be run in increments of 5% by withdrawing additional water with the calibration vessel

    Carrying Cases:

    Gauge Options:

    Air Meter Gauge with Rubber ProtectorACM-6-07A

    Standard Air Meter GaugeACM-6-07

    ACM-6-36

    ACM-6-36ACM-6-32

    ACM-6-32

    ACM-6-34A

    ACM-6-34A

    ACM-6-31

    RM-1

    ACM-6-33

    ACM-6-33

    ACM-6-38PAM-0176

    ACM-33AACM-33A

    ACM-6-33

    ACM-6-32

    ACM-6-34A ACM-6-34A

    ACM-6-36

    CA-0500-30

    H-2785.38HP

    H-2783.31

  • [email protected]

    myerstest.com

    21 Washington AveScarborough, ME 04074

    Parts Diagram:

    Part# Description Qty.ACM-6-60 Ultra Pump 1

    ACM-60-1 Top Knob 1

    ACM-6-60-2 Steel Nut 1

    ACM-6-60-3 Vinyl Shielding 1

    ACM-6-60-4 Top Housing 1

    ACM-6-60-5 Housing O-Ring 1

    ACM-6-60-6 Pump Shaft 1

    ACM-6-60-7 Internal Rod 1

    ACM-6-60-8 Rod Shock O-Ring (Optional) 1

    ACM-6-60-9 Plunger O-Ring 1

    ACM-6-60-10 Plunger Spool 1

    ACM-6-60-61 Check Valve with Gasket 1

    ACM-6-60-PK Pump Repair Kit 1

    Item # Part# Description Qty.

    01 ACM-6-01 Pressure Chamber 1

    02 ACM-6-02 Pressure Chamber Cap 1

    03 ACM-6-03 45° Elbow 1

    04 ACM-6-04 Chamber Gasket 2

    05 ACM-6-05 Bleeder Valve Stem 1

    06 ACM-6-06 Bleeder Cap & Gasket 1

    07 ACM-6-07 Air Meter Gauge 1

    11 ACM-6-11 Needle Valve Stem 1

    12 ACM-6-12 Needle Valve Nut 1

    13 ACM-6-13 Needle Valve Lever 1

    14 ACM-6-14 Needle Valve Spacer 1

    15 ACM-6-15 Needle Valve O-Ring 1

    16 ACM-6-16 Needle Valve Spring 1

    17 ACM-6-17 Spring Retainer Nut/Clip 1

    18 ACM-6-18 Valve Seat Assembly 1

    19 ACM-6-19 Air Meter Lid 1

    20 ACM-6-20 Cover Lid O-Ring 1

    21 ACM-6-21 Petcock-Ball Valve Type 2

    22 ACM-6-22A ACM Style Clamp Assembly 4

    29 ACM-6-29 Meter Base 1