NOTES: 1. METHOD APPLIES TO WATERBODIES THAT ARE NOT STATE DESIGNATED FISHERIES WHERE FLUME CROSSINGS ARE NOT REQUIRED. IF TOPOGRAPHY PERMITS TEMPORARY EQUIPMENT BRIDGE INSTALLATION, THE CONTRACTOR SHALL TRENCH, STRING, WELD, COAT, WEIGHT (IF NECESSARY). LOWER IN AND BACKFILL UTILIZING THE MAIN LINE CREW TRAVELING OVER THE BRIDGE. IF TOPOGRAPHY PROHIBITS INSTALLATION OF A TEMPORARY EQUIPMENT BRIDGE, CONTRACTOR SHALL TRENCH UP TO BOTH SIDES OF CROSSING; STRING, WELD, COAT AND WEIGHT (IF NECESSARY) USING THE MAINLINE CREW. IN STREAM EXCAVATION, LOWER IN, AND BACKFILL WILL UTILIZE A CLAM OR HOES WORKING FROM THE BANKS. 2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE. 3. CONSTRUCT SEDIMENT BARRIERS ALONG THE SIDES OF STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. 4. IN-STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL. 5. INSTALL TEMPORARY (SOFT) PLUGS AT THE EDGE OF STREAM BANKS UNTIL JUST PRIOR TO PIPE INSTALLATION TO CONTROL WATER FLOW & TRENCH SLOUGHING. 6. TRENCH THROUGH WATERBODY USING MAINLINE EXCAVATION EQUIPMENT WHERE PRACTICAL. 7. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION. 8. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE-CONSTRUCTION PROFILE AND SUBSTRATE. 9. RESTORE STREAM BANKS TO APPROPRIATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED. CONSTRUCTION RIGHT OF WAY WIDTH TEMPORARY CONSTRUCTION AREA SPOIL PILE SEDIMENT BARRIER WATERBODY SPOIL PILE TEMPORARY EQUIPMENT CROSSING PIPE WELDED, COATED & WEIGHTED (IF NECESSARY) SPOIL PILE IN-STREAM SPOIL SOFT PLUG (SEE NOTE 5) FLOW SEDIMENT BARRIER IN-STREAM SPOIL SPOIL PILE TRENCH SEDIMENT BARRIER SEDIMENT BARRIER PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_Waterbody_Crossings.dwg DRAWING TITLE: FIGURE NO. FILE NO. DATE: SCALE: Associated Engineering Drawings DONLIN GOLD PROJECT APPLICANT: Donlin Gold, LLC 4720 Business Park Blvd., Suite G-25 Anchorage, Alaska 99503 AS SHOWN TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT DETAIL 10/23/2015 PA-146T POA-1995-120 P01C-TYWC-03.DWG (BAKER) OCT 2013 A TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT N.T.S. 146T

TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

NOTES:

1. METHOD APPLIES TO WATERBODIES THAT ARE NOT STATE DESIGNATED FISHERIES WHERE FLUME CROSSINGS ARE NOT

REQUIRED. IF TOPOGRAPHY PERMITS TEMPORARY EQUIPMENT BRIDGE INSTALLATION, THE CONTRACTOR SHALL TRENCH,

STRING, WELD, COAT, WEIGHT (IF NECESSARY). LOWER IN AND BACKFILL UTILIZING THE MAIN LINE CREW TRAVELING OVER THE

BRIDGE. IF TOPOGRAPHY PROHIBITS INSTALLATION OF A TEMPORARY EQUIPMENT BRIDGE, CONTRACTOR SHALL TRENCH UP

TO BOTH SIDES OF CROSSING; STRING, WELD, COAT AND WEIGHT (IF NECESSARY) USING THE MAINLINE CREW. IN STREAM

EXCAVATION, LOWER IN, AND BACKFILL WILL UTILIZE A CLAM OR HOES WORKING FROM THE BANKS.

2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE.

3. CONSTRUCT SEDIMENT BARRIERS ALONG THE SIDES OF STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO

PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY.

4. IN-STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL.

5. INSTALL TEMPORARY (SOFT) PLUGS AT THE EDGE OF STREAM BANKS UNTIL JUST PRIOR TO PIPE INSTALLATION TO CONTROL

WATER FLOW & TRENCH SLOUGHING.

6. TRENCH THROUGH WATERBODY USING MAINLINE EXCAVATION EQUIPMENT WHERE PRACTICAL.

7. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION.

8. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE-CONSTRUCTION PROFILE AND SUBSTRATE.

9. RESTORE STREAM BANKS TO APPROPRIATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED.

CONSTRUCTION

RIGHT OF WAY WIDTH

TEMPORARY CONSTRUCTION AREA

SPOIL PILE

SEDIMENT BARRIER

WATERBODY

SPOIL PILE

TEMPORARY

EQUIPMENT CROSSING

PIPE WELDED, COATED

& WEIGHTED (IF NECESSARY)

SPOIL PILE

IN-STREAM SPOIL

SOFT PLUG

(SEE NOTE 5)

FLOW

SEDIMENT BARRIER

IN-STREAM SPOIL

SPOIL PILE

TRENCH

SEDIMENT BARRIER

SEDIMENT BARRIER

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_Waterbody_Crossings.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL FLOWING WATERBODY

CROSSING OPEN-CUT DETAIL

10/23/2015

PA-146T

POA-1995-120

P01C-TYWC-03.DWG (BAKER) OCT 2013

A

TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT

N.T.S.

146T

Page 2: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

NOTES:

1. THIS METHOD APPLIES TO SWALES, DRAINS, SMALL STREAMS OR CREEKS WITH LIMITED FLOW AT TIME OF CONSTRUCTION WHERE DOWNSTREAM SILTATION MUST BE

AVOIDED AND THE CROSSING WIDTH IS NOT PROHIBITIVE.

2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE.

3. COMPLETE ALL IN-STREAM ACTIVITIES AS EXPEDIENTLY AS POSSIBLE.

4. INSTALL TEMPORARY VEHICLE CROSSING, IF REQUIRED.

5. IN-STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN THE SITE SPECIFIC CROSSING

PLANS.

6. CONSTRUCT SEDIMENT BARRIERS TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING INTO WATERBODY. CONSTRUCTED SEDIMENT BARRIERS SHALL EXTEND

ALONG THE SIDES OF THE SPOIL AND TOPSOIL STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW

CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY.

7. CONSTRUCT UPSTREAM STRUCTURE (DAM) FOLLOWED BY DOWNSTREAM STRUCTURE (DAM). WATER STRUCTURES' (AQUA DAM, JERSEY BARRIERS, SAND BAGS, STEEL

PLATE, POLYETHYLENE LINER, ETC.) FINAL LOCATION WILL BE APPROVED BY THE COMPANY INSPECTOR.

8. SIZE PUMPS FOR DIVERSION OF ENTIRE STREAM FLOW. CONTRACTOR SHALL MAINTAIN 100% SPARE PUMPING CAPACITY ON SITE. PUMPS SHALL BE INSTALLED ON

POLYETHYLENE BARRIERS FOR FUEL/OIL SPILL CONTAINMENT. PUMP INTAKES WILL BE SCREENED TO PREVENT ENTRAPMENT OF FISH. CONTRACTOR SHALL MONITOR

PUMPS AND WATER STRUCTURES ON A 24 HOUR BASIS UNTIL THE CROSSING INSTALLATION IS COMPLETE. SHOULD LEAKAGE AT THE DAM STRUCTURES OCCUR,

CONTRACTOR SHALL DEWATER BETWEEN THE STRUCTURES THROUGH AN APPROPRIATE FILTER AND ONTO A WELL VEGETATED UPLAND AREA.

9. LEAVE HARD PLUGS AT STREAM BANK EDGE UNTIL JUST PRIOR TO PIPE INSTALLATION.

10. COMPLETE CONSTRUCTION OF IN-STREAM PIPE SECTION. WEIGHT PIPE AS NECESSARY PRIOR TO COMMENCEMENT OF IN-STREAM ACTIVITY.

11. TRENCH THROUGH WATERBODY AS EXPEDIENTLY AS PRACTICAL. INSTALL TEMPORARY (SOFT) PLUGS, IF NECESSARY, TO CONTROL WATER FLOW AND TRENCH SLOUGHING.

12. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION.

13. LOWER-IN PIPE, INSTALL TRENCH PLUG AND BACKFILL IMMEDIATELY.

14. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE-CONSTRUCTION PROFILE AND SUBSTRATE.

15. DISMANTLE DOWNSTREAM WATER STRUCTURE (DAM) AND UPSTREAM WATER STRUCTURE (DAM) AFTER TRENCH BACKFILL.

16. RESTORE STREAM BANKS TO APPROXIMATE ORIGINAL CONDITION. STABILIZE WATERBODY BANKS AND INSTALL TEMPORARY BARRIERS.

CONSTRUCTION

R.O.W. WIDTH

EXTRA TEMP. WORKSPACE

(AS REQUIRED)

FLOW

WATERBODY

DRAINAGE

BACKHOE

BACKHOE

TE

MP

.

EQ

UIP

ME

NT

C

RO

SS

IN

G

50'50'

50'

50'

10'

10'

SPOIL PILE

SEDIMENT

BARRIER

IN-STREAM

SPOIL

TRENCH

HARD

PLUG

TOPSOIL

SEDIMENT

BARRIER

WATER

INLET

IN-STREAM SPOIL

POLYETHYLENE

BERMED BARRIER

STANDBY

SEDIMENT

BARRIER

SPOIL

PILE

HARD

PLUG

PIPE WELDED, COATED

& WEIGHTED (IF NECESSARY)

TOPSOIL

SEDIMENT

BARRIER

WATER STRUCTURE

(DAM) TYPICAL

CONSTRUCTION

R.O.W. WIDTH

EXTRA TEMP. WORKSPACE

(AS REQUIRED)

BACKHOE

SPOIL PILE

SEDIMENT

BARRIER

IN-STREAM

SPOIL

TRENCH

HARD

PLUG

TOPSOIL

SEDIMENT

BARRIER

PIPE WELDED, COATED

& WEIGHTED (IF NECESSARY)

HARD

PLUG

BACKHOE

EQ

UIP

ME

NT

C

RO

SS

IN

G

WATERBODY

FLOW

IN-STREAM SPOIL

SEDIMENT

BARRIER

SPOIL PILE

STANDARD

DAM

FLUME

STEEL

PIPE

STANDARD DAM

10'

10'

TBD

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Waterbody_Crossings.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL WATERBODY

CROSSING OPEN-CUT DETAIL

9/21/2015

PA-147T

POA-1995-120

P01C-TYWC-04.DWG, P01C-TYWC-05.DWG (BAKER) OCT 2013

A

TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT DAM & PUMP

N.T.S.

147T

B

TYPICAL WATERBODY CROSSING OPEN-CUT DRY FLUME

N.T.S.

147T

Page 3: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

NOTES:

1. NORMAL FLOW OF DRAINAGE NOT TO BE CHANGED FOLLOWING PIPELINE CONSTRUCTION OPERATIONS.

2. CONSTRUCT ALL CROSSINGS IN ACCORDANCE WITH ENVIRONMENTAL PERMIT REQUIREMENTS AND CONDITIONS.

3. PIPELINE TO BE INSTALLED BY OPEN-CUT METHOD.

TOP OF BANK

TRENCHTRENCH

TEMPORARY VEHICLE CROSSING

WA

TE

RC

OU

RS

E

BUFFER

ZONES

SPOIL PILE

SPOIL PILE

BELLHOLE

TOPSOIL OR

STRIPPINGS

BORING MACHINE

OVERSIZE BELLHOLE

TOPSOIL OR

STRIPPINGS

TOPSOIL OR

STRIPPINGS

TOPSOIL OR

STRIPPINGS

SUBSOIL

BELLHOLE

WATERBODY

OVERSIZE BELLHOLE

SUBSOIL

BORING MACHINE

5'

MIN.

MIN.

COVER

NATURAL

GRADE

PIPELINE

MARKER

PIPELINE MARKER

NATURAL GRADE

COVER

VARIES

MIN.

COVER

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Waterbody_Crossings.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL WATERBODY

CROSSING DETAIL

9/21/2015

PA-148T

POA-1995-120

P01C-TYWC-06.DWG, P01C-TYWC-07.DWG (BAKER) OCT 2013

A

TYPICAL WATERBODY CROSSING HORIZONTAL BORE PLAN AND SECTION

N.T.S.

148T

B

TYPICAL SMALL CREEK CROSSING SECTION

N.T.S.

148T

Page 4: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

2' MIN.

2' MIN.

5-15

SLOPE(%) SPACING (FEET)

300

>15-30 200

>30 100

SLOPE BREAKER NOTES:

1. SLOPE BREAKERS SHALL BE CONSTRUCTED OF NATIVE SOIL AND INSTALLED AT LOCATIONS AS SHOWN ON

THE CONSTRUCTION DRAWINGS, OR AS REQUIRED.

2. SLOPE BREAKER SHALL BE ORIENTED AS SHOWN OR OTHER PATTERN AS REQUIRED.

3. SLOPE BREAKERS SHALL BE CONSTRUCTED AT A 2-8% GRADIENT ACROSS THE SLOPE.

4. THE SLOPE BREAKERS SHALL BE 18" DEEP (AS MEASURED FROM THE TROUGH TO THE TOP OF THE SLOPE

BREAKER). THE TROUGH WILL BE A MINIMUM OF 5' WIDE ACROSS THE WIDTH OF THE RIGHT-OF-WAY.

5. THE OUTLET OF THE SLOPE BREAKER MUST FREELY DISCHARGE ALL RUNOFF OFF THE DISTURBED R.O.W.

INTO A STABLE, WELL VEGETATED AREA OR INTO AN ENERGY DISSIPATOR.

6. WHERE SLOPE BREAKERS EXTEND BEYOND THE EDGE OF THE CONSTRUCTION R.O.W. TO DIRECT RUNOFF

INTO STABLE, WELL VEGETATED AREAS, THESE LOCATIONS MUST BE APPROVED.

SILT FENCING, STAKED HAY BALES,

ROCK, OR STABLE VEGETATED

AREA AS AN ENERGY DISSIPATOR

FLOW

18"

2' M

IN

.

5

' M

IN

.

FLOW

FLOW ENERGY DISSIPATOR NOTES:

1. THE OUTLET SHALL CONTAIN AN ENERGY DISSIPATOR IF THE COMPANY DETERMINES EXISTING VEGETATION

IS NOT SUFFICIENTLY STABLE TO PREVENT EROSION. THE ENERGY DISSIPATOR SHALL BE CONSTRUCTED

AS FOLLOWS:

OUTFALL END OF DISSIPATOR SHOULD BE LOWER THAN SLOPE BREAKER END.

SILT FENCE, STRAW BALE OR ROCK DISSIPATORS SHOULD BE KEYED INTO THE END OF THE SLOPE

BREAKER. PROVIDE ENOUGH AREA INSIDE "L" TO CAPTURE AND HOLD SEDIMENT.

R

IG

H

T

-O

F

-W

A

Y

2' MIN.

C

O

M

P

A

C

T

E

D

F

I

L

L

D

O

W

N

S

L

O

P

E

2' MIN.

C

O

M

P

A

C

T

E

D

F

I

L

L

D

O

W

N

S

L

O

P

E

L

E

S

S

T

H

A

N

<

3

°

R

IG

H

T

-

O

F

-

W

A

Y

C

O

M

P

A

C

T

E

D

F

I

L

L

C

O

M

P

A

C

T

E

D

F

I

L

L

LIMITS OF

DISTURBED R.O.W.

EDGE OF

DISTURBED R.O.W.

ROCK ENERGY

DISSIPATOR

KEY ROCK INTO

WATER BAR

STABLE

VEGETATED

AREA

R.O.W.

BOUNDARY

R.O.W.

BOUNDARY

5-15

SLOPE(%) SPACING (FEET)

300

>15-30 200

>30 100

5-15

SLOPE(%) SPACING (FEET)

300

>15-30 200

>30 100

ROCK OR STABLE VEGETATED

AREA AS AN ENERGY DISSIPATOR

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Slope_Breaker.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL SLOPE BREAKER WITH

LONGITUDINAL CROSS SLOPES DETAIL

9/21/2015

PA-149T

POA-1995-120

P01W-TYEC-10.DWG, P01W-TYEC-11.DWG, P01W-TYEC-12.DWG

(BAKER) OCT 2013

A

TYPICAL SLOPE BREAKER WITH LONGITUDINAL CROSS SLOPES

N.T.S.

149T

B

TYPICAL SLOPE BREAKER WITH LONGITUDINAL CROSS SLOPES

N.T.S.

149T

C

TYPICAL SLOPE BREAKER WITH LONGITUDINAL CROSS SLOPES

N.T.S.

149T

Page 5: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

2

0

%

S

L

O

P

E

1

:

1

RIG

HT

O

F W

AY

RIG

HT

O

F W

AY

2

0

%

S

L

O

P

E

±68' 5'

20'

25'

"MODERATE"

DISTURBANCE±110' "HEAVY" DISTURBANCE

±15'

"MODERATE"

DISTURBANCE

150'

FILL

APPROX. 1.5:1 SLOPE

OR AS PER FIELD CONDITIONS

2'

4.5'

APPROX. 1:1 SLOPE

OR AS PER FIELD CONDITIONS

DITCH SPOIL

TOPSOIL

1'

TOP OF CROWN

BURIED PIPELINE

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Side_Slope_Section.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL SIDE SLOPE SECTION -

TWO TONED DETAIL

9/21/2015

PA-150T

POA-1995-120

P01W-TYRW-01.DWG, P01W-TYRW-02.DWG (BAKER) OCT 2013

A

ACTIVE CONSTRUCTION RIGHT OF WAY

N.T.S.

150T

B

RECLAIMED RIGHT OF WAY

N.T.S.

150T

Page 6: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

CROSS SECTION

SIDE VIEW

NOTES:

1. TRENCH BREAKERS SHALL BE INSTALLED:

· ON SLOPES ALONG THE TRENCH LINE WHERE THE NATURAL DRAINAGE PATTERN, PROFILE, AND TYPE OF BACKFILL MATERIAL MAY RESULT IN

LOSS OF BACKFILL MATERIAL OR ALTERATION OF THE NATURAL PATTERN

· AT THE BASE OF SLOPES ADJACENT TO WATERBODIES AND WETLANDS

· WHERE NEEDED TO AVOID DRAINING A WETLAND

2. OPEN WEAVE HEMP OR JUTE SACKS SHALL BE FILLED WITH A MINIMUM OF 55lbs IN A MIXTURE OF SAND & SUBSOIL.

3. BREAKER SPACING AND CONFIGURATION, INCLUDING THE NEED TO KEY THE BREAKER INTO THE UNDISTURBED SOIL AT THE SIDES AND BOTTOM

OF THE TRENCH, MAY CHANGE AS DETERMINED BY COMPANY ENGINEER.

NOTES:

1. MINI-TRENCH BREAKERS SHALL BE INSTALLED AT EDGE OF EACH WETLAND.

2. OPEN WEAVE HEMP OR JUTE SACKS SHALL BE FILLED WITH A MINIMUM OF 55lbs. OF SAND OR SUBSOIL.

3. BREAKER CONFIGURATION MAY BE CHANGED TO INCLUDE KEYING AS DETERMINED BY COMPANY ENGINEER.

TRENCH BREAKER

PIPELINE

12"

12"

TOPSOIL

OR NATIVE MATERIAL

24"

7"

14"

SACK LIMIT

12" MINIMUM OR AS

DIRECTED BY COMPANY

TOPSOIL

OR NATIVE MATERIAL

TRENCH LIMIT

KEY SLOT

UPLAND

WETLAND

UPLAND

PIPELINE

MINI TRENCH BREAKER

EDGE OF WETLAND

CROSS SECTION

SIDE VIEW

TOPSOIL

OR NATIVE MATERIAL

TOPSOIL

OR NATIVE MATERIAL

TRENCH LIMIT

SACK LIMIT

KEY BREAKER 6"

BELOW PADDING

IN ROCK OR

BOULDER AREAS

12"

14"

24"

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_Trench_Breaker.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL TRENCH BREAKER

DETAIL

10/23/2015

PA-151T

POA-1995-120

P01W-TYTR-01.DWG, P01W-TYTR-02.DWG, P01W-TYTR-03.DWG

(BAKER) OCT 2013

A

ACTIVE CONSTRUCTION RIGHT OF WAY

N.T.S.

151T

B

TYPICAL TRENCH BREAKER REQUIREMENTS

N.T.S.

151T

Page 7: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

GRADE

10'-0"

6'-6"

10'-0"

6"

6"

6"

3"

3"

8'-0"

2'-0"

4'-6"

2'-0

"3

'-6

"

SE

E N

OT

E #

1

NOTES:

1. MARKERS SHALL BE PLACED DIRECTLY OVER THE PIPELINE WHEN THERE IS AT LEAST 1'-0" OF

CLEARANCE BETWEEN THE TOP OF THE PIPE.

2. PIPE AND THE BOTTOM OF THE MARKER. MARKERS SHALL BE SLIGHTLY OFFSET IF THE

CLEARANCE IS LESS THAN 1'-0". MARKERS WILL BE OFFSET IF THE PIPELINE IS IN A ROADWAY.

NOTES:

1. CONTRACTOR TO ASSEMBLE SIGN AND MOUNT ON POST.

2. REFLECTIVE STRIPING SHOULD BE ADDED ON ALL SIDES OF POST.

GRADE

1"x1"

3" GALV. PIPE

1

2

" GALV.

BOLT & NUT

2

1

2

" PIPE

DOT

REFLECTIVE

TAPE

BRADY/CARSONITE

WARNING STAKE

(YELLOW COLOR)

REFLECTIVE DECAL

(BOTH SIDES)

3" STD WT PIPE

BLACK

INTERNATIONAL

ORANGE

MEDIUM YELLOW

6" WIDE

REFLECTIVE TAPE

MEDIUM YELLOW

WELD 1"x1" ANGLE TO

PIPE POST FOR ANCHOR

INSTALL 3" STD. WT.

PIPE POST 9' LONG

4'-0"

6'-0"

2'-0"

1'-0"

1'-0" 1'-0"

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Pipeline_Marker.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL PIPELINE MARKER

DETAIL

9/21/2015

PA-152T

POA-1995-120

P01C-TYMK-01.DWG, P01C-TYMK-02.DWG, P01C-TYMK-03.DWG

(BAKER) OCT 2013

A

TYPICAL PIPELINE MARKER

N.T.S.

152T

B

TYPICAL PIPELINE WARNING MARKER

N.T.S.

152T

C

TYPICAL PIPELINE AERIAL MARKER

N.T.S.

152T

Page 8: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

NOTES:

1. ALL WIRE SHALL BE INSULATED STRANDED COPPER #12 THHN AS SHOWN ABOVE.

2. TERMINAL BLOCK SHALL BE WIRED BY CONTRACTOR AS SHOWN IN TERMINAL DETAIL ABOVE.

3. ALL WIRE CONNECTIONS TO CARRIER PIPE SHALL BE MADE AS SHOWN IN DETAIL ABOVE. WIRE SHALL BE CONNECTED TO PIPE BY CADWELD

PROCESS WITH COPPER HEAT SLEEVE.

4. CADWELD WIRE CONNECTIONS SHALL BE PRIMED WITH ROYSTON SPRAY PRIMER OR EQUAL AND ALLOWED TO DRY 3 TO 4 MINUTES OR UNTIL

TACKY, AND COVERED WITH ROYSTON HANDY CAP OR EQUAL.

5. WIRE INSULATION SHALL BE PROTECTED FROM DAMAGE.

6. LAY WIRES ALONGSIDE PIPE. NOT OVER OR UNDER PIPE.

7. CATHODIC PROTECTION TEST STATION AND ALL OTHER MATERIALS SHALL BE FURNISHED BY CONTRACTOR.

8. INSTALL AT ALL LOCATIONS INDICATED ON ALIGNMENT SHEETS.

NOTE:

ALL WIRES TO MAKE A COMPLETE LOOP AROUND PIPE.

NOTES:

1. ALL WIRE SHALL BE INSULATED STRANDED COPPER #12 THHN AS SHOWN ABOVE.

2. TERMINAL BLOCK SHALL BE WIRED BY CONTRACTOR AS SHOWN IN TERMINAL DETAIL ABOVE.

3. ALL WIRE CONNECTIONS TO CARRIER PIPE SHALL BE MADE AS SHOWN IN DETAIL ABOVE. WIRE SHALL BE CONNECTED

TO PIPE BY CADWELD PROCESS WITH COPPER HEAT SLEEVE.

4. CADWELD WIRE CONNECTIONS SHALL BE PRIMED WITH ROYSTON SPRAY PRIMER OR EQUAL AND ALLOWED TO DRY 3

TO 4 MINUTES OR UNTIL TACKY, AND COVERED WITH ROYSTON HANDY CAP OR EQUAL.

5. WIRE INSULATION SHALL BE PROTECTED FROM DAMAGE.

6. LAY WIRES ALONGSIDE PIPE. NOT OVER OR UNDER PIPE.

7. CATHODIC PROTECTION TEST STATION AND ALL OTHER MATERIALS SHALL BE FURNISHED BY CONTRACTOR.

8. INSTALL AT ALL LOCATIONS INDICATED ON ALIGNMENT SHEETS.

COTT (5) LEAD

BIG FINK TEST STATION OR EQUIVALENT

NOTE:

WIRES TO BE TERMINATED WITH RING TERMINALS.

PIPE CONNECTION DETAIL

(SEE NOTES 3,4, & 5)

TERMINAL DETAIL

PIPE CONNECTION DETAIL

(SEE NOTES 3,4, & 5)

TERMINAL DETAIL

WIRE

PIPE COATING

CARRIER PIPE

#12 COPPER HEAT SLEEVE

CADWELD CONNECTION

ROYSTON HANDY CAP OR EQUAL

WIRE

PIPE COATING

CARRIER PIPE

#12 COPPER HEAT SLEEVE

CADWELD CONNECTION

ROYSTON HANDY CAP OR EQUAL

2'-0"

30"

3'-6"

24"

GRADE

PIPELINE WARNING SIGN

SEE TERMINAL DETAIL

CATHODIC PROTECTION TEST STATION

TAPE

#12 WHITE WIRE (SPARE)

SEE CONN. DETAIL (TYP.)

#12 WHITE WIRE

COUPON TO BE PLACED ALONGSIDE

BOTTOM HALF OF PIPE

FLOW

30"

3'-6"

24"

GRADE

PIPELINE WARNING SIGN

SEE TERMINAL DETAIL

CATHODIC PROTECTION TEST STATION

18"

NOTE:

ALL WIRES TO MAKE A COMPLETE LOOP AROUND PIPE.

2'-0"

TAPE

#12 WHITE WIRE (SPARE)

SEE CONN. DETAIL (TYP.)

#12 BLACK WIRE

FLOW

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Cathodic_Protection.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL CATHODIC

PROTECTION DETAIL

9/21/2015

PA-153T

POA-1995-120

P01C-TYTS-01.DWG, P01C-TYTS-02.DWG (BAKER) OCT 2013

A

TYPICAL CATHODIC PROTECTION COUPON TEST STATION

N.T.S.

153T

B

TYPICAL PIPELINE WARNING MARKER

N.T.S.

153T

Page 9: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

HANDWHEEL

NOTES:

1. REFERENCE DRAWING (DONLIN PIPELINE MLV DWG) AND CONSTRUCTION SPECIFICATIONS FOR DETAILED CONSTRUCTION GUIDELINES.

2. LOCATION OF GATE TO BE FIELD DETERMINED.

TBD TBD

TBD

TBD

TBD

TBD

12" MLV

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_MLV_Fencing.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL MLV FENCING DETAIL

9/21/2015

PA-154T

POA-1995-120

P01M-DTVA-01.DWG (BAKER) OCT 2013

A

TYPICAL MLV FENCING

N.T.S.

154T

Page 10: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

LEGEND

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

PERMANENT RIGHT OF WAY BOUNDARY

TEMPORARY USE AREA

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

NODWELL 240

FUEL TANKER

NODWELL 240

LUBE & OIL TRUCK

CAT D-6 LGP

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER BUNCHER

WHEELED HYDRO AX

NODWELL 240 FUEL TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

LOG DECK

PIONEER ACCESS

(APPROX. 25' WIDE)

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

HUSKY 8 TRANSPORTER

MAT STAGING

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

4'X 16' SWAMP MATS

TRACKED FELLER BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

TRACKED FELLER

BUNCHER

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

GRADED R.O.W.MODE

9/21/2015

PA-155T

POA-1995-120

P01C-TYRWS-01.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 11: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

DODGE 3500

MEGA CAB

PICK-UP

SKIDS

SEGREGATED ORGANIC SPOIL PILE

NODWELL 240 FUEL TANKER/WATER

TANKER

NODWELL 240 LUBE & OIL

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

PICK-UP TRUCK

LENGTH: 20.8', WIDTH: 8'

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

MA

KE

-U

P A

RE

A, W

OR

KIN

G S

ID

E &

T

RA

VE

L L

AN

E

55'

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

GRADED R.O.W. MODE

9/21/2015

PA-156T

POA-1995-120

P01C-TYRWS-05.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 12: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

ORGANIC SPOIL PILE

2'

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

MAKE-UP AREA, WORKING SIDE & TRAVEL LANESEGREGATED ORGANIC SPOIL & TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION SUMMER

GRADED R.O.W. MODE

9/21/2015

PA-157T

POA-1995-120

P01C-TYRWS-07.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 13: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

LEGEND

PERMANENT RIGHT OF WAY BOUNDARY

TEMPORARY USE AREA

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

NODWELL 240

FUEL TANKER

NODWELL 240

LUBE & OIL TRUCK

CAT D-6 LGP

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER

BUNCHER

WHEELED HYDRO

AX

NODWELL 240 FUEL

TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

LOG DECK

PIONEER ACCESS

(APPROX. 25' WIDE)

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

HUSKY 8 TRANSPORTER

MAT STAGING

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

4'X 16' SWAMP MATS

TRACKED FELLER

BUNCHER

TRACKED FELLER

BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

PERMAFROST R.O.W. MODE

9/21/2015

PA-158T

POA-1995-120

P01C-TYRWS-08.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 14: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

DODGE 3500

MEGA CAB

PICK-UP

SKIDS

SEGREGATED ORGANIC SPOIL PILE

NODWELL 240 FUEL TANKER/WATER

TANKER

NODWELL 240 LUBE & OIL

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

PICK-UP TRUCK

LENGTH: 20.8', WIDTH: 8'

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

MA

KE

-U

P A

RE

A, W

OR

KIN

G S

ID

E &

T

RA

VE

L L

AN

E

55'

GRAVEL WORK PAD

(18" THICK MINUMUM)

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

PERMAFROST R.O.W. MODE

9/21/2015

PA-159T

POA-1995-120

P01C-TYRWS-12.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 15: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

ORGANIC SPOIL PILE

2'

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

MAKE-UP AREA, WORKING SIDE & TRAVEL LANE

SEGREGATED ORGANIC SPOIL & TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

GRAVEL WORK PAD

(18" THICK MINIMUM)

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION SUMMER

PERMAFROST R.O.W. MODE

9/21/2015

PA-160T

POA-1995-120

P01C-TYRWS-14.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 16: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

LEGEND

CONSTRUCTION RIGHT OF WAY BOUNDARY

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

HUSKY 4

FLOATING EXCAVATOR

NODWELL 240

FUEL TANKER

NODWELL 240

LUBE & OIL TRUCK

CAT D-6 LGP

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER

BUNCHER

WHEELED HYDRO AX

NODWELL 240 FUEL TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

LOG DECK

TEMPORARY USE AREA

PIONEER ACCESS

(APPROX. 25' WIDE)

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

HUSKY 8 TRANSPORTER

MAT STAGING

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

4'X 16' SWAMP MATS

TRACKED FELLER BUNCHER

TRACKED FELLER

BUNCHER

HUSKY 4

FLOATING

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

WETLANDS R.O.W. MODE

9/21/2015

PA-161T

POA-1995-120

P01C-TYRWS-15.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 17: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

DODGE 3500

MEGA CAB

PICK-UP

4' X 16'

SWAMP MATS (TYP.)

PICK-UP TRUCK

LENGTH: 20.8', WIDTH: 8'

SKIDS

SEGREGATED ORGANIC SPOIL PILE

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

NODWELL 240 FUEL TANKER/WATER

TANKER

NODWELL 240 LUBE & OIL

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

AS NEEDED

PASSING LANE (MOVES WITH CONSTRUCTION)

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

NOTES:

1. MATS OR CORDUROY TIMBER AS NEEDED.

2. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN SUMMER

WETLANDS R.O.W. MODE

9/21/2015

PA-162T

POA-1995-120

P01C-TYRWS-19.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 18: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

ORGANIC SPOIL PILE

2'

4'-6

"

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

16'X4'' SWAMP MATS OR

CORDUROY (TYP.)

(AS REQ'D.)

MAKE-UP AREA, WORKING SIDE & TRAVEL LANE

SEGREGATED ORGANIC SPOIL & TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

1

:

1

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION SUMMER

WETLANDS R.O.W. MODE

9/21/2015

PA-163T

POA-1995-120

P01C-TYRWS-21.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 19: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

LEGEND

PERMANENT RIGHT OF WAY BOUNDARY

TEMPORARY USE AREA

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

NODWELL 240

FUEL TANKER

(MOBILE)

CAT D-6 LGP

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER

BUNCHER

WHEELED HYDRO AX

NODWELL 240 FUEL TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

LOG DECK

PIONEER ACCESS

(APPROX. 25' WIDE)

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

HUSKY 8 TRANSPORTER

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

TRACKED FELLER BUNCHER

TRACKED FELLER

BUNCHER

HUSKY 4

HIGH FLOATATION

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

HUSKY 4

HIGH FLOATATION

EXCAVATOR

NODWELL 240

LUBE & OIL TRUCK

(MOBILE)

SNOW CLEARING STORED BETWEEN TREES

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

GRADED R.O.W MODE

9/22/2015

PA-164T

POA-1995-120

P01C-TYRWW-01.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 20: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

SNOW CLEARING STORED BETWEEN TREES

SNOW CLEARING STORED BETWEEN TREES

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

SKIDS

SEGREGATED ORGANIC SPOIL PILE

NODWELL 240 FUEL TANKER/WATER TANKER

NODWELL 240 LUBE & OIL

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

MA

KE

-U

P A

RE

A, W

OR

KIN

G S

ID

E &

TR

AV

EL

L

AN

E

55'

SNOWCAT

1644

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY

BOUNDARY

SNOWCAT 1644

ICE PAD OR

GRAVEL PAD

WHERE NEEDED

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

GRADED R.O.W. MODE

9/22/2015

PA-165T

POA-1995-120

P01C-TYRWW-06.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 21: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

ORGANIC SPOIL PILE

2'

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

MAKE-UP AREA, WORKING SIDE & TRAVEL LANESEGREGATED ORGANIC SPOIL & TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION

R.O.W MODE

9/22/2015

PA-166T

POA-1995-120

P01C-TYRWW-08.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 22: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

LEGEND

PERMANENT RIGHT OF WAY BOUNDARY

TEMPORARY USE AREA

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER BUNCHER

WHEELED HYDRO AX

NODWELL 240 FUEL TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

TRACKED FELLER BUNCHER

TRACKED FELLER

BUNCHER

HUSKY 4

HIGH FLOATATION

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

HUSKY 4

HIGH FLOATATION

EXCAVATOR

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL TRUCK

(MOBILE)

LOG DECK

PIONEER ACCESS

(APPROX. 25' WIDE)

HUSKY 8 TRANSPORTER

MAT STAGING

4'X 16' SWAMP MATS

SNOW CLEARING STORED BETWEEN TREES

SNOW CLEARING STORED BETWEEN TREES

SNOWCAT 1644

HUSKY 4

HIGH FLOATATION

EXCAVATOR

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

PERMAFROST R.O.O.W. MODE

9/22/2015

PA-167T

POA-1995-120

P01C-TYRWW-09.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 23: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

SEGREGATED ORGANIC SPOIL PILE

NODWELL 240 FUEL TANKER/WATER TANKER

NODWELL 240 LUBE & OIL

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

SNOWCAT

1644

SNOWCAT 1644

ICE PAD OR

GRAVEL PAD

WHERE NEEDED

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

NOTES:

1. MATS OR CORDUROY TIMBER AS NEEDED.

2. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

PERMAFROST R.O.W. MODE

9/22/2015

PA-168T

POA-1995-120

P01C-TYRWW-14.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 24: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

ORGANIC SPOIL PILE

2'

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

ICE PAD OR GRAVEL

PAD AS NEEDED.

MAKE-UP AREA, WORKING SIDE & TRAVEL LANE

SEGREGATED ORGANIC SPOIL &

TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

ICE WORK PAD (12" THICK MINIMUM)

WHERE WATER IS AVAILABLE, OR GRAVEL

WORKPAD (12" THICK MINIMUM) WHERE

WATER IS NOT AVAILABLE.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION WINTER

PERMAFROST R.O.W. MODE

9/22/2015

PA-169T

POA-1995-120

P01C-TYRWW-16.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 25: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

LEGEND

PERMANENT RIGHT OF WAY BOUNDARY

TEMPORARY USE AREA

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

50'

WHEELED

HYDRO AX

WHEELED FELLER

BUNCHER

HUSKY 4 HIGH

FLOATATION

EXCAVATOR

WHEELED FELLER BUNCHER

WHEELED HYDRO AX

NODWELL 240 FUEL TANKER

CAT D-6 LGP

NODWELL 240 LUBE & OIL

AS NEEDED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

40'X8' BUILDING

SKID MOUNTED

(QUANTITY MAY VARY)

CHIPPER OPERATION

HUSKY 8 TRANSPORTER

TRACKED FELLER BUNCHER

TRACKED FELLER

BUNCHER

HUSKY 4

FLOATING

EXCAVATOR

SLEIGH CAMP

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

HUSKY 4

HIGH FLOATATION

EXCAVATOR

HUSKY 4

FLOATING EXCAVATOR

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL TRUCK

(MOBILE)

LOG DECK

PIONEER ACCESS

(APPROX. 25' WIDE)

HUSKY 8

TRANSPORTER

MAT STAGING

4'X 16' SWAMP MATS

SNOW CLEARING STORED BETWEEN TREES

SNOW CLEARING STORED BETWEEN TREES

SNOWCAT 1644

NOTES:

1. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

WETLANDS R.O.W. MODE

9/22/2015

PA-170T

POA-1995-120

P01C-TYRWW-17.DWG (BAKER) OCT 2013

0 15 30

Ft

Page 26: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

4' X 16'

SWAMP MATS OR

CORDUROY (TYP.)

AS REQ'D. FOR

HOT BOGS.

SEGREGATED ORGANIC SPOIL PILE

NODWELL 240 FUEL TANKER/WATER TANKER

NODWELL 240 LUBE & OIL

NODWELL 240

FUEL TANKER

(MOBILE)

NODWELL 240

LUBE & OIL

(MOBILE)

CO

NS

TR

UC

TIO

N R

IG

HT

O

F W

AY

100'

PIPELINE TRENCH

CENTERLINE

35'

65'

25'

OR

GA

NIC

/T

RE

NC

H S

PO

IL

TRENCH SPOIL PILE

TRENCH SPOIL PILE

SIDE SLOPE

SIDE SLOPE

SIDE SLOPE

CAT 561N

PIPELAYER

BOTTOM OF OPEN

PIPELINE DITCH

2' WIDE

4'-6" DEEP

EDGE OF OPEN

TRENCH

14"Ø STEEL PIPE

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CAT 561N

PIPELAYER

CONSTRUCTION RIGHT OF WAY BOUNDARY

CONSTRUCTION RIGHT OF WAY BOUNDARY

SNOWCAT

1644

SNOWCAT 1644

LEGEND

PIPELINE/TRENCH CENTERLINE

CONSTRUCTION R.O.W. BOUNDARY

ORGANIC SPOIL PILE

TRENCH SPOIL PILE

BOTTOM OF OPEN PIPELINE TRENCH

SIDESLOPES OF OPEN TRENCH

CAT 561N

PIPELAYER

NOTES:

1. MATS OR CORDUROY TIMBER AS NEEDED.

2. EQUIPMENT QUANTITY AND TYPE MAY VARY.

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

RIGHT OF WAY PLAN WINTER

WETLANDS R.O.W. MODE

9/22/2015

PA-171T

POA-1995-120

P01C-TYRWW-22.DWG (BAKER) OCT 2013

Page 27: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

TRENCH SPOIL PILE

14" DIAMETER

GAS PIPE

ORGANIC SPOIL PILE

2'

4'-6

"

25' 55'

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

10

0' W

ID

E R

IG

HT

O

F W

AY

B

OU

ND

AR

Y

SKID

16'X4'' SWAMP MATS OR

CORDUROY (TYP.)

(ONLY AS REQ'D.)

MAKE-UP AREA, WORKING SIDE & TRAVEL LANE

SEGREGATED ORGANIC SPOIL &

TRENCH SPOIL

100'

CONSTRUCTION RIGHT OF WAY

NODWELL 240

CAT 561N

PIPELAYER

35' 65'

CAT 561N

PIPELAYER

DIT

CH

C

/L

1

:

1

2'-5'±

(OR AS ATTAINABLE)

FROST PACKFROST PACK

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_ROW.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

CROSS SECTION WINTER

WETLANDS R.O.W. MODE

9/22/2015

PA-172T

POA-1995-120

P01C-TYRWW-24.DWG (BAKER) OCT 2013

0 7.5 15

Ft

Page 28: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

HELICOPTER

PAD

HELICOPTER

HANGER

FUEL STORAGE

WHS SHOP #1 SHOP #2WATER STORAGE

POWER PLANT

TREATMENT

PLANT

OFFICE

COMPOUND

PARKING

28 BEDS 161 BEDS

PAD AREA =+/- 8 ACRES

RECREATION

AREA

KITCHEN

DINER

PARKING

STORAGE STORAGE STORAGE

56 BEDS 72 BEDS

425'-0"

775'-0"

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_Mapping_404_Support\Revision_A\PA_Camp_Layout.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL CAMP PLOT PLAN

200 TO 300 MAN CAMP DETAIL

9/23/2015

PA-173T

POA-1995-120

Camp 1.dwg (?) MAR 2012

A

TYPICAL CAMP PLOT PLAN 200 TO 300 MAN CAMP

N.T.S.

173T

Page 29: TYPICAL FLOWING WATERBODY CROSSING OPEN-CUT...4. the slope breakers shall be 18" deep (as measured from the trough to the top of the slope breaker). the trough will be a minimum of

P

R

E

L

IM

IN

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

!

NOTES:

1. MINIMUM DEPTH OF COVER: 36". ADDITIONAL COVER MAY BE REQUIRED FOR BUOYANCY CONTROL. RIVER AND STREAM SCOUR, AND BENDS.

2. EXCAVATION:

LOG THE TRENCH MATERIAL AS IT IS DUG. SEGREGATE ICE RICH MATERIAL IN A SPOIL PILE SEPARATE FROM DITCH SPOIL WHICH IS ACCEPTABLE

FOR BACKFILL. IN EXTREME CASES OF ICE CONTENT, IT MAY BE NECESSARY TO HAUL IN ADDITIONAL SELECT MATERIAL AND/OR TO HAUL THE ICE

RICH SPOIL TO AN APPROVED DISPOSAL SITE, SUCH AS AN ABANDONED MATERIAL SITE, COULD BE CONSIDERED.

3. PRIOR TO FINAL DESIGN:

GEOTECHNICAL LOGGING OF BORE HOLES TO DETERMINE ICE CONTENT IN THE DITCH PROFILE AND BELOW THE DITCH BOTTOM FOR AN

ADDITIONAL 10' OR WHATEVER DEPTH WAS DETERMINED TO AFFECT PIPELINE SETTLEMENT IN THE EVENT OF THAWING BELOW THE PIPELINE.

4. PLACE AND ROACH THE REMAINING DITCH SPOIL. INCLUDING THE ICE RICH SPOIL, OVER TOP OF THE PADDING AND ALLOW IT TO THAW DURING

SUMMER SEASON.

5. PLACE APPROPRIATE EROSION CONTROL DEVICES (ECDs) ALONG THE ROACH DITCH LINE WHERE ICE RICH SPOIL MIGHT FLOW INTO AN EXISTING

DRAINAGE WHEN IT MELTS. SEED THE ROACHED SPOIL PILE AND ANY DISTURBED RIGHT OF WAY. INSPECT THE DITCH LINE IN THE SUMMER/FALL

FOLLOWING WINTER CONSTRUCTION AND USE LOW GROUND PRESSURE EQUIPMENT TO DRESS UP OR RE-SHAPE THE ROACHED SPOIL OVER THE

DITCH AS NEEDED. RE-SEED AND RE-PLACE ECDs IF NECESSARY. REPEAT INSPECTION ANNUALLY FOR THE FIRST THREE SEASONS OR AS NEEDED

TO MAINTAIN SOIL STABILITY.

6. PLACEMENT OF SELECT, THAW STABLE FILL FOR PIPE BEDDING IN ANY OVER-EXCAVATED SECTIONS TO PROPERLY SUPPORT AND BED THE PIPE.

7. PLACEMENT OF SELECT, THAW STABLE PADDING AROUND THE PIPE TO 6" ABOVE THE PIPE. ACCEPTABLE DITCH SPOIL WOULD BE PREFERRED.

IMPORTED MATERIAL MIGHT BE NEEDED IF DITCH SPOIL IS NOT ACCEPTABLE.

8. OVER-EXCAVATE 3 FEET BELOW TARGET DITCH DEPTH WHERE VISIBLE SEGREGATED ICE (FROZEN GROUND CLASSIFICATION Vx) IS DISCOVERED

IN THE DITCH BOTTOM. BACKFILL OVER-EXCAVATION WITH THAW-STABLE BEDDING. PLACE GEOGRID, IF SO DIRECTED BY THE ENGINEER, TO SPAN

AREAS OF OVER-EXCAVATION.

℄ 14" O.D. PIPE

2

:

1

6"

6" MIN BEDDING (NOTE 6)

WORKPAD (IF REQUIRED)

1'-0" MIN

OVER-EXCAVATION

(NOTE 6)

3'-0" MIN

(NOTE 1)

ICE RICH SPOIL

(NOTE 2)

DITCH SPOIL FOR

BEDDING/BACKFILL

(NOTE 2)

FINISHED GRADE

(NOTE 4 & 5)

NATIVE OR COMMON

BACKFILL

PADDING

(NOTE 7)

LIMITS

OF CLEARING

RIG

HT

O

F W

AY

RIG

HT

O

F W

AY

1'

TOP OF CROWN

BURIED PIPELINE

PATH: C:\Users\mlengiewicz\Dropbox\Donlin\181202_010_mapping_404_support\revision_a\PA_Pipe_Buried.dwg

DRAWING TITLE:

FIGURE NO. FILE NO.

DATE:SCALE:

Associated Engineering Drawings

DONLIN GOLD PROJECT

APPLICANT: Donlin Gold, LLC

4720 Business Park Blvd., Suite G-25

Anchorage, Alaska 99503

AS SHOWN

TYPICAL PIPE TRENCH DETAIL

9/30/2015

PA-174T

POA-1995-120

P01C-SCIS-01.dwg (BAKER) OCT 2013

A

TYPICAL PIPE TRENCH SECTION

N.T.S.

174T

B

TYPICAL RECLAIMED TRENCH SECTION

N.T.S.

174T