31
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 1 CMS Project at UR CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

Embed Size (px)

Citation preview

Page 1: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 1

CMS Project at URCMS Project at URCMS Project at URCMS Project at UR

Pawel de Barbaro

University of Rochester

DoE Review

July 15-16, 2002

Page 2: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 2

ParticipantsParticipantsParticipantsParticipants

Task D Participants (CMS-HCAL) Faculty: Prof. A. Bodek

Research Faculty: Dr. P. de Barbaro, Dr. H. Budd, Dr. W. Sakumoto

Research Associate: Dr. Y. Chung

Task B Participants (CMS-HCAL) Faculty: Prof. P. Slattery

Research Faculty: Dr. G. Ginther

Task D Participants (CMS-TOB) Faculty: Prof. P. Tipton

Research Faculty: Eva Halkiadakis, Andy Hocker

Graduate Students: Ricardo Eusebi

Page 3: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 3

System OverviewSystem OverviewSystem OverviewSystem Overview

System OverviewSystem OverviewSystem OverviewSystem Overview

HOB

HB

HFHE

Page 4: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 4

HCAL - Engineering in WH6 HCAL Engineering DesignHCAL Engineering Design HCAL Engineering DesignHCAL Engineering Design

Page 5: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 5

ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities

CMS Projects at U. of Rochester:

HCAL• Optical Readout System for Hadron Barrel (HB)

Calorimeter• Assembly&Integration of Readout boxes for HB,

HE and HO • construction of Motion Table for H2 test beam at

CERN

Tracker• construction of Silicon Strip Tracker (Tracker

Outer Barrel, TOB), talk by P. Tipton

Page 6: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 6

CMS HCAL OutlineCMS HCAL OutlineCMS HCAL OutlineCMS HCAL Outline

• Absorber

• Optics

• Readout Box

• HPDs

• Other tasks

• Conclusions

Page 7: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 7

Activity at CERNActivity at CERNActivity at CERNActivity at CERN

• Scintillators installed into HB- wedges at bldg 186

•All HB- wedges tested with radioactive source system, pronounced “ready”

•Wedges transported to SX5 for installation into cradle.

•HB+ wedges at 186, scintillator installated and tested.

•Assembly of HB+ into cradle in Sep 02.

Page 8: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 8

HB- Wedges at Bldg 186HB- Wedges at Bldg 186HB- Wedges at Bldg 186HB- Wedges at Bldg 186

Page 9: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 9

HB AbsorberHB AbsorberHB AbsorberHB Absorber

• All HB- and HB+ wedges at CERN

• HB- assembled at SX5, HB+ wedges to be assembled in Sept 2002.

• HB- Wedge 16 (damaged during transport) has been rebuilt, tested

Page 10: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 10

HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5

Page 11: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 11

HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5

Page 12: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 12

Assembled HB- Barrel in Assembled HB- Barrel in SX5SX5

Assembled HB- Barrel in Assembled HB- Barrel in SX5SX5

Page 13: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 13

Lab 5 FactoryLab 5 FactoryLab 5 FactoryLab 5 Factory

• HB Optics factory in final phase.

• Will be winding down in December. (Need to repair/replace megatiles for HB-16). Reduce staffing from 13 to 5.

• Continue to build optical cables for HB and fiber parts for optical decoder units.

• Factory will redirect to work on components for RBX’s, HV, LV, electronics components.

Page 14: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 14

Lab5 Optics factory (HB Lab5 Optics factory (HB megatile production)megatile production)

Lab5 Optics factory (HB Lab5 Optics factory (HB megatile production)megatile production)

Page 15: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 15

Other Optics tasksOther Optics tasksOther Optics tasksOther Optics tasks

Improve performance of optical cables

• Task taken over from UIC.

• Problem: tests at CERN this summer indicated that cables are very hard to install and connect/disconnect.

• Solution: increasing slightly (1.5mils) hole size for alignment pins can improve connection/disconnection, without compromising RMS of light transmission

Page 16: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 16

Optical cable layoutOptical cable layoutOptical cable layoutOptical cable layout

Page 17: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 17

Placement of readout boxesPlacement of readout boxesPlacement of readout boxesPlacement of readout boxes

Page 18: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 18

Full RBX with 19 ch RMs

RBX Interior -- HV distributor and backplane

HB RBX AssemblyHB RBX Assembly

Page 19: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 19

The readout module (RM) integrates the HPD, front end electronics, and digital optical drivers. PRR passed March 1-2.

HB Production begun – mechanics only. HE in design.

Electronics cards

HPD MountHV

Interface

Card

Optical Sorter

RBX Readout ModuleRBX Readout Module

Page 20: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 20

Optical decoder unit (ODU)Optical decoder unit (ODU)Optical decoder unit (ODU)Optical decoder unit (ODU)

Page 21: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 21

ODU: part facing HPDODU: part facing HPDODU: part facing HPDODU: part facing HPD

Page 22: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 22

Hybrid Photo Detectors Hybrid Photo Detectors (HPDs)(HPDs)

Hybrid Photo Detectors Hybrid Photo Detectors (HPDs)(HPDs)

Page 23: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 23

RBX production statusRBX production statusRBX production statusRBX production status

• HB• HB RBX shell parts completed, at Lab 5 ready for assembly• HB ODUs finished, at Lab 5• Backplanes finished, at FNAL• Assembly work started at Lab 5

• HE• Design almost complete• Second mechanical prototype in construction at Ole Miss• Subassemblies for ODUs ready. ODUs will be built at Notre

Dame factory this summer (QuarkNet)• HE RBX parts scheduled to be completed in September 02.

• HO• Design starting this month.• Will have a PRR at CERN during September CMS week.• Plan to complete all RBX’s by March 1 , 03

Page 24: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 24

Near Term / 2002 Test BeamNear Term / 2002 Test BeamNear Term / 2002 Test BeamNear Term / 2002 Test Beam

• Will instrument HB+ wedges in November

• Test beam calibration of wedges of HB+ in summer of 2002

• Will use second generation QIE’s running at 40Mhz.

• CCAs

• GOL / VCSEL into HTR DCC Prototypes

• Assemble HB+ in September 2002

Page 25: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 25

ConclusionsConclusionsConclusionsConclusions

Tasks Completed:• HCAL Barrel absorber ready • Production and installation of Scintillator

megatiles completed• HB- barrel assembled and testedNew tasks for Rochester:• Integration and testing of readout boxes at Lab

5 at Fermilab (CMS Rochester Techs under Rochester upervision).

• Installation and Commissioning of US CMS detector at CERN (Pawel de Barbaro will become US CMS Coordinator at CERN in March 2003)

Page 26: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 26

Front End ElectronicsFront End ElectronicsFront End ElectronicsFront End Electronics

• QIE chips at FNAL (first submission).• Chips are ~ fully functioning. Front end noise

being studied.• CCA chips at FNAL. Problem with communication

to chip. (Bug in layout solved by laser microsurgery). Seems fully functional!

• A chance that both CCA and QIE can skip a generation of submissions, have production parts by March 02.

• GOL (Gigabit Optical Link) Serializer prototype chip at FNAL. Being tested at 45 Mhz, works fine. (Normal operation 40 Mhz).

• VCSEL chosen, parts being ordered.• Fiber optic cable plant being finalized.

(Discussion this week at CERN).

Page 27: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 27

FE/DAQ ElectronicsFE/DAQ Electronics

Page 28: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 28

FE Readout CardFE Readout CardFE Readout CardFE Readout Card

QIE

QIE

QIE

QIE

QIE

QIE

CCA

CCA

CCA

GOL

GOL

GOL

FromHPD

VoltageRegulators(3)+5 V analog+5 V digital

+3.3 V

CLOCK

CONTROLBACKPLANE

SIGNALS

VCSEL

Page 29: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 29

Six channel FE ProtoSix channel FE Proto

Page 30: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 30

HCAL – Opto-LinkHCAL – Opto-Link

Page 31: U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002

U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 31

VCSEL/GOL TestingVCSEL/GOL TestingVCSEL/GOL TestingVCSEL/GOL Testing

Prototype GOLCustom VCSEL Packaging