U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 1
CMS Project at URCMS Project at URCMS Project at URCMS Project at UR
Pawel de Barbaro
University of Rochester
DoE Review
July 15-16, 2002
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 2
ParticipantsParticipantsParticipantsParticipants
Task D Participants (CMS-HCAL) Faculty: Prof. A. Bodek
Research Faculty: Dr. P. de Barbaro, Dr. H. Budd, Dr. W. Sakumoto
Research Associate: Dr. Y. Chung
Task B Participants (CMS-HCAL) Faculty: Prof. P. Slattery
Research Faculty: Dr. G. Ginther
Task D Participants (CMS-TOB) Faculty: Prof. P. Tipton
Research Faculty: Eva Halkiadakis, Andy Hocker
Graduate Students: Ricardo Eusebi
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 3
System OverviewSystem OverviewSystem OverviewSystem Overview
System OverviewSystem OverviewSystem OverviewSystem Overview
HOB
HB
HFHE
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 4
HCAL - Engineering in WH6 HCAL Engineering DesignHCAL Engineering Design HCAL Engineering DesignHCAL Engineering Design
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 5
ResponsibilitiesResponsibilitiesResponsibilitiesResponsibilities
CMS Projects at U. of Rochester:
HCAL• Optical Readout System for Hadron Barrel (HB)
Calorimeter• Assembly&Integration of Readout boxes for HB,
HE and HO • construction of Motion Table for H2 test beam at
CERN
Tracker• construction of Silicon Strip Tracker (Tracker
Outer Barrel, TOB), talk by P. Tipton
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 6
CMS HCAL OutlineCMS HCAL OutlineCMS HCAL OutlineCMS HCAL Outline
• Absorber
• Optics
• Readout Box
• HPDs
• Other tasks
• Conclusions
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 7
Activity at CERNActivity at CERNActivity at CERNActivity at CERN
• Scintillators installed into HB- wedges at bldg 186
•All HB- wedges tested with radioactive source system, pronounced “ready”
•Wedges transported to SX5 for installation into cradle.
•HB+ wedges at 186, scintillator installated and tested.
•Assembly of HB+ into cradle in Sep 02.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 8
HB- Wedges at Bldg 186HB- Wedges at Bldg 186HB- Wedges at Bldg 186HB- Wedges at Bldg 186
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 9
HB AbsorberHB AbsorberHB AbsorberHB Absorber
• All HB- and HB+ wedges at CERN
• HB- assembled at SX5, HB+ wedges to be assembled in Sept 2002.
• HB- Wedge 16 (damaged during transport) has been rebuilt, tested
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 10
HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 11
HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5HB- Assembly at SX5
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 12
Assembled HB- Barrel in Assembled HB- Barrel in SX5SX5
Assembled HB- Barrel in Assembled HB- Barrel in SX5SX5
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 13
Lab 5 FactoryLab 5 FactoryLab 5 FactoryLab 5 Factory
• HB Optics factory in final phase.
• Will be winding down in December. (Need to repair/replace megatiles for HB-16). Reduce staffing from 13 to 5.
• Continue to build optical cables for HB and fiber parts for optical decoder units.
• Factory will redirect to work on components for RBX’s, HV, LV, electronics components.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 14
Lab5 Optics factory (HB Lab5 Optics factory (HB megatile production)megatile production)
Lab5 Optics factory (HB Lab5 Optics factory (HB megatile production)megatile production)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 15
Other Optics tasksOther Optics tasksOther Optics tasksOther Optics tasks
Improve performance of optical cables
• Task taken over from UIC.
• Problem: tests at CERN this summer indicated that cables are very hard to install and connect/disconnect.
• Solution: increasing slightly (1.5mils) hole size for alignment pins can improve connection/disconnection, without compromising RMS of light transmission
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 16
Optical cable layoutOptical cable layoutOptical cable layoutOptical cable layout
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 17
Placement of readout boxesPlacement of readout boxesPlacement of readout boxesPlacement of readout boxes
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 18
Full RBX with 19 ch RMs
RBX Interior -- HV distributor and backplane
HB RBX AssemblyHB RBX Assembly
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 19
The readout module (RM) integrates the HPD, front end electronics, and digital optical drivers. PRR passed March 1-2.
HB Production begun – mechanics only. HE in design.
Electronics cards
HPD MountHV
Interface
Card
Optical Sorter
RBX Readout ModuleRBX Readout Module
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 20
Optical decoder unit (ODU)Optical decoder unit (ODU)Optical decoder unit (ODU)Optical decoder unit (ODU)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 21
ODU: part facing HPDODU: part facing HPDODU: part facing HPDODU: part facing HPD
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 22
Hybrid Photo Detectors Hybrid Photo Detectors (HPDs)(HPDs)
Hybrid Photo Detectors Hybrid Photo Detectors (HPDs)(HPDs)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 23
RBX production statusRBX production statusRBX production statusRBX production status
• HB• HB RBX shell parts completed, at Lab 5 ready for assembly• HB ODUs finished, at Lab 5• Backplanes finished, at FNAL• Assembly work started at Lab 5
• HE• Design almost complete• Second mechanical prototype in construction at Ole Miss• Subassemblies for ODUs ready. ODUs will be built at Notre
Dame factory this summer (QuarkNet)• HE RBX parts scheduled to be completed in September 02.
• HO• Design starting this month.• Will have a PRR at CERN during September CMS week.• Plan to complete all RBX’s by March 1 , 03
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 24
Near Term / 2002 Test BeamNear Term / 2002 Test BeamNear Term / 2002 Test BeamNear Term / 2002 Test Beam
• Will instrument HB+ wedges in November
• Test beam calibration of wedges of HB+ in summer of 2002
• Will use second generation QIE’s running at 40Mhz.
• CCAs
• GOL / VCSEL into HTR DCC Prototypes
• Assemble HB+ in September 2002
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 25
ConclusionsConclusionsConclusionsConclusions
Tasks Completed:• HCAL Barrel absorber ready • Production and installation of Scintillator
megatiles completed• HB- barrel assembled and testedNew tasks for Rochester:• Integration and testing of readout boxes at Lab
5 at Fermilab (CMS Rochester Techs under Rochester upervision).
• Installation and Commissioning of US CMS detector at CERN (Pawel de Barbaro will become US CMS Coordinator at CERN in March 2003)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 26
Front End ElectronicsFront End ElectronicsFront End ElectronicsFront End Electronics
• QIE chips at FNAL (first submission).• Chips are ~ fully functioning. Front end noise
being studied.• CCA chips at FNAL. Problem with communication
to chip. (Bug in layout solved by laser microsurgery). Seems fully functional!
• A chance that both CCA and QIE can skip a generation of submissions, have production parts by March 02.
• GOL (Gigabit Optical Link) Serializer prototype chip at FNAL. Being tested at 45 Mhz, works fine. (Normal operation 40 Mhz).
• VCSEL chosen, parts being ordered.• Fiber optic cable plant being finalized.
(Discussion this week at CERN).
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 27
FE/DAQ ElectronicsFE/DAQ Electronics
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 28
FE Readout CardFE Readout CardFE Readout CardFE Readout Card
QIE
QIE
QIE
QIE
QIE
QIE
CCA
CCA
CCA
GOL
GOL
GOL
FromHPD
VoltageRegulators(3)+5 V analog+5 V digital
+3.3 V
CLOCK
CONTROLBACKPLANE
SIGNALS
VCSEL
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 29
Six channel FE ProtoSix channel FE Proto
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 30
HCAL – Opto-LinkHCAL – Opto-Link
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS 31
VCSEL/GOL TestingVCSEL/GOL TestingVCSEL/GOL TestingVCSEL/GOL Testing
Prototype GOLCustom VCSEL Packaging