117
ANNA UNIVERSITY TIRUNELVELI TIRUNELVELI 627 007 Laboratory Requirements for the UG / PG Programmes offered by the Colleges affiliated to the Anna University Tirunelveli for the Academic Year 2010-2011 B.E. / B.Tech. / (REGULATIONS 2008) M.E. / M.Tech. / M.B.A. / M.C.A. (REGULATIONS 2009) M.Sc. (REGULATIONS 2003)

UG _ PG Lab Equipments

  • Upload
    srajece

  • View
    69

  • Download
    8

Embed Size (px)

DESCRIPTION

asdffasasdasdasdasdasdasdsadasdas

Citation preview

Page 1: UG _ PG Lab Equipments

ANNA UNIVERSITY TIRUNELVELI TIRUNELVELI 627 007

Laboratory Requirements for the UG / PG Programmes offered by the

Colleges affiliated to the Anna University Tirunelveli for the

Academic Year 2010-2011

B.E. / B.Tech. / (REGULATIONS 2008)

M.E. / M.Tech. / M.B.A. / M.C.A. (REGULATIONS 2009)

M.Sc. (REGULATIONS 2003)

Page 2: UG _ PG Lab Equipments

Faculty of Civil Engineering

B. E. Civil Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

CE38 -Survey Practical - I

CE39 - Computer Aided Building Drawing

Semester 4

CE48 –Hydraulic Engineering Laboratory

CE49 –Survey Practical - II

Page 3: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

B. E. Aeronautical Engineering (R 2008) Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

ME37 –Manufacturing Technology Lab - I

ME38 –Fluid Mechanics and Machinery Laboratory

ME39 – Electrical Engineering Laboratory

Semester 4

ME48 – Computer Aided Machine Drawing Laboratory

ME49 –Manufacturing Technology Lab - II

Page 4: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

B.E. Automobile Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

AT 37 – Automotive Components Laboratory

ME38 - Fluid Mechanics and Machinery Lab

AT39 – Manufacturing Technology Laboratory

Semester 4

ME47 - Strength of Materials Lab

AT48 – Engine Performance and Emission Testing Laboratory

AT49 - Computer Aided Machine Drawing Laboratory

AT411 – Electronics and Micro-processors Laboratory

Page 5: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

B. E. Bio – Medical Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EC29 – Circuits and Devices Laboratory(Common for branches under I &C Faculty)

Semester 3 BM38 – Bio Chemistry and Human Physiology Lab

BM39 – Electronic Circuits Lab

Semester 4

BM47 – Integrated Circuits Lab

BM 48 – Pathology and Microbiology Lab

Page 6: UG _ PG Lab Equipments

Faculty of Technology B.Tech. Bio Technology (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

BT37 – Bio Chemistry Lab

BT38 – Bio-organic Chemistry Lab

BT39 – Cell Biology Lab

Semester 4

BT47 – Microbiology Lab

BT48 – Instrumental Methods of Analysis Lab

BT49 – Chemical Engineering Lab

Page 7: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

B.E. Computer Science and Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EC29 – Circuits and Devices Laboratory(Common for branches under I &C Faculty)

Semester 3

CS37 – Digital Laboratory

CS 38 – Data Structures Laboratory

CS 39 – Object Oriented Programming Laboratory

Semester 4

CS47 – Operating Systems Laboratory

CS48 – Data Base Management Systems Lab

CS49 – Microprocessor Lab

Page 8: UG _ PG Lab Equipments

Faculty of Electrical Engineering

B.E. - Electrical and Electronics Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty)

Semester 3

EE37 - Electronic Devices and Circuits Laboratory

EE38 – Measurements & Instrumentation Laboratory

EE39 - Data Structures and Algorithms Laboratory

Semester 4

EE47 – Control Systems Laboratory

EE48 – Linear and Digital Integrated Circuits Laboratory

EE49 - Electrical Machines Laboratory – I

Page 9: UG _ PG Lab Equipments

Faculty of Electrical Engineering

B.E. - Electronics and Instrumentation Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty)

Semester 3

EE 37 – Electronic Devices and Circuits Laboratory

EI38 – Electrical Machines Laboratory

EE39 – Data Structures and Algorithms Laboratory

Semester 4

EI47 – Transducers and Measurements Laboratory

EE48 – Linear and Digital Integrated Circuits Lab

EI49 - Thermodynamics Laboratory

Page 10: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

B. E. - Electronics and Communication Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EC29 – Circuits and Devices Laboratory(Common for branches under I &C Faculty)

Semester 3

EC 37 – Digital Electronics Lab

EC38 – Electronic Circuits Laboratory – I

EC39 – Data structures and Object Oriented Programming Lab

Semester 4

EC47 – Electronics circuits II and simulation lab

EC48 – Linear Integrated Circuit Lab

EC49 – Electrical Engineering and Control System Lab

Page 11: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

B.Tech. Information Technology (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches

EC29 – Circuits and Devices Laboratory (Common for branches under I &C Faculty)

Semester 3 IT38 - Data Structures and Algorithm Laboratory

CS37 – Digital Laboratory

CS39 – Object Oriented Programming Laboratory

Semester 4 CS47 – Operating Systems Lab

CS48 – Database Management Systems Lab

CS49 – Microprocessors Lab

Page 12: UG _ PG Lab Equipments

Faculty of Electrical Engineering

B.E. Instrumentation and Control Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty)

Semester 3

EE37 - Electronic Devices and Circuits Laboratory

EI38 - Electrical Machines Laboratory

EE39 - Data Structures and Algorithms Laboratory

Semester 4

EI47 – Transducer and Measurements Laboratory

EE48 – Linear and Digital Integrated Laboratory

EI49 – Thermodynamics Laboratory

Page 13: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. Applied Electronics (R 2009)

Semester I

AP 916 – Electronics Design Laboratory I

Semester II

AP 926 –Electronics Design Laboratory II

Page 14: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

M.E. CAD/CAM (R 2009)

Semester I

CC916 – CAD Laboratory

Semester II

CC926 – CAM Laboratory

Page 15: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. Communication Systems (R 2009)

Semester I

CU 916 –Communication Systems Laboratory I

Semester II

CU 926 – Communication Systems Laboratory II

Page 16: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. Computer and Communication Engineering (R 2009)

Semester I

CP 917 – Computer and Communication Laboratory I

Semester II

CP 927 – Computer and Communication Laboratory II

Page 17: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering (R 2009)

Semester I

CS 916 – Data Structures Laboratory

CS 917 – Networking Laboratory

Semester II

CS 926 – Operating System Laboratory

IT926 – Internet Programming Laboratory

Page 18: UG _ PG Lab Equipments

Faculty of Civil Engineering

(R 2009)

M.E. Construction Engineering and Management

Semester 1

No Laboratory Course

Semester 2

CN926 – Advanced Construction Engg and Computing Techniques

Page 19: UG _ PG Lab Equipments

Faculty of Electrical Engineering

M.E. Embedded System Technologies (R 2009)

Semester I

No Laboratory Courses

Semester II

ET926 – Embedded System Laboratory

Page 20: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

M.E. Engineering Design (R 2009)

Semester I

ED 916 – CAD Laboratory

Semester II

ED 926 – Analysis & Simulation Laboratory

Page 21: UG _ PG Lab Equipments

Faculty of Electrical Engineering

M.E. Power Electronics and Drives

(R 2009)

Semester I

No Laboratory Courses

Semester II

PE926 – Power Electronics and Drives Laboratory

Page 22: UG _ PG Lab Equipments

Faculty of Electrical Engineering

M.E. – Power System Engineering

(R 2008)

Semester I

PS916 – Power System Simulation Lab I

Semester II

PS926 – Power System Simulation Lab II

Page 23: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. VLSI Design (R 2009)

Semester I

VL916 – VLSI Design Lab I

Semester II

VL 926 – VLSI Design Lab II

Page 24: UG _ PG Lab Equipments

Faculty of Technology

(R 2009)

M.Tech. Bio-Technology

Semester I

BT 914 – Preparative and Analytical techniques in bio-technology

Semester II

BT 925 – Microbial and Immuno Technology Laboratory

Semester III

BT 931 – Advanced Molecular Biology and Genetic Engineering Laboratory

BT 932 – Advanced Bioprocess and downstream Processing Laboratory

Page 25: UG _ PG Lab Equipments

Faculty of Management Studies

M.B.A. Business Administration (R 2009)

Semester II

BA928 – Business Application Software

Page 26: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009)

Semester I

MC916 – Programming and Data Structures Laboratory

MC917 – DBMS Laboratory

Semester II

MC 926 – Object Oriented Programming Laboratory

MC 927 – System Software Laboratory

MC 928 – Algorithms Laboratory

Semester III

MC 936 – Graphics Laboratory

MC937 – Microprocessor Laboratory

MC 938 – Web Programming Laboratory

Semester IV

MC 946 – Visual Programming Laboratory

MC 947 – Network Programming Laboratory

MC 948 – Case Tools

Semester V

MC 956 – Middleware Technology Laboratory

MC 957 – Software Development Laboratory

Page 27: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.Tech. Information Technology (R 2009)

Semester I

CS916 – Data Structures Laboratory

CS917 – Networking Laboratory

Semester II

IT 926 – Internet Programming Laboratory

SE917 – Case Tools Laboratory

Page 28: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

B.E. Mechanical Engineering (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

ME37 – Manufacturing Technology Lab – I

ME38 - Fluid Mechanics and Machinery Lab.doc

ME39 – Electrical Engineering Laboratory

Semester 4

ME47 - Strength of Materials Lab.

ME48 - Computer Aided Machine Drawing Lab

ME49 - Manufacturing Technology Lab II

Page 29: UG _ PG Lab Equipments

Faculty of Technology

B.Tech. Polymer Technology (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3

PT37 – Polymer Chemistry Laboratory

PT38 – Organic Chemistry Laboratory

Semester 4

PT47 – Chemical Engineering Laboratory

PT48 – Mould Engineering Laboratory

Page 30: UG _ PG Lab Equipments

Faculty of Technology

B.Tech. Textile Technology (Fashion Technology) (R 2008)

Semester 1

CS17 – Computer Practice Laboratory – I (Common to all branches)

GE19 – Engineering Practices Laboratory (Common to all branches)

PCP18 – Physics & Chemistry Laboratory – I (Common to all braches)

Semester 2

GE 27 - Computer Practice Laboratory – II (Common to all branches)

GS28 – Physics & Chemistry Laboratory II (Common to all branches)

ME29 – Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Page 31: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

III Semester B. E. – Aeronautical Engineering (R2008) AE39 Thermodynamics Laboratory

Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. 4 stroke twin cylinder diesel engine 1

2. Cut section model of 4 stroke kirloskar diesel engine and cut section model of 2 stroke petrol engine

1

3. Parallel and counter flow heat exchanger test rig

1

4. Bomb Calorimeter 1

5. Vapour compression refrigeration test rig

1

6. Vapour compression air-conditioning test rig

1

7. Conductive Heat Transfer set up 1

8. Composite wall 1

Faculty of Mechanical Engineering IV Semester B. E. – Aeronautical Engineering (R2008)

AE47 - Aircraft Structures Lab –I Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Universal Testing Machine 1 2. Mechanical Extensometer 1

3. Electrical stain gauge 10

4. Hinged bar suspended by two wires of different materials. 1

5. Stain indicator 1

6. Dial Gauges 12

7. Beam Test set up with various end conditions 2

8. Column Test Apparatus 1

9. Thin walled pressure vessel 1

Page 32: UG _ PG Lab Equipments

Faculty of Mechanical Engineering IV Semester B. E. – Aeronautical Engineering (R2008)

AE48 - Aerodynamics Laboratory Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Blower, Balance, and small aspect ratio model

1 each.

2. Water flow channel & models 1 set

3. Subsonic wind tunnel 1 No.

4. Smoke apparatus and rake 1 each.

5. Manometer, Pitot-Static tube 1 No.

6. Circular cylinder and Aerofoil pressure distribution models

1 each

7. Wind tunnel strain gauge balance

1 No.

8. Supersonic wind tunnel, Mercury manometer

1 No.

9. Schlieren system and Shadow graph system

1 No.

10. Sharp nosed and Blunt nosed models

1 No. each

Faculty of Mechanical Engineering IV Semester B. E. – Aeronautical Engineering (R2008)

AE49 – Aircraft Component Drawing Requirement for a batch of 30 students

S.No. Description of

Equipment Quantity required Quantity

available

Deficiency %

1. Drawing Boards, Drafting machines

30

Page 33: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.E. Applied Electronics

(R 2009) Semester I AP 916 – Electronics Design Laboratory I (Requirement for a batch of 25 students)

Sl.

No. Description of Equipment Quantity Required

Quantity Available

Deficiency in %

1. PIC Microcontroller Development Boards and Tools (Compiler /Assembler) 5 Nos.

2. DSP Trainer Kit and Development tools 5 Nos.

3. 16-bit Microprocessor prototype / Development board 5 Nos.

4. MODELSIM Simulator/ Equivalent Software Multi user

5. PSPICE circuits Simulator / Equivalent Software Multi user

6. FPGA Trainer/ Development Board and Tools 5 Nos.

7.

Personal Computers with following specifications P4, 2 GB RAM, 120 GB HDD

12 Nos.

Faculty of Information and Communication Engineering

M.E. Applied Electronics (R 2009) Semester I

AP 926 – Electronics Design Laboratory II (Requirement for a batch of 25 students)

S.No Name of the Equipment Quantity required

Quantity available

Deficiency %

1. CPLD / FPGA development board & tools 10 Nos

2. Microcontroller Development Board and Tools 10 Nos

3. Mathematical Simulating Tool Like MATLAB with control system tool boxes Multi user

4. Personal Computers with following specifications P4, 2 GB RAM, 120 GB HDD

12 Nos.

Page 34: UG _ PG Lab Equipments

Faculty of Mechanical Engineering III Semester B. E. – Automobile Engineering (R2008)

AT39 – Manufacturing Technology Laboratory Requirement for a batch of 30 students

S. No.

Description of Equipment Quantity required

Quantity available

Deficiency %

1. Centre Lathe with accessories 5 No.

2. Shaping Machine 2 No.

3. Slotting Machine 1 No.

4. Radial Drilling Machine 2 No.

5. Upright Drilling Machine 2 No.

6. Milling Machine 2 No.

7. Cylindrical Grinding Machine 1 No.

Faculty of Mechanical Engineering IV Semester B. E. – Automobile Engineering (R2008) AT48 Engine Performance and Emission Testing Lab

Requirement for a batch of 30 students S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Hydraulic dynamometer 1 No. 2. Eddy current dynamometer 1 No.

3. Electrical dynamometer 1 No.

4. Single cylinder two stroke cut section engine

1 No.

5. Single cylinder four stroke cut section engine

1 No.

6. Two-wheeler engine test rig 1 No. 7. Automotive multicylinder SI

engine test rig with heat balance arrangement

1 No.

8. Automotive multicylinder CI engine test rig with heat balance arrangement

1 No.

9. Emission Measuring Instruments for Petrol 7 Diesel Engines

1 No. each

10. Piezo – Electric pick up, Charge Amplifier, Angle Encoder and PC

1 Set

Page 35: UG _ PG Lab Equipments

Faculty of Mechanical Engineering IV Semester B. E. – Automobile Engineering (R2008)

AT49 - Computer Aided Machine Drawing Lab Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Computer nodes 30 Nos.

2. Software like i) AutoCAD ii) Pro-E

15

licenses

5 Nos.

Faculty of Mechanical Engineering

IV Semester B. E. – Automobile Engineering (R2008) AT411 – Electronics and Microprocessors Lab

Requirement for a batch of 30 students S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Voltmeters 5 No.

2. Ammeters 5 No.

3. PN Diode, BJT, JFET, Logic Gates, Shift Registers and Counters

1 set.

4. Digital Logic Trainer Kits 1 No.

5. Breadboards 1 No.

6. Microprocessor Kits – 8085 5 No.

7. D/A Converter Interface 1 No.

8. Stepper Motor Interface 1 No.

9. CRO 1 No.

10. Waveform Generator 1 No.

11. Multimeter 1 No.

Page 36: UG _ PG Lab Equipments

Faculty of Mechanical Engineering III Semester B. E. – Aeronautical Engineering (R2008)

AT411 – Manufacturing Technology Laboratory Requirement for a batch of 30 students

S.

No. Description of Equipment Quantity

required Quantity available

Deficiency %

8. Centre Lathe with accessories 5 No.

9. Shaping Machine 2 No.

10. Slotting Machine 1 No.

11. Radial Drilling Machine 2 No.

12. Upright Drilling Machine 2 No.

13. Milling Machine 2 No.

14. Cylindrical Grinding Machine 1 No.

Faculty of Mechanical Engineering

III Semester B. E. – Automobile Engineering (R2008) AT 37 – Automotive Components Laboratory

Requirement for a batch of 30 students S.

No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Multi Cylinder Petrol Engine 2 No.

2. Multi Cylinder Diesel Engine 2 No.

3. Petrol and Diesel fuel systems 2 No. each

4. Heavy duty vehicle chassis frame 1 No.

5. Light duty vehicle chassis frame 1No. 6. Front axle 2 No. 7. Rear axle 2 No. 8. Differential 2 No. 9. Clutch and Gear box 2 No.

each

10. Steering Systems with different gearboxes

4 No.

Page 37: UG _ PG Lab Equipments

Faculty of Management Studies M.B.A. Business Administration (R 2009)

II Semester BA928 – Business Application Software (Requirement for a batch of 25 students)

Sl. No Name of the Equipment Quantity

required Quantity available

Deficiency %

Hardware

1. P IV or above configured systems 13 Nos.

Software

1. Office Automation Package – Such as Microsoft Office 5 Nos.

2. Accounting Packages such as Tally/TCS EX / Wings 5 Nos.

3. Statistical Packages such as SPSS/SAS 5 Nos.

4. Operation Research Packages such as POM, TORA……. 5 Nos.

5. DBMS Packages SQL Server / Oracle 5 Nos.

6. Fronted tools such as visual studio / Dev 2000 5 Nos.

7.

Data mining related downloadable packages from www.xlminer.com; www.dtreg.com (also supported by statistical packages)

Page 38: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B.E. Bio Medical Engineering (R2008) BM38 – Bio Chemistry and Human Physiology Lab

Requirement for a batch of 30 students

Sl. No.

Description of Equipment Quantity required

Quantity available

Deficiency %

1. Test tube, microscope (Binocular), colorimeter

2. Centrifuge, Test tubes, anticoagulant

3. Blood Glucose kit

4. Cholesterol kit

5. SGOT/SGPT kit

6. Creatinine kit

7. Electrophoresis apparatus

8. Glass tanks, thin layer chromatography

9. ESR glan tube wintrobe PCV tube (Haematocrit tube) , sahli’s Haemo globinometer, Microscope, Haemocytometer(Mirror coated)

10. Differential count Leishman stain (readymade), Blood group antigen, microscope slides.

11. Ishihara chart, Snellen’s chart, Opthalmoscope

12. Weber’s and Rinnee’s test.

Page 39: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. E. Bio Medical Engineering (R2008)

BM39 - Electronic Circuits Lab Requirement for a batch of 30 students

S.No Name of the Equipments / Components

Quantity Required

Quantity Available

Deficiency %

1 Variable DC Power Supply (0-30V) 10

2 Fixed Power Supply + / - 12V 5

3 CRO 30MHz 10

4 Multimeter Digital 10

5 Function Generator (1 MHz) 5

6 Digital LCR Meter 1

Consumables

7 BC107, BF195, 2N2222, BC147, BFW10, SL100

8 IC 555, LEDs

9 Resistors 1/4 Watt Assorted

10 Capacitors

11 Inductors

12 Bread Boards

13 Transformer Diodes, Zener Diodes

(Minimum of 25 Nos.

each)

Page 40: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering IV Semester B. E. Bio Medical Engineering (R2008)

BM47 - Integrated Circuits Lab Requirement for a batch of 30 students

Sl. No Name of the equipments / Components

Quantity Required

Quantity available

Deficiency %

1 Dual ,(0-30V) variable Power Supply 10

2 CRO 30MHz 9

3 Digital Multimeter 10

4 Function Generator 1 MHz 8

5 IC Tester (Analog/Digital) 2

6 Bread board 10

Consumables (Minimum of 25 Nos. each)

1 IC 741 25 2 IC NE555 25 3 LED 25 4 Potentiometer

5 Seven Segment Display 25 6 Capacitor

7 Resistors 1/4 Watt Assorted 25

8 Single Strand Wire 25

9 Encoder and Decoder ICs (IC7445, IC 74147) 25

10 Multiplexer and Demultiplexer ICs. ( IC74150, IC74154) 25

11 Shift register ICs, Counter ICs 25

12 IC7400 25

13 IC7404 25

14 IC7402

15 IC7408 25 16 IC7411 25 17 IC7432 25

Page 41: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering IV Semester B. E. Bio Medical Engineering (R2008)

BM48 - Pathology and Microbiology Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

13. Test tubes, Test tube racks, Bunsen burner(gas),(Benedict’s solution, Acetic acid, Sulphosalicylic acid), centrifuge, microscope.

1 set

14. Slides, cover slips,H & E stains 1 set 15. Microscope 1 set 16. Beakers, graded alcohols, acetone,

moulds (or maling bodies), paradigm wax, water bath, microtone for section cutting,slides,cover slips,hotair oven,refrigerator to store chemical and ice.

1 set

17. whanman filter paper for bleeding time Test tubes.

1 set

18. Simple Stain test SIMPLE STAIN, Glass Slide Reagents – Methylene blue Crystal Violet Cabal luschin

1 set

19. Gram Stain test

SIMPLE GRAM STAIN Reagents - Crystal Violet Gram’s Iodine 95% ethyl alcohol Safranin Urine bacterial count/ml exceeding 100,000(10s) denotes urinary tract infection. Normal : 0 – 1000ml Glass Slide

1 set

20. AFB Strain test ACID FAST STAIN (ZIEHL – NEELSON METHOD) Reagents – Carbal Iushin Acid Alcohol Methylene blue Glass Slide

1 set

21. Bone marrow charts

Page 42: UG _ PG Lab Equipments

Faculty of Technology III Semester B.Tech. – Bio Technology (R 2008)

BT37 – Bio Chemistry Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Heating Mantles 5

2. Water Baths 5

3. Buners 10

4. TLC Plates Required Numbers

5. Colorimeter 2 Nos.

6. Consumables and Reagents.

Faculty of Technology

III Semester B.Tech. – Bio Technology (R 2008) BT38 – Bio-organic Chemistry Lab

Requirement for a batch of 30 students Sl.No. Description of Equipment Quantity

required Quantity available

Deficiency %

15. Heating Mantles Nos. 5

16. Water baths Nos. 5

17. Bunsen Burners Nos. 15

18. Round bottom flasks of various volumes (100ml, 500 ml, 250 ml) Nos. 5

19. Condensers Nos. 5

20. Distillation units Nos. 2

21. Reagents and consumables

Page 43: UG _ PG Lab Equipments

Faculty of Technology III Semester B.Tech. – Bio Technology (R 2008)

BT39 – Cell Biology Lab Requirement for a batch of 30 students

Sl.No. Description of Equipment Quantity

required Quantity available

Deficiency %

7. Microbiological Hood for sterilization with UV lighting

1 No.

8. Bunsen Burners 10 Nos.

9. Orbital Shaker and Incubator 2 Nos.

10. Refrigerator 1 No.

11. Reagents and consumables Required amount.

Faculty of Technology IV Semester B.Tech. – Bio Technology (R 2008)

BT47 – Microbiology Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Microbiological Hood for sterilization with UV lighting

One

2. Bunsen Burners 15

3. Orbital Shaker and incubator 2 Nos.

4. Refrigerator 1 No.

5. Reagents and consumables Required amount.

Page 44: UG _ PG Lab Equipments

Faculty of Technology

IV Semester B.Tech. – Bio Technology (R 2008) BT48 - Instrumental Methods of Analysis Lab

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

22. UV – VIS Spectro photometer, 1

23. Fluorimeter (Optional). 24. TLC chamber (common to

biochemistry) 1

25. Reagents and consumables Required amount

26. Measuring cylinders, bathometric flasks of various volumes.

Faculty of Technology

IV Semester B.Tech. – Bio Technology (R 2008) BT49 – Chemical Engineering Lab

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Simple Distillation 2 Nos.

2. Steam Distillation 1 No.

3. Orifice meter 1 No.

4. Venturi meter 1 No.

5. Flow through Straight pipe 1 No.

6. Flow through packet column 1 No.

7. Liquid Solid Fluidization 1 No.

8. Leaf Filter 1 No.

9. Plate and frame filter press 1 No.

10. Double pipe heat exchanger 1 No.

11. Packed Column Distillation 1 No.

12. Liquid-Liquid Extraction (Batch strain) 1 No.

13. Batch Adsorption Studies 1 No.

14. Spectrophotometer 1 No.

Page 45: UG _ PG Lab Equipments

Faculty of Technology I Semester M. Tech. – Bio-Technology (R 2009)

BT 914 – Preparative and analytical techniques in Bio-technology (Requirement for a batch of 25 students)

Sl. No Name of the Equipment Quantity

required Quantity available

Deficiency %

1. pH Meter 2

2. Spectro Photometer 1

3. Spectro Flurometer 1

4. TLC Plates 1 Box

5. Ion Exchange resins 500 gms

6. Gel Filtration 5 gms

7. SDS Page Electrophoresis 2

Page 46: UG _ PG Lab Equipments

Faculty of Technology II Semester M. Tech. – Bio-Technology (R 2009)

BT 925 – Microbial and Immuno Technology Laboratory (Requirement for a batch of 25 students)

Sl. No Name of the Equipment Quantity

required Quantity available

Deficiency %

1. Laminar Flow Chamber 2

2. Autoclave 1

3. Hot air Oven 1

4. Spectrophotometer 1

5. pH meter 1

6. Water bath Shaker 1

7. Elisa washer 1

8. Elisa Reader 1

9. Microscope (Phase Contrast) 2

10. High Speed Bench Top Centrifuge 1

11. SDS PAGE Apparatus 2

12. Gel Transfer Apparatus 1

13. Animal House (Small) 1

14. Refrigerator 1

15. Freezer (-20’C) 1

16. Colony Counting Machine 1

17. Dot blot Apparatus 1

18. Microwave Oven 1

Page 47: UG _ PG Lab Equipments

Faculty of Technology I Semester M. Tech. – Bio-Technology (R 2009)

BT 931 – Advanced Molecular Biology and Genetic Engineering Laboratory (Requirement for a batch of 25 students)

Sl. No Name of the Equipment Quantity required

Quantity available

Deficiency %

1. DNA Electrophoresis Units 5

2. SDS – Page Units 5

3. 370 C Incubator 1

4. Shaker (room temperature) 1

5. PCR machine 1

6. Centrifuge - Non-Refrigerated 2

7. Centrifuge - Refrigerated 1

8. Laminar Hood 1

9. -20o C deep freezer 1

10. Refrigerator 1

11. UV – Transilluminator 1

12. Gel documentation system 1

13. Spectrophotometer U-V range 1

14. Ice machine 1

15. Micro oven 1

16. Rocker 2

17. Western blot apparatus 1

18. Elisa plate Reader 1

19. Southern blot – Hybridization oven 1

20. Water bath (10`C – 60`C) 1

21. Electroporator 1

Page 48: UG _ PG Lab Equipments

Faculty of Technology III Semester M. Tech. – Bio-Technology (R 2009)

BT 932 – Advanced Bioprocess and downstream processing Laboratory (Requirement for a batch of 25 students)

Sl. No Name of the Equipment Quantity

required Quantity available

Deficiency %

1. Shaker 2

2. Laminar Flow Chamber 2

3. Water Bath 2

4. Spectrophotometer 1

5. pH meter 1

6. Weighing Balance 1

7. Vortex Mixer 2

8. Micro Centrifuge 1

9. Bioreactor (One Insitu) 3

(2 bath 1 continuous)

10. Gas analyzer 1

11. Refrigerated water bath 1

12. Air Compressor 1

13. Peristaltic Pump 6

14. Sonicator 1

15. Dynomill / Homogenizer (any one) 1

16. Refrigerated Centrifuge 1

17. FPLC / HPLC 1

18. Chromatographic Column 1

19. Lyophilizer 1

20. Ice Machine 1

21. Micro filtration / Ultrafiltration Unit with membranes 1

22. -80`C deep freezer 1

23. CO2 Incubator 1

24. Spinner flask 1

Page 49: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

M.E. CAD/CAM (R 2009) Semester I

CC 916 – CAD Laboratory (Requirement for a batch of 25 students)

Sl. No.

Description of Equipment

Quantity Required

Quantity Available

Deficiency in %

1. CAD Workstations 10 Nos

2.

CAD, 3D Modeling Software with assembly, Mechanism simulation and drafting modules

10 Nos

Faculty of Mechanical Engineering

M.E. CAD/CAM (R 2009) Semester II

CC 926 – CAM Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1.

CAM Software for tool path generation for planer machining, contour machining, drilling, turning etc. & post processing modulus for different CNC controllers

10 Nos

2. Medium production type CNC turning center with popular industrial type controller

1

3. Medium production type CNC machining center with popular industrial type controller

1

4. Bench Model CMM 1

5. Vision & image processing software 2

6. Data Processing Software 2

Page 50: UG _ PG Lab Equipments

Faculty of Civil Engineering III Semester B. E. – Civil Engineering (R2008)

CE38 - Survey Practical – I Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required

Quantity available

Deficiency %

27. Total Station 3 Nos

28. Theodolites Atleast 1 for every

10 students

29. Dumpy level Atleast 1 for every

10 students

30. Plain table Atleast 1 for every

10 students

31. Pocket stereoscope 1

32. Ranging rods

33. Leveling staff

34. Cross staff

35. Chains

36. Tapes

37. Arrows

1 for a set of 5

students

Faculty of Civil Engineering III Semester B. E. – Civil Engineering (R2008)

CE39 - Computer Aided Building Drawing Requirement for a batch of 30 students

Sl. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Computer system of Pentium IV or equivalent

1 for each

student

2. Licensed version of any reputed Analysis, Design & Drafting software

1 copy for a set

of 3 students

Page 51: UG _ PG Lab Equipments

Faculty of Civil Engineering IV Semester B. E. – Civil Engineering (R2008)

CE47 – Strength of Materials Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

38. UTM of minimum 400 KN capacity

1

39. Torsion testing machine for steel rods

1

40. Izod impact testing machine 1

41. Hardness testing machine Rockwell Vicker’s (any 2) Brinnel

1 each

42. Beam deflection test apparatus 1

43. Extensometer 1

44. Compressometer 1

45. Dial gauges few

46. Le Chatelier’s Apparatus 2

47. Vicat’s apparatus 2

48. Mortar cube moulds 10

Page 52: UG _ PG Lab Equipments

Faculty of Civil Engineering

IV Semester B. E. – Civil Engineering (R2008) CE48 – Hydraulic Engineering Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Bernoulli’s theorem – Verification Apparatus

1 No.

2. Calculation of Metacentric height water tank Ship model with accessories

1 No. 1 No.

3. Measurement of velocity Pitot tube assembly

1 No.

4. Flow measurement open channel flow (i)Channel with provision for fixing notches (rectangular, triangular & trapezoidal forms) (ii)Flume assembly with provisions for conducting experiments on Hydraulic jumps, generation of surges etc.

1 Unit

1 Unit

5. Flow measurement in pipes (i) Venturimeter, U tube manometer fixtures like Valves, collecting tank (ii) Orifice meter, with all necessary fittings in pipe lines of different diameters (iii) Calibration of flow through orifice tank with Provisions for fixing orifices of different shapes, collecting tank (iv) Calibration of flow through mouth piece Tank with provisions for fixing mouth pieces Viz external mouth pieces & internal mouth piece Borda’s mouth piece

1 Unit

1 Unit

1 Unit

1 Unit

6. Losses in Pipes Major loss – Friction loss Pipe lengths (min. 3m) of different diameters with Valves and pressure rapping & collecting tank Minor Losses Pipe line assembly with provisions for having

1 Unit

1 Unit

Page 53: UG _ PG Lab Equipments

Sudden contractions in diameter, expansions Bends, elbow fitting, etc.

7. Pumps (i) Centrifugal pump assembly with accessories (single stage) (ii) Centrifugal pump assembly with accessories (multi stage) (iii) Reciprocating pump assembly with accessories (iv) Deep well pump assembly set with accessories

1 Unit

1 Unit 1 Unit 1 Unit

8. Turbine (i)Impulse turbine assembly with fittings & accessories (ii)Francis turbine assembly with fittings & accessories (iii)Kaplan turbine assembly with fittings & accessories

1 Unit 1 Unit 1 Unit

Faculty of Civil Engineering IV Semester B. E. – Civil Engineering (R2008)

CE49 - Survey Practical – II Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Theodolites Atleast 1 for every 10 students

2. Dumpy level Atleast 1 for every 10 students

3. Plain table Atleast 1 for every 10 students

4. Pocket stereoscope 1

5. Ranging rods

6. Leveling staff

7. Cross staff

8. Chains

1 for a set of 5 students

Page 54: UG _ PG Lab Equipments

9. Tapes

10. Arrows

Faculty of Civil Engineering M.E. Construction Engineering and Management

(R 2009) II Semester CN 926 – Advanced Construction Engineering and Computing Technologies

(Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Available Not

Available Deficiency

in %

1. Concrete making equipments. Concrete Mixer – Automatic /Automated

2.

Equipments for self- compacting concrete. Flow ability test -> U-box, V-funnel, C-box

3. Workability and slump equipments for hpc & scc. Flowability, slump cone

4.

Equipments for compression testing with very high precision with automated graph UTM-Displacement control machine

5. Ndt equipments - upv, rebound hammer, core cutting machine (electrically operated)

6. Permeability apparatus –Permeability tester

7. Oven (range 0 to 600 degree c)

Software Required

8. MS office

9. QE pro

10. MS office suit

11. Primavera power user

12. Primavera contractor standard

13. Pert master

14. Primavera monte carlo simulation

15. Primavera expedition

Page 55: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. Computer and Communication Engineering (R 2009) Semester I

CP 917 – Computer and Communication Laboratory I (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1. MATLAB Package (30 user License) Multi user License

2. DSP Processor 4 Nos.

3. Shift Register, Modulo-2 Adder As required

4. Personal Computer (1:2) 13 Nos.

5. PIC Microcontroller 6 Nos.

Faculty of Information and Communication Engineering

M.E. Computer and Communication Engineering (R 2009) Semester II

CP 927 – Computer and Communication Laboratory II (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1. Fiber Optics Trainer with LED/LD/PD/APD 4 Nos.

2. Optical Link Simulator-OPTISM / SIMULINK 4 user License

3. Personal Computer (1:2)

13 Nos.

4. ATM Network Simulator / Equipment 4 user License

5. JAVA Tool JDK 1:2 / Equipment Multiuser License

Page 56: UG _ PG Lab Equipments

I Year B.E. / B.Tech.

Semester – I (R 2008)

CS17 COMPUTER PRACTICE LABORATORY – I Requirements for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

Hardware

1. LAN system with 33 nodes (OR) stand alone PCs 33 Nos.

2. Printer 3 Nos. Software

1. Operating System Windows / Unix Clone

Available / Not

Available

2. Compiler C compiler

Available / Not

Available

3. Application package Office suite

Available / Not

Available

Page 57: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. Tech. – Information Technology (R 2008)

CS37 – Digital Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Dual power supply/ single mode powersupply +12/-12V

15/30

2. IC Trainer 10 bit 15 3. Bread Boards 15 4. Multimeter 5 5. IC 7400 60 6. IC7402 60 7. IC 7404 60 8. IC 7486 60 9. IC 7408 60 10. IC 7432 60 11. IC 7483 60 12. IC74150 60 13. IC74151 40 14. IC74147 40 15. IC7445 40 16. IC7476 40 17. IC7491 40 18. IC555 40 19. IC7494 40 20. IC7447 40 21. IC74180 40 22. IC7485 40 23. IC7473 40 24. IC74138 40 25. IC7411 40 26. IC7474 40 27. Computer with HDL software 30 28. Seven segment display 40 29. Assembled LED board/LEDs 40/200 30. Wires Single strand

Page 58: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. E. – Computer Science and Engineering (R2008)

CS38 – Data Structures Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. SOFTWARE REQUIRED

TURBO C version 3 (or) GCC version 3.3.4

2. OPERATING SYSTEM WINDOWS 2000 / XP / NT OR LINUX

3. COMPUTERS REQUIRED (Minimum Requirement : Pentium III or Pentium IV with 256 RAM and 40 GB harddisk)

30 Nos.

Faculty of Information and Communication Engineering

III Semester B. E. – Computer Science and Engineering (R2008) CS39 – Object Oriented Programming Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1 Software – Turbo C (freeware) – to be installed in all PC’s.

2 Hardware a) PCs.

Processor – 2.0 GHz or higher

RAM – 256 MB or higher Hard disk – 20 GB or

higher OS- Windows 2000/

Windows XP/ NT

30 Nos

Page 59: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. Tech. – Information Technology (R 2008)

CS39 – Object Oriented Programming Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1 Software – Turbo C (freeware) – to be installed in all PC’s.

2 Hardware a) PCs.

Processor – 2.0 GHz or higher

RAM – 256 MB or higher Hard disk – 20 GB or

higher OS- Windows 2000/

Windows XP/ NT

30 Nos

Faculty of Information and Communication Engineering

IV Semester B. Tech. – Information Technology (R 2008) CS47 – Operating Systems Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment

Quantity available

Deficiency %

1. Software Ubuntu / OpenSUSE / Fedora / Red Hat / Debian / Mint OS Linux could be loaded in individual PCs.

(OR) A single server could be loaded with Linux and connected from the individual PCs.

2. Hardware 30 PCs

Page 60: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering IV Semester B. Tech. – Information Technology (R 2008)

CS48 – DBMS Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

available Deficiency

% 1.

Software Front end : VB/VC ++/JAVA Back end: Oracle 11g, my SQL, DB2 Platform: Windows 2000 Professional/XP Oracle server could be loaded and can be connected from individual PCs.

2. Hardware 30 Personal Computers

Faculty of Information and Communication Engineering IV Semester B. E. – Computer Science and Engineering (R2008)

CS48 – DBMS Lab Requirement for a batch of 30 students

S.No. Description of Equipment

Quantity available

Deficiency %

1. Software Front end : VB/VC ++/JAVA Back end: Oracle 11g, my SQL, DB2 Platform: Windows 2000 Professional/XP Oracle server could be loaded and can be connected from individual PCs.

2. Hardware 30 Personal Computers

Page 61: UG _ PG Lab Equipments

aculty of Information and Communication Engineering IV Semester B. Tech. – Information Technology

CS49 – Microprocessor Lab Requirement for a batch of 30 students

Sl.

No. Description of Equipment

Quantity Required

Quantity available

Deficiency %

1. 8085 Trainer Kit with onboard 8255, 8253, 8279 and 8251 15 nos.

2. TASM/MASM simulator in PC (8086 programs) 30 nos.

3. 8051 trainer kit 15 nos.

4. Interfacing with 8086 – PC add-on cards with 8255, 8253, 8279 and 8251 15 nos

5. Stepper motor interfacing module 5 nos.

6. Traffic light controller interfacing module 5 nos.

7. ADC, DAC interfacing module 5 nos.

8. CRO’s 5 nos.

Faculty of Information and Communication Engineering

M.Tech. Information Technology (R 2009) Semester I

CS916 – Data Structures Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1. Hardware – Pentium PC Desktops 25

2.

Software – Turboc3 complier / Borland C++ Complier / Developer C++/VC++ installed in 25 Desktop machines or can be made available with the server

Page 62: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.Tech. Information Technology

(R 2009) Semester I CS 917 – Networking Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1.

Hardware and Software Requirements: Linux OS – can be client / server type Or Pc’s installed with Linux OS

25 Nos.

2.

Software Requirements: Network Simulating Software NS2->Freely downloadable (Linux/Windows Version) OMNET++4.0-> Freely downloadable (Linux/Windows Version) Opnet -> Proprietory – for 25 students

Faculty of Information and Communication Engineering M.E. Computer Science and Engineering

(R 2009) Semester I CS916 – Data Structures Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1. Hardware – Pentium PC Desktops 25

2.

Software – Turboc3 complier / Borland C++ Complier / Developer C++/VC++ installed in 25 Desktop machines or can be made available with the server

Page 63: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.E. Computer Science and Engineering

(R 2009) Semester I CS 917 – Networking Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1.

Hardware and Software Requirements: Linux OS – can be client / server type Or Pc’s installed with Linux OS

25 Nos.

2.

Software Requirements: Network Simulating Software NS2->Freely downloadable (Linux/Windows Version) OMNET++4.0-> Freely downloadable (Linux/Windows Version) Opnet -> Proprietory – for 25 students

Faculty of Information and Communication Engineering M.E. Computer Science and Engineering

(R 2009) Semester II CS926 – Operating System Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1. Machines with Unix/Linux or Linux/Unix server and Nodes with windows

2. Java, C, JDBC

3. Ethereal / Comview along with Windows/Linux/Unix Utilities like netstat, ipconfig, traceroute etc.

4. Simple_OS or any real time operating systems

25 machines

Page 64: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.E. Communication Systems

(R 2009) Semester I CU 916 – Communication Systems Lab I

(Requirement for a batch of 25 students) Sl.

No. Description of Equipment Quantity Required

Quantity Available

Deficiency in %

1. MATLAB Package 15 user License

2. Personal Computers 13 Nos.

3. Antenna Trainer Kit 2 Nos.

4. Network Analyzer 1 Nos.

5. Shift Registers Modulo-2 Adders Bread Boards, Consumables

As Required

6. Digital Fiber Optics Link Trainer Kit 2 Nos.

7. Glass Fiber – Connectorized 2 Nos.

8. Pulse Generator 2 Nos.

9. 100 MHZ Digital Storage Oscilloscope 2 Nos.

Faculty of Information and Communication Engineering M.E. Communication Systems

(R 2009) Semester II CU 926 – Communication Systems Lab II (Requirement for a batch of 25 students)

Sl.

No. Description of Equipment Quantity Required

Quantity Available

Deficiency in %

1. MATLAB Package 15 user License

2. Network Analyzer 2 Nos.

3. Advanced Design Systems Package 3 user License

4. GPS Receivers / GPS Kit 2 Nos.

5. Microwave Devices for measurement 2 Nos.

6. Microstrip couplers 2 Nos.

7. Personal computers 13 Nos.

Page 65: UG _ PG Lab Equipments

I Year B. E. /B.Tech.

Semester – II (R 2008) EC29 – Circuits and Devices Laboratory

Requirement for a batch of 30 students (3 per Batch)

Sl. No. Description of Equipment Quantity required Quantity available

Deficiency %

1. 0-30V RPS 12

2. 0-50V RPS 2

3. 0-5V RPS 2

4. 0-30V Voltmeter 10

5. 0-10V Voltmeter 5

6. 0-50V Voltmeter 2

7. 0-1V Voltmeter 3

8. 0-30mA Ammeter 5

9. 0-100mA AC Amplifier 2

10. Audio Oscillator 5

11. CRO (30 MHZ) 15

12. Diodes, Zener Diodes 20

13. Transistors (PNP & NPN) 10

14. UJT 10

15. SCR 10

16. JFET 10

17. MOSFET 10

18. DIAC & TRIAC 10

19. Photodiode 5

20. Photo Transistor 5

21. Required passive components

22. Variable Resistor

Page 66: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. E. – Electronics and Communication Engineering

(R 2008) EC37 – Digital Electronics Lab

Requirement for a batch of 30 students Sl. No

Name of the equipments / Components

Quantity Required

Quantity available

Deficiency %

1 Digital IC Tester 2 Nos

2 Power Supply 5V DC 10

3 Multimeter Digital 10

4 Computer with HDL software Installed

2

Consumables (Minimum of 25 Nos. each)

1 IC7400 25

2 IC7404 25

3 IC74682 25

4 IC7402 25

5 IC7408 25

6 IC7411 25

7 IC7432 25

8 IC7483 25

9 IC7485 25

10 IC7486 25

11 IC74150 25

12 IC74151 25

13 IC74147 25

14 IC7445 25

15 IC7474 25

16 IC7476 25

17 IC7491 25

18 IC7494 25

19 IC7447 25

20 IC74180 25

21 IC555 25

22 Seven Segment Display 25

23 LEDs 25

24 Bread Board 25

25 Wires

Page 67: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

III Semester B. E. – Electronics and Communication Engineering (R 2008)

EC38 – Electronic Circuits Lab I

Requirement for a batch of 30 students (3 per Batch)

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Variable DC Power Supply (0-30V)

8

2. CRO 30MHz 10

3. Multimeter Digital 6

4. Function Generator 1 MHz 8

5. DC Ammeter 10

6. DC Voltmeter 10

Consumables (Minimum of 25 Nos. each)

7. BC107, BC147,BC 108, BC 148, BC547, BC 548, SL 100, SK100 or Equivalent transistors.

8. Resistors 1/4 Watt Assorted

9. Capacitors

10. Inductors

11. Diodes, Zener Diodes

12. Bread Boards

13. Transformers

Page 68: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

III Semester B. E. – Electronics and Communication Engineering (R 2008)

EC39 – Data structures and Object Oriented Programming Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. P IV Computer Variable DC Power Supply 30 Nos

2. C and C++ Compiler 30 Users

Faculty of Information and Communication Engineering

IV Semester B. E. – Electronics and Communication Engineering (R 2008)

EC47 – Electronics circuits II and simulation lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

4. Variable DC Power Supply (0-30V) 8

5. Fixed Power Supply + / - 12V 4

6. CRO 30MHz 6

7. Multimeter Digital 6

8. Multimeter Analog 2

9. Function Generator 1 MHz 6

10. Digital LCR Meter 1

11. PC with SPICE Simulation Software

6

12. BC 107,BF195, 2N2222, BC147

13. Resistors

14. Capacitors

15. Inductors

16. Diodes , Zener Diodes 17. Bread Boards

Consumables (Minimum of

25 Nos. each)

Page 69: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

IV Semester B. E. – Electronics and Communication Engineering (R 2008)

EC48 – Linear Integrated Circuit Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Dual, (0-30V) variable Power

Supply 10

2. CRO 30MHz 9

3. Digital Multimeter 10

4. Function Generator 1 MHz 8

5. IC Tester (Analog) 2

6. Bread board 10

7. Computer (PSPICE installed) 1

Consumables (Minimum of 25 Nos. each)

1. IC 741 25

2. IC NE555 25

3. LED 25

4. LM317 25

5. LM723 25

6. ICSG3524 / SG3525 25

7. Transistor – 2N3391 25

8. Diodes, IN4001, BY126 25

9. Zener diodes 25

10. Potentiometer

11. Step-down transformer 230V/12-0-12V 1

12. Capacitor

13. Resistors 1/4 Watt Assorted 25

14. Single Strand Wire

Page 70: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering IV Semester B. E. – Electronics and Communication Engineering (R

2008) EC49 – Electrical Engineering and Control System Lab

Requirement for a batch of 30 students

Sl. No. Apparatus Range Quantity Quantity Available

Deficiency %

1. Open circuit and load characteristics of separately excited and self excited D.C. Generator. 1 Motor Generator set - 1

2 Rheostat 200, 5A 175, 1.5A

1 2

3 Voltmeter DC 300V 30V

1 1

4 Ammeter DC 30A 2A

1 2

5 DPST switch 2

6 Three point starter 1

7 Tachometer 1

2. Load test on D.C. shunt motor. 1 DC Motor - 1

2 Rheostat 175, 1.5A 1

3 Voltmeter DC 300V 1

4 Ammeter DC 30A 1

5 DPST switch 1

6 Three point starter 1

7 Tachometer 1

3. Swinburne’s test and speed control of D.C. shunt motor

1 DC Motor - 1

2 Rheostat 100, 5A 175, 1.5A

1 1

3 Voltmeter DC 300V 1

4 Ammeter DC 5A 2A

1 1

5 DPST switch 1

6 Tachometer 1

Page 71: UG _ PG Lab Equipments

4. Load test on single-phase transformer and open circuit and short circuit test on single-phase transformer.

1 Single phase Transformer

- 1

2 Wattmeter 300V, 5A,UPF 300V, 5A,LPF

1 1

3 Voltmeter AC 300V 2

4 Ammeter AC 5A 30A

1 1

5 Single phase auto-transformer

1

6 Resistive load 1

5. Regulation of three-phase alternator by EMF and MMF method. 1 Motor Alternator set - 1

2 Rheostat 200, 5A 175, 1.5A

1 1

3 Voltmeter DC Voltmeter AC

300V 600V

1 1

4 Ammeter DC Ammeter AC

2A 30A

1 1

5 DPST switch TPST switch

1 1

6 Tachometer 1

6. Load test on three phase Induction motor. 1 Three Phase

Induction Motor - 1

2 Wattmeter 600V, 10A,UPF 2

3 Voltmeter AC 600V 1

4 Ammeter AC 10A 1

5 Brake drum arrangement

6 Star delta starter 1

7 Tachometer 1

7. No load and blocked rotor test on three-phase induction motor (Determination of equivalent circuit parameters)

1 Three Phase Induction Motor

- 1

2 Wattmeter 600V, 10A,UPF 600V, 5A,LPF

2 2

3 Voltmeter AC 600V 150V

1 1

4 Ammeter AC 10A 5A

1 1

5 Brake drum arrangement

Page 72: UG _ PG Lab Equipments

6 Three phase auto-transformer

1

8. Study of D.C. motor and Induction motor starters. 1 Three point starter 1

2 Four point starter 1

3 Star-delta starter 1

4 DOL starter 1

5 Three phase auto-transformer

1

9. Digital simulation of linear systems.

Simulink software

for minimum 3 users license

10.

Stability analysis of linear system using Mat lab.

Matlab software

for minimum 3 users license

11. Study of effect of P, PI, PID controllers using Mat lab.

Matlab software

for minimum 3 users license

12. Design of lead and lag compensator. 1 Resistor 2 Capacitor 3 Function generator 4 Bread Board 13. Transfer function of separately excited D.C. generator. 1 Motor Generator set - 1 2 Rheostat 200, 5A

175, 1.5A 1 2

3 Voltmeter DC 300V 30V

1 1

4 Ammeter DC 30A 2A

1 2

5 DPST switch 2 6 Three point starter 1 7 Tachometer 1 14. Transfer function of armature and field controller D.C. motor. 1 DC Motor - 1 2 Rheostat 175, 1.5A 1 3 Voltmeter DC 300V 1 4 Ammeter DC 30A 1

5 DPST switch 1

6 Three point starter 1

7 Tachometer 1

Page 73: UG _ PG Lab Equipments

Faculty of Mechanical Engineering M.E. Engineering Design

(R 2009) Semester I ED 916 – CAD Laboratory

(Requirement for a batch of 25 students) Sl.

No. Description of Equipment Quantity Required

Quantity Available

Deficiency in %

1.

Hardware: Desktop Computer System of the following Configuration (Minimum) Processor : Dual Core Main Memory : 1 GB or Higher RAM Hard Disk : 40 GB or Higher Display : High Resolution 1024 x 768 -AGP Licensed Operating System Printer / Plotter: A3 size.

25 Nos.

2.

Application Software: 25 Licensed or more number of Modelling software to carryout CAD exercises (like Pro-E, CATIA, Solid works, Nx etc.)

25 License

Faculty of Mechanical Engineering

M.E. Engineering Design (R 2009) Semester I

ED 926 – Analysis & Simulation Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency in %

1.

Hardware: Desktop Computer System of the following Configuration (Minimum) Processor : Dual Core Main Memory : 1 GB or Higher RAM Hard Disk : 80 GB or Higher Display : High Resolution 1024x768 -AGP Licensed Operating System Printer / Plotter: A3 size.

25 Nos.

2.

Application Software: 25 Licensed or more number of software to carryout Analysis of Mechanical Components exercises (like NASTRAN, ANSYS etc) Kinematics & Dynamics simulation software exercises (like ADAMS, MATLAB etc)

25 License

Page 74: UG _ PG Lab Equipments

I Year B.E. /B.Tech.

Semester – II (R 2008)

EE29- Electrical Circuits Laboratory

Requirement for a batch of 30 students

Sl. No.

Name of the Equipment Range / Spec Quantity

required Quantity available

Deficiency %

1. C.R.O 30MHZ 6

2. D.C, Power Supply (regulated)

0-30 V 6

3. Function Generator

Frequency: 1 MHZ Amplitude: Max volt: 20V Min volt: 20mV Waveforms: Sine, Square, triangular

6

4. Digital Storage Oscilloscope -

1

Page 75: UG _ PG Lab Equipments

Faculty of Electrical Engineering

IV Semester B.E. – Electrical and Electronics Engineering (R 2008) EE37 - Electronic Devices and Circuits Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Regulated Power Supply 15

2. Dual Tree CRO (20 MHz) 15

3. Function Generator 15

4. 31/2 Digit digital multimeter 10

5. Bread Boards 40

6. Transistor 25 Nos.

7. JFET 10 Nos.

8. Diode 10 Nos.

9. Zener Diode 5 Nos.

10. UJT 5 Nos.

11. Photo Diode 5 Nos.

12. Photo Transistor 5 Nos.

13. Thermistors 5 Nos.

14. OP-amp 10 Nos.

15. Milli Ammeter (0-100mA) 15 Nos.

16. Micro Ammeter (0-50µA) 10 Nos.

17. Low range voltmeter (0-30V) 10 Nos.

18. Resistor of various ranges 50 Nos.

19. Capacitors of various ranges 50 Nos.

20. Connecting wires Sufficient Nos

Page 76: UG _ PG Lab Equipments

Faculty of Electrical Engineering

III Semester B.E. – Electronics and Instrumentation Engineering (R 2008)

EE39 - Data Structures and Algorithms Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Computer(Pentium 4) 40 Nos with one

server

2. Dot matrix printer 3 Nos

3. Laser Printer 2 Nos

4. UPS (5 KVA) 2

5. Turbo C 40 Nodes

Faculty of Electrical Engineering III Semester B.E. – Electronics and Instrumentation Engineering

(R 2008) EE39 - Data Structures and Algorithms Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Computer(Pentium 4) 40 Nos with one

server

2. Dot matrix printer 3 Nos

3. Laser Printer 2 Nos

4. UPS (5 KVA) 2

5. Turbo C 40 Nodes

Page 77: UG _ PG Lab Equipments

Faculty of Electrical Engineering

IV Semester B.E. – Electrical and Electronics Engineering (R 2008) EE48 – Linear and Integrated Circuits Laboratory

Requirement for a batch of 30 students S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Interface such as, A/D, D/A converter, DMA, PIC Serial, Interface, Temperatures controller, Stepper motor, Key board

4 each

2. CRO and function generator 3 each

3. IC trainer Kit 15

4. Analog AC trainer kit 4

5. Components and bread boards 10 each

6. Chips IC – 7400 10

7. Chips IC – 7402 10

8. Chips IC – 7408 10

9. Chips IC – 7432 10

10. Chips IC – 7410 25

11. Chips IC – 555 10

12. Chips IC – 741 10

13. Chips IC – 74153 10

14. Chips IC – 7474 10

15. Chips IC – 7490 10

16. Chips IC – 7447 10

17. Chips IC – 7476 10

18. Chips IC – 7420 10

19. Chips IC – 7404 15

20. Chips LM – 317 10

21. Chips LM – 723 10

22. Chips MA – 7840 10

23. Chips LM – 380 10

24. Chips ICL - 8038 10

25. Traffic light control kit 2

26. VDU 2

27. 7 segment Display 5

28. Interfacing card such as keyboard etc.

3 each

29. Work tables 15

Page 78: UG _ PG Lab Equipments

Faculty of Electrical Engineering IV Semester B.E. – Electronics and Instrumentation Engineering (R

2008) EE48 – Linear and Integrated Circuits Laboratory

Requirement for a batch of 30 students \S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Interface such as, A/D, D/A converter, DMA, PIC Serial, Interface, Temperatures controller, Stepper motor, Key board

4 each

2. CRO and function generator 3 each 3. IC trainer Kit 15 4. Analog AC trainer kit 4 5. Components and bread boards 10 each 6. Chips IC – 7400 10 7. Chips IC – 7402 10 8. Chips IC – 7408 10 9. Chips IC – 7432 10 10. Chips IC – 7410 25 11. Chips IC – 555 10 12. Chips IC – 741 10 13. Chips IC – 74153 10 14. Chips IC – 7474 10 15. Chips IC – 7490 10 16. Chips IC – 7447 10 17. Chips IC – 7476 10 18. Chips IC – 7420 10 19. Chips IC – 7404 15 20. Chips LM – 317 10 21. Chips LM – 723 10 22. Chips MA – 7840 10 23. Chips LM – 380 10 24. Chips ICL - 8038 10 25. Traffic light control kit 2 26. VDU 2 27. 7 segment Display 5 28. Interfacing card such as keyboard

etc. 3 each

29. Work tables 15

Page 79: UG _ PG Lab Equipments

Faculty of Electrical Engineering III Semester B.E. – Instrumentation and Control Engineering (R

2008) EI38 - Electrical Machines Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. D.C motor – Generator set D.C motor – Shunt Generator D.C motor – Compound Generator

2 set 2 set

2. D.C. Shunt Motor 2 Nos.

3. D.C. Series Motor 1 No.

4. D.C. Compound Motor 1 No.

5. Single phase transformers 7 Nos.

6. Three phase transformers 2 Nos.

7. D.C. Motor – Alternator set 4 sets

8. Three phase Induction Motor (Squirrel cage) 3 Nos.

9. Three phase slip ring Induction Motor 1 No.

10. Single phase Induction Motor 2 Nos.

11. Resistive load 3 phase – 2 , single phase - 3 5 Nos.

12. Inductive load 1 No.

13. Single phase Auto transformer 5 Nos.

14. Three phase Auto transformer 3 Nos.

15. Moving Coil Ammeter of different ranges 20 Nos.

16. Moving Coil Voltmeter of different ranges 20 Nos.

17. Moving Iron Ammeter of different ranges 20 Nos.

18. Moving Iron voltmeter of different ranges 20 Nos.

19. Wire wound Rheostats of different ratings 30 Nos.

Page 80: UG _ PG Lab Equipments

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

20. Tachometers 10 Nos.

21. Single element wattmeters of different ranges UPF / LPF

20 Nos.

22. Double element wattmeters of different ranges 4 Nos.

23. Power factor meter 2 Nos.

24. Digital multimeter 5 Nos.

25. Three point starter, four point starter,DOL starter, manual star / delta starter, semi automatic and fully automatic star / delta starter

1 No each for study experiment

26. SCR based semi and fully controlled rectifier module 2 Nos.

27. SCR based chopper module 2 Nos.

28. SCR based inverter module 2 Nos.

29. SCR based AC voltage regulation module 2 Nos.

30. SCR, MOSFET, IGBT Trainer module Each 2 Nos.

Page 81: UG _ PG Lab Equipments

Faculty of Electrical Engineering IV Semester B.E. – Instrumentation and Control Engineering

(R 2008) EI47 - Transducer and Measurements Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

Loading Effect on potentiometer 1. Potentiometer – Linear displacement

transducer kit 1 No

2. Regulated power supply 1 No 3. FET voltmeter, ordinary voltmeter 1 No

Characteristics of Strain Guage and Load cell 4. Strain guage and Load cell kit 1 No 5. Variable power supply 1 No 6. Loads for measurement A set

Characteristics of LVDT 7. LVDT trainer kit 1 No. 8. Power supply 1 No.

Half Effect Transducers 9. Hall effect characteristics trainer 1 No. 10. Power supply 1 No. 11. Voltmeter 1 No.

Photoelectric tachometer 12. Speed control trainer kit 1 No 13. Power supply 1 No. 14. Wires Some 15. Multimeter 1 No.

Characteristics of LDR 16. Photo conductive trainer kit 1 No. 17. Multimeter 1 No. 18. Connecting wires 1 No.

Characteristics of thermistor 19. Thermistor Trainer kit 1 No. 20. Heater 1 No. 21. Thermistor 1 No. 22. Thermometer 1 No. 23. Voltmeter 1 No.

Characteristics of Thermocouple 24. Thermocouple trainer kit 1 No.

Page 82: UG _ PG Lab Equipments

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

25. Thermocouple 1 No. 26. Heater 1 No. 27. Voltmeter 1 No.

Step Response characteristics of RTD and Thermocouple 28. Thermocouple and RTD trainer kit 1 No. 29. Thermocouple and RTD sensors 1 No. 30. Heater 1 No. 31. Thermometer 1 No. 32. Voltmeter 1 No. 33. I/P trainer kit 1 No. 34. Pressure source 1 No. 35. Control valve etc 1 No.

Measurement Of Medium Resistance Using a) Wheatstone’s Bridge 36. Resistors 1 No. 37. Galvanometer 1 No. 38. Regulated Power Supply 1 No. 39. Bread Board 1 No. 40. Decade Resistance Box 1 No. 41. Multimeter 1 No.

b) Kelvin’s Double Bridge 42. Power supply 1 No. 43. Fixed resistance 1 No. 44. Unknown resistance 1 No. 45. Decade Resistance box 1 No. 46. Multimeter 1 No. 47. Galvanometer 1 No. 48. Bread Board 1 No.

Schering’s Bridge for capacitance measurement 49. Resistors Some set 50. Capacitance Some set 51. Decade Resistance box 1 No. 52. Decade Capacitance Box 1 No. 53. CRO 1 No. 54. Function Generator 1 No.

Anderson’s Bridge for inductance measurement. 55. Resistors Some Set 56. Decade Inductance box 1 No. 57. Decade Condenser box 1 No. 58. Regulated Power Supply 1 No. 59. CRO 1 No. 60. Bread Board 1 No.

Calibration of Single Phase Energy Meter 61. Wattmeter 2 No. 62. Voltmeter 1 No. 63. Ammeter 1 No. 64. Resistive Load 1 No.

Page 83: UG _ PG Lab Equipments

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

Calibration of wattmeter 65. Ammeter 1 No. 66. Voltmeter 1 No. 67. Wattmeter 1 No. 68. Load 1 No.

Calibration of Ammeter 69. Standard Ammeter 1 No. 70. Ammeter 1 No. 71. Variable resistive load 1 No. 72. RPS 1 No.

Calibration of Voltmeter 73. Standard Voltmeter 1 No. 74. Voltmeter 1 No. 75. Auto transformer 1 No. 76. RPS 1 No.

Series type Ohmmeters 77. Ohmmeter (Analog Multimeter) 1 No. 78. Voltmeter 1 No. 79. Ammeter 1 No. 80. Resistor 1 No. 81. RPS 1 No.

Shunt type Ohmmeter 82. Ohmmeter (Analog Multimeter) 1 No. 83. Voltmeter 1 No. 84. Ammeter 1 No. 85. Resistor 1 No. 86. RPS 1 No.

Page 84: UG _ PG Lab Equipments

Faculty of Electrical Engineering IV Semester B.E. – Electronics and Instrumentation Engineering

(R 2008) EI49 - Thermodynamics Laboratory

Requirement for a batch of 30 students S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

Thermodynamics Lab 1. Engine – cut section models 1 set

2. Single cylinder petrol engine with Mechanical dynamometer

1 set

3. Multi cylinder petrol engine with hydraulic dynamometer

1 set

4. Multi cylinder diesel engine with Electrical dynamometer

1 set

5. Steam boilers with suitable mountings and accessories

1 set

6. Refrigeration Test Rig 1 No.

7. Forced convection Heat transfer Test set up.

1 No.

8. Free convection Heat transfer test set up.

1 No.

9. Apparatus for measuring pipe friction 1 No.

10. Francis turbine 1 No.

11. Pelton wheel 1 No.

12. Turgo impulse wheel 1 No.

13. Stop watches 6 Nos.

Page 85: UG _ PG Lab Equipments

Faculty of Electrical Engineering IV Semester B.E. – Instrumentation and Control Engineering

(R 2008) EI49 - Thermodynamics Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

Thermodynamics Lab 1. Engine – cut section models 1

2. Single cylinder petrol engine with Mechanical dynamometer

1

3. Multi cylinder petrol engine with hydraulic dynamometer

1

4. Multi cylinder diesel engine with Electrical dynamometer

1

5. Steam boilers with suitable mountings and accessories

1

6. Refrigeration Test Rig 1

7. Forced convection Heat transfer Test set up.

1

8. Free convection Heat transfer test set up.

1

9. Apparatus for measuring pipe friction

1 No.

10. Francis turbine 1 No.

11. Pelton wheel 1 No.

12. Turgo impulse wheel 1 No.

13. Stop watches 6 Nos.

Page 86: UG _ PG Lab Equipments

Faculty of Electrical Engineering

M.E. Embedded System and Technologies (R 2009) Semester II

ET926 – Embedded System Laboratory (Requirement for a batch of 25 students)

S.No Name of the Equipment Quantity required

Quantity available

Deficiency %

1. PC terminals-networked with high capacity server

25

2. HP laser printer 1

3. UPS –5 kVA 1

4. Dot matrix printer 1

5. Visual Basic 1

6. Visual C++ 1

7. Matlab software 5 Licenses

8. KEIL IDE vision2 software with RTK51 & RT 166 real time kernel enabled

3

9. Intel/Atmel/Philips/silabs 8083/87C5xx/803xx/80L5xx/8F5xx micro controller board

3

10. Xilinx webpack 5.1 software with models 1m 5.6 xE 3

11. Xilinx cool runner XCL –100 kit 3

12. Code composer studio for C2x & C5x 3

13. TMs 3202X/C5X series DSP processor bits 3

14. Cypress/ ATMEL FPSLIC software 3

15. Cypress/ ATMEL FPSLIC programmable kits 3

16. 8031/89C51 – trainer kit with interfacing boards 5

17. Universal programmer VLSI Ki5 2

18. ATMEL trainer board 5

19. KEIL PK 51 with trainer boards [S/W – 5 user license] 5

20. Vx works-tornado, and X86/Power PC boards 5 user license {RTOS}

5

Page 87: UG _ PG Lab Equipments

S.No Name of the Equipment Quantity required

Quantity available

Deficiency %

21. Cypress warp tools 5 licenses

22. ORCAD 9.1 cadence, mentor graphics design tools 1 Licenses

23. OPNET/QUALNET/NS2, Simulator Software. Multi user

24. Microcontroller kit with Ethernet Controller & Board Support Package

1

25. 8051/ PIC Microcontroller boards 5 each

26. Temp Sensor, Traffic Light Control, Stepper Motor 2 each

27. 16 bit Processor : msp430 Microcontroller 1

28. ARM 7 Development Board with RTOS 1

29. RTOS : ARM7/ARM9 with RTOS Multiuser

30. ORCAD/Pspice. Licensed Version Multiuser

31. MatLab Lab View Licensed Version Multiuser

32. DSP Processor TMS 320FC5X/3X series with code compressor studio

1

33.

Xilinx/Alterc FPGA Kit like Spartan/Virtex/ Altera Cyclone FPGA with board support packages

1

34. Opnet/ Qualnet/ NS2 simulator Software Multiuser

35. Microcontroller kit with Ethernet Controller & Board Support Package

1

Page 88: UG _ PG Lab Equipments

I Year B.E./ B.Tech. Semester – I (R 2008)

GE19 Engineering Practices Laboratory Requirements for a batch of 30 students

Sl.No. Description of Equipment Quantity required

Quantity available

Deficiency %

CIVIL

1.

Assorted components for plumbing consisting of metallic pipes, plastic pipes, flexible pipes, couplings, unions, elbows, plugs and other fittings.

15 sets

2. Carpentry vice (fitted to work bench) 15 No.

3. Standard woodworking tools 15 sets

4. Models of industrial trusses, door joints, furniture joints 5 each

5.

Power Tools: (a) Rotary Hammer (b) Demolition Hammer (c) Circular Saw (d) Planer (e) Hand Drilling Machine (f) Jigsaw

2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos

MECHANICAL

1. Arc welding transformer with cables and holders 5 No.

2. Welding booth with exhaust facility 5 No.

3. Welding accessories like welding shield, chipping hammer, wire brush, etc. 5 sets

4. Oxygen and acetylene gas cylinders, blow pipe and other welding outfit. 2 No.

5. Centre lathe 2 No.

6. Hearth furnace, anvil and smithy tools 2 sets

Page 89: UG _ PG Lab Equipments

7. Moulding table, foundry tools 2 sets

8. Power Tool: Angle Grinder 2 Nos

9. Study-purpose items: centrifugal pump, air-conditioner One Each.

ELECTRICAL

1. Assorted electrical components for house wiring 15 sets

2. Electrical measuring instruments 10 sets

3. Study purpose items: Iron box, fan and regulator, emergency lamp One each

4. Megger (250V/500V) 1 No.

5. Power Tools:

(a) Range Finder (b) Digital Live-wire detector

2 Nos 2 Nos

ELECTRONICS

1. Soldering guns 10 No.

2. Assorted electronic components for making circuits 50 No.

3. Small PCBs 10 No.

4. Multi Meters 10 No.

5. Study purpose items: Telephone, FM radio, low-voltage power supply 2 each

Page 90: UG _ PG Lab Equipments

I Year B.E. / B.Tech. Semester - II (R2008)

GE27 COMPUTER PRACTICE LABORATORY - II Requirements for a batch of 30 students

Sl.No. Description of Equipment Quantity required

Quantity available

Deficiency %

Hardware

3. UNIX Clone Server 1 No.

4. 33 Nodes (thin client or PCs) 33 Nos.

5. Printer 3 Nos.

Software

4. Operating System (33 user license or License free Linux) Unix Clone Available /

Not Available

5. Compiler C compiler Available / Not Available

Page 91: UG _ PG Lab Equipments

I Year B.E. / B.Tech. Semester - II (R 2008)

GS28 PHYSICS & CHEMISTRY LABORATORY - II Requirements for a batch of 30 students

Physics Laboratory

Sl.No. Description of Equipment Quantity required

Quantity available Deficiency %

1. Torsional Pendulum apparatus (With accessories) 5 Nos.

2. Non-uniform Bending apparatus (With accessories) 5 Nos.

3. Viscosity (Poiseuille’s flow) apparatus (With accessories) 5 Nos.

4. Band gap apparatus/ Post office box 5 Nos.

5. Spectrometer (With grating, prism and accessories)

5 Nos.

6. Carey Foster Bridge 5 Nos.

Chemistry Laboratory

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Electronic balance 1 No.

2. pH meter 8 Nos.

3. Conductivity bridge 8 Nos.

4. Potentiometer 8 Nos.

5. Platinum electrodes 8 Nos.

6. Calomel electrodes 8 Nos.

7. Spectrophotometer 1 No.

8. Flame photometer 1 No.

9. Oswald viscometer 15 Nos.

10. Glassware Sufficient Quantity

Page 92: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering III Semester B. Tech. – Information Technology (R 2008)

IT38 – Data Structures and Algorithm Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

18. SOFTWARE REQUIRED

TURBO C version 3 (or) GCC version 3.3.4

19. OPERATING SYSTEM WINDOWS 2000 / XP / NT OR LINUX

20. COMPUTERS REQUIRED (Minimum Requirement : Pentium III or Pentium IV with 256 RAM and 40 GB harddisk)

30 Nos.

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering (R 2009) Semester II

IT 926 – Internet Programming Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1. PC’s 25

2. Java, J2SEE, Browsers like IE, firefox

Open source

3. Web server like Tomcat Open Source

4. Any Database

All the software mentioned above should be installed in all the 25 Systems

Page 93: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.Tech. Information Technology (R 2009) Semester II

IT 926 Internet Programming Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1. PC’s 25

2. Java, J2SEE, Browsers like IE, firefox

Open source

3. Web server like Tomcat Open Source

4. Any Database

All the software mentioned above should be installed in all the 25 systems

M.Sc. (5 Years) COMPUTER TECHNOLOGY (R 2003)

LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description Quantity required

(i) Hardware

60 Terminals

a. COBOL b. C c. Word Processing and

Presentation Software d. RDBMS e. C++ f. JAVA g. Case Tool with UML h. VB i. VC++

(ii) Software

j. Multimedia Software

Page 94: UG _ PG Lab Equipments

M.Sc. (5 Years) INFORMATION TECHNOLOGY (R 2003)

LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description Quantity required

(i) Hardware 60 Terminals

a. COBOL b. C c. Word Processing and

Presentation Software d. RDBMS e. C++ f. JAVA g. Case Tool with UML h. VB i. VC++ j. Multimedia Software

(ii) Software

k. Scripting Software

Faculty of Information and Communication Engineering M.C.A. Computer Application

(R 2009) Semester I MC 916 – Programming and Data Structures Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive

25 Nos.

2. Windows 2000/any higher versions/ XP/ vista 25 Nos.

3. Turbo C Version 3.0 / Bortland C 25 Nos.

Page 95: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester I

MC 917 – DBMS Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

Hardware

1. Computer System with Higher Configuration 25 Nos.

Softwares

1. Windows XP Operating System with Licensed Version 25 Nos.

2. Microsoft SQL Server with Licensed for 25 Numbers client connection

1 No.

3. Microsoft Office 2003 / 2007 with Licensed Version 25 Nos.

4.

Microsoft Visual Studio 2008 with Licensed Version

or Microsoft Developer 2000 with Licensed Version

25 Nos.

5. Antivirus with Licensed Version 25 Nos.

Page 96: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester III

MC 937 – Microprocessor Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1. 8086 Microprocessor Kit 25 Nos.

2. TASM /MASM/ NASM Software(PC) 25 Nos.

3. 8255 Traffic Controller Interface 25 Nos.

4. Stepper Motor Interface 25 Nos.

5. CRT Interface for waveform Generator 25 Nos.

6. DC Motor controller Interface 25 Nos.

7. 8279 Keyboard / Display Controller 25 Nos.

8. ADC / DAC Interface Board 25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester II

MC 926 – Object Oriented Programming Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows 2000/any higher versions/ XP/ vista

25 Nos.

2. Turbo C Version 3.0 / Bortland C 25 Nos.

Page 97: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester II

MC 927 – System Software Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1. Linux Server 1

2. Desktop machines

or Linux machines

25 Nos.

3. Softwares: C Complier available with Linux OS

25 user License

Faculty of Information and Communication Engineering M.C.A. Computer Application

(R 2009) Semester II MC 928 – Algorithm Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

8. Hardware: Computer System with High Configuration

25 Nos.

Softwares

1. Windows XP Operating System with Licensed Version 25 Nos.

2. Turbo C / C++ Or JDK, J2SDK

25 Nos.

3. Microsoft Office 2003/2007 with Licensed Version 25 Nos.

4. Microsoft Visual Studio with Licensed Version 25 Nos.

5. Antivirus with Licensed Version 25 Nos.

Page 98: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.C.A. Computer Application

(R 2009) Semester III MC 936 – Graphics Laboratory

(Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1. System 25 Nos.

2. C Compiler 25 Nos.

3. Opengl + VC++ 25 Nos.

4. Image editing software (Crimp or Photoshop) 25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester III

MC 938 – Web Programming Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1.

System Configuration – Latest Processor Minimum of 1 GB RAM, Hard Disk Drive with 80 GB or more, DVD Drive

25 Nos.

2. Operating Systems windows / linux 25 Nos.

3.

Java SDK (1.6) / Tomcat Server / IIS Server Browser (IE /Netscape/Mozilla) FrontPage / DreamWeaver / Web Page design S/W / Photoshop (for image processing in websites Visual studio .Net for Asp.Net Application development

25 Nos.

Page 99: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering M.C.A. Computer Application

(R 2009) Semester IV MC 946 – Visual Programming Laboratory

(Requirement for a batch of 25 students)

Sl. No.

Description of the Equipment

Quantity Required

Quantity available

Deficiency in %

1.

System Configuration: Latest Processor, 1 GB RAM, Hard Disk with 80 GB or more DVD Drive OS Windows

25 Nos.

2. Visual Studio 6 / Visual Studio .net 25 Nos.

Faculty of Information and Communication Engineering M.C.A. Computer Application

(R 2009) Semester IV MC 947 – Network Programming Laboratory

(Requirement for a batch of 25 students)

Sl. No.

Description of the Equipment

Quantity Required

Quantity available

Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows family OS/Linux Family OS

25 Nos.

2. C/C++/Java 25 Nos.

Page 100: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester IV

MC 948 – Case Tools Laboratory (Requirement for a batch of 25 students)

Sl. No.

Description of the Equipment

Quantity Required

Quantity available

Deficiency in %

1. Computers 25

2. Rational Rose / Open Source case Tools 25

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester V

MC 956 – Middleware Technologies Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1.

System Configuration – Latest Processor Minimum of 1 GB RAM, Hard Disk Drive with 80 GB or more, DVD Drive

25 Nos.

2. Operating Systems windows / Linux 25 Nos.

3.

Java SDK (1.6) Touscat Server / IIS Server Browser (IE /Netscape /Mozilla) Visual Studio (COM, DCOM) JAVA , J2EE (RMI, CORBA), Or C# and .NET

25 Nos.

Page 101: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.C.A. Computer Application (R 2009) Semester V

MC 957 – Software Development Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of the Equipment Quantity

Required Quantity available

Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive

25 Nos.

2. Windows 2000/any higher versions/ XP/ vista Rational Rose

25 Nos.

I Year B. E. / B.Tech. Semester - II (R 2008)

ME29 Computer Aided Drafting and Modeling Laboratory Requirements for a batch of 30 students

S. No. Description of Equipment Quantity

Required Quantity available

Deficiency %

1. Pentium IV computer or better hardware, with suitable graphics facility

30 No.

2. Licensed software for Drafting and Modeling 30 licenses

3. Laser Printer or Plotter to print / plot drawings 2 No.

Page 102: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

III Semester B. E. – Mechanical Engineering (R2008) ME37 – Manufacturing Technology Lab – I

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Centre Lathe with accessories 15

2. Welding

2.1 Arc welding machine 04

2.2 Gas welding machine 01

2.3 Brazing machine 01

3. Sheet Metal Work facility

3.1 Hand Shear 300mm 01

3.2 Bench vice 05

3.3 Standard tools and calipers for sheet metal work 05

4 Sand moulding Facility

4.1 Moulding Table 05

4.2 Moulding boxes, tools and patterns 05

5 Plastic Moulding

5.1 Injection Moulding Machine 01

Page 103: UG _ PG Lab Equipments

Faculty of Mechanical Engineering

III Semester B.E. – Automobile Engineering (R2008) ME38 - Fluid Mechanics and Machinery Lab

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

49. Orifice meter setup Available/ Not

available

50. Venturi meter setup Available/ Not

available

51. Rotameter setup Available/ Not

available

52. Pipe Flow analysis setup Available/ Not

available

53. Centrifugal pump/submergible pump setup

Available/ Not

available

54. Reciprocating pump setup Available/ Not

available

55. Gear pump setup Available/ Not

available

56. Pelton wheel setup Available/ Not

available

57. Francis turbine setup Kaplan turbine setup

Available/ Not

available

58. Wind tunnel with pressure measuring devices

Available/ Not

available

Faculty of Mechanical Engineering

III Semester B. E. – Mechanical Engineering (R2008) ME38 - Fluid Mechanics and Machinery Lab

Requirement for a batch of 30 students S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

59. Orifice meter setup 1 No. 60. Venturi meter setup 1 No. 61. Rotameter setup 1 No. 62. Pipe Flow analysis setup 1 No.

63. Centrifugal pump/submergible pump setup

1 No.

Page 104: UG _ PG Lab Equipments

64. Reciprocating pump setup 1 No.

65. Gear pump setup 1 No.

66. Pelton wheel setup 1 No.

67. Francis turbine setup 1 No. 68. Kaplan turbine setup 1 No.

Faculty of Mechanical Engineering III Semester B. E. – Aeronautical Engineering (R2008)

ME38 - Fluid Mechanics and Machinery Laboratory Requirement for a batch of 30 students

S.

No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Venturimeter setup 1

2. Pipe friction set up 1

3. Pitot tube set up 1

4. Jet pump 1

5. Submersible pump 1

6. Centrifugal pump 1

7. Reciprocating pump 1

8. Pelton wheel turbine and Francis turbine

1

9. Viscosity Meter 1

10. Hele-shaw apparatus 1

Faculty of Mechanical Engineering

III Semester B. E. – Mechanical Engineering (R2008) ME39 - Electrical Engineering Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. DC Shunt motor 2

2. DC Series motor 1 3. DC shunt motor-DC Shunt Generator

set 1

4. DC Shunt motor-DC Series Generator set

1

Page 105: UG _ PG Lab Equipments

5. Single phase transformer 2

6. Three phase alternator 2 7. Three phase synchronous motor 1

8. Three phase Squirrel cage Induction motor

1

9. Three phase Slip ring Induction motor

1

10. Single phase Induction motor 1

Faculty of Mechanical Engineering IV Semester B. E. – Mechanical Engineering (R2008)

ME47 - Strength of Materials Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

11. Universal Tensile Testing machine with double shear attachment – 40 Ton Capacity

1

12. Torsion Testing Machine (60 NM Capacity)

1

13. Impact Testing Machine (300 J Capacity)

1

14. Brinell Hardness Testing Machine 1

15. Rockwell Hardness Testing Machine 1

16. Spring Testing Machine for tensile and compressive loads (2500 N)

1

17. Metallurgical Microscopes 3

18. Muffle Furnace (800 C) 1

Faculty of Mechanical Engineering IV Semester B.E. – Aeronautical Engineering (R 2008)

ME47 – Strength of Materials Laboratory Requirement for a batch of 30 students

S.

No. Description of Equipment Quantity

required Quantity available

Deficiency %

69. Hardness Testing Machine 1

70. Universal Testing Machine 1

Page 106: UG _ PG Lab Equipments

71. Impact Testing Machine 1

72. Fatigue tester- Rotating Beam 1

73. Fatigue tester –Reverse plate bending

1

Faculty of Mechanical Engineering

IV Semester B. E. – Mechanical Engineering (R2008) ME48 - Computer Aided Machine Drawing Lab

Requirement for a batch of 30 students

S. No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Computer Systems 17” Graphics Terminal Pentium IV Processor 80 GB HDD 512 MB RAM Advanced graphics accelerator

30 Nos.

2. Laser Printer 01

3. Plotter (A2 Size) 01

4. Software

30 seats of latest/recent versions of AutoCAD/CATIA/SOLIDWORKS/SOLID EDGE/NX/PRO-E/COLLABCAD or equivalent software

Faculty of Mechanical Engineering

IV Semester B. E. – Mechanical Engineering (R2008) ME49 - Manufacturing Technology Lab II Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required Quantity available

Deficiency %

1. Centre Lathes 2 Nos

2. Turret and Capstan Lathes 1 No each

3. Horizontal Milling Machine 1 No

4. Vertical Milling Machine 1 No

5. Surface Grinding Machine 1 No

6. Cylindrical Grinding Machine 1 No.

7. Shaper 2 Nos

8. Slotter 1 No.

9. Planner 1 No.

Page 107: UG _ PG Lab Equipments

10. Radial Drilling Machine 1 No.

11. Tool Dynamometer 1 No

12. Gear Hobbing Machine 1 No

13. Tool Makers Microscope 1 No

M.Sc. (5 Years) INFORMATION TECHNOLOGY (R 2003)

LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description Quantity required

(i) Hardware

30 Terminals

a. C b. C++ c. RDBMS d. VB e. VC++ f. Case Tool with UML g. JAVA

(ii) Software

h. Scripting Languages

Page 108: UG _ PG Lab Equipments

Faculty of Mechanical Engineering IIISemester B.E. – Marine Engineering (R2008)

MV38 - Marine Hydraulics & Fluid Machinery Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

FLUID MECHANICS LABORATORY

74. Buoyancy Experiment Cargo Ship Model War Ship Model

01 01

75. Pitot tube Flow Nozzle Rotameter Notches

01 01 02 02

76. Venturimeter 02

77. Orifice meter 01

78. Frictional Losses in pipes 01

FLUID MACHINERY LABORATORY 79. Centrifugal pump 01

80. Multistage Centrifugal Pump 01

81. Impulse Turbine (Pelton) 01

82. Reaction Turbine (Francis) 01

83. Reciprocating pump 01

84. Submersible pump 01

85. Jet pump 01

Page 109: UG _ PG Lab Equipments

Faculty of Mechanical Engineering III Semester B. E. – Marine Engineering (R2008)

MV39 - Welding Techniques, Lathe and Special Machine Shop Requirement for a batch of 30 students

S.

No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Light duty Lathe 10 2. Medium duty Lathe 03 3. Heavy duty Lathe 04 4. Shaper 01 5. Slotter 01 6. Planner 01 7. Radial drilling m/c 01 8. Surface grinder 01 9. Pedestal grinder 01 10. Vertical milling m/c 01 11. Universal milling m/c 03 12. Tool & cutter grinder 01 13. Gear hobber 01 14. CNC Lathe Machine 01 15. Capstan Lathe 01 16. Cylindrical grinding m/c 01 17. Power hacksaw 01 18. Duplicating Lathe 01

WELDING WORK SHOP

19. Welding Transformer Air Cooled with Fan

04

20. Maxi – MIG 400A Welding Set 01 21. AOL make TIG Control Outfit 01 22. Welding Rectifier Throluxe – 401

MMA 01

23. Water Cooled Torch 0150102071 400 AMPS

02

24. Bending Machine Pipe dia ½” to 3” 01 25. Gas welding and cutting set 02

FITTING SHOP

26. Power Hacksaw 01 27. Vernier Height Gauge 02 28. Surface Plate with stand 02 29. Fitting Bench Vice 40 30. Hand tools (Different types) -

Page 110: UG _ PG Lab Equipments

Faculty of Mechanical Engineering IV Semester B. E. – Marine Engineering (R 2008)

MV48 – Strength of Materials and Applied Mechanics Lab Requirement for a batch of 30 students

S. No. Description of Equipment Quantity

required Quantity available

Deficiency %

1 UTM (Universal Testing Machine) 01

2 Compression Testing Machine 01

3 Deflection Testing Rig 01

4 Hardness – Vickers, Brinell, Rockwell, Testing Machines

01

5 Spring Testing Machines – Tension, Compression

01

6 Impact Testing Machines – (Izod, Charpy)

01

7 Load Cells 01

8 Fatigue Testing Machine 01

9 Crucible furnace 01

10 Sand Strength Testing Machine 01

11 Permeability 01

12 Shear Strength Testing Machine 01

13 Compression Strength Testing Machine

01

14 Transfer Strength Testing Machine 01

Page 111: UG _ PG Lab Equipments

Faculty of Mechanical Engineering IV Semester B.E. – Marine Engineering (R2008)

MV49 - Heat Engines Lab and Boiler Chemistry Lab Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

HEAT ENGINES LAB

1. Orsat Apparatus 02 nos. 2. Steam Turbine 01 3. Steam Calorimeter 01 4. Air Blower 01 5. Air Compressor 02 nos. 6. Vapour Compression Refrigeration

test rig 01

7. Vapour compression Air Conditioning test rig

01

8. Bomb calorimeter and Junker’s calorimeter

01

9. Crucible Metener Burner, Electric Benser Hot air oven

01

Flash & Fire point – closed cup apparatus

01

Redwood’s Viscometer 01

10.

Say bolt’s Viscometer 01 11. Carbon residue apparatus. 12. Wind Tunnel 01 FUELS AND LUBRICATION OIL TESTING EQUIPMENTS 13. Redwood Viscometer 01 14. Saybolt’s Viscometer 01 15. Abel’s flash point and fire point

apparatus 01

16. Closed cup apparatus (Pensky) 01 17. Bomb Calorimeter with Beckman

(Digital) 01

18. Junker’s Gas Calorimeter 01

BOILER CHEMISTRY LAB 19. Burette, Pipette, Beaker, Conical

Flask, Bunsen Burner 1 each

20. Burette, Pipette, Conical Flask, STD 1 each

Page 112: UG _ PG Lab Equipments

Flask 100ml 21. Burette, Pipette, Conical Flask, STD

Flask 1 each

22. Burette, Pipette, Conical Flask. 1 each 23. Do Bottle, Burette, Pipette, Conical

Flask. 1 each

24. Wephlo turbidity meter, STD Flask Pipette.

1 each

25. PH meter, Buffer tablets, beaker. 1 each 26. Petridish, Hot air Oven, Weighing

Balance 1 each

27. Water Analysis kit. 1 no. 28. Meker Burner, Silica, Crucible, Electric

Bunsen, Petridish Hot air Oven 1 each

29. Burette, Pipette, Conical Flask, turbidity meter, Bunsen Burner, Beaker, STD Flask.

1 each

THERMAL ENGINEERING

30. Internal Combustion Engines Section 01 31. Fuel and Lubrication Oil Testing

Equipments 01

32. Heat Transfer Equipments 01 33. Steam Lab. Equipments 01 34. Refrigeration and Air Conditioning

Equipments 01 set

35. Automobile Components 01 36. Engine Research Centre 01 37. Computers with UPS 01 38. Miscellaneous Equipments 01

INTERNAL COMBUSTION ENGINES SECTION 39. Multi Cylinder Petrol Engine 01 40. Twin Cylinder Diesel Engine 01 41. Kirloskar Diesel Engine 01 42. Greaves Cotton diesel engine 01 43. Two Stroke Petrol Engine 03 nos. 44. Two Stroke Diesel Engine Model 01 45. Four Stroke Petrol Engine 01 46. Four Stroke Diesel Engine Model 01 47. Two Stroke Petrol Engine Model 01 48. Multi Cylinder Petrol Engine 01 49. Four Stroke Single Cylinder Diesel

Engine (Anil) 01

50. MK-12 Petrol Start Kerosene run Engine

01

51. Battery charger 01

Page 113: UG _ PG Lab Equipments

I Year B.E. / B.Tech. Semester - I (R 2008)

PCP18 PHYSICS & CHEMISTRY LABORATORY - I Requirements for a batch of 30 students

Physics Laboratory

S.No. Description of Equipment Quantity required

Quantity available Deficiency %

7. Lees’ disc apparatus (With accessories) 5 Nos

8. Air Wedge apparatus (With traveling microscopes and accessories)

5 Nos

9. Spectrometer (With grating, prism and accessories)

5 Nos

10.

Diode laser (2 mW power) or He-Ne laser (2mW) (Lycopodium powder, Optical fibre Kit and accessories)

5 Nos

11. Ultrasonic interferometer (With accessories) 5 Nos

12. B-H Curve traces apparatus 5 Nos

Chemistry Laboratory

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

11. Electronic balance 1 No.

12. pH meter 8 Nos.

13. Conductivity bridge 8 Nos.

14. Potentiometer 8 Nos.

15. Platinum electrodes 8 Nos.

16. Calomel electrodes 8 Nos.

17. Spectrophotometer 1 No.

18. Flame photometer 1 No.

19. Oswald viscometer 15 Nos.

20. Glassware Sufficient Quantity

Page 114: UG _ PG Lab Equipments

Faculty of Technology

III Semester B.Tech. – Polymer Technology (R 2008) PT37 - POLYMER CHEMISTRY LAB

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

86. Bunsen Burner 15

87. Electronic Balance 1

88. Thermostatic Water bath 2

89. Melting Point Apparatus 1

90. Retort Stand 15

91. Polymer Samples and Glass wares Sufficient qty.

Faculty of Technology III Semester B.Tech. – Polymer Technology (R 2008)

PT38 - ORGANIC CHEMISTRY LABORATORY Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Conical flask 15

2. Liebig condenser 15

3. Round bottom flask 15

4. Burette 15

5. Pipette 15

6. Iodine flask 15

7. Test tubes 01 Gross

8. Test tube holder 15

9. Tongs 15

10. Bunsen burner 15

11. Chemicals ------

Page 115: UG _ PG Lab Equipments

Faculty of Technology IV Semester B.Tech. – Polymer Technology (R 2008)

PT47 – Chemical Engineering Laboratory Requirement for a batch of 30 students

S.No. Description of Equipment Quantity

required Quantity available

Deficiency %

1. Fluidized bed 1

2. Packed bed 1

3. Stop watch 2

4. Measuring cylinder (1 Lit) 2

5. Sieve shaker and sieve set 1

6. Ball mill 1

7. Jaw crusher 1

8. Electronic balance 1

9. Plastics tray 2

10. Friction pipe apparatus 1

11. Single speed centrifugal pump 1

12. Venturi meter apparatus 1

13. Orifice/mouth piece apparatus 1

14. Stop watch 4

15. Meter scale 4

16. Vernier caliper 2

17. Flow measuring meters 3

18. Stop watch 2

19. Thermometer 5

20. Tacho meter 1

21. Measuring jar (2 lit and 1 Lit each one)

2

22. Air compressor 1

23. Parallel and counter flow heat exchanger

1

24. Stephen Boltzman apparatus 1

25. Thermal conductivity Apparatus

1

Page 116: UG _ PG Lab Equipments

Faculty of Technology

IV Semester B.Tech. – Polymer Technology (R 2008) PT48 – Mould Engineering Laboratory

Requirement for a batch of 30 students

S.No. Description of Equipment Quantity required

Quantity available

Deficiency %

1. Shaping machine 5

2. Vertical milling machine 2

3. Horizontal milling machine 2

4. Lathe 15

5. Plain surface grinding machine 1

6. Bench grinder 2

7. Vernier caliper 2

8. Vernier height gauge 2

9. Sine bar 2

10. Sine center 1

11. Gear tooth vernier caliper 1

Faculty of Information and Communication Engineering

M.Tech. Information Technology (R 2009) Semester I

SE 917 – Case Tools Laboratory (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity Required Quantity

Available

Deficiency

in % Hardware

1. One High End Server 1 No.

2. PC and Desktop 25 Nos.

Software

3. Rational Rose / Equivalent Multiuser

Page 117: UG _ PG Lab Equipments

Faculty of Information and Communication Engineering

M.E. VLSI Design (R 2009) Semester I

VL 916 – VLSI Design Laboratory I (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency

in %

1. Xilinx or Altera kit with software 6 kits

2. Tanner or Cadence or Mentor Graphics 6 licenses

3. Texas Instruments or Analog Devices DSP kit with software 6 licenses

4. Digital storage scope and logic analyzer 2 minimum

Faculty of Information and Communication Engineering

M.E. VLSI Design (R 2009) Semester I

VL 926 – VLSI Design Laboratory II (Requirement for a batch of 25 students)

Sl. No. Description of Equipment Quantity

Required Quantity Available

Deficiency

in %

1. Xilinx or Altera kit with software 6 kits

2.

ARM kits with software (or) Cypress PSOC kits with software (or) Renessas kits with software (or) Equivalent microcontroller kits with software

6 kits