OKLAHOMA OIL & GAS UIC Department Jim Phelps Underground Injection Control Compliance Officer

UIC Permitting Process

Embed Size (px)

Citation preview

Page 1: UIC Permitting Process

OKLAHOMA OIL & GAS

UIC Department Jim PhelpsUnderground Injection Control Compliance Officer

Page 2: UIC Permitting Process

What do we do?

Regulate Compliance/Enforcement Number One Mission is

Protecting the Base of Treatable Water

Page 3: UIC Permitting Process

What is the 1015?

It is the base application

Used to complete the permit

Page 4: UIC Permitting Process

Form 1015 Side 1

Page 5: UIC Permitting Process

From Admin to the Engineer/Geologist

Area of Review Notice Sampling Identifying Deficiencies Recommendation or denial Protest

Page 6: UIC Permitting Process

After Recommendation

Permit written Approval from Sr. Hydrologist Signature from UIC Manager Final Permit issued MIT Form 1012

Page 7: UIC Permitting Process

Sr. Hydrologist

Six mile radius check on well sight for seismicity

Well does not penetrate the Granite, Granite Wash, or Reagan Sand

Interim Orders

Page 8: UIC Permitting Process

UIC Manager

Surety Check Permit Details BTW (Base of Treatable Water)

covered Pressure Allowable Permit issued

Page 9: UIC Permitting Process

MIT

Mechanical Integrity Test Structure of the well Ability to hold pressure Alternative testing

Page 10: UIC Permitting Process

Form 1012A

Fluid Injection Report Annual or Semi-annual Monthly Average Pressure and Rates

Page 11: UIC Permitting Process

Exception to the Rule

MIT Surface Casing Packer Setting

Page 12: UIC Permitting Process

SNC(Significant Violation)

1. Well with no order2. Injecting after failure3. Injecting with no test4. Injecting after order vacated5. Injecting after Emergency order expires6. Using a non-commercial well as

commercial7. Injection/disposal after breakout and

operator not repairing the problem