DEPARTEMEN PEKERJAAN UMUM BADAN PENELITIAN DAN PENGEMBANGAN
PUSAT PENELITIAN DAN PENGEMBANGAN JALAN DAN JEMBATANJl. Jend. A. H. Nasution 264 Kotak Pos 2 Ujungberung Telp. (022) 7802251-3 Fax.(022) 708052 - Bandung 40294 e-mail: [email protected]
PERCOBAAN MARSHALLSNI 06-2489-1991 SPESIFIKASI AGREGAT ASPAL No. 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 a : JMF AC-WC DEF. PLASTIS DAN RETAK : BERASAL DARI TAYU (PT. BUMIREJO REMBANG) : ASPAL STARBIT b 4.5 4.5 4.5 4.5 5.0 5.0 5.0 5.0 5.5 5.5 5.5 5.5 6.0 6.0 6.0 6.0 6.5 6.5 6.5 6.5 c 1192.2 1195.7 1193.5 1195.2 1195.6 1194.9 1192.3 1192.0 1192.7 1193.7 1193.0 1193.3 1189.1 1196.8 1198.2 d 1202.1 1206.0 1203.7 1201.3 1203.5 1202.9 1197.7 1197.4 1198.4 1197.2 1195.9 1196.1 1192.0 1199.8 1198.4 e 677.8 679.9 678.8 687.1 684.8 686.7 689.9 686.4 688.9 682.9 685.8 683.6 681.5 684.3 683.1 f 524.3 526.1 524.9 514.2 518.7 516.2 507.8 511.0 509.5 514.3 510.1 512.5 510.5 515.5 515.3 g 2.274 2.273 2.274 h 2.474 2.474 2.474 i 17.40 17.44 17.41 j 8.08 8.12 8.08 k 53.59 53.43 53.57 l 99 103 101 120 109 115 119 118 120 103 112 108 94 92 93 m 1189.0 1237.0 1213.0 1441.2 1309.1 1375.1 1429.2 1417.2 1441.2 1237.0 1345.1 1291.1 1128.9 1104.9 1116.9 TANGGAL DIKERJAKAN DIPERIKSA n 1117.7 1162.8 1140.2 o 3.43 3.30 3.56 : 10 OKTOBER 2005 : YUSEF / TRIYANTO : IWAN R / SUTARMAN p 325.9 352.2 320.6 q r
2.2732.324 2.305 2.315
2.4742.456 2.456 2.456
17.4216.01 16.71 16.36
8.095.35 6.14 5.74
53.5366.60 63.27 64.92
1140.21441.2 1309.1 1375.1
3.433.43 3.94 3.43
332.9420.3 332.5 401.0
2.3152.348 2.333 2.341
2.4562.438 2.438 2.438
16.3615.60 16.15 15.86
5.743.69 4.32 3.98
64.9376.34 73.26 74.89
1375.11429.2 1417.2 1441.2
3.603.81 3.56 3.94
384.6375.1 398.5 366.1
2.3412.321 2.339 2.328
2.4382.421 2.421 2.421
15.8717.01 16.38 16.75
4.004.11 3.38 3.81
74.8375.84 79.37 77.27
1429.21237.0 1345.1 1291.1
3.774.19 3.94 4.06
379.9295.2 341.7 317.7
2.3292.329 2.322 2.325
2.4212.403 2.403 2.403
16.7217.16 17.43 17.31
3.773.08 3.40 3.25
77.4982.05 80.50 81.23
1291.11128.9 1104.9 1116.9
4.063.94 4.19 4.57
318.2286.8 263.6 244.3
2.325
2.403
17.30
3.24
81.26
1116.9
4.23
264.9
4.23 4.23 4.23 4.23 4.73 4.73 4.73 4.73 5.23 5.23 5.23 5.23 5.73 5.73 5.73 5.73 6.24 6.24 6.24 6.24
6.80 6.80 6.80 6.80 7.65 7.65 7.65 7.65 8.51 8.51 8.51 8.51 9.37 9.37 9.37 9.37 10.25 10.25 10.25 10.25
Gmm * : 2.438 Ka Gmm : 5.5 Keterangan : a = % aspal terhadap agregat b = % aspal terhadap campuran c = berat kering (gr) d = berat dalam keadaan jenuh (gr) e = berat dalam air (gr) * Gmm :
Bj. agregat bulk : 2.629 Bj. agregat eff. : 2.648 Bj. aspal : 1.0315 f = isi (d-e) i = % rongga thd. agregat 100-(g*(100-b))/bj.bulk) g = berat isi (c/f) j = % rongga thd. campuran 100-(100x(g/h) h = berat jenis maksimum (teoritis) k = % rongga terisi aspal (100x(i-j))/i l = pembacaan arloji stabilitas 100 m = stabilitas (l x konversi) %agregat %aspal n = stabilitas (kg) + BJ. agregat BJ. aspal = m x koreksi benda uji
Abs. Aspal : 0.282 o = kelelehan (mm) p = Hasil bagi Marshall n / o (kg/mm) q = Kadar aspal eff. (%) c-((Abs.aspal/100)*(100-c)) r = Tebal film aspal (mikron)
1000*(Pb-Pba)SA*BJAspal*(100-Pb)
ditentukan dengan cara AASHTO T 209 pada kadar aspal optimum perkiraan (Pb) Pb = 0,035(%CA)+0,045(%FA)+0,18(%FF)+K K = 0,5-1 untuk Laston; 2-3 untuk Lataston
** BJ. Eff Agr
(100-Pb) (100/Gmm)-(Pb/BJ.aspal)
*** Absorpsi aspal terhadap total agregat = 100 x (BJ. Eff. agr - BJ. Bulk agr) (BJ. Eff. agr x BJ. Bulk agr) x BJ. Asp
DEPARTEMEN PEKERJAAN UMUM BADAN PENELITIAN DAN PENGEMBANGAN
PUSAT PENELITIAN DAN PENGEMBANGAN JALAN DAN JEMBATANJl. Jend. A. H. Nasution 264 Kotak Pos 2 Ujungberung Telp. (022) 7802251-3 Fax.(022) 708052 - Bandung 40294 e-mail: [email protected]
PERCOBAAN PRDBS 598 Part 104 (1989) SPESIFIKASI AGREGAT ASPAL No. 1 a : JMF AC-WC DEF. PLASTIS DAN RETAK : BERASAL DARI TAYU (PT. BUMIREJO REMBANG) : ASPAL STARBIT c 5.0 5.0 5.0 5.5 5.5 5.5 6.0 6.0 6.0 Ka Gmm : d 2656.7 2651.1 e 2661.5 2657.8 f 1530.3 1528.7 g 1131.2 1129.1 h 2.349 2.348 i 2.456 2.456 j 15.14 15.16 k 4.36 4.39 l 71.17 71.06 m n TANGGAL DIKERJAKAN DIPERIKSA o p : 10 OKTOBER 2005 : YUSEF / TRIYANTO : IWAN R / SUTARMAN q r r
2.3482651.9 2650.6 2656.0 2655.3 1534.4 1533.2 1121.6 1122.1 2.364 2.362
2.4562.438 2.438
15.1515.01 15.09
4.383.02 3.11
71.1179.89 79.40
2
2.3632648.0 2652.0 2653.6 2657.6 1530.9 1532.2 1122.7 1125.4 2.359 2.356
2.4382.421 2.421
15.0515.67 15.75
3.062.56 2.65
79.6483.67 83.20
3
2.3585.5 Bj. agregat bulk : 2.629
2.421
15.71
2.602.648
83.43Bj. aspal : 1.0315 Abs. Aspal : 0.282
Gmm * : 2.438
Bj. agregat eff. :
Keterangan : a = % aspal terhadap agregat b = % aspal terhadap campuran c = berat kering (gr) d = berat dalam keadaan jenuh (gr) e = berat dalam air (gr) * Gmm : ditentukan dengan cara AASHTO T 209 pada kadar aspal optimum perkiraan (Pb)
f = isi (d-e) g = berat isi (c/f) h = berat jenis maksimum (teoritis) 100 %agregat BJ. agregat+
%aspal BJ. aspal =
i = % rongga thd. agregat 100-(g*(100-b))/bj.bulk) j = % rongga thd. campuran 100-(100x(g/h) k = % rongga terisi aspal (100x(i-j))/i l = pembacaan arloji stabilitas m = stabilitas (l x konversi) n = stabilitas (kg) m x koreksi benda uji (100-Pb) (100/Gmm)-(Pb/BJ.aspal)
o = kelelehan (mm) p = Hasil bagi Marshall n / o (kg/mm) q = Kadar aspal eff. (%) c-((Abs.aspal/100)*(100-c)) r = Tebal film aspal (mikron)
1000*(Pb-Pba)SA*BJAspal*(100-Pb) *** Absorpsi aspal terhadap total agregat = 100 x (BJ. Eff. agr - BJ. Bulk agr) (BJ. Eff. agr x BJ. Bulk agr) x BJ. Asp
Pb = 0,035(%CA)+0,045(%FA)+0,18(%FF)+K K = 0,5-1 untuk Laston; 2-3 untuk Lataston
** BJ. Eff Agr
DEPARTEMEN PEKERJAAN UMUM BADAN PENELITIAN DAN PENGEMBANGAN
PUSAT PENELITIAN DAN PENGEMBANGAN JALAN DAN JEMBATANJl. Jend. A. H. Nasution 264 Kotak Pos 2 Ujungberung Telp. (022) 7802251-3 Fax.(022) 708052 - Bandung 40294 e-mail: [email protected]
PERCOBAAN MARSHALLSNI 06-2489-1991 SPESIFIKASI AGREGAT ASPAL No. a : JMF AC-WC DEF. PLASTIS DAN RETAK : BERASAL DARI TAYU (PT. BUMIREJO REMBANG) : ASPAL STARBIT c d e f g h i j k l m n TANGGAL DIKERJAKAN DIPERIKSA o p : 10 OKTOBER 2005 : YUSEF / TRIYANTO : IWAN R / SUTARMAN q r r
Setelah direndam selama 1 x 24 jam suhu 60 o C1 2 3 5.50 5.50 5.50 5.50 1193.8 1211.2 1214.5 1194.5 1211.9 1215.6 694.6 703.8 704.4 499.9 508.1 511.2 + 2.388 2.384 2.376 2.438 2.438 2.438 14.16 14.32 14.60 2.05 2.22 2.55 85.54 84.47 82.53 79 76 69 948.8 912.8 828.7 948.8 912.8 828.7 4.57 4.27 4.45 207.5 213.9 186.4
2.383
2.438
14.36
2.27
84.18
896.7
4.43
202.6
5.23 5.23 5.23 5.23
8.51 8.51 8.51 8.51
Setelah direndam selama 1 x 30 menit suhu 60 o C1 2 3 5.50 5.50 5.50 5.50 Ka Gmm : 1232.9 1218.7 1195.2 1234.5 1219.6 1198.4 714.5 703.1 680.8 520.0 516.5 517.6 + 2.629 2.371 2.360 2.309 2.438 2.438 2.438 14.78 15.19 17.00 2.75 3.22 5.29 81.39 78.81 68.91 82 86 82 984.8 1032.9 984.8 984.8 1032.9 984.8 3.94 4.01 4.45 250.1 257.4 221.6
2.347
2.438
15.66
3.752.648
76.37Bj. aspal : 1.0315
1000.8
4.13Abs. Aspal
243.0:
5.23 5.23 5.23 5.230.282
8.51 8.51 8.51 8.51
Gmm * : 2.438
5.5
Bj. agregat bulk :
Bj. agregat eff. :
Keterangan : a = % aspal terhadap agregat b = % aspal terhadap campuran c = berat kering (gr) d = berat dalam keadaan jenuh (gr) e = berat dalam air (gr) * Gmm : ditentukan dengan cara AASHTO T 209 pada kadar aspal optimum perkiraan (Pb)
f = isi (d-e) g = berat isi (c/f) h = berat jenis maksimum (teoritis) 100 %agregat BJ. agregat+
%aspal BJ. aspal =
i = % rongga thd. agregat 100-(g*(100-b))/bj.bulk) j = % rongga thd. campuran 100-(100x(g/h) k = % rongga terisi aspal (100x(i-j))/i l = pembacaan arloji stabilitas m = stabilitas (l x konversi) n = stabilitas (kg) m x koreksi benda uji (100-Pb) (100/Gmm)-(Pb/BJ.aspal)
o = kelelehan (mm) p = Hasil bagi Marshall n / o (kg/mm) q = Kadar aspal eff. (%) c-((Abs.aspal/100)*(100-c)) r = Tebal film aspal (mikron)
1000*(Pb-Pba)SA*BJAspal*(100-Pb) *** Absorpsi aspal terhadap total agregat = 100 x (BJ. Eff. agr - BJ. Bulk agr) (BJ. Eff. agr x BJ. Bulk agr) x BJ. Asp
Pb = 0,035(%CA)+0,045(%FA)+0,18(%FF)+K K = 0,5-1 untuk Laston; 2-3 untuk Lataston
** BJ. Eff Agr
GAMBAR PERCOBAAN MARSHALL AC-WC DEF PLASTIS DAN RETAKDENGAN ASPAL STARBIT
2.410 2.380 Kepadatan, gr/cc 2.350 VMA, % 4.50 5.00 5.50 Kadar aspal, % 6.00 6.50 7.00 2.320 2.290 2.260 2.230 2.200 4.00
22.0 20.0 18.0 16.0 14.0 12.0 10.0 4.00
4.50
5.00
5.50 Kadar aspal, %
6.00
6.50
7.00
100.0 90.0 80.0 VFB, % VIM, % 4.50 5.00 5.50 6.00 Kadar aspal, % 6.50 7.00 70.0 60.0 50.0 40.0 30.0 4.00
12.0 10.0 8.0 6.0 4.0 2.0 0.0 4.00
4.50
5.00
5.50 6.00 Kadar aspal, %
6.50
7.00
1800 1600 Stabilitas, kg Kelelehan, mm 4.50 5.00 5.50 6.00 6.50 7.00 1400 1200 1000 800 600 4.00
7.0 6.0 5.0 4.0 3.0 2.0 1.0 4.00
4.50
5.00
5.50 Kadar aspal, %
6.00
6.50
7.00
Kadar aspal, %
1000 Marshaal quotient, kg/mm Tebal film aspal, mikron 4.50 5.00 5.50 6.00 6.50 7.00 800 600 400 200 0 4.00
14 12 10 8 6 4 2 4.00
4.50
5.00
5.50
6.00
6.50
7.00
Kadar aspal, %
Kadar aspal, %
KepadatanStabilitas
KAO Kepadatan VFB VIMmarshall VMA VIMprd Stabilitas Kelelehan4.00 4.50 5.00 5.50 Kadar aspal, % 6.00 6.50 7.00
5.5 % 2.335 t/m3 73.61 % 4.23 % 16.07 % 3.06 % 1414.74 kg 3.63 mm 389.96 kg/mm 89.60 % 8.51 mikron
VMA VFB VIM 2x75 VIM PRD Kelelehan MQ
Hasil bagi m Stab. sisa TFA
Kadar aspal optimum = 5.50%Kelelehan Density MQ VIM Stabilitas VMA
Optimum = 7,35%
Perhitungan tebal film aspal Pb Gb SA Gsb Gse = = = = = Kadar aspal Berat jenis aspal Luas permukaan agregat Berat jenis campuran bulk agregat Berat jenis maksimum teoritis Absorption aspal Tebal film aspal (mikron) 100* Gse-Gsb Gsb*Gse
Pba = BFT = Pba =
BFT =
1000* (Pb-Pba) SA*Gb (100-Pb)
Lap.1 1" 3/4" 1/2" 3/8" #4 #8 # 30 # 50 # 100 # 200 100 98.4 84.4 74.6 49.8 30.0 16.3 10.6 8.5 6.9
SA. Faktor Lap.1 0.41 0.41
0.41 0.82 2.87 6.14 12.29 32.77
0.20 0.25 0.47 0.65 1.04 2.26
Luas permukaan agregat Berat jenis aspal Bj. Campuran bulk agregat Bj. Campuran effektif agregat Bj. Maks. teoritis Kadar aspal Absorption aspal Tebal film aspal
= 5.28 = 1.030 = 2.6424 = 2.7145 = 2.485 = 5.648 = 1.04 = 8.98