27
UJWAL Ministry of Power, Coal and New & Renewable Energy 1 ACHIEVEMENTS AND INITIATIVES OF GOVERNMENT OF INDIA YEAR ST

Ujjwal Bharat

Embed Size (px)

DESCRIPTION

Ujjwal Bharat

Citation preview

  • UJWAL

    Ministry of Power, Coal and New & Renewable Energy

    1ACHIEVEMENTS AND

    INITIATIVES OF

    GOVERNMENT OF INDIA

    YEAR

    ST

  • 2Record breaking progress towards fulfilling Honble Prime Minister Shri Narendra Modis vision of...

    POWER FOR ALL24X7

    A Year which started the journey towards Year Round Power for All

    3

  • 4ACHIEVEMENTS

    3.6%

    22,566 MW

    22,100 ckm

    65,554 MVA

    Power deficit reduced to

    the lowest ever

    Highest ever generation capacity addition

    Highest ever increase in Transmission lines

    Highest ever increase inSub-station capacity

    5

    `3.35 LAKH Cr.

    Highest coal production growth

    in 23 years

    8.3%

    8.4%Power Generation Growth

    (Highest in 20 years)

    of potential revenues to coal bearing states through transparent coal e-auctions & allotments

    A Year which surpassed past records

    First time ever,

    exceeded renewable capacity addition targets in solar, wind, small hydro etc.

    Over

  • 6TARGETS

    100 Cr.tonnes/year by 2020

    Doubling Coal Indias production to

    50%by 2020

    Power Generation to increase by

    >5 Times1,75,000 MW

    10%

    by 2022

    increase in renewable capacity to

    of current consumption

    Energy saving to increase to

    7

  • MISSION

    BY 2019POWER FOR ALL24X7

    8

    BY 2019POWER FOR ALL24X7

    9

  • FRO

    MDA

    RK

    NES

    STO

    LI

    GH

    T

    POWER IS DELIVERED THROUGH A CHAIN OF ACTIVITIESA chain is only as strong as the weakest link

    FUEL GENERATION

    Annual production growth of Coal only 1.5% between 2010-14

    Loss of ` 1.86 lakh Cr. estimated by CAG in Coal allocation

    >24,000 MW of power capacity idle due to lack of fuel

    Less than 1% of solar potential realized

    Power generation exceeds 1 lakh Cr. units for the first time

    Plans to increase solar capacity by > 30 times

    Highest coal production growth in 23 years

    Increased coal & gas availability to revive stalled projects

    10

    TRANSMISSION DISTRIBUTION CONSUMPTION

    Measures to build an exceptionally strong power delivery chain are on and are showing results

    Discoms losing `70,000 Cr. annually

    and accumulated losses of > `2,50,000 Cr.

    Spiralling consumer tariffs

    Lack of focused energy conservation efforts

    28 Cr. people without access to power

    Largest power outage in history with 62 Cr. people in darkness in 2012

    Approved new schemes for investment of `1.09 lakh Cr. in

    Discoms

    Overall energy deficit down to 3.6%, the lowest ever

    Highest ever increase in Transmission lines & sub station capacity (22,100 ckm and 65,559 MVA respectively)

    11

  • 12 13

    COALTAINT

    CLEANING

    REMOVING THE

  • COALTAINT

    CLEANING

    REMOVING THE

    ENERGY EMPLOYMENTShutdown of plants dependant on cancelled coal mines

    Livelihood of thousands of workers endangered

    Crisis averted by focused action through implementation of transparent e-auction process in just four months

    14

    ECONOMY

    Cancellation of 204 coal blocks by Supreme Court presented a potential grave crisis of:

    Economic activity halts, NPAs mount

    15

  • REGIONAL DEVELOPMENTCoal bearing states like Jharkhand, Chhattisgarh, Odisha, West Bengal, Madhya Pradesh, Maharashtra and Telangana to get potential revenue (including auction proceeds and royalties) of

    over the lifetime of the mines

    From auction of 29 Coal blocks & allotments of 38 coal blocks to states/PSUs

    `3.35 lakh Cr.

    Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to

    Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas

    16

    REJUVENATED ECONOMYReduced import potential and generated momentum for Make in India

    `3.35 lakh Cr.

    Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to

    Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas

    17

  • 18

    PRODUCTIONIMPROVEMENT

    INCREASINGTHROUGH EFFICIENCY

    RFID/GPS tagging

    Reduced Transportation Cost

    Reduction in coal theft using

    Coal linkage rationalization to reduce transportation costs and save environment

    19

    Coal Project Monitoring Portal

    Improved coal quality

    for quicker decision making, faster dispute resolution and accelerated removal of bottlenecks

    using compulsory crushing, washing and third party sampling

  • 20

    100 Cr. Tonnes

    by 2020

    Double coal production to

    21

    DOUBLINGCOAL INDIAPRODUCTIONIN 5 YEARS

    Better evacuation of coal planned by investing massively in new railway rakes, expediting railway lines, modern equipment and mechanization

    Partnership between Railways,coal-bearing states and Coal India to strengthen infrastructure creation. Signed MoUs with Odisha and Jharkhand

    Trebling exploration activities for enhancing coal production

    Over 60 new mines to be opened

  • 22

    7,900 Cr. units of power 24,150 MW of

    Innovative and transparent new scheme for making gas available for power generation and generating

    over the next two years from

    gas based capacity

    SUPPLY RESUMED23

    Gas BasedPowerPlants

    Reviving these

    will reduce peak load shortages in summer and ensure grid stability.

    Below` 4.70/unit

    First round of auctionhas resulted in power

    Many of the stranded gas based power projects are located in the Southern region which is power deficit due to transmission constraints

  • RAPID INCREASE INGENERATION CAPACITY

    5 NEW Ultra Mega Power Projects of

    20,000 MW to be setup inplug-and-play mode attracting an investment of

    > ` 1 LAKH Cr.

    24

    RAPID INCREASE INGENERATION CAPACITY

    GENERATION

    All clearances and linkages will be in place before the project is awarded by a transparent system

    Old plants to be upgraded to enhance capacity and reduce emission

    Agreement signed for expansion of Patratu Thermal Power Station, Jharkhand to

    4,000 MW

    25

  • GENERATION

    MORE THAN

    32,000 MW to 1,75,000 MW5 TIMES

    India is running the largest renewable capacity expansion

    program in the world

    Increasing the overall renewable capacity target by

    Opportunity for unemployed graduates & farmers to

    become solar enterpreneures

    from

    by 2022

    Green Generation for Clean & Energy

    Secure India

    100,000 MW of Solar and 60,000 MW of Wind capacity

    Renewable Purchase Obligation (RPO) and Renewable Generation

    Obligation ( RGO) to boost renewable energy

    26

    GENERATIONRE-Invest

    2015

    Financing Green Energy

    Worlds largest renewable energy financing meet. Commitments of

    of renewable manufacturing commitment

    of renewable financing commitment

    62,000 MW1187

    exhibitors from

    countries 70,000 MW

    2500 delegates200 globalinvestors &financiers 202 speakers including

    Nearly

    International speakers from 29 countries

    from 32 countries

    2,73,000 MW

    27

  • RAPIDGREENPROGRESS

    We are like tenant farmerschopping down the fence around our

    house for fuel when we should be using Nature's inexhaustible sources of

    energy sun, wind and tide.

    Thomas Edison

    28

    1,112 MW42%Highest ever increase in

    solar capacity of increase in solar capacity during

    2014-15

    ` 50 to ` 200/tonnes

    Coal cess quadrupled from

    to help finance clean energy projects and Ganga rejuvenation

    Accelerated depreciation restored for wind power

    from July 2014 to help increase wind capacity

    25solar parks

    ~1000 MW with capacity of

    each planned

    17solar parks

    in 14 states have already

    been approved

    29

    Tender by NTPC to setup

    of Solar Projects2,170 MW

  • TRANSMITTING & DISTRIBUTING POWER POWERLESS TO POWERFUL

    SMART GRIDNational Smart Grid Mission approved to bring efficiency in power supply network and facilitate reduction in losses & outages

    SMARTGRID

    30

    GREEN ENERGY CORRIDOR` 38,000 Cr.projects being rolled out to ensure evacuation from renewable energy plants

    CREATING COMPETITION

    ` 1 LAKH Cr.

    Electricity Act being amended to give consumers a choice to choose and change power service provider like a mobile connection. Competition will lead to lower tariffs & better service

    transmission projects to be bid out over the next year

    Level playing field in transmission through seperation of POSOCO and POWERGRID

    31

  • Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)

    ` 63,027 Cr.Total Govt. expenditure

    to rural homes, micro small and cottage industries

    Feeder segregation for 24x7 power

    Now small hamlets also covered

    Adequate power to farmers

    New transformers and upgradation

    Remote Villages

    of last mile infrastructure

    to be covered: Off-grids and micro-grids

    Solar Installationsby Discoms to promote clean and green energy

    Total investment of `1.09 Lakh Cr.

    32

    (IPDS)

    Total investment of `1.09 Lakh Cr. Integrated Power Development Scheme

    ` 45,816 Cr.

    tamper-proof meters at homes

    infrastructure upgradation in urban areas

    Underground cabling and high tech GIS transformers in densely populated areas

    IT implementation for better customer service

    Solar installations like rooftop solar also covered

    Total Govt. expenditure

    Smart-metering for large consumers and

    Comprehensive sub-transmission & distribution

    An integrated scheme for urban areas covering:

    33

  • 34

    ENERGY EFFICIENCY PROGRAMMES

    TARGETTO SAVE 10% of CURRENT ENERGY CONSUMPTION

    ENERGY EFFICIENCY PROGRAMMES

    NATIONWIDE CAMPAIGNFOR ENERGY CONSERVATIONLAUNCHED

    ENERGY EFFICIENCY:

    POWER SAVEDIS WORTH 1.33 UNITS PRODUCED

    ONE UNIT OF

    35

  • (DELP) taken up in about 151 cities in 18 states to replace 20.45 Cr. bulbs in 6.3 Cr. households by 2016

    Distribution of bulbs has already commenced in Andhra Pradesh where 45 Lakh LED bulbs have been distributed to about 22.5 Lakh consumers

    ALL INCANDESCENT BULBS TO BE CHANGED TO LED IN THREE YEARS

    CONSUMPTION36

    DOMESTIC EFFICIENT LIGHTING PROGRAMME

    Due to transparent procurement, price of LED has reduced by 74% from ` 310 in Feb 2014 to ` 82 in Mar 2015

    ` 310

    ` 204

    `149` 104

    ` 82

    Energy Efficient Street Lighting Programme to cover 251 municipalities across India to replace 90 lakh street lights by 2016

    Installation of LED street lights has already been completed in Greater Vishakhapatnam Municipal Corporation and Jhalawar Municipal Corporation

    CONSUMPTION

    Feb-14 Aug-14 Nov-14 Feb-15 Mar-15

    74% Reduction

    37

    LED PRICE

  • 38

    SABKA SAATH, SABKA VIKAS

    39

    Massive thrust to expedite projects in North East to overcome power shortages and increase prosperity. Investment of `9,865 Cr. for upgrading power systems in

    8 North Eastern States (Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura)

    For the first time, National State Power Ministers conference was held in Guwahati where Ministers & Officials from all over India converged in North East

    24X7 power plans made for Andhra Pradesh and Rajasthan. Action plans for other states at advanced stage of finalization

    Entire Coal auction revenue will go to coal bearing states especially under developed states of Eastern India like Jharkhand, Chhattisgarh, Odisha, West Bengal etc.

    CO-OPERATIVE FEDERALISM

  • Massive thrust on renewables to increase share of clean energy

    More than 1 lakh solar pumps sanctioned in the past year

    40

    Solar pumps helped lakhs of farmers increase output, income and also provide drinking water

    Drinking water problem will be solved for more than 7.6 lakh families through solar pumps for drinking water

    41

    UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year

    Compulsory crushing and washing of coal to reduce ash transport by linking plants to their closest mines

    ZERO EFFECT ON ENVIRONMENT

  • 42

    o Massive thrust for MAKE IN INDIA program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy

    43

    o Massive thrust for MAKE IN INDIA program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy

    o Domestic industry being encouraged to scale up and become more cost effective o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India o Defence establishments will buy 300 MW solar plants o Similar initiatives across sectors

  • SwachhBharatThe PSUs under the three Ministries are committed to active involvement in this effort. As a first step, they are investing over

    44

    ` 2,250 Cr. for over 1,25,000 toiletsseparately for boys and girls by 15th August, 2015 particularly in the needy states such as Bihar, Odisha, West Bengal, Jharkhand, Chhattisgarh, Andhra Pradesh and Rajasthan.

    After construction, the PSUs will also maintain these toilets for a period of five years thus ensuring a complete sanitation programme.

    Awareness is being created in local communities to improve over all sanitation.

    45

  • 46

    National Transmission Asset Management Centre (NTAMC) to remotely monitor national power grid and help increase power availability

    Optical fiber network to connect all high voltage substations thus reducing outages

    47

    TRANSPARENCY & EFFICIENCY in USING TECHNOLOGY

    DIGITAL

    Reduction in coal theft using RFID/GPS tagging

    Coal project monitoring portal for quick decision making, faster dispute resolution and accelerated removal of bottlenecks

    Smart Grid & Smart Metering to improve power availability

    e-Office implemented in Ministries

  • TRANSPARENCY

    48

    TRANSPARENCY

    Fully transparent and online process for coal auctions adopted

    Support for restarting stranded gas-based power plants on the basis of reverse e-bidding process to discover lowest customer tariff

    Reduced red-tape and paper-work through delegation of powers and expansion of online interface

    49

  • 50

    24365

    A GOVERNMENT WHICH CARES

    51

    RapidEmergencyResponse

    Delhi: After transmission tower collapse in May 2014, central government worked day and night to restore power in 15 days which would have otherwise taken more than six months

    Cyclone Hudhud: Central teams assigned to restore power in cyclone hit areas. Damaged streetlights converted to LED within six weeks to restore as well as improve lighting

    J&K Floods: Special teams rushed to the state to restore power on war footing

    Nepal: Helped Nepal's electricity grid come online after the earthquake and is now working towards rebuilding the distribution network

  • www.ujwalbharat.gov.in

    Ministry of Power, Coal and New & Renewable Energy

    GOVERNMENT OF INDIA

    UjwalBharat2015@UjwalBharat

    Prime Minister Narendra Modiat RE-Invest 2015

    India has now graduated from megawatts to

    gigawatts in terms of renewable energy production.