UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that

Embed Size (px)

Citation preview

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    1/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    2/54

    Dewan Tun Abdul Razak (DECTAR), UKM

    Bangi.

    3.5 hectar of building consist two auditorium

    Constructed on 1970

    Maximum capacity 3300 peoples

    Function: art and culture events, convocationevents, annual dinner, competition and

    examination.

    1.0 INTRODUCTION

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    3/54

    Chancellor Tun Abdul

    Razak AuditoriumHall or DECTAR

    Main hall of the

    oldest and largest inthe National University

    of Malaysia or UKM

    Construction began

    on 21st June 1976

    Inaugurated on 29

    September 1979

    RM692,228.21

    153.450 squarefeet

    Formal events

    2.0 HISTORY OF THE AUDITORIUM

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    4/54

    DECTAR in 1984

    DECTAR in 2013

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    5/54

    Multi purpose

    auditoria

    Floor area is

    105' x 104.6

    1200 portable banquet

    seats

    150 round table

    2100 terrace seats

    3.0 PREVIEW OF THE AUDITORIUM

    Tun Abdul Razak gallery

    Diplays all the art work by

    Latif Mohaideen

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    6/54

    Ergonomicplanning and

    colour

    coordination

    Dark brownish

    colour parquet with

    pattern

    Good from any various aspectperformance

    The amount of light, its direction,

    intensity and colour

    Audience feel enjoy

    and relax during

    watching performance

    Cream/white

    colour terrace

    seat and ceiling

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    7/54

    Dramatic stage

    lighting system,

    including front

    lighting, foot

    lighting, spot

    lights,

    follow spot

    lights

    Soft grey colour

    to match dark

    and soft colourfrom the

    auditorium

    surrounding

    Made up from

    wood floor and

    compositeconcrete with fire

    insulation and

    covered with

    carpet

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    8/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    9/54

    4.0 DESIGN AND LAYOUT OF AUDITORIUMGround

    Floor Level

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    10/54

    1st Floor

    Level

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    11/54

    2ndFloor

    Level

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    12/54

    Over view of DECTAR frominfront

    Over view of DECTAR from

    side view opposite the

    main road

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    13/54

    DECTARDewan Tun

    Abdul Razak

    Panggung Seni

    Main

    Entrance

    10 metres

    Parking

    Area

    Main

    road

    Distance of the building

    from main road

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    14/54

    1stfloor

    2nd

    floor

    GroundFloor

    DECTARPanggung Seni

    STAGESTAGE

    Side View of the Building

    seating area for audiences,

    main stage,

    store which located underthe staging seat,

    toilets,

    lobby,

    fitting room,

    lighting room,

    VIP rooms,

    Gamelan studio,

    post guard,

    foyer of auditorium

    control room

    art foyer,

    store,VIP rooms,

    toilets,

    pre-view room,

    prayer room,

    technical office,

    technician room,air-cond room,

    dance studio,

    second layer for staging

    seat and dimmer

    light axle located

    Wayang Kulitstudio,designers room,

    coach theater room,

    gallery,

    A.H.U room,

    cultural office,

    water storage tank,

    toilets,

    prayer room and store

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    15/54

    located on both side of

    auditorium and at the

    main entrance

    2100 units of terrace seat

    cover with cream colour

    leather

    1200 moveable seat which

    being arrange at the centre

    SEATS

    5.0 ELEMENTS OF AUDITORIUM

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    16/54

    STAIRS

    Stair in this auditorium is finished by

    using light colour tile

    Allows reflect of sound in the

    auditorium

    tile colour is soft because to allow

    the light to reflect In terms of ergonomic planning, it

    gives relaxing view and feel to the

    audiences to focus on the stage

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    17/54

    concrete wall is layer with fiber glass to absorb the

    sound and avoid it from escape to outside of the

    auditorium

    strip wooden blocks is arranged with a large space in

    between it to allow full absorption of the sound through

    out of the auditorium

    WALL

    Fiber

    glass

    layer

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    18/54

    Huge wooden block

    is attach to the wall

    near both side of

    stage to allow thesound reflect on the

    surface of the

    wooden block to the

    audiences in the

    auditorium.

    WALL

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    19/54

    FLOOR

    Parquet is used as floor

    finishes

    reflects the light in the

    auditorium which givesshinning effect to the floor

    area.

    Reflect sound as well

    because parquet is solid

    material which reflect sound

    Easy to clean

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    20/54

    CEILING

    plaster ceiling with some tiny

    hole finishes at the plaster

    ceiling surface.

    tiny holes is for decorative

    purpose and also act as sound

    absorber where it allows sound

    to travel through the hole

    this type of ceiling does not

    reflect the sound in the

    auditorium.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    21/54

    Second

    layer door

    Double layer door is use for main entrance door

    Double layer door is use to make sure the loud sound in the

    auditorium do not escape to the outside

    span of the door is large and thick to insulate the sound in the

    auditorium.

    DOUBLE

    LAYER DOOR

    First layer

    door

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    22/54

    STAGE

    center of attraction in an auditorium

    has two levels and it is cover with carpet as it finishes

    performance and speech take place

    Carpet and curtain is use not only for esthetic value but also as

    a material that can absorb sound

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    23/54

    6.0 EQUIPMENTS OF AUDITORIUM - AUDIO

    LOUDSPEAK

    ER

    1

    Electro-voice X-Line Compact Full-

    Bandwidth Line Array

    Passive Loudspeaker

    Monitor Loudspeaker

    -Axis symmetrical design

    -Give uniform volume of sound for overall

    space

    -compact, lightweight and portable

    -Fixed to the wall

    -Projects sound which locate

    near only

    -used by the performer to hear the sound

    produce by themselves or the equipments

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    24/54

    SOUNDCONTROL

    CONSOLE

    2

    Pearl Expert Avolites

    (modern)

    Conventional console

    -portable, can be placed anywhere

    -produce a better quality of sound-need to be set up first

    -located in control room

    -seldomly used, frequently broken

    -hard to adjust to have a good

    quality of sound

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    25/54

    VIDEO

    PROJECTOR

    3

    -to projects any image from the

    inputs

    to the projection screen

    -portable, can be placed anywhere

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    26/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    27/54

    MICROPHONES

    5

    Vocal microphone

    Instrument

    microphone

    -do not give a good quality of

    sound-for example : used for speech

    -give a good quality of sound

    -for example : used for music live

    band show

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    28/54

    PARABOLICALUMINIZED

    REFLECTOR (PAR)

    LED SPOTLIGHT

    1

    -Located at the

    stage.

    -have various

    colours

    -used to shows the

    mood of the events.

    -will be turned on

    for

    Theatre

    Music live band

    6.0 EQUIPMENTS OF AUDITORIUM - LIGHTING

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    29/54

    FOLLOW

    SPOTLIGHT

    -use when theres

    special person

    (VIP) enter the

    auditorium, the

    spotlight follows

    his/her movement.

    -the movement is

    adjustable

    manually by

    humans.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    30/54

    DOWNLIGHT2

    -Use for formal

    occasions, such as

    Speech giving

    ceremonyExaminations

    Dinner feast

    Convocations

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    31/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    32/54

    LIGHTINGCONTROL

    PANEL

    4

    -Used to on/off the

    lights.

    -Used to control the

    dimness of the light

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    33/54

    7.0 INSTRUMENT UPDATE OF THE AUDITORIUM

    Sound Amplifier

    to reduce the sound problem that

    produces by the acoustical sound

    effects

    to adjust the sound setting like the

    volume of sound and others to be

    suitable to the function in the

    auditorium

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    34/54

    Vertical Curve

    Speaker

    speaker installed suspended at the

    ceiling of the auditorium

    speaker comes in three or more

    speaker that combines in curve

    frame to form the curve shape

    spread the sound from front to theback of the auditorium. Its cover the

    distribution of sound and the entire

    listener at every position in the

    auditorium can hear the sound in the

    same decibel.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    35/54

    Rotary Motor

    use to move the curtain at the stage.

    The motor only one in use and the

    other installed as standby rotary

    motor.

    also uses to move the colour lighting

    on the stage.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    36/54

    Lighting

    the white lamp use in formal function

    and the yellow lamp use for not

    formal function like dinner

    On stage installed with colour

    spotlight to give dramatic effect on

    stage.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    37/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    38/54

    depends on the elements of the

    auditorium such as the wall, ceiling, floor,

    furniture, finishes and the audients in the

    auditorium.

    REVERBERATION AND

    ECHODELAY

    8.0 ACOUSTICAL EFFECT AND LIGHTNING OF THE AUDITORIUM

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    39/54

    Timber finishes on

    wall

    batten timber not just installedindependent on the wall but it

    come with the fiber glass layer

    install before the batten

    space between each timber

    about half inch to allow thesound flow through the space

    and the fiber glass layer will

    reduce the reverberation

    effect.

    REVERBERATION

    AND ECHO

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    40/54

    Carpet on floor

    Floor at VIP seat area is using

    carpet for it finishes

    absorb the sound

    avoid sound from reflect

    around the auditorium

    decorative purpose

    REVERBERATION

    AND ECHO

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    41/54

    Furniture

    to reduce the acoustical

    effects in the auditorium

    to absorb the sound

    reverberation and echo

    REVERBERATION

    AND ECHO

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    42/54

    Honeycomb Type Ceiling

    absorbs more sound and

    reduce the reflection of sound

    use about 90% in this

    auditorium

    acoustical effect like

    reverberation and echo will be

    reduce in DECTAR auditorium

    REVERBERATION

    AND ECHO

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    43/54

    DELAY

    this effect reduce by using

    mechanical instrument

    install with new and update

    sound amplifier

    equipment is adjust to be

    suitable to the function in

    the auditorium

    equipment is adjust to besuitable to the function in

    the auditorium

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    44/54

    LIGHTING

    PERFORMANCE

    The white lamp use in formal

    function and the yellow lampuse for informal function like

    dinner

    This lighting comes in

    downlight and small

    spotlight

    The stage lighting system

    installed with colour spotlight to

    give dramatic effect on stage

    The lighting on stage canbe move by the rotary

    motor.

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    45/54

    9.0 PERFORMANCE OF EQUIPMENT

    Convocation

    Award winning

    Dinner feast Speech giving

    Music live band shows

    Examinations

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    46/54

    10.0 MANAGEMENT OF AUDITORIUM

    Purpose of

    application

    Detail space uses

    & charge

    Applicant detail

    -Fill up the form

    to make

    appliaction to

    use theauditorium

    -always make

    sure that this

    auditorium is

    functioning well

    and always been

    ready to be use

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    47/54

    Applicant

    detail

    Detail space uses

    Faculities that

    has been approve

    Charge

    As aapproval to

    use the

    auditorium,

    the applicant

    will get thereply form

    from the

    management

    .

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    48/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    49/54

    -Rehearsal will be

    conduct for everyevent to make

    sure everything

    will run smoothly

    - This auditoriumalso provide a

    generator as a

    backup if in case

    that there is a

    blackout

    Sound rehearsal LCD checking

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    50/54

    11.0 MAINTENANCE OF AUDITORIUM

    Maintanence

    checklist

    Evaluation

    notes

    Items

    - Maintenance will

    be done regularlyonce a week

    - The light will be

    maintain once in a

    three month

    - Maintanence work

    need to be record

    in the record book

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    51/54

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    52/54

    Example of

    vandalism

    -If there is serious cases like

    vandalism, special report to bedone

    -It must be include all the proof

    like picture

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    53/54

    CONCLUSIO

    N

    From our observation, four mainaspects which is design, layout,

    element and equipment used in

    the auditorium plays important

    role in this DECTAR performance

    Even though this DECTAR was

    built half a century but this

    auditorium still performs well with

    some new technologies applies in

    the auditorium. This is all to give

    good acoustical effect and providebest performance of auditorium

    together with the high technology

    of lighting system

  • 8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb

    54/54

    THANK YOU