Upload
muhammad-nuriqram
View
218
Download
0
Embed Size (px)
Citation preview
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
1/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
2/54
Dewan Tun Abdul Razak (DECTAR), UKM
Bangi.
3.5 hectar of building consist two auditorium
Constructed on 1970
Maximum capacity 3300 peoples
Function: art and culture events, convocationevents, annual dinner, competition and
examination.
1.0 INTRODUCTION
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
3/54
Chancellor Tun Abdul
Razak AuditoriumHall or DECTAR
Main hall of the
oldest and largest inthe National University
of Malaysia or UKM
Construction began
on 21st June 1976
Inaugurated on 29
September 1979
RM692,228.21
153.450 squarefeet
Formal events
2.0 HISTORY OF THE AUDITORIUM
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
4/54
DECTAR in 1984
DECTAR in 2013
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
5/54
Multi purpose
auditoria
Floor area is
105' x 104.6
1200 portable banquet
seats
150 round table
2100 terrace seats
3.0 PREVIEW OF THE AUDITORIUM
Tun Abdul Razak gallery
Diplays all the art work by
Latif Mohaideen
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
6/54
Ergonomicplanning and
colour
coordination
Dark brownish
colour parquet with
pattern
Good from any various aspectperformance
The amount of light, its direction,
intensity and colour
Audience feel enjoy
and relax during
watching performance
Cream/white
colour terrace
seat and ceiling
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
7/54
Dramatic stage
lighting system,
including front
lighting, foot
lighting, spot
lights,
follow spot
lights
Soft grey colour
to match dark
and soft colourfrom the
auditorium
surrounding
Made up from
wood floor and
compositeconcrete with fire
insulation and
covered with
carpet
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
8/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
9/54
4.0 DESIGN AND LAYOUT OF AUDITORIUMGround
Floor Level
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
10/54
1st Floor
Level
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
11/54
2ndFloor
Level
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
12/54
Over view of DECTAR frominfront
Over view of DECTAR from
side view opposite the
main road
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
13/54
DECTARDewan Tun
Abdul Razak
Panggung Seni
Main
Entrance
10 metres
Parking
Area
Main
road
Distance of the building
from main road
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
14/54
1stfloor
2nd
floor
GroundFloor
DECTARPanggung Seni
STAGESTAGE
Side View of the Building
seating area for audiences,
main stage,
store which located underthe staging seat,
toilets,
lobby,
fitting room,
lighting room,
VIP rooms,
Gamelan studio,
post guard,
foyer of auditorium
control room
art foyer,
store,VIP rooms,
toilets,
pre-view room,
prayer room,
technical office,
technician room,air-cond room,
dance studio,
second layer for staging
seat and dimmer
light axle located
Wayang Kulitstudio,designers room,
coach theater room,
gallery,
A.H.U room,
cultural office,
water storage tank,
toilets,
prayer room and store
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
15/54
located on both side of
auditorium and at the
main entrance
2100 units of terrace seat
cover with cream colour
leather
1200 moveable seat which
being arrange at the centre
SEATS
5.0 ELEMENTS OF AUDITORIUM
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
16/54
STAIRS
Stair in this auditorium is finished by
using light colour tile
Allows reflect of sound in the
auditorium
tile colour is soft because to allow
the light to reflect In terms of ergonomic planning, it
gives relaxing view and feel to the
audiences to focus on the stage
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
17/54
concrete wall is layer with fiber glass to absorb the
sound and avoid it from escape to outside of the
auditorium
strip wooden blocks is arranged with a large space in
between it to allow full absorption of the sound through
out of the auditorium
WALL
Fiber
glass
layer
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
18/54
Huge wooden block
is attach to the wall
near both side of
stage to allow thesound reflect on the
surface of the
wooden block to the
audiences in the
auditorium.
WALL
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
19/54
FLOOR
Parquet is used as floor
finishes
reflects the light in the
auditorium which givesshinning effect to the floor
area.
Reflect sound as well
because parquet is solid
material which reflect sound
Easy to clean
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
20/54
CEILING
plaster ceiling with some tiny
hole finishes at the plaster
ceiling surface.
tiny holes is for decorative
purpose and also act as sound
absorber where it allows sound
to travel through the hole
this type of ceiling does not
reflect the sound in the
auditorium.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
21/54
Second
layer door
Double layer door is use for main entrance door
Double layer door is use to make sure the loud sound in the
auditorium do not escape to the outside
span of the door is large and thick to insulate the sound in the
auditorium.
DOUBLE
LAYER DOOR
First layer
door
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
22/54
STAGE
center of attraction in an auditorium
has two levels and it is cover with carpet as it finishes
performance and speech take place
Carpet and curtain is use not only for esthetic value but also as
a material that can absorb sound
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
23/54
6.0 EQUIPMENTS OF AUDITORIUM - AUDIO
LOUDSPEAK
ER
1
Electro-voice X-Line Compact Full-
Bandwidth Line Array
Passive Loudspeaker
Monitor Loudspeaker
-Axis symmetrical design
-Give uniform volume of sound for overall
space
-compact, lightweight and portable
-Fixed to the wall
-Projects sound which locate
near only
-used by the performer to hear the sound
produce by themselves or the equipments
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
24/54
SOUNDCONTROL
CONSOLE
2
Pearl Expert Avolites
(modern)
Conventional console
-portable, can be placed anywhere
-produce a better quality of sound-need to be set up first
-located in control room
-seldomly used, frequently broken
-hard to adjust to have a good
quality of sound
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
25/54
VIDEO
PROJECTOR
3
-to projects any image from the
inputs
to the projection screen
-portable, can be placed anywhere
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
26/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
27/54
MICROPHONES
5
Vocal microphone
Instrument
microphone
-do not give a good quality of
sound-for example : used for speech
-give a good quality of sound
-for example : used for music live
band show
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
28/54
PARABOLICALUMINIZED
REFLECTOR (PAR)
LED SPOTLIGHT
1
-Located at the
stage.
-have various
colours
-used to shows the
mood of the events.
-will be turned on
for
Theatre
Music live band
6.0 EQUIPMENTS OF AUDITORIUM - LIGHTING
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
29/54
FOLLOW
SPOTLIGHT
-use when theres
special person
(VIP) enter the
auditorium, the
spotlight follows
his/her movement.
-the movement is
adjustable
manually by
humans.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
30/54
DOWNLIGHT2
-Use for formal
occasions, such as
Speech giving
ceremonyExaminations
Dinner feast
Convocations
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
31/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
32/54
LIGHTINGCONTROL
PANEL
4
-Used to on/off the
lights.
-Used to control the
dimness of the light
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
33/54
7.0 INSTRUMENT UPDATE OF THE AUDITORIUM
Sound Amplifier
to reduce the sound problem that
produces by the acoustical sound
effects
to adjust the sound setting like the
volume of sound and others to be
suitable to the function in the
auditorium
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
34/54
Vertical Curve
Speaker
speaker installed suspended at the
ceiling of the auditorium
speaker comes in three or more
speaker that combines in curve
frame to form the curve shape
spread the sound from front to theback of the auditorium. Its cover the
distribution of sound and the entire
listener at every position in the
auditorium can hear the sound in the
same decibel.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
35/54
Rotary Motor
use to move the curtain at the stage.
The motor only one in use and the
other installed as standby rotary
motor.
also uses to move the colour lighting
on the stage.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
36/54
Lighting
the white lamp use in formal function
and the yellow lamp use for not
formal function like dinner
On stage installed with colour
spotlight to give dramatic effect on
stage.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
37/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
38/54
depends on the elements of the
auditorium such as the wall, ceiling, floor,
furniture, finishes and the audients in the
auditorium.
REVERBERATION AND
ECHODELAY
8.0 ACOUSTICAL EFFECT AND LIGHTNING OF THE AUDITORIUM
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
39/54
Timber finishes on
wall
batten timber not just installedindependent on the wall but it
come with the fiber glass layer
install before the batten
space between each timber
about half inch to allow thesound flow through the space
and the fiber glass layer will
reduce the reverberation
effect.
REVERBERATION
AND ECHO
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
40/54
Carpet on floor
Floor at VIP seat area is using
carpet for it finishes
absorb the sound
avoid sound from reflect
around the auditorium
decorative purpose
REVERBERATION
AND ECHO
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
41/54
Furniture
to reduce the acoustical
effects in the auditorium
to absorb the sound
reverberation and echo
REVERBERATION
AND ECHO
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
42/54
Honeycomb Type Ceiling
absorbs more sound and
reduce the reflection of sound
use about 90% in this
auditorium
acoustical effect like
reverberation and echo will be
reduce in DECTAR auditorium
REVERBERATION
AND ECHO
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
43/54
DELAY
this effect reduce by using
mechanical instrument
install with new and update
sound amplifier
equipment is adjust to be
suitable to the function in
the auditorium
equipment is adjust to besuitable to the function in
the auditorium
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
44/54
LIGHTING
PERFORMANCE
The white lamp use in formal
function and the yellow lampuse for informal function like
dinner
This lighting comes in
downlight and small
spotlight
The stage lighting system
installed with colour spotlight to
give dramatic effect on stage
The lighting on stage canbe move by the rotary
motor.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
45/54
9.0 PERFORMANCE OF EQUIPMENT
Convocation
Award winning
Dinner feast Speech giving
Music live band shows
Examinations
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
46/54
10.0 MANAGEMENT OF AUDITORIUM
Purpose of
application
Detail space uses
& charge
Applicant detail
-Fill up the form
to make
appliaction to
use theauditorium
-always make
sure that this
auditorium is
functioning well
and always been
ready to be use
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
47/54
Applicant
detail
Detail space uses
Faculities that
has been approve
Charge
As aapproval to
use the
auditorium,
the applicant
will get thereply form
from the
management
.
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
48/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
49/54
-Rehearsal will be
conduct for everyevent to make
sure everything
will run smoothly
- This auditoriumalso provide a
generator as a
backup if in case
that there is a
blackout
Sound rehearsal LCD checking
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
50/54
11.0 MAINTENANCE OF AUDITORIUM
Maintanence
checklist
Evaluation
notes
Items
- Maintenance will
be done regularlyonce a week
- The light will be
maintain once in a
three month
- Maintanence work
need to be record
in the record book
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
51/54
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
52/54
Example of
vandalism
-If there is serious cases like
vandalism, special report to bedone
-It must be include all the proof
like picture
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
53/54
CONCLUSIO
N
From our observation, four mainaspects which is design, layout,
element and equipment used in
the auditorium plays important
role in this DECTAR performance
Even though this DECTAR was
built half a century but this
auditorium still performs well with
some new technologies applies in
the auditorium. This is all to give
good acoustical effect and providebest performance of auditorium
together with the high technology
of lighting system
8/14/2019 UKM auditorium.pptny of the 6th. Construction began on 21st June 1976 it was costing RM692,228.21 and 153.450 square feet completed. DECTAR is the largest hall in Malaysia at that time. DECTAR was inaugurated on 29th Septemb
54/54
THANK YOU