HEAD OFFICE Uttarakhand Pollution Control Board
"Gauri Devi Prayavaran Bhawan"
46B, I.T. Park, Sahastradhara Road, Dehra Dun
uTIANAKHAND
UKPCB
UKPCB/HOI aCn A6/1ass-377, Date:.07.2020
To, Executive Director (Tech), NMCG (National Mission for Clean Ganga)[ Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti,
1st floor, Major Dhyanchandd National Statidum, India Gate, New Delhi-110002.
Sub: Monthly Progress Report (June, 2020) on Approached Action Plan for
Rejuvenation of River Pr. , Il (Dhela, Bhela, Suswa) as per Hon'ble
National Green Tribunal order dated 20.09.2018, 19.12.2018, 08.04.2019 reg.
sir, Please find the enclosed herewith a copy of monthly progress of June, 2020 for
your kind perusal & necessary action please.
Enclosed:- As above.
Your's faithfully
(S.P. Subudhi) LFS. Member Secretary
Copy to: To the following for kind information pleases:
1- Member Secretary, Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi. 2- Project Director, SPMG, Dehradun.
Member Secretaryy
National Mission for Clean Ganga Format tor Submission of Monthly Progress Report for the month of June 2020 by States/0's
(Hon'ble NGT in the Matter of O.A no. 673/2018 dated 06.12.2019)
Submission of Progress by State/UT-Compliance
Status S.No. Activity to be monitored Timeline
The DPRs for in-situ bio-remediation have been Ensure 100% treatment of sewage at 31.03.2020
least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the
STPs must be ensured
1. sent to SPMG as per Annexure-I
31.03.2020 DPRs for STP of rivers stretches (except kalyani)
have been submitted to NMCG vide letter No.
231/SPMG/NamamiGange/STP/1&D, dateed
16.04.2020 as per Annexure-ll.
.The DPR preparation of one of the river stretch
downstream of Pantnagar on river Kalyani is
under progress. No polluted drain found in the
stretch Haridwar to Sultanpur on river Ganga
Some observations has been sent by NMCG on
three DPRs (Kashipur Septage (1&D) Scheme
Phase-& Rejuvenation of River Pilakhar), which will be removed shortly.
Timeline for completing all steps of 31.03.2021 action plans including completion of setting up STPs and their commissioning Chief Secretaries may set up appropriate
monitoring
2.
5.
Specifying accountability of nodal
not authorities
Secretary level. Chief Secretaries may have an
accountable person in their office
for this purpose.
below the
Fortnightly commencing 21.12.2019 Monthly (preferably before 20" of every month)
Monitoring at State level must take
place.
Progress report may be furnished by the
States/UTs to b.
Secretary, Ministry of Jal Shakti. Member
Pollution Control Boad Secretary Central
Identification of polluting sources including drains has been done and DPR for in-situ treatment has been submitted to NMCG (Details Enclosed)
6.1 Progress Report may be comprised of
details along with completion timelines on:
i ldentification of polluting sources
including drains contributing to river pollution and action as per National Green Tribunal order on in-situ
treatment.
networks
Analysis,
ii- StatuS of STPs, 1&D and sewerage As per Annexure-1 & I Details of Existing infrastructure, Gap
Proposed along with
completion timeline.
he state Board is also monthly conductingB
the monitoring of 09 River stretches.
The
analysis report for the month of June 2020 is
enclosed at Annexure-IV. The monitoring of
drains, tributaries and ground water in the
catchment area is proposed to be monitored
v- Latest water quality of polluted river, its tributaries, drains with flow
details and ground water quality in the catchment of polluted river.
by October, 2020. .Direction have been issued to all concerns
ULBs to stop dumping the waste along water vi-Preventing dumping of waste and scientific waste management including bio-medical wastes, plastic wastes and
decentralizing including waste generated from hotels,
ashrams etc.
bodies.
processing, For scientific management of solid waste DPR waste
are being prepared (detail status giveen
above(Annexure-ll) .for "Plastic compactor "additional funds given
to Dehradun Rudrapur Kashipur ,Ramnagar, Bajpur, Kichha
functional.
in Dehradun -2 places, Bajpur-6 places.
In Doiwala, plastic compactoris already
.On site composting/decentralized composting
.Two common bio-medical waste treatment disposal facilities Iocated at Bhagwanpur, Roorkee Garhwal area and at Gadarpur,
U.S.N. Kumaon area are in operational. The
proposal of 01 more proposed common bio- medical facility at Narandarnagar is under
consideration. vii- Ground water regulation vii- Adopting good irrigation practices,ix- Protection and management of Flood point no.1-3 Bids are 1.Sushwa river- Mothrawala to
2.Gaula river -Along Kicha 3.Kausi river-Sultanpur to Pattikala 4.Ganga river-Haridwar to Sultanpur
Raiwala invited for work and
it is proposed work
will be completed
within 18 month
after
administrative
well approval
Point no 4. Work is
completed
Plain Zone(FPZ),
receivingas
financial as
XRain water harvesting xi- Maintaining minimum
environmental flow of river. xii- Plantation on both sides of the river
xiii- Setting up bio-diversity parks on
removing flood plains by
encroachment.
Progress of DPRs of Bio- Remediation (in-situ) Projects of Rivre ivers Stretches Annexure-
Cost of
1&D & STP
(Rs. in lakh)
5
River River Stretch Keference of Letters SI
3 4
1 2 7
Bhela 1Kashipur to Rajpura Randa
Submitted to SPMG vide letter No. 168/Nagar Anu Namami gange/27 dated 11-03-2020 334.33
Kashipur to Garhuwala
Thakurdwara Dhela I 2
3 Sultanpur to Pattikalan
4 In the vicinity of Rudrapur
Kosi River
Pilakhar
IV
IV
Submitted to SPMG vide letter No. 164/Nagar Anu Namami gange/23 dated 11-03-2020
Mothorwala to Raiwala 126.64
Submitted to SPMG vide letter No. 167/Nagar
Anu Namami gange/26 dated 11-03-2020 5 Bindal &Rispana River Suswa river 375.19
Submitted to NMCG vide letter No. 166/Nagar
Anu Namami gange/25 dated 11-03-2020 Shaympur Rishikesh 47.59
Submitted to NMCG vide letter No.163/Nagar
Anu Namami gange/22 dated 11-03-2020 6 Drains of Kiccha Gola river Kiccha II 17.78
Submitted to NMCGVide letter No. 93/Nagar
Anu Namami gange/14
dated 04-02-2020 7 Drains of Rudrapur
Kalyani 684.18
omitted to NMCG vide Anu Namami gange/37 dated 10-06-2020
IV 13.44 vide letter No. 239/Nagar
Nanddhor Along Sitarganj
Progress of Detailed DPRs of 9 Rivers Stretche hes
Annexure-ll
Cost of 1&D & STP
(Rs. in lakh) 5
SI River Stretch Reference of
Letters River Remarks
2 3 4 7
Project submitted to NMCG Project submitted to NMCG
,Kashipur to Bhela 2887.39 1 Rajpura Randa
Kashipur to 2 Garhuwala NMCG vide letter
No.
231/SPMG/Namami Gange/STP/1&D, dated 16.04.2020
Dhela 2030.72
Thakurdwara
Will be covered
under ongoing project. |Project submittedto NMCG Under preparation
No polluted drain.
Mothorwala to 3 Suswa river Raiwala
4 Along Kicha Kiccha 3230.39
Down Stream
of Pantnagar Haridwar to
Sultanpur
5 Kalyani
6 Ganga IV
Project Submited to NMCG Project submitted t NMCG Project submitted t
Sultanpur to
Pattikalan Kosi River IV 1376.67
NMCG vide letter Nanddhor
River No.
231/SPMG/Namami Gange/STP/1&D,
2735.72 Along Sitarganj
IV 8
dated 16.04.2020 7505.12
In the vicinity 9 Pilakhar IV
of Rudrapur NMCG
Urban Development Department, Uttarakhand Dr:9-6-202o Status Report- Hon'ble NGT, New Delhi, OA No. 673 /2018, "Morn Rver Stretehes are now Critically Polluted".co ;CPCS No. pf
Current Chy
Fopulation
No. ofwards wth
wards with
100% 02D olecton SegregatioGeneratecollected
Total Solld
Waste
Total
waste River/ River
Stretch 100%
Souree
vLB Name rent DPR Stats Bulk
Generator|Status of legacy Waste Plastic Compactor
(TPD). d in TPD n
DPR of Rs. 15.51 Cr Bhela (Kashpurashipur (M. tw Rajura Tande)
Dhela (KashipurKashipur (M.
175819 prepared, process Available 39.8 40 40 53
DPR of Rs. 7.68 Cr prepared.Additional Funds
Corp)
Released, Rs. 4 Lacs of Approval DPR of Rs. 15.S1 Cr
prepared, process of Approval
Additiona Released, Rs 4 Lacs
398 175819 40 $3
Avalable|OPR of Rs. 7.68 Cr prepared. Funds to Garhuwala
53 Corp.) Thakurdwara
Meeting held in Chairmanship of Secretary Urban
Development, Uttarakhand and directions issued
vide Letter No, 388/ VI3)- 2020 12 (8 SWM) 19, Dt
20-2-2020. (Annexure 3) Foliowing decisions were
taken: - Legacy Waste durnp site of Dehradun shall be
remediated/ treated with the Financiai and Technical support of UUSDA (ADB Funded Project) of Urban
Deveiopment 2- Directions issued to ULB Rishikesh, Roorkee, Doiwala, Rudrapur to treat their legacy waste Note: UUSDA-Uttarakhand Urban Sector Development Agency, AD8- ASian Develooment Bank
Sva (Mothrowaia to
Reiwala
Dehradun Mtop) 83
196.25 803983 100 100 10 280 280 Plant Functional Available
Additiana Funds Released, Rs. Lacs
DPR in Cluster of
|Functionai, R:. 1 98 Rishikesh Prepared, Susva (Mothrowrala to Dowala (NP) 226
Ralwala) Process of Procurerment of "8:o Remediation
Machine" initiated Lacs revenue
geneated by seling recyclabies
30 Costing Rs.35.62 Cr., Available 61370 20 20 20 30
in ProcesSs
Approval.
Revised DPR of Kichha along Kichha Additiona funds
Released. Rs 40
25 21.5 Haldwani Approved, Available Kichha (NPP) 28.96 74356 20 20 15
REP in process. acs
Revised DPR of Kichha along Kichha
Lalkuan (NP) 4.25 7644 4.2 4.2 Haldwani Approved, Available RFP in process
Kalyani down stream of Pant
Nagar
Rudrapur (NPP) |Haldwant Approved, AvailableWork Order ued for bio
Remrdiation of Legacy Revlsed DPR of
55.22 175723 40 40 4 60 G0 Additionai Funds RFP in process Waste Released. Rs 4 Lacs
Ganga (Haridwar to Sultanpur)
Hardwar
INPP) 19.5 251000 60 50 255 255 Plant Functional Available Rs 19.6646.96- 26 62Cr DP*P eperd.
DPR Approved, Environmental Clearence in
Process.
Kosi (Sultanpur to Pallikala)
Ramnagar (NPP)
243 $4787 20 20 24 |Available 20 24 Additional Funds
Released, Rs 4 Lacs
To be covered with
Gadarpur Cluster, DPR preaped, Kosi (Sultanpur to
Pallkkala) Sultanpur
NP 404 1474S 2 2
Costing Rs. 13,99 Available
Cr., in process of
Approval.
DPR of Rs. 4.02 Cr approved, Rs. 70. 34|,
Lacs Ist Insti
reeasea. To be covered with
Gadarpur Cluster, DPR preaped,
Costing Rs. 13.99
Cr., in process of
Approval
Nandoralnog sttargan
S*agan NPP) 31711 13 13 19 In Cluster
Flakhar downBazpur iNPP| stream of Bajpur 31172 13 3.65 Available 13
Additionai Released, R Lacs
Funds
380 370 159 810.7805.3S
COD BOD TDS Conductivity pH DO
24
River sampling site
4.6
S.No.
256 370 8.1 32
32
Kosi
8
1
240 171 3.5 Dhella (upstream)
Sample could not be collected due to Covid-19
28
Dhela (downstream)
5.2 260 175 7.7 3.8
160
Bhella (upstream)
26 570 385 6.2 0.4 Bhella (downstream)
36 6.4 470 319 7.2 3.1 Kalyani (upstream)
44
6
8.2 420 282 7.8 2.9 Kalyani (downstream)
Dry Dry Dry Dry Dry Dry Nandaur (upstream)
48
8
8.6 270 8.2 175 2.6 Nandaur (downstream)
80 12 440 282 Kichha 10
Sample could not be collected due to Covid-19 Pilakhar 11
Note: Sample collected on 16 June 2020