HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara Road, Dehra Dun uTIANAKHAND UKPCB UKPCB/HOI aCn A6/1ass-377, Date:.07.2020 To, Executive Director (Tech), NMCG (National Mission for Clean Ganga)[ Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti, 1st floor, Major Dhyanchandd National Statidum, India Gate, New Delhi-110002. Sub: Monthly Progress Report (June, 2020) on Approached Action Plan for Rejuvenation of River Pr. , Il (Dhela, Bhela, Suswa) as per Hon'ble National Green Tribunal order dated 20.09.2018, 19.12.2018, 08.04.2019 reg. sir, Please find the enclosed herewith a copy of monthly progress of June, 2020 for your kind perusal & necessary action please. Enclosed:- As above. Your's faithfully (S.P. Subudhi) LFS. Member Secretary Copy to: To the following for kind information pleases: 1- Member Secretary, Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi. 2- Project Director, SPMG, Dehradun. Member Secretaryy

UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

HEAD OFFICE Uttarakhand Pollution Control Board

"Gauri Devi Prayavaran Bhawan"

46B, I.T. Park, Sahastradhara Road, Dehra Dun

uTIANAKHAND

UKPCB

UKPCB/HOI aCn A6/1ass-377, Date:.07.2020

To, Executive Director (Tech), NMCG (National Mission for Clean Ganga)[ Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti,

1st floor, Major Dhyanchandd National Statidum, India Gate, New Delhi-110002.

Sub: Monthly Progress Report (June, 2020) on Approached Action Plan for

Rejuvenation of River Pr. , Il (Dhela, Bhela, Suswa) as per Hon'ble

National Green Tribunal order dated 20.09.2018, 19.12.2018, 08.04.2019 reg.

sir, Please find the enclosed herewith a copy of monthly progress of June, 2020 for

your kind perusal & necessary action please.

Enclosed:- As above.

Your's faithfully

(S.P. Subudhi) LFS. Member Secretary

Copy to: To the following for kind information pleases:

1- Member Secretary, Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi. 2- Project Director, SPMG, Dehradun.

Member Secretaryy

Page 2: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

National Mission for Clean Ganga Format tor Submission of Monthly Progress Report for the month of June 2020 by States/0's

(Hon'ble NGT in the Matter of O.A no. 673/2018 dated 06.12.2019)

Submission of Progress by State/UT-Compliance

Status S.No. Activity to be monitored Timeline

The DPRs for in-situ bio-remediation have been Ensure 100% treatment of sewage at 31.03.2020

least in-situ remediation Commencement of setting up of STPs and connecting all the drains and other sources of generation of sewage to the

STPs must be ensured

1. sent to SPMG as per Annexure-I

31.03.2020 DPRs for STP of rivers stretches (except kalyani)

have been submitted to NMCG vide letter No.

231/SPMG/NamamiGange/STP/1&D, dateed

16.04.2020 as per Annexure-ll.

.The DPR preparation of one of the river stretch

downstream of Pantnagar on river Kalyani is

under progress. No polluted drain found in the

stretch Haridwar to Sultanpur on river Ganga

Some observations has been sent by NMCG on

three DPRs (Kashipur Septage (1&D) Scheme

Phase-& Rejuvenation of River Pilakhar), which will be removed shortly.

Timeline for completing all steps of 31.03.2021 action plans including completion of setting up STPs and their commissioning Chief Secretaries may set up appropriate

monitoring

2.

5.

Specifying accountability of nodal

not authorities

Secretary level. Chief Secretaries may have an

accountable person in their office

for this purpose.

below the

Fortnightly commencing 21.12.2019 Monthly (preferably before 20" of every month)

Monitoring at State level must take

place.

Progress report may be furnished by the

States/UTs to b.

Secretary, Ministry of Jal Shakti. Member

Pollution Control Boad Secretary Central

Identification of polluting sources including drains has been done and DPR for in-situ treatment has been submitted to NMCG (Details Enclosed)

6.1 Progress Report may be comprised of

details along with completion timelines on:

i ldentification of polluting sources

including drains contributing to river pollution and action as per National Green Tribunal order on in-situ

treatment.

networks

Analysis,

ii- StatuS of STPs, 1&D and sewerage As per Annexure-1 & I Details of Existing infrastructure, Gap

Proposed along with

completion timeline.

Page 3: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

he state Board is also monthly conductingB

the monitoring of 09 River stretches.

The

analysis report for the month of June 2020 is

enclosed at Annexure-IV. The monitoring of

drains, tributaries and ground water in the

catchment area is proposed to be monitored

v- Latest water quality of polluted river, its tributaries, drains with flow

details and ground water quality in the catchment of polluted river.

by October, 2020. .Direction have been issued to all concerns

ULBs to stop dumping the waste along water vi-Preventing dumping of waste and scientific waste management including bio-medical wastes, plastic wastes and

decentralizing including waste generated from hotels,

ashrams etc.

bodies.

processing, For scientific management of solid waste DPR waste

are being prepared (detail status giveen

above(Annexure-ll) .for "Plastic compactor "additional funds given

to Dehradun Rudrapur Kashipur ,Ramnagar, Bajpur, Kichha

functional.

in Dehradun -2 places, Bajpur-6 places.

In Doiwala, plastic compactoris already

.On site composting/decentralized composting

.Two common bio-medical waste treatment disposal facilities Iocated at Bhagwanpur, Roorkee Garhwal area and at Gadarpur,

U.S.N. Kumaon area are in operational. The

proposal of 01 more proposed common bio- medical facility at Narandarnagar is under

consideration. vii- Ground water regulation vii- Adopting good irrigation practices,ix- Protection and management of Flood point no.1-3 Bids are 1.Sushwa river- Mothrawala to

2.Gaula river -Along Kicha 3.Kausi river-Sultanpur to Pattikala 4.Ganga river-Haridwar to Sultanpur

Raiwala invited for work and

it is proposed work

will be completed

within 18 month

after

administrative

well approval

Point no 4. Work is

completed

Plain Zone(FPZ),

receivingas

financial as

XRain water harvesting xi- Maintaining minimum

environmental flow of river. xii- Plantation on both sides of the river

xiii- Setting up bio-diversity parks on

removing flood plains by

encroachment.

Page 4: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

Progress of DPRs of Bio- Remediation (in-situ) Projects of Rivre ivers Stretches Annexure-

Cost of

1&D & STP

(Rs. in lakh)

5

River River Stretch Keference of Letters SI

3 4

1 2 7

Bhela 1Kashipur to Rajpura Randa

Submitted to SPMG vide letter No. 168/Nagar Anu Namami gange/27 dated 11-03-2020 334.33

Kashipur to Garhuwala

Thakurdwara Dhela I 2

3 Sultanpur to Pattikalan

4 In the vicinity of Rudrapur

Kosi River

Pilakhar

IV

IV

Submitted to SPMG vide letter No. 164/Nagar Anu Namami gange/23 dated 11-03-2020

Mothorwala to Raiwala 126.64

Submitted to SPMG vide letter No. 167/Nagar

Anu Namami gange/26 dated 11-03-2020 5 Bindal &Rispana River Suswa river 375.19

Submitted to NMCG vide letter No. 166/Nagar

Anu Namami gange/25 dated 11-03-2020 Shaympur Rishikesh 47.59

Submitted to NMCG vide letter No.163/Nagar

Anu Namami gange/22 dated 11-03-2020 6 Drains of Kiccha Gola river Kiccha II 17.78

Submitted to NMCGVide letter No. 93/Nagar

Anu Namami gange/14

dated 04-02-2020 7 Drains of Rudrapur

Kalyani 684.18

Page 5: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

omitted to NMCG vide Anu Namami gange/37 dated 10-06-2020

IV 13.44 vide letter No. 239/Nagar

Nanddhor Along Sitarganj

Page 6: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

Progress of Detailed DPRs of 9 Rivers Stretche hes

Annexure-ll

Cost of 1&D & STP

(Rs. in lakh) 5

SI River Stretch Reference of

Letters River Remarks

2 3 4 7

Project submitted to NMCG Project submitted to NMCG

,Kashipur to Bhela 2887.39 1 Rajpura Randa

Kashipur to 2 Garhuwala NMCG vide letter

No.

231/SPMG/Namami Gange/STP/1&D, dated 16.04.2020

Dhela 2030.72

Thakurdwara

Will be covered

under ongoing project. |Project submittedto NMCG Under preparation

No polluted drain.

Mothorwala to 3 Suswa river Raiwala

4 Along Kicha Kiccha 3230.39

Down Stream

of Pantnagar Haridwar to

Sultanpur

5 Kalyani

6 Ganga IV

Page 7: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

Project Submited to NMCG Project submitted t NMCG Project submitted t

Sultanpur to

Pattikalan Kosi River IV 1376.67

NMCG vide letter Nanddhor

River No.

231/SPMG/Namami Gange/STP/1&D,

2735.72 Along Sitarganj

IV 8

dated 16.04.2020 7505.12

In the vicinity 9 Pilakhar IV

of Rudrapur NMCG

Page 8: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

Urban Development Department, Uttarakhand Dr:9-6-202o Status Report- Hon'ble NGT, New Delhi, OA No. 673 /2018, "Morn Rver Stretehes are now Critically Polluted".co ;CPCS No. pf

Current Chy

Fopulation

No. ofwards wth

wards with

100% 02D olecton SegregatioGeneratecollected

Total Solld

Waste

Total

waste River/ River

Stretch 100%

Souree

vLB Name rent DPR Stats Bulk

Generator|Status of legacy Waste Plastic Compactor

(TPD). d in TPD n

DPR of Rs. 15.51 Cr Bhela (Kashpurashipur (M. tw Rajura Tande)

Dhela (KashipurKashipur (M.

175819 prepared, process Available 39.8 40 40 53

DPR of Rs. 7.68 Cr prepared.Additional Funds

Corp)

Released, Rs. 4 Lacs of Approval DPR of Rs. 15.S1 Cr

prepared, process of Approval

Additiona Released, Rs 4 Lacs

398 175819 40 $3

Avalable|OPR of Rs. 7.68 Cr prepared. Funds to Garhuwala

53 Corp.) Thakurdwara

Meeting held in Chairmanship of Secretary Urban

Development, Uttarakhand and directions issued

vide Letter No, 388/ VI3)- 2020 12 (8 SWM) 19, Dt

20-2-2020. (Annexure 3) Foliowing decisions were

taken: - Legacy Waste durnp site of Dehradun shall be

remediated/ treated with the Financiai and Technical support of UUSDA (ADB Funded Project) of Urban

Deveiopment 2- Directions issued to ULB Rishikesh, Roorkee, Doiwala, Rudrapur to treat their legacy waste Note: UUSDA-Uttarakhand Urban Sector Development Agency, AD8- ASian Develooment Bank

Sva (Mothrowaia to

Reiwala

Dehradun Mtop) 83

196.25 803983 100 100 10 280 280 Plant Functional Available

Additiana Funds Released, Rs. Lacs

DPR in Cluster of

|Functionai, R:. 1 98 Rishikesh Prepared, Susva (Mothrowrala to Dowala (NP) 226

Ralwala) Process of Procurerment of "8:o Remediation

Machine" initiated Lacs revenue

geneated by seling recyclabies

30 Costing Rs.35.62 Cr., Available 61370 20 20 20 30

in ProcesSs

Approval.

Revised DPR of Kichha along Kichha Additiona funds

Released. Rs 40

25 21.5 Haldwani Approved, Available Kichha (NPP) 28.96 74356 20 20 15

REP in process. acs

Revised DPR of Kichha along Kichha

Lalkuan (NP) 4.25 7644 4.2 4.2 Haldwani Approved, Available RFP in process

Page 9: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

Kalyani down stream of Pant

Nagar

Rudrapur (NPP) |Haldwant Approved, AvailableWork Order ued for bio

Remrdiation of Legacy Revlsed DPR of

55.22 175723 40 40 4 60 G0 Additionai Funds RFP in process Waste Released. Rs 4 Lacs

Ganga (Haridwar to Sultanpur)

Hardwar

INPP) 19.5 251000 60 50 255 255 Plant Functional Available Rs 19.6646.96- 26 62Cr DP*P eperd.

DPR Approved, Environmental Clearence in

Process.

Kosi (Sultanpur to Pallikala)

Ramnagar (NPP)

243 $4787 20 20 24 |Available 20 24 Additional Funds

Released, Rs 4 Lacs

To be covered with

Gadarpur Cluster, DPR preaped, Kosi (Sultanpur to

Pallkkala) Sultanpur

NP 404 1474S 2 2

Costing Rs. 13,99 Available

Cr., in process of

Approval.

DPR of Rs. 4.02 Cr approved, Rs. 70. 34|,

Lacs Ist Insti

reeasea. To be covered with

Gadarpur Cluster, DPR preaped,

Costing Rs. 13.99

Cr., in process of

Approval

Nandoralnog sttargan

S*agan NPP) 31711 13 13 19 In Cluster

Flakhar downBazpur iNPP| stream of Bajpur 31172 13 3.65 Available 13

Additionai Released, R Lacs

Funds

380 370 159 810.7805.3S

Page 10: UKPCB Park, Road, Dehra Dun UKPCB/HOI aCn A6/1ass-377, · 2020-07-29 · HEAD OFFICE Uttarakhand Pollution Control Board "Gauri Devi Prayavaran Bhawan" 46B, I.T. Park, Sahastradhara

COD BOD TDS Conductivity pH DO

24

River sampling site

4.6

S.No.

256 370 8.1 32

32

Kosi

8

1

240 171 3.5 Dhella (upstream)

Sample could not be collected due to Covid-19

28

Dhela (downstream)

5.2 260 175 7.7 3.8

160

Bhella (upstream)

26 570 385 6.2 0.4 Bhella (downstream)

36 6.4 470 319 7.2 3.1 Kalyani (upstream)

44

6

8.2 420 282 7.8 2.9 Kalyani (downstream)

Dry Dry Dry Dry Dry Dry Nandaur (upstream)

48

8

8.6 270 8.2 175 2.6 Nandaur (downstream)

80 12 440 282 Kichha 10

Sample could not be collected due to Covid-19 Pilakhar 11

Note: Sample collected on 16 June 2020