Welcome!
The New Market Model in AustriaUNECE Gas Centre Task Force on Gas Markets Regulation
Brussels, 11 December 2012
“The oil & gas company TSO”
Gas &PowerActivities
ITO Gas ITO Gas Connect =
MAM
ITO BOG 51%
ISO TAG GmbH 11%
SSO OGSAInternational
LogisticsCEGH EconGasEconGas
Petrom GasPetrom Gas
TradingTrading Power
17.12.2012 Task Force on Gas Markets Regulation3
Group Strategy in short: integrated equity gas marketer
- Growth guided by E&P equity gas availability – supported by portfolio optimization- Infrastructure investment supports group integration and enables equity gas monetization
Apart from ITO`s legal obligations
Group Strategy in short: integrated equity gas marketer
- Growth guided by E&P equity gas availability – supported by portfolio optimization- Infrastructure investment supports group integration and enables equity gas monetization
Apart from ITO`s legal obligations
R&M
OMV Group 2011: EBIT EUR Mm 2,500; Employees: 30,500
E&P
The new Austrian market model
17.12.2012 Task Force on Gas Markets Regulation4
What happens (hopefully) on January 1st?
− Joint Market areas for transport instead of point-to-point transports and control area transports (=domestic)
− Additional system administrators in the transmission system
− Third party access:
− Entry-Exit instead of point-to-point
− Back-pack principle for final customers still “applicable” (up to the VTP)
− Balance groups also in the transmission system – unbalanced nomination
− Changes to the tariff system – regulator’s cost added to transit;
− Exit from transmission area being paid by consumer collective
− SSOs paying their share
17.12.2012 Task Force on Gas Markets Regulation5
Why does it matter?
ST. PÖLTEN
WIENLI N Z
S A LZ B U RG
GRA ZI N N S B RU CK
BREGENZEI S EN S T A D T
KLA GEN FU RT
VTP
NCG
Slovenia
Hungary
PSV
SlovakiaAustria is an important transitcountry
− Transit: domestic = 4 :1
− Transit capability 100 Bcm
− Domestic consumption8.6 bcm 2011
Germany
Italy Croatia
17.12.2012 Task Force on Gas Markets Regulation6
Market areas and system administrators
Market area EastMarket areaTyrol
Market areaVorarlberg
MAM = GCA new
BGC
DAM
VTP new = CEGH
NO (1-n) TSOs + DSOs
storage production
NO (1-n)
BGR (1-n)
BGC
DAM
NO (1-n)
BGR (1-n)
BGC = AGCS
DAM = AGGM
BGR (1-n) partlynew in transit
BGC: Balance group coordinator
DAM: Distribution area manager
NO: Network Operator
BGR: Balance group representative
VTP: Virtual trading point
MAM: Market area manager
17.12.2012 Task Force on Gas Markets Regulation7
Relationships
Distribution
Transmission
StoragePro-
ductionEnd consumer
Virtual Connection / Trading
Phys. Connections between Network Operators
MAM
DAM BGC
VTPEntry/Exit
TSO1
TSOn
DSO1
DSOn
17.12.2012 Task Force on Gas Markets Regulation8
Gas Connect Austria as Market Area Manager
− Duties of the MAM according to the Gas Act 2011 :
Capacity Calculation Model �
Organisation of Online Capacity Platform [WIP 1/4/2013]
Nomination Management [WIP – 1/1/2013]
Balancing [WIP – 1/1/2013]
Balance Group Management �
Market Area Management [WIP – 1/1/2013]
Network Development Plan �
Coordination Maintenance �
17.12.2012 Task Force on Gas Markets Regulation9
Registration / One-Stop-Shop
17.12.2012 Task Force on Gas Markets Regulation10
Example: One-Stop-Shop− Balance group representatives / Registration procedure
17.12.2012 Task Force on Gas Markets Regulation11
20
11
23
11
1
4
10
12
1
3
1
0
5
10
15
20
25
S H
ExitStor InSale
EntryStor OutPurchaseProductionBiogas
BG h
Measured valueof consumption
Schedule
BG d BG Bio
Measured valueof production
Market area overall
Distribution area
VGM
debit credit
OperatorVTP
BG border traffic
Measuredvalue
Schedule
BKO
MAM
BioEK FP
BG grid
Schedule
ProductionStorage
Gasexchange
Market Model:Balancing Mechanisms
Measured valueof consumption
Schedule ScheduleMeasured
value
debit debit debit debitcredit credit credit credit
Source: AGCS
Result per hourResult per hour Daily statementDaily statement
Daily statementDaily statement
BG with MGMBG with MGM
BG with BKO BG with BKO BG with BKOBG with BKO
Exchange price + 4 EUR/MWh
Avg. price (stock exchange/MOL)
*0,9/*1,2 EUR/MWh
Min./max. price recall
Nom. outNom. out Nom. inNom. in
ConsumptionConsumptionNom.
purchaseNom.
purchase ConsumptionConsumptionNom.
purchaseNom.
purchase
ImportExport
Nom. supplyfor
final consumers
industry
Gas exchangeGas exchange
MT (activetrading)
MGM (automatic balancing)
VGM(activetrading)
Nom. supply for final consumers SLP
MOL Merit Order List
MOL Merit Order List
AE
price
h
AE
price
d
Auction
ROD
Day
Ahead
MOL
Flow
ROD
l
Auction
ROD
DAY
AHEAD
RUDU
MOL
Market Model : Balancing Energy Mechanisms -Pricing/Sourcing
Source: AGCS
Comparison of P2P and en/ex productsP2P products
Satisfied customersEn/ex products
Satisfied customers?
Only point-to-point (P2P) transport reservations
Flexible entry/exit reservations into/out of the market area� Entry reservation �transportation to VTP� Exit reservation �transportation from VTP
Title transfer exclusively at cross-border interconnection points
Title transfer exclusively at the VTP
Rigid contract-based capacity use Flexible capacity use, via (several) balance groups
Bespoke service� Firm� Interruptible
Standardised service� Firm
� Freely allocable capacity� Dynamically allocable capacity
� Interruptible (classes)
Business hours � 24/7 Business hours � regulated
Allocation mechanism � FCFS Allocation mechanism � auction
Distance-based charging� Transportation charges based on P2P distance
Tariffs determined by decree� System utilisation charge set for each en/ex point
17.12.2012 Task Force on Gas Markets Regulation14
Capacity Sales
GCA taking new approaches to marketing �
− Automated en/ex marketing on FCFS basis from 1 Jan. 2013 onwards (OCB®+)
− Participation in the European Platform Initiative �− Standardised marketing tool at European level, due for launch on
1 April 2013
− Capacity marketing by means of auctions in accordance with the CAM Network Code
− Option of marketing “bundled capacity” at cross-border interconnection points
− Development costs shared with participating TSOs
− Active role in designing the future customer portal
� Maximisation of customer satisfaction
17.12.2012 Task Force on Gas Markets Regulation15
Contract changes
Transformation under section 170(6) Natural Gas Act 2011�
− Existing transportation contracts amended
− Separate capacity reservations at en/ex points in lieu of booked P2P capacity
− System users required to pay rates established by order at these points
− Amendments do not entitle parties to terminate contracts
− Transition will as far as possible be automated following a customer information drive
� Legal limits to TSOs’ freedom and customer focus
17.12.2012 Task Force on Gas Markets Regulation16
© 2012GAS CONNECT AUSTRIA GmbH
floridotowerFloridsdorfer Hauptstraße 11210 Wien, Vienna, AustriaT +43 1 27500-88000
www.gasconnect.at
Goodbye.
Back-up slides
17.12.2012 Task Force on Gas Markets Regulation18
List of abbreviations
Abbreviation Meaning
BG Balance group
BGC Balance group coordinator
BGR Balance group representative
DAM Distribution area manager
DSO Distribution system operator
ENTSOG European network of tranmission system operato rs for gas
GTC General terms and conditions
MAM Market area manager
NO Network Operator
TSO Transmission system operator
TYNDP Ten year network development plan
VTO Virtual trading point operator
VTP Virtual trading point
17.12.2012 Task Force on Gas Markets Regulation19