Project Name : Gresik Gas Cogeneration Plan Project
Line : WTP System
UNIT TOTAL UNIT TOTAL
1 PIPEPIPE, A53 Gr. B, Smls, Sch. 20, BE, ASME
B36.10M10 10 400 M 400 M 1,032,554.35 413,021,740.00 NSSMC Jepang 3 Minggu ARPO DDP SITE Offer Sch. 40 OK 400 M 6,900,000 462,300,000.00
JFE / TUBOS /
NSS 2-3 WeeksOK. Shall be
quoted 402 m
2 45 ELBOW45 ELBOW, A234 WPB, Smls, Sch. 20, BW, ASME
B16.910 10 4 EA 4 EA 1,188,804.35 4,755,217.40 BKL Thailand 4 Minggu ARPO DDP SITE
OK, BKL
Benkan4 EA 1,884,000 7,536,000.00
AWAJI / BKN /
TECHNOFORG
E / BKL/TK 2-3 Weeks
Machi
ning
OK, Machining
accepted
3 90 ELBOW90 ELBOW, A234 WPB, Smls, Sch. 20, BW, ASME
B16.910 10 18 EA 18 EA 2,075,231.48 37,354,166.64 BKN Jepang 4 Minggu ARPO DDP SITE OK 18 EA 2,335,200 42,033,600.00
AWAJI / BKN /
TECHNOFORG
E / BKL/TK 2-3 Weeks
Machi
ning
OK, Machining
accepted
4 NIPPLE NIPPLE, A105, #3000, SW, ASME B16.11 3/4 3/4 3 EA 3 EA 43,478.26 130,434.78 As Per AML 1.5 Bulan ARPO DDP SITE
Please inform
Quoted item
or not?
3 EA 38,160 114,480.00 MEGA /
VIAR2-3 Weeks
Please inform
Quoted item or
not?
5 PLUG PLUG, A105, #3000, SW, ASME B16.11 3/4 3/4 3 EA 3 EA 16,304.35 48,913.05 As Per AML 1.5 Bulan ARPO DDP SITE
Please inform
Quoted item
or not?
3 EA 17,040 51,120.00 MEGA /
VIAR2-3 Weeks
Please inform
Quoted item or
not?
6 SOCKOLET SOCKOLET, A105, #3000, SW, ASME B16.11 10 3/4 2 EA 2 EA 78,913.04 157,826.08 MEG Italia 4 Minggu ARPO DDP SITE OK 2 EA 38,880 77,760.00 MEGA / VIAR 2-3 Weeks OK
7 FLANGE FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 10 10 5 EA 5 EA 787,756.41 3,938,782.05 ULM Spanyol 4 Minggu ARPO DDP SITE OK 5 EA 845,760 4,228,800.00 GALPERTI
2-3 Weeks OK
8 GASKET
GASKET, Spiral Wound Gasket, Hoop SS304,
Flex. Graphite Filler, IR SS304, OR Low-CS, Thk:
3mm, RF, ASME B16.5/ASME B16.20
10 10 5 EA 5 EA 290,760.87 1,453,804.35 As Per AML 1.5 Bulan ARPO DDP SITE
Please inform
Quoted item
or not?
5 EA 542,213 2,711,065.00
SIP / TRI STAR
/ INGI /
TOMBO3-4 Weeks
OK, SIP and
Tombo not
allowed. Please
follow AML
9 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME
B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME
B18.2.2/B1.1 CL.2B
7/8 125 60 EA 60 EA 77,717.39 4,663,043.40 Lokal Lokal 4 Minggu ARPO DDP SITE Stud Bolt
Please
mention
brand and
follow AML
60 EA 19,575 1,174,500.00
BBN / Alloy
Mas
3-4 Weeks
Please inform
Quoted item or
not?
465,523,927.75 520,227,325.00
Include Include
465,523,927.75 520,227,325.00
MATERIAL TAKE OFF FOR WATER TREATMENT PACKAGE SYSTEM
NO. PART NAME DESCRIPTION
SIZE
QTY UNIT
TRACON QUOTE
REMARK Checke By PPLARGE SMALL QTY UNIT
PRICEBrand
Delivery
Time
Delivery
Term
Checked By
PP
MITRA GALPERTI
REMARKDelivery Term
PRICEBrand
Delivery
Time
TOTAL PRICE
PACKING, HANDLING AND DOCUMENTATION
TOTAL PRICE (DDP Site)
QTY UNITCOO
Project Name: Gresik Gas Cogeneration Plan
Project
Line : NATURAL GAS FEED SYSTEM
UNIT TOTAL UNIT TOTAL
1 PIPEPIPE, A53 Gr. B, Smls, Sch. 20, BE,
ASME B36.10M8 8 994 M
994
M 728,478.26 724,107,390.44
NSSMC Jepang
3 Minggu ARPO DDP SITE
Offer Sch. 40
994
M 6,100,000 1,012,600,000.00
JFE / TUBOS /
NSS2 -3 weeks
Offer Sch
40
OK, Shall be quoted
996 m, Schedule 40
2 PIPEPIPE, A53 Gr. B, Smls, Sch. 40, BE,
ASME B36.10M4 4 53 M
53M 275,135.87 14,582,201.11
NSSMC Jepang3 Minggu ARPO DDP SITE
53M 2,118,480 19,066,320.00
JFE / TUBOS /
NSS 2 -3 weeksOK, Shall be quoted
54 m
3 PIPEPIPE, A53 Gr. B, Smls, Sch. 40, PE,
ASME B36.10M1 1/2 1 1/2 12 M 12
M 83,233.70 998,804.40 NSSMC Jepang
3 Minggu ARPO DDP SITE12
M 631,540 1,263,080.00 JFE / TUBOS /
NSS 2 -3 weeks OK
4 45 ELBOW45 ELBOW, A234 WPB, Smls, Sch. 20,
BW, ASME B16.98 8 3 EA
3
EA 730,434.78 2,191,304.34
BKN Jepang
4 Minggu ARPO DDP SITE
3
EA 645,008 1,935,024.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeks
Machinin
g from
sch 40
OK
5 90 ELBOW90 ELBOW, A234 WPB, Smls, Sch. 20,
BW, ASME B16.98 8 52 EA
52
EA 1,115,620.89 58,012,286.28
BKL Thailand
4 Minggu ARPO DDP SITE
52
EA 1,260,000 65,520,000.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK/SK
B
2 -3 weeks
Machinin
g from
sch 40
OK
6 90 ELBOW90 ELBOW, A234 WPB, Smls, Sch. 40,
BW, ASME B16.94 4 13 EA
13
EA 187,828.73 2,441,773.49
BKL Thailand
4 Minggu ARPO DDP SITE
13
EA 18,200 236,600.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK/SK
B
2 -3 weeks
OK
7 90 ELBOW90 ELBOW, A105, #3000, SW, ASME
B16.111 1/2 1 1/2 8 EA
8
EA 84,107.90 672,863.20
ULM Spanyol
4 Minggu ARPO DDP SITE
8
EA 110,500 884,000.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeksMEGA /
VIAR / JD
OK
8 CONC. REDUCERCONC. REDUCER, A234 WPB, Smls,
Sch. 40, BW, ASME B16.96 4 1 EA
1
EA 284,508.54 284,508.54
BKN Jepang
4 Minggu ARPO DDP SITE
1
EA 149,500 149,500.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeks
OK
9 CONC. REDUCERCONC. REDUCER, A234 WPB, Smls,
Sch. 40, BW, ASME B16.94 3 1 EA
1
EA 115,108.70 115,108.70
BKN Jepang
4 Minggu ARPO DDP SITE
1
EA 116,298 116,298.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeks
OK
10 CONC. REDUCERCONC. REDUCER, A234 WPB, Smls,
Sch. 40, BW, ASME B16.93 1 1/2 1 EA
1
EA 96,847.83 96,847.83
BKL Thailand
4 Minggu ARPO DDP SITE
1
EA 86,996 86,996.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeks
OK
11 ECC. REDUCERECC. REDUCER, A234 WPB, Smls, Sch.
20 x Sch. 40, BW, ASME B16.98 4 1 EA
1
EA 801,413.04 801,413.04
BKN Jepang
4 Minggu ARPO DDP SITE
1
EA 584,220 584,220.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeks
Offer
SCH 40 /
Machinin
g
OK
12 NIPPLE NIPPLE , A105, #3000, SW, ASME
B16.11 3/4 3/4 7 EA 7 EA 43,478.26 304,347.82 As Per AML 1.5 Bulan ARPO DDP SITE
7
EA 31,200 218,400.00
MEGA / VIAR
2 -3 weeks
Offer Hex
Nipple
NPT
Machining? Please make
sure spec
13 PLUGPLUG, A105, #3000, THD, ASME
B16.11 3/4 3/4 5 EA
5
EA 19,615.38 98,076.90
ULM Spanyol
4 Minggu ARPO DDP SITE
5
EA 14,300 71,500.00
MEGA / VIAR
2 -3 weeks
Offer Hex
Head
Plug
OK.
14RED. COUPLING
SW X NPT
RED. COUPLING SW X NPT, A105,
#3000, SW x NPT, ASME B16.11 3/4 1/2 2 EA 2 EA 63,043.48 126,086.96 As Per AML 1.5 Bulan ARPO DDP SITE
2
EA 29,445 58,890.00
MEGA / VIAR
2 -3 weeks
Machinin
g to SW
from NPT
Make sure spec
15 RED. TEERED. TEE, A234 WPB, Smls, Sch. 20 x
Sch. 40, BW, ASME B16.98 4 1 EA
1
EA 1,887,500.00 1,887,500.00
BKN Jepang
4 Minggu ARPO DDP SITE
1
EA 1,558,284 1,558,284.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeksMachinin
g
Machining is accepted
16 RED. TEERED. TEE, A105, #3000, SW, ASME
B16.111 1/2 3/4 1 EA 1
EA 249,465.82 249,465.82 ULM Spanyol
4 Minggu ARPO DDP SITE1
EA 135,720 135,720.00 MEGA / VIAR
2 -3 weeks OK
CHECKED BY PPQTY UNIT
PRICE Brand
Delivery
Time
Delivery
TermSMALL QTY UNIT
PRICE Checked by
PPREMARK
MATERIAL TAKE OFF FOR NATURAL FEED GAS SYSTEM
(1ST MTO FROM P&ID)
NO. PART NAME DESCRIPTION
SIZE
QTY UNIT
TRACON QUOTE
REMARKLARGE Delivery TermBrand
Delivery
Time
MITRA GALPERTI
17 SOCKOLETSOCKOLET, A105, #3000, SW, ASME
B16.118 3/4 4 EA
4
EA 57,051.28 228,205.12
MEG Italia
4 Minggu ARPO DDP SITE
4
EA 31,590 126,360.00
MEGA / VIAR
2 -3 weeks
Offer ¾"
× (3" -
80")
3000#
SW
A105N
OK
18 SOCKOLETSOCKOLET, A105, #3000, SW, ASME
B16.118 1 1/2 1 EA
1
EA 98,076.92 98,076.92
MEG Italia
4 Minggu ARPO DDP SITE
1
EA 43,680 43,680.00
MEGA / VIAR
2 -3 weeks
offer 1½"
× (6"-
10")
3000#
SW
A105N
OK
19 SOCKOLETSOCKOLET, A105, #3000, SW, ASME
B16.114 3/4 2 EA
2
EA 54,647.43 109,294.86
MEG Italia
4 Minggu ARPO DDP SITE
2
EA 31,590 63,180.00
MEGA / VIAR
2 -3 weeks
Offer ¾"
× (3" -
80")
3000#
SW
A105N
OK
20 TEETEE, A234 WPB, Smls, Sch. 20, BW,
ASME B16.98 8 2 EA
2
EA 1,839,743.59 3,679,487.18
BKN Jepang
4 Minggu ARPO DDP SITE
2
EA 1,363,726 2,727,452.00
AWAJI /
BKN /
TECHNOFO
RGE /
BKL/TK
2 -3 weeksMaching
sch 40
OK
21 TREADOLETTREADOLET, A105, #3000, SW, ASME
B16.114 3/4 2 EA
2
EA 57,023.41 114,046.82
MEG Italia
4 Minggu ARPO DDP SITE
2
EA 34,710 69,420.00
MEGA / VIAR
2 -3 weeks
offer ¾"
× (4"-
36")
3000#
NPT
A105N
OK
22 FLANGEFLANGE, A105, ANSI Cl. 300, SO-RF,
ASME B16.58 8 13 EA 13
EA 955,966.47 12,427,564.11 ULM Spanyol
4 Minggu ARPO DDP SITE13
EA 730,470 9,496,110.00 GALPERTI /
ULMA / MFF 2 -3 weeks OK
23 FLANGEFLANGE, A105, ANSI Cl. 300, SO-RF,
ASME B16.54 4 4 EA 4
EA 363,034.18 1,452,136.72 ULM Spanyol
4 Minggu ARPO DDP SITE4
EA 449,865 1,799,460.00 GALPERTI /
ULMA / MFF 2 -3 weeks OK
24 FLANGEFLANGE, A105, ANSI Cl. 300, SO-RF,
ASME B16.53 3 1 EA 1
EA 263,568.38 263,568.38 ULM Spanyol
4 Minggu ARPO DDP SITE1
EA 185,640 185,640.00 GALPERTI /
ULMA / MFF 2 -3 weeks OK
25 FLANGEFLANGE, A105, ANSI Cl. 300, SW-RF,
ASME B16.51 1/2 1 1/2 2 EA
2EA 214,476.50 428,953.00
ULM Spanyol4 Minggu ARPO DDP SITE
2EA 106,665 213,330.00
GALPERTI /
ULMA / MFF 2 -3 weeksOffer Sch
80
OK
26 FLANGEFLANGE, A105, ANSI Cl. 150, SO-RF,
ASME B16.56 6 1 EA
1
EA 347,649.58 347,649.58
ULM Spanyol
4 Minggu ARPO DDP SITE
1
EA 633,750 633,750.00
GALPERTI /
ULMA / MFF
2 -3 weeks
150#,
connect
to boiler
skid
OK
27 FLANGEFLANGE, A105, ANSI Cl. 150, SO-RF,
ASME B16.53 3 1 EA
1
EA 145,726.50 145,726.50
ULM Spanyol
4 Minggu ARPO DDP SITE
1
EA 219,375 219,375.00
GALPERTI /
ULMA / MFF
2 -3 weeks
150#,
connect
to HRSG
skid
OK
28 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
8 8 13 EA 13 EA 296,739.13 3,857,608.69 NICHIAS Lokal 4 Minggu ARPO DDP SITE #300
13
EA 469,945 6,109,285.00
SIP / TRI STAR /
INGI
3-4 weeks
OK, SIP is not
allowed. Please
follow AML
29 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
4 4 4 EA 4 EA 114,130.43 456,521.72 NICHIAS Lokal 4 Minggu ARPO DDP SITE #300
4
EA 224,315 897,260.00
SIP / TRI STAR /
INGI
3-4 weeks
OK, SIP is not
allowed. Please
follow AML
30 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
3 3 1 EA 1 EA 89,130.43 89,130.43 As Per AML 1.5 Bulan ARPO DDP SITE
1
EA 188,790 188,790.00
SIP / TRI STAR /
INGI
3-4 weeks
OK, SIP is not
allowed. Please
follow AML
31 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
1 1/2 1 1/2 2 EA 2 EA 57,608.70 115,217.40 As Per AML 1.5 Bulan ARPO DDP SITE
2
EA 111,244 222,488.00
SIP / TRI STAR /
INGI
3-4 weeks
OK, SIP is not
allowed. Please
follow AML
32 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
6 6 1 EA 1 EA 210,869.57 210,869.57 Flexitalic USA 4 Minggu ARPO DDP SITE #150
1
EA 338,604 338,604.00
SIP / TRI STAR /
INGI
3-4 weeks
150#,
connect
to boiler
skid
OK, SIP is not
allowed. Please
follow AML
33 GASKET
GASKET, Spiral Wound Gasket, Hoop
SS304, Flex. Graphite Filler, IR SS304,
OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
3 3 1 EA 1 EA 89,130.43 89,130.43 Flexitalic USA 4 Minggu ARPO DDP SITE #150
1
EA 200,564 200,564.00
SIP / TRI STAR /
INGI
3-4 weeks
150#,
connect
to HRSG
skid
OK, SIP is not
allowed. Please
follow AML
34 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
7/8 150 156 EA
156
EA 87,391.30 13,633,042.80
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
156
EA 53,250 8,307,000.00
BBN / Alloy Mas
3-4 weeks
OK
35 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
3/4 115 8 EA
8
EA 58,695.65 469,565.20
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
8
EA 25,200 201,600.00
BBN / Alloy Mas
3-4 weeks
OK
36 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
3/4 120 32 EA
32
EA 60,326.09 1,930,434.88
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
32
EA 33,750 1,080,000.00
BBN / Alloy Mas
3-4 weeks
OK
37 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
3/4 95 8 EA
8
EA 50,543.48 404,347.84
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
8
EA 29,700 237,600.00
BBN / Alloy Mas
3-4 weeks
OK
38 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
5/8 90 4 EA
4
EA 42,934.78 171,739.12
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
4
EA 21,750 87,000.00
BBN / Alloy Mas
3-4 weeks
150#,
connect
to HRSG
skid
OK
39 BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd,
ASME B18.2.1/B1.1 CL.2A, A194-2H,
Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
3/4 105 8 EA
8
EA 55,434.78 443,478.24
Lokal
Lokal 4 Minggu ARPO DDP SITE Stud Bolt
8
EA 25,200 201,600.00
BBN / Alloy Mas
3-4 weeks
150#,
connect
to boiler
skid
OK
848,135,774.38 1,138,134,380.00
Include
848,135,774.38
TOTAL PRICE
PACKING, HANDLING AND DOCUMENTATION