Unit_4 Balance Civil Works 08.008.14

Embed Size (px)

Citation preview

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    1/20

    sr.

    noDescription Constraints

    TRANSFORMER YARD AREA

    1 Drain along Road beyond Transformer yard

    2 AWU towards U#3, founds not completed

    3Cable trench near GT

    4Balance precast cover in RAT

    5

    Balance paving near GT

    6Pending works of drain along A row

    7 Painting of fencing gates to be done.

    8

    Precast fixing in fire fighting pipe line

    9 Cable trench and Drain cleaning and dewatering

    10 Gcb Balance cladding

    11

    Providing rain water down comers and connecting

    with floor bends (As per dwg)

    POWER HOUSE BUILDING

    12 Sheeting for Elevator within PHB

    13 C-Row & A-Row Cladding sheet

    u ect to proper

    alignment as per

    drawing

    14 Gable End Cladding Sheet

    15 Windows on A-Row,B Row,C- Row & Gable End

    0.0M Floor

    16 Toilets

    17 Wall along C-Row

    18 C-Row Column Encasing

    19 Balance ironite flooring

    20

    Toilet: Balance work wc wash washing basin, doors

    fixing, fixtures and fittings, painting etc

    21 cladding C - row and Gable end

    22 Fixing of Chequered plate

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    2/20

    23

    Balance brickwork & plaster along C row and Gable

    end.

    24 General painting of walls and structural steel.

    25 Balance Window and cladding Fixing

    26 Final Painting work internal and External PHB

    6.9 M Floor

    27 Ironite Flooring

    28 Kerb wall around openings

    29 Toilets

    30 Plastering near Staircase

    8.5 M

    31 ,

    32 Turbine MCC room: Painting work balance

    10 m floor

    33 Final painting to be done.

    34Door fixing C-Row

    35 Window and cladding

    13.6 Floor

    36 Ironite Flooring

    37 Kerb wall around openings

    38 Toilets

    39 Granite Flooring40 S.S handrailing.

    41 Construction of parapet wall

    42

    CER Room---Pop,paiting,Seepage repair,fall ceiling

    repair ,outer face plaster work

    damage done by Ril IT

    and C & I

    Swas Room Block:

    43

    False ceiling workWater flooding from

    top to be arrested by

    RIL

    44 Acid resistant paint & OBD Not in scope

    45 Drains to be cleaned and connected to main drain

    46Final painting

    47 Outer face plaster and painting

    48 Windows to be fixed.

    LT SWGR room:

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    3/20

    49 Window repair

    50 Final painting

    H T Switch Gear Room

    51Opning hole packed

    52 AWU ducting opining pending

    53 Final painting

    19.0m Floor

    54Ironite flooring to be completed.

    55 Balance brickwork around openings in AHU room

    56 Windows to be fixed in AHU room.

    57 Balance 1no door to be provided.

    58 Civil scrap dump in cable room

    59Window fixing and cladding & gable end

    60 Final painting to be done.

    22.0m floor

    61 Final painting to be done.

    62Window fixing and cladding & gable end

    63 Fixing of window glass incomplete.

    26.0 m floor

    64 Hardener flooring to start

    65 Hand railing.

    66 Roof water treatment.

    67 Kerb wall and parapet wall to complete.

    68 Windows along B row to complete.

    69 AWU towards U#3 not completed

    70 Over head tank of 5000 lit for toilets & pipeing main.

    37.6m floor

    71 Roof water treatment.

    72 Parpet wall to complete.

    73 Closing of openings around Roof extractors

    CD BAY,BOILER & ESP AREA UPTO CHIMNEY

    74 Drain along C-RowWater left from boiler to

    be removed

    75 Drain parallel to Bunker 4A

    76 Pavement in Bunker 4A Area

    77 Mill Reject Silo Foundation

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    4/20

    78 TP 12 Roof Sheeting

    79 Bunker 4A Cladding sheet

    80 Bunker 4B Cladding sheet81 BAT Culvert between U#4 to U#5 behind ESP Front not available

    82 BAT Culvert from PA&FD Area to ESP of U#4 Front not available

    83 Pavement between Road & ESP along East West Front not available

    84 BAT top slab on the south side of ESP

    85 Precast cover for BAT & S Row Drain

    86 Boiler Elevator Cladding Sheet

    87 Pavement between PHB & Service Bldg.

    itd scope only from 37

    grid

    88Finishing works of CPU Regeneration Area liketiling,screed concrete,kerb wall,etc

    89 Air Receiver Foundation

    90 Sewer line pavement ACW pipe not installed

    91 CPU Waste water pit in CD bay Front not available

    92 BAT Pedestal in ESP Area completed

    93 Drain between ESP & BAT towards U#3 alongE-W dirn.

    ASH SLURRY SUMP AREA

    94 Column Encasing

    95 Pavement between Ash Slurry sump & Electrical Room96 Handrail & Chequered plate in Ash slurry sump Chequered plate not av

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    5/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    6/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    7/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    8/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    9/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    10/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    11/20

    STATUS AS ON 08-08-14 Completion Date

    Completed Completed

    Completed Completed

    Completed Completed

    COMPLETED 30-6-14

    COMPLETED Available scope completed

    COMPLETED Available scope completed

    12/8/2014 15/6/2014

    NOT IN SCOPEFire fighting works area not in

    scope

    Completed Completed

    Completed Completed

    20-6-14

    NO ELEVATOR No elevator

    A-row completed & C row 20-

    8-14

    A-row completed & C row 10-6-

    14

    Completed 10/6/2014

    NCL issue NCL issue

    COMPLETED 15-6-14

    COMPLETED 10/6/2014

    COMPLETED completed

    COMPLETED completed

    30-08-14 15-6-14

    PT. NO 14 & 13 15-6-14

    COMPLETED completed

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    12/20

    COMPLETED completed

    after mansoon after mansoon

    NCL issue 20-6-14

    after mansoon 20-6-14

    COMPLETED 20-6-14

    COMPLETED 5/6/2014

    COMPLETED 15-6-14

    COMPLETED 15-6-14

    COMPLETED 20-6-14

    COMPLETED 15-6-14

    COMPLETED 20-6-14

    COMPLETED completed

    COMPLETED completed

    20-6-14

    COMPLETED 14-6-14

    COMPLETED 15-6-14

    Reliance trailer damaged the

    granite around 400 m2 -20-08-

    14

    20-6-14

    Completed 10/6/2014

    Completed

    17-08-14 10/6/2014

    Not in scope

    Completed Already cleaned

    After arresting of water leakage

    from Ril - 5 days required

    After arresting of water leakage

    from Ril

    COMPLETED 20-6-14

    COMPLETED Completed

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    13/20

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    26-6-14

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    COMPLETED completed

    COMPLETED 20-6-14

    completed 20-6-14

    completed completed

    completed completed

    not in scope not in scope

    completed 15-6-14

    completed NCL issue

    completed completed

    not in scope not in scope

    not in scope not in scope

    completed 15-6-14

    not in scope not in scope

    Completed

    Completed

    Completed completed

    Completed Front not available

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    14/20

    Completed completed

    completed but the entire sheets

    were removed by other agency

    Twice

    15-6-14

    completed but the entire sheets

    were removed by other agencyTwice

    15-6-14

    Design issues 15 days

    completed 16 days

    completed 19 days

    completed 10/6/2014

    completed 15-6-14

    PowerMech work at top not

    completed safety issues to

    work at bottom

    20-6-14

    not in scope not in scope

    completed

    completed available front completed

    10/8/2014

    boiler water to be removed by

    Reliance15-6-14

    completed

    Completed Completed

    Not in scope 10/6/2014

    ailable in RIL Store

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    15/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    16/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    17/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    18/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    19/20

  • 8/11/2019 Unit_4 Balance Civil Works 08.008.14

    20/20