    UnitI1. Explain in detail the various elements of operation strategy. - JUNE 20102. Define Productions system. Explain how the concept of production system helps in

    understanding of production and operations management. - JUNE 2010

    3. What are the various functions of operations? How are they linked to other parts of anorganization? NOVEMBER/DECEMBER 20104. Discuss the design issues under which the operations system function.NOVEMBER/DECEMBER 2010

    5. Compare and discuss the cost and flexibility tradeoff in operations strategy. (6)NOVEMBER/DECEMBER 2010

    6. What are the steps involved in strategic-formulation process? How does themanufacturing technology provide unique advantages to organization in providing

    products and services to customers? (10) NOVEMBER/DECEMBER 2010

    7. Explain the system concept of production (8) - JUNE 20118. Discuss the organization of production function. (8) - JUNE 20119. Discuss the need and scope of strategic operations management. (8) - JUNE 201110.

    Explain the recent trends in production and operations management. (8) - JUNE 201111.With illustrations from Indian and International context enumerate the recent trends inproduction and operations management.May/June 2012

    12. In todays global environmental scenario the nature of operations management in anycountry is similar to International Operations ManagementComment. Take a stand andsubstantiate your views.May/June 2012

    Repeatedly asked questions

    1. Concept of Production system2. Recent trends in production and operations management.\

    UnitII1. The past data about the load on a stamping centre are as follows: - JUNE 2010

    Month Load, Machine hoursMay 2009 584

    June 2009 610

    July 2009 655August 2009 747

    September 2009 862

    October 2009 913

    November 2009 963(i) Find an exponential smoothing forecast for the month of December

    2009. Take (a =0.33).

    (ii) Compare your answer with a five month moving average forecast.(16)

    2. Explain the activities involved in long range capacity planning decision. (8) - JUNE 20103. Discuss the information flow for planning and control with MRP. (8) - JUNE 20104. Write about the aggregate planning methods, advantages and their limitation.(8)

    NOVEMBER/DECEMBER 2010

  • 7/29/2019 University Questions - OM

    2/4

    5. What are the factors influencing effective capacity and what are all the factors favoringovercapacity and under capacity? Discuss. (8) - NOVEMBER/DECEMBER 2010

    6. Alpha company has the following sales pattern compute the salesforecast for the year 10. (10) - NOVEMBER/DECEMBER 2010

    Year: 1 2 3 4 5 6 7 8 9

    Sales (in lakhs); 6 8 11 23 29 34 40 45 56(ii) Explain the demand patterns in forecasting. ( 6)7. An Arun export limited is a major garment export house based at New Delhi. The sales

    figures (in 1000 units) of a particular garment during the past 20 weeks are given in table

    below. JUNE 2011

    Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Demand 21 24 18 22 27 23 21 25 27 18 19 22 26 24 17 21 29 27 23

    i) Calculate the three week moving average forecast for the given 20 weeks and also

    forecast the demand for 21st

    week (4)

    ii) Calculate the weighted moving average forecast for the given 20 weeks with theweights being W1 = 1, W2 = 2 and W3 = 3. And also forecast the demand for 21

    stweek.

    (4)iii) Find the simple exponential smoothing forecast for all the 20 weeks and also forecastthe demand for 21

    stweek. Assume = 0.2 and F1=21 (8)

    8. Describe the importance and functions of capacity requirement planning for amanufacturing operation. (8) - JUNE 2011

    9. Discuss how aggregate production planning is related to master production schedule. (8) -JUNE 2011

    10.With a detailed sketch explain the evolution of ERP from MRP. - May/June 201211.List the various types of demand forecasting and explain in detail any two qualitative and

    quantitative methods of demand forecasting. - May/June 2012

    Repeatedly Asked Questions:1. Demand Forecasting2. Aggregate planning3. Capacity planning4. MRP

    UnitIII

    1. Name and describe the steps in developing a new product. What are the keydifferences between a prototype and a production design? JUNE 2010

    2. Describe the relationship between process design and product design. JUNE 20103. Explain the production aspects of product design. JUNE 20104.

    Give reasons for excess work content and techniques to reduce it with examplesNOVEMBER/DECEMBER 2010

    5. What is rating? What are the factors affecting performance rating of a worker andexplain various methods of performance rating. NOVEMBER/DECEMBER 2010

    6. Explain the process selection with a suitable example - JUNE 20117. Discuss the various types of services operations. - JUNE 20118. Describe the steps in conducting method study. - JUNE 20119. Discuss the various methods to improve productivity. - JUNE 2011

  • 7/29/2019 University Questions - OM

    3/4

    10.Write an essay about the factors to be considered in deciding the product design. -May/June 2012

    11.Explain the process of work measurement. Also bring out the applicability ofwork measurement in industrial settings. - May/June 2012

    Repeatedly Asked Questions:1. Product DesignUnitIV

    1. Explain the activities and the functions of materials and management. - JUNE 20102. Discuss briefly vendor rating and value analysis. - JUNE 20103. Describe the principles of stores layout and various records used in stores. - JUNE 20104. Distinguish between P and Q systems of inventory and what are the cases that exist in

    each of the systems. - NOVEMBER/DECEMBER 20105. Write about seven wastes in production and what are the basic elements and benefits of

    JIT. - NOVEMBER/DECEMBER 2010

    6.

    What are the methods used for accounting the issues of stores and what are the mainreasons for accumulation of obsolete, surplus and scrap items how it can be avoided. -

    NOVEMBER/DECEMBER 2010

    7. What are the levels of management and MIS and what are the various output reports andlimitations of MIS. - NOVEMBER/DECEMBER 2010

    8. What are the objectives of integrated materials management? JUNE 20119. Discuss materials management information systems (MMIS). JUNE 201110.Discuss methods of vendor rating with an example. JUNE 201111.Describe the various selective inventory control techniques. JUNE 201112.List down the objectives of purchasing functions. May/June 201213.What is value analysis? Explain the steps to be carried out in performing value analysis.

    May/June 201214.What is selective inventory control? Explain in detail the purpose applicability and

    process of selective inventory control. May/June 2012

    Repeatedly Asked Questions:1. Vendor Rating and Value Analysis2. Inventory Control3. MIS4. Material Management

    UnitIV1. What are the three principles of crashing projects? Discuss. JUNE 20102. Horizontal bar charts and other charting techniques offers operation managers

    macro-control of projects, whereas CPM and PERT offers micro-control. Explain.JUNE 2010

    3. Describe how managers may simultaneously consider both quantitative andqualitative factors in facility location analysis. JUNE 2010

    4. Explain why we balance production lines. Mention the steps in line balancing.

  • 7/29/2019 University Questions - OM

    4/4

    JUNE 2010

    5. Compare PERT and CPM and give some project management software. -NOVEMBER/DECEMBER 2010

    6. Explain the material flow system and patterns in facility layout and give theircharacteristics. - NOVEMBER/DECEMBER 2010

    7.

    There are five existing facilities which are to be served by a single new facility. Thedetails of the existing facilities are: NOVEMBER/DECEMBER 2010Existing facility (i) : 1 2 3 4

    5

    Coordinates (a b) 5,10 20,5 15,20 30,25 25,5Number of trips of

    Loads/Year (W) 100 300 200 300 100

    Find the optimum location of the new facility based on gravity location concept.

    8. What role does the globalization play in the facilities location problem and give theapplication areas and inputs of line of balance. NOVEMBER/DECEMBER 2010

    9. List and with examples explain any eight heuristic sequencing rules for schedulingproduction. - May/June 201210. Explain in detail the factors to be considered in deciding the facility location. Alsolist he various facility location decision models. - May/June 2012

    Repeatedly Asked Questions:1. Facility Location2. Project Management ( PERT & CPM)