© 2018 UOP LLC. A Honeywell Company All rights reserved.
UOP’s Modular Solutions Implementation for RefinersMike Trivunovic
February 20, 2018UOP 8080E-0
Honeywell UOP ME-TECH SeminarDubai, UAE
UOP Offers Complete Solutions for Refineries and Petrochemical Plants
1
Simplify Process Technology Implementation with UOP’s Comprehensive Solutions
• Complete Technology Package– Planning and Consulting Studies– Basic Engineering Design– Engineering Services– Advanced Process Control & Monitoring– Catalysts & Adsorbents– Key Mechanical Equipment– Modular Solutions– Installation support– Inspection Services
• UOP has been delivering Refining Modular Solutions for over 30 years
Modular Process Unit Delivery:UOP Technology Transfer Through Modularization
2
UOP Schedule A Detailed Design 3-D Model Shop Fabrication
Efficient Site Work Installation and Commissioning Completed Process Unit
Seamless Technology Transfer From Basic Design to Start-up
Example above is a 19 month delivery for a modular Penex in Pakistan~ 3 months required to install 20 modules
Benefits of UOP’s Modular Approach
Modular Approach Reduces Cost, Schedule, and Risk
3
• UOP Fixed Price• Superior quality via
shop fabrication & UOP inspection
• Effective labor• Avoid cost overruns
and change orders• Earlier start-up
• UOP basic/ detailed design, fabrication, & site services
• Parallel path design, procurement, fabrication & site
• Extensive UOP MOD experience
• Fewer disruptions to operations
• Less site construction & congestion
• Improved safety and security
• Less waste & material loss
Lower Cost ShorterSchedule
SmootherSite Works
UOP Continues to Expand Modular Offerings and Delivery More Value
4
• CCR Regenerator• Merox™ Treating• Chlorsorb™ Unit• Recovery Plus™ system• Recovery Max™ system
• UOP Modular Refinery• PetroPlexTM is UOP’s new
Integrated Naphtha Complex
CD
U
Sat Gas
NHTIsom
Plat
DHT
Pro
duct
s Ta
nkag
e
Merox
Merox
OSBL (utilities, controls etc)
PSA HPU
UOP Modular Refinery
• Platforming™
• Isomerization• Hydrotreating
• Iso-Alky™
• CDU• Olefins Reduction
Continuous Innovations in UOP’s Modular Portfolio
Project Development Model – Refinery Project5
Significant Incremental Revenue from Early Start-Up
5
0.5 0.5 1.0 2.5 0.5
0.5 2.0 0.75 0.25
Tech. Selection
Basic Design FEED Detailed Engineering, Procurement,
and Construction Start Up
Tech. Selection
Basic & Detailed EngineeringModule Fabrication Ship & Install Start
Up
K/O FID S/U
S/UFID
>4.5 Years “Traditional Stick Build Approach”
<3 Years “Modular Approach”
Refinery Capacity EnhancementIncluding a New Modular Penex Isomerization Unit
6
UOP 8080E-6
Refinery Capacity Enhancement
Multiple Units Revamped for 20% Capacity Increase and Meet Clean Fuel Requirements
7
LPG MEROX
Sour Gas
Visbreaker
Naphtha
Gasoline(Euro III)
Amine
SRD
Diesel MaxCat/Frac/Thermal
Sections
Asphalt Air Blowing
At Res
CDU
VDU
CrudeOil
Gases
Naphtha
SulfurRecovery
LPGGas-Con
DHDS
NAPHTHA GASES
Gases
NHT
F.OBlending
Kero Diesel
Kerosene
Vac Residue
SR Diesel
H2HSD
GasesNaphtha RFO
VIS. BTM
VAC RESIDUE
D-MX RESIDUE
Stab. Naphtha
Gases
Platformer CCR
HVGO HVGOLVGO
Sulfur
LPG
Fuel GasFuel Gas
IsomerateLPG
HOBC
JP-1-8
Kero
HSD(Euro III)
Furnace Oil
Asphalt
LDO
LVGOLVGO
500 MTPD
Isomerization
GasesH2
Reformate
H-Naphtha
H2
HSD/LDOBlending
JP-1/JP-8Blending
GasolineBlending
H2S
H2
< 10% Increase
< 10-20% Increase
20%-30% Increase
New
Kero Merox
Objective: Increase Capacity and Improve Product Quality Within Shortest Schedule
• Schedule – Pressure to implement Euro III standards quickly
• FEED work not completed– Revamp study not completed– Design basis not defined– Basic Engineering for Isomerization Unit
not available
• Size and complexity of revamp project implementation for refinery team
• Overall schedule for Isomerization unit underestimated
• Disruption to existing units and unit down-time• Restrictive plot space availability
13 8
• Increased crude processing capacity– 100,000 BPSD to 120,000 BPSD– Reduce reliance on fuel imports
• Process additional indigenous crudes/condensates feed compositions:
– Light, low in sulfur– Low in Conradson carbon
• Improve final product specifications– Euro II to Euro III
• Optimize feed blend and flow scheme • Debottleneck downstream process units• Minimize modifications and overall Capex
Refiner Problem
Production Needs (Revamp Obj’s) Project Implementation Challenges
Case Study: Refinery Capacity EnhancementNew Modular Isomerization Unit
Case Study: Refinery Capacity EnhancementNew Modular Isomerization Unit
9
UOP’s Approach for Project Implementation
Phase 1 - Optimization and Configuration Study• Define technically feasible /economically optimum flow scheme by:
– Maximizing process units which are adequate as-is– Minimizing process units requiring revamp– Identify New Unit(s)- e.g.- Isomerization
• Provide a fixed-price proposal for new modular isom unit
Result: Parallel execution scheme to achieve shortest schedule
Phase 2 –Parallel Path Execution• Issue process studies for revamped units• Supply new Modular Isom Unit
– Basic engineering, detailed design & procurement activities overlapped for optimal schedule
• Work proceeded in parallel for modular isomerization unit
UOP Solution
Case Study: Refinery Capacity EnhancementNew Modular Isomerization Unit
10
• Revamp of Crude Unit, DHT, NHT, Gas Con, LPG Merox, and CCR Platforming Unit
• Addition of a new 14,000 B/D Modular Penex™ Process Unit• I-82 Penex Catalyst• New PSA unit for increased H2
• Supply of DCS/DRCS and PSA control system as integrated package
UOP’s Revamp Solution
Refinery Benefits• ~ 20% increase in total refinery throughput• Higher utilization of lower value naphtha into high octane gasoline• Upgrade from Euro 2 to Euro 3 gasoline product specs• Fast track execution meeting mandated timeline
– Schedule: 88 months, FCA fabrication shop – 9 Months faster than traditional stick build approach, earlier revenue!
Project KO
Month 0
Design Complete
11
Ship 1st Modules
18
Final Shipment
20
M C
26
UOP 8080E-10
UOP Solution
LPG
HeavyFuel Oil
UOP Modular Merox™ Unit Implementation11
UOP 8080E-11
Fuel Gas Extraction
*
LPGExtraction
LSR GasolineSweetening
KeroseneJet Fuel
Sweetening
LPGExtraction
FCCGasoline
Sweetening
Isom
Platforming™Unit
AlkylationInAlk
Cat. Con.
Fuel Gas
Gasoline
KeroseneJet Fuel
Diesel
ATM CrudeTower
VacuumTower
*
*
*
*
*
*
**
UOP Modular Equipment Offering Available*
SaturateGas. Con.
*
NaphthaHDS
*
DieselHDS
*
FCC
Case Study: 5,000 B/D Kerosene Jet Fuel SweeteningModular Merox™ Unit Implementation
12
Objective: Add Kerosene Jet Fuel Production & Increase Refinery Profitability
• Quality and quantity of local skilled construction labor• Limited experience refinery project managers and
engineers• On-site safety issues with operating unit• Rainy weather impact on construction• Limited plot space• Tight project schedule
• Location: West Africa• Refinery: 21,000 B/D heavy conversion refinery• Process Units: Atmo distillation, VAC, HCU, DHT, Visbreaker, Reformer
Project Implementation Challenges
• Meet growing local jet fuel demand and decrease imports- Gov’t requirement
• Meet Jet-1 fuel specs• Increase refinery profitability• Use proven technology
Production Needs (Revamp Obj’s)
Refiner Problem
Case Study: 5,000 B/D Kerosene Jet Fuel SweeteningModular Merox™ Unit Implementation
13
Modular Fabrication Key to Schedule, Quality, and Implementation
Refinery Benefits
• Addition of a new 5,000 B/D Modular Merox™
Process Unit (fixed price)• Designed for Kerosene treatment to
Jet A-1 specs• Operations Training
UOP Technology Solution
• Production of A-1 Jet Fuel• Increase profitability• Fast track schedule for modules, < 1 year• Low risk project implementation• Easy Installation
UOP Merox process reduces acids and converts mercaptans to
disulfides using UOP’s proprietary fixed-bed catalyst, caustic, and air
UOP Solution
MeroxReactor
WaterWash
SaltFilter
ClayFilter
SweetenedKerosene/Jet Fuel
PrewashCausticSettler
Kerosene/Jet Fuel
DiluteCaustic
Air
UOP is Uniquely Positioned to Modularize UOP Units…With Quality in Mind
14
• Basic Design by UOP• Detailed Design including 3D Model• Module Fabrication in Shop • Project Management• Quality Control and Inspection• Preparation for Shipment• UOP Field Operating
Services- Start-Up
3D Model of UOP Merox Unit
UOP Modular Merox Unit Scope
Designed with Operators in MindComprehensive Check Out
Case Study: 5,000 B/D Kerosene Jet Fuel SweeteningModular Merox™ Unit Implementation
15
UOP Modular Merox Process is a Proven Technology Solution for Kerosene Treatment
• UOP Kerosene Merox Unit successful addition to produce A-1 Jet Fuel
• Modular execution provided high quality system with operations in mind
• Fast track schedule and easy installation allowed for trouble free start up
Case Study Conclusions
Installation 2015Modules Design: Easy Transport & Install
Case Study: 5,000 B/D Kerosene Jet Fuel SweeteningModular Merox™ Unit Implementation
16
UOP 8080E-16
Case Study: 25 K B/D Naphtha Complex RevampNew Modular Isomerization Unit
• Tight project schedule with fixed compliance deadline• Short turn-around: implement in 5 - 6 weeks• Minimize disruption to operating plant • Limited / narrow plot space for new Isom unit
• Meet growing local gasoline demand• Upgrade ~50/50 Euro III/ IV production to 100%
Euro IV gasoline specs• Accommodate 25% crude capacity increase• Increase Naphtha utilization / decrease export• Decrease MTBE usage
Objective: Increase Capacity and Improve Product Quality Within Shortest Schedule
13 17
NHT
CCRPlatforming
Unit
Penex Unit
NaphthaNaphthaSplitter
Reformate
Isomerate
SR + HC
NaphthaHC Heavy
DP
C5 to HGUDIH
GasolineBlend
Refiner Problem
Production Needs (Revamp Obj’s) Project Implementation Challenges
Light Isomerate
2nd Penex Unit added+140%
+150%
+200% +70%
Case Study: 25 K B/D Naphtha Complex RevampNew Modular Isomerization Unit
18
Increased Gasoline Production + Naphtha Utilization ~ US $200M NPV Increase
• Limited revamp of NHT & CCR Platforming Unit– Capacity increases of 140% for NHT and 150% for CCR
• Addition of a new 10,000 B/D Modular Penex™ Process Unit and integrate with existing 8,000 B/D Penex Unit
Case Study: 25 K B/D Naphtha Complex RevampNew Modular Isomerization Unit
• 70% increase in gasoline production from original design• 90+% utilization of lower value naphtha into
gasoline product• Meets Euro IV gasoline product specs• No import / use of MTBE• Fast track execution meeting mandated timeline
– Schedule: 15 months, FCA fabrication shop – 9 Months faster than traditional stick build approach
UOP Solution
UOP 8080E-18
Refinery Benefits
UOP’s Revamp Solution
19
Modules Fabrication Progress February 2017
UOP delivered ~ 60 modules
Modules Delivery and Installation at site March-April 2017
UOP 8080E-19
Compressor Suction & Discharge, Drum & Coolers
Design Complete
7
Ship 1st Modules
11
Install Modules
15
Mechanical Completion
18Month 0
Project KO
Case Study: 25 K B/D Naphtha Complex RevampNew Modular Isomerization Unit
20
Increased Production + Naphtha Utilization = US $200M NPV Increase
• Innovative revamp engineering by UOP successfully integrated new flow scheme and Modular Penex unit with existing Naphtha units
• 70% increase in gasoline production
• Upgrade to EURO-IV / V Gasoline without MTBE
• 90+% utilization of lower value naphtha
• New modular Isomerization Unit implemented in 18 months fast track schedule
• UOP managed revamp from design to fabrication, start-up, and production
• Customer managed the installation of the modules with UOP support on-site
Case Study: 25 K B/D Naphtha Complex Revamp: New Modular Isomerization Unit
Case Study Conclusions
UOP 8080E-20
• Fixed Delivery Schedule
• Parallel activities to minimize overall delivery schedule
• UOP offers a Fixed Price minimizing change orders
• Performance Guarantees and Mechanical Guarantees with one partner
• UOP’s technical support helps customers maximize profit by optimizing on-stream reliability
• UOP’s proven commitment to our customer for every project
Schedule Assurance & Fast
Track Delivery
Price Assurance
Performance Assurance
UOP Modular Solutions for Technology Implementation21
UOP Delivers Modular Equipment with Fixed Schedule and Price & Guaranteed Performance
• Single point accountability for the process revamp and critical equipment
• UOP stands with our customer to ensure successful start-up and support over entire unit life
Accountability Assurance
22
UOP 8080E-22