UPCOMING DESIGN & CONSTRUCTION PROJECTS2nd Quarter 2018

(Project & Construction Management)

DESIGN PHASE PROJECTS

Manchester - Rehabilitation and Repair of Wharf 2

Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation.

Design Time Frame NIGP Codes Small Business Opportunities

PHA Contact

2nd Qtr. 2018 – 2nd Qtr. 2019 Consultants9625892533

Contractors9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Turning Basin - Design Repairs and Inspection of the Storm Water Sewer System

Determine existing conditions of the storm water sewer system. Develop design repair plans and specs for construction bid.

Design Time Frame NIGP Codes Small Business Opportunities

PHA Contact

2nd Qtr. 2018 – 4th Qtr. 2018 Consultants9625892533

Contractors9097691360

• Site Preparation• Storm Water Systems

Jessica [email protected]

CONSTRUCTION PHASE PROJECTS

Barbours Cut - Expansion of Gate Facilities

This design objective is to increase the gate capacity to handle anticipated future growth at this terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Quarter 2019 90976 9143891316 28500 91430 91461

• Site Preparation• Demolition• Earthwork

Alvin Jackson [email protected]

Barbours Cut - Rehabilitation of Wharf 3

The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 - 4th Qtr. 2019 90976 91430 91438 9147990976 91223 91485 90924

• Material Testing• Surveying • Storm Water Controls• Photography• Chain Link Fence• Security• Electrical• Signs and Paint Striping

Bill Aguirre [email protected]

Barbours Cut - Lash Dock Demolition

The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2018 - 3rd Qtr. 2018 90976 912239124091244

• Photography• Demolition of Structures• Concrete Traffic Barriers• Barge Services

Bill Aguirre [email protected]

BCT - Rehabilitation of Container Yard C1N and C2N

The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 – 2nd Qtr. 2020 91360 9132790976

• Demolition• Concrete• Grading • Excavation

Barbara H. Smith [email protected]

Bayport - Construct Rail Spur (3.1-7509 PTRA Track South Bayport)

Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 – 3rd Qtr. 2019 912239097696148

• Clearing Brush• Storm Water Controls• Flagman• Traffic Controls• Surveying• Photography• Material Testing• Rail Roads

Alvin Jackson [email protected]

Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal

Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2018 -1st Qtr. 2019 914849122391438

• Fender Replacement• Pile Diving

Alvin Jackson [email protected]

JacintoPort – Repair of Deck & Back Up Pavement on Wharf Nos. 1, 2 & 3

This project consists of repairing existing holes in the deck at JacintoPort Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2018 – 1st Qtr. 2019 9148491223914389097691430

• Structural Concrete Repair• Steel Rebar• Concrete Forming• Striping

Jessica [email protected]

Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal

Repair of top floor slab of the transit shed.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 – 2nd Qtr. 2019 9136091430

• Concrete and Rebar• Excavation

Barbara H. Smith [email protected]

Turning Basin North - Wharf 11, 12 and 13 Damage Repair

This project consists of repairing damage to piles, shear walls and structural members of the wharfs.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2018 – 1st Qtr. 2019 9148491223914389097691430

• Structural Concrete repair• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Turning Basin North - Splash Zone Painting 2018

Painting and preservation of splash zone area.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 – 2nd Qtr. 2019 914849146191484

• Water blasting• Painting• Sandblasting

Ural Thompson [email protected]

Turning Basin - Transit Sheds 30-31 - Roof Repair

Roof removal and replacement for Transit Sheds 30/31

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2018 – 1st Qtr. 2019 914739097692678

• Roofing• Site Clearing• Waste and Remediation

Ural Thompson [email protected]

Turning Basin North - Ramp Road 7 Speed Gate

This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 - 4th Qtr. 2018 91484914382850099000

• Security Systems• Electrical• Communications

Alvin Jackson [email protected]

Turning Basin - Bi-Annual Rail and Switch Replacement - 2019

Repairs or replaces rail and rail switches throughout the Turning Basin Terminal

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 - 4th Qtr. 2020 90976929009122392533

• Rail and Ballast• Concrete and Rebar• Rail Switches• Drainage

Alvin Jackson [email protected]

Turning Basin - Demolition of Seafarers Building

This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Quarter 2018 909769092491843

• Hauling• Photography• Demolition

Alvin Jackson [email protected]

Turning Basin - Rehabilitation and Repair of Wharf 9

Structural concrete repair, fender replacement, and geotechnical rehabilitation.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 - 1st Qtr. 2020 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]