Update: BSEE Oversight of Shell’s 2015 Chukchi Sea Drilling Program
Kevin Pendergast, PE CPG Regional Supervisor, Field Operations - Alaska Region September 24, 2015
“To promote safety, protect the environment and conserve
resources offshore through vigorous regulatory oversight and
enforcement.”
BSEE Mission Statement
Shell – 2015 Chukchi Sea Program
2
Project Location
Source: Shell Gulf of Mexico, Revised Outer Continental Shelf Lease Exploration Plan Chukchi Sea, Alaska (Rev 2 March 2015)
Burger Prospect Drilling Characteristics Normally Pressured Wells Shallow Target: <10,000 ft Shallow Water: <200 ft
Drilling is Straightforward Logistical, Seasonal Constraints are Drivers USFWS LOA restricts simultaneous drilling
on rigs spaced less than 15 miles apart. Current drill sites are 8.9 miles apart.
Shell – 2015 Chukchi Sea Program Operations Overview
3
Mobile Offshore Drilling Units (MODUs) [2] Transocean Semisubmersible Polar Pioneer Noble Drillship Discoverer
Support Vessels and Work Boats [35-40] Size Range ~34 ft to 813 ft (~10 m to ~248 m) Well Control, Oil Spill Response/Storage, Ice
Management, Offshore Supply Helicopters [4] and Fixed-wing Aircraft [3] Man Camps, Staging Areas, Ops Centers,
Shell Ice/Weather Advisory Center
Shell – 2015 Chukchi Sea Program Scale of Operations
4
Arctic Containment System
Shell – 2015 Chukchi Sea Program Key Arctic Strategies
5
Source: BSEE Files
Availability of Capping Stack (24 hrs)
Shell – 2015 Chukchi Sea Program Key Arctic Strategies
6
Source: Shell International E&P
Same Season Relief Well Schedule Considerations (34-38 days) Equipment Availability (Same season=On hand)
Mudline Cellar
Protection from ice gouge if required to move off Ice Management
Shell – 2015 Chukchi Sea Program Key Arctic Strategies
7
24/7 BSEE coverage on each MODU Began approx. July 25; will continue until
MODU’s depart Burger for the season Polar Pioneer still drilling Burger J well
Allowed to drill/work in hydrocarbon zones until Sept. 28
Discoverer plans to begin Burger V well Must wait until Polar Pioneer plugs Burger J
End of all drilling activities currently set at November 1
Shell – 2015 Chukchi Sea Program Inspections Program and Operational Update
8
High degree of vigilance observed by BSEE Open communication between BSEE and
operator and other agencies enhances oversight and safety Challenges:
Logistics Weather Stakeholder communications
Shell – 2015 Chukchi Sea Program Inspections Program and Operational Update
9
Conducted inspections of Shell oil spill response equipment in:
Valdez, AK Seattle and Everett, WA Anchorage, AK Prudhoe Bay, AK Wainwright, AK
Conducted a Government Initiated Unannounced Exercise Tabletop (TTX)
Tested elements of Shell’s Oil Spill Response Plan not demonstrated during the Shell-led TTX in May
Shell – 2015 Chukchi Sea Program
10
Oil Spill Preparedness Activities
Shell – 2015 Chukchi Sea Program
10
Oil Spill Preparedness Equipment Inspections 2015
Current Expl. Plan allows additional wells or continued work on wells at Burger Prospect Depending on what Shell discovers this
year, BSEE expects them to pursue additional Chukchi wells in 2016 Enhanced interagency coordination during
plan review/permitting key in winter 2015/16
Shell – 2016 Chukchi Sea Program Overview
12
“To promote safety, protect the environment and conserve
resources offshore through vigorous regulatory oversight and
enforcement.”