Update on the“Concertation Gaz” Process
Benoît Pouzieux et Jean-Marc Brimont
AgendaAn effective and mature process
The need to connect with the European process
2010 achievements and upcoming challenges
- 2 -
Update on the “Concertation Gaz” process
AgendaAn effective and mature process
The need to connect with the European process
2010 achievements and upcoming challenges
- 3 -
Update on the “Concertation Gaz” process
Reminder of the essentials Objectives
Share a common understandingBuild consensual solutionsProvide analyses and proposals to feed the regulator’s
deliberations
- 4 -
A 2-level structureA steering committeeWorking groups
All the stakeholders gatheredShippers, suppliers, consumers, regulator, operators,
energy ministry …Chaired by the 2 TSOs
A common cooperative asset
An effective and mature processThe reference way to add or to improve
transmission servicesHigh attendance and active contributions
Diversity of positions expressed
Connected infrastructures on-boarded when necessary
- 5 -
Concrete achievementsIn 2010, 5 regulator’s ruling based upon “Concertation Gaz”
proposals
Regulator’s 2011 tariff consultation fed by inputs from “Concertation gaz”
A shared practice of “co-building” every evolution
A productive system
A new website since May 2010
www.concertationgaz.com
A clearer schedule
Slides and minutes available quickly
News Flash
- 6 -
Forum functionalities to post reactions or questions
RSS flow for real-time updates
A more interactive interface
AgendaAn effective and mature process
The need to connect with the European process
2010 achievements and upcoming challenges
- 7 -
Update on the “Concertation Gaz” process
A new framework
Harmonisation process
Priorities from the European Commission
Framework guidelines (FG)
Network codes (NC)
Consultation windows
ACER, ENTSOG, Commission
- 8 -
ENTSOG Commission ACER
… to interact with
Several interactions
- 9 -
Different topicsthird-party access data exchange and settlement capacity-allocation and congestion-management transparency balancing …
tFG 1 NC 1
FG 2 NC 2
FG 3 NC 3
Different schedules
… to be taken into account
Why and how to connect to the European process?to share a common analysis of draft documentsto build a “French” input to fuel the harmonisationto include the harmonisation outcome in the
specifications of the workings groupsto anticipate the harmonised rulesto prepare the implementation of the network codes
- 10-
A strengthened and renewed need of “Concertation gaz”
AgendaAn effective and mature process
The need to connect with the European process
2010 achievements and upcoming challenges
- 11-
Update on the “Concertation Gaz” process
12
The Concertation Gaz and its Working Groups
Evolution of network’s contractual structure
Operational network code
Capacity allocation
Balancing
Management of intraday flexibility
Contractual scheme for downstream capacities
3CTG
IT System coordination
13
Evolution of the network contractual structure (1/2)
Objective 1 : Improve the access to the Southern Zone
July 2009 - CRE ruling:
Merger of GRTgaz zones should be gradual towards 2015 horizon As technical conditions are met, a single market place should be created in 2011
GRT/TIGF joint study under the supervision of the French Ministry :
As of 2010, existing constraints could be eased by the joint model As of 2013, there should be no congestion at the GRTgaz/TIGF interface
Southern Zone possible, based on the operational rule proposed byGRTgaz
Evolution of market conditions at GRTgaz South/TIGF interfaces
Mechanisms to improve conditions of access to the Southern market zone ( eg.market coupling, flow commitments …)
Context
Prospects
Results
Public consultation on CRE decision in progress
14
Evolution in the network contractual structure (2/2)
Objective 2 : Improve access to the L-gas perimeter
Results of the GRTgaz preliminary study
Prospects
Merger of L and H perimeter feasible by 2013 Sharing of costs for provision of L gas required Coordination between Storengy and GRTgaz required
Short term : basic conversion service can be set to zero as of 2011 Sharing of Swap contract costs required Nominations between perimeters maintained without change in balancing rules
and the role of the balancing shipper Operational rule should be introduced
Evolution of market terms at the North B/ North H interface
Public consultation on CRE decision in progress
15
Operational Network Code
Objective : Define the GRTgaz operational network code
Results
Prospects
Definition of a rule regarding the distribution of available capacitiesbetween N/S Link and PITS Serene Sud (winter) / Sediane Littoral(summer)
Feedback on the summer rule
Definition of the form and content of the Network Code
Topic prioritization and treatment: min. scenario in Obergailbach,conditions of availability of interruptible and backhaul capacities,definition of climatic capacities and availability of interruptible capacitiesat PITS …
Information on netting and rebound rules on Entry Points
16
Capacity Allocation
Objective : Improvement of capacity allocation rules
Results
Prospects
February 8th 2010 decision on the allocation of capacitywithin the framework of GDF Suez’s commitments
July 8th, 2010 :decision on rules to be applied onmulti-annual and annual capacities as of April 1st 2010
GDFSuez’s Commitments: GRTgaz procedure for the marketing of LT capacities at Taisnières and Obergailbach entry points
Improvements of rules on N/S link: detailed study on 3 methods :“need based”, auctions, prorata
Implementation of Framework Guidelines for CMP and CAM Continuation of the studies on auction-based allocation mechanisms
CRE approved GRT proposal based on the WG results
17
Balancing
Objective : Define the target balancing system for 2012-2013
Results
Prospects for June 2011
September 30th 2010 CRE deliberation to decide on changes to gas transmission network balancing rules
Stakeholders’ views on possible target system
Definition of the main principles of GRTgaz target system in the framework of European guidelines :
•TSO resort mainly to the market to balance the system on a daily basis.• Stronger incentives for shippers to balance their positions• Enhanced quantity/quality of information on both the global position of the network and the individual imbalances
CRE approved Target balancing-system principles proposed by the WG
GRTgaz : Implementation plan for the target as of 2013 TIGF : Assessment and possible upgrades to the current system
18
Management of Intra-Day Flexibility
Objectives: - Define market rules for intra-day flexibility management- Operational rules for electricity producers
Results
ProspectsPublic consultation on CRE deliberation in progress: access rules for customers with high flexibility needs
Presentation of GRTgaz/TIGF joint study on the ability of gas infrastructures toprovide flexibility to the market
Elaboration of the flexbility supply offer by TSOs
Operational management of flexibility shortages
Definition of operational rules : temporary procedure
Based on CRE deliberation,possible work could be :
Define the contractual structure of the flexibility offer Integrate operational terms into this structure
19
Contractual scheme for downstream capacities
Objective : Simplify access to delivery capacity for end consumers
Results Synthesis of market expectations for changes in the contractual scheme
SWOT analysis : choice of a high-modularity scenario allowing :
Gradual and customized access for new entrants
Transfer of right of use for delivery capacities to a balancing shipper
A stronger link between the TSO and the end consumer
Positive feedback from market actors
20
Contractual scheme for downstream capacities
Legal assessment of the scenario
“Flash consultation” of all shippers
April 2011 : final version of the draft contract
October 2011 : implementation at the launch date of TRANS@ctions V1c
Prospects
21
3CTG (Industrial Customers)
Objective: Foster dialogue and partnership with end consumersand provide them with information on the GRTgaz offer
Kick-off meeting in June to define the topics to be treated
Load shedding
Interruptibility
Gas quality
Metering
Connection Contract liability limits.
Results
Prospects
22
IT System Coordination
Objective : Inform stakeholders of changes to the IT system
Presentation of the Trans@ctions capacity booking portal
Implementation process of the final version at the end of 2011
Prospects
Results
23
As a conclusion …
Major changes to the market structure are to be designed and implemented.
Your implication within the process is essential to develop better market conditions for the benefit of all stakeholders.
24
Thank you for your attention