2 Village of Vinton
Vision Statement
The vision of the Village of Vinton is to be a city of economic opportunity with cultural pride and civic engagement achieving a high quality of life for today and the future.
During the Strategic Plan Update held on March 30, 2016 Council defined each term found in the vision statement as follows: Economic opportunity means (V1): Financial education incentives—personal
& business. Cultural pride means (V2): Create and promote an identity. Civic engagement means (V3): Government and community participating
together. Quality of life means (V4): Live and play: home, health, safety, financial security,
recreation, and enjoyment.
Mission Statement
The mission of the Village of Vinton is to provide the means for development, growth, and sustainability with proper planning and resources.
During the Strategic Plan Update held on March 30, 2016 Council defined each term found in the mission statement as follows: Development means (M1): Cultivate future opportunities. Growth means (M2): Increasing and improving businesses, residential and
professional knowledge. Sustainability means (M3): Maintaining the solvency of the community. Proper planning means (M4): Identify strengths and weaknesses to realize
specific goals.
Core Values
Honesty Transparency Fair and just Hard working Speak from the heart Lead by example Take ownership Have pride in our community
2016 Strategic Plan Update 3
Village of Vinton City Council Leadership Philosophy
The City Council of the Village of Vinton will lead… · By example · By being decisive · By taking initiative · “Take the bull by the horns” · By taking calculated risks · By being positive · By being observant – look at all the angles · By being a good listener · By being understanding and considerate · By being respectful of others · By taking charge · By accepting the decision when made · By being humble
Village of Vinton City Council Communication Philosophy
The City Council of the Village of Vinton will communicate… · Truthfully · Understanding the needs and knowledge of the audience · With humility · Respectfully – without patronizing or being degrading · Factually · By listening first · Clearly and concisely
4 Village of Vinton
Village of Vinton City Council Expectations
Council expects the following of one another… · Listen, understand and do your homework · Be willing to help each other · Be objective and rational · Don’t take things personally · Be professional · Be respectful and courteous · Remain centered and focused and honest with yourself · Make up your own mind (Don’t be overly influenced by others) · Be influential · Be patient · Be nice · Communicate fully with each other
Village of Vinton Staff Expectations
Staff is expected to… · Be professional · Be knowledgeable · Be respectful · Be courteous · Communicate issues, concerns and information for decision making · Have integrity · Point council in the right direction to obtain good information · Provide their expertise · Have a good work ethic · Be ethical
2016 Strategic Plan Update 5
Village of Vinton City Council and Staff Expectations
Staff expects Council to (as defined by Council members themselves)… · To ask questions clearly · Provide the proper training · Respect the staff · Provide direction to staff · Reward the staff for their hard work – give good compliments · Provide encouragement and motivation · Provide good/safe work environment · Provide leadership · Be a role model for them · Be dependable, reliable, available to the staff · Don’t be bossy – follow the chain of command
6 Village of Vinton
Village of Vinton
2016 Strategic Plan Update
Vision Elements
Mission Statement The mission of the Village of Vinton is to provide the means for devel-opment, growth, and sustainability
with proper planning and re-sources.
Vision Statement
The vision of the Village of Vinton is to be a city of economic
opportunity with cultural pride and civic engagement achieving a high quality of life for today and the
future.
Civic
Engagement
Economic
Development Infrastructure
Cultural Pride Health &
Safety Recreation
2016 Strategic Plan Update 7
Vision Elements
Infrastructure
Water– Continue to work toward a city wide water system.
Waste Water– Continue to work toward a city wide sewer system.
City Streets– Evaluate and address needed city street improvements.
Economic Development
Create a business incubator—start
relationship with HUB of Human Innovation.
Create a Public Improvement District.
Establish taskforce to survey and identify gaps in types of businesses and service offered in Vinton.
Educate and promote business incentives to encourage new business development, promote existing businesses and recruit private transportation company for public use.
Annexation implementation to ensure sustainable growth.
8 Village of Vinton
Civic Engagement
Develop & implement a volunteer
initiative in the community and create a student engagement program.
Improve communication between staff and council
Public awareness—maintain an environment of transparency
Provide ESL / Citizenship classes Identify procedures and
expectations of all volunteer committees.
Cultural Pride
Create a logo and slogan for the city to be used in public awareness, educational material and marketing of the city.
Create a historical preservation program to educate the public on the history of Vinton and the surrounding area.
Create cultural events to promote the character and history of the community and surrounding area.
2016 Strategic Plan Update 9
Health & Safety
Create two year plan for a weekly
farmers market Survey local health services and
providers to identify gaps in services and seek to fill those gaps.
Update the street lighting plan to determine the need for street safety.
Create neighborhood watch groups in the community.
Continue remediation process for a multi-purpose center.
Recreation
Identify area mountain bike trails, cycling trails and tie the existing trails to the existing river trail.
Continue creating parks as per the existing Master Park Plan.
Continue creating trails as per the existing Master Park Plan.
Complete development of the Community Garden
Identify funding sources and apply for funds to develop the community learning center.
10 Village of Vinton
Each action step is directly targeted to address at least one of the defined points from both the Vision and
the Mission statement. For specificity please refer to page 2 for definitions. To have a cohesive action plan
to carry out these predetermined goals, the teams met and created the following action step:
Infrastructure:
I. Water – Continue to work toward a city wide water system: V3, V4, M1, M3
a) Pursue grants for design & construction
b) Pursue acquisition of private systems.
II. Waste Water– Continue to work toward a city wide sewer system: V3, V4, M1, M3
a) Continue to look for construction funds under the following funding sources: Texas Water
Development Board, Border Environment Cooperation Commission, U.S. Department of
Agriculture.
b) At least twice per year, inform the public on the status of the project and proper maintenance of
existing septic systems
III. City Streets– Evaluate and address needed city street improvements: V2, V4, M1, M4
a) Create an assessment from the property taxes collected for street projects (collaborate with City
Attorney)
b) Meet with City Engineer to revise cost estimates
c) Public Works director to collaborate with engineer and develop street maintenance plan.
d) Review and compare pricing for striping Valley Chile Road
e) Research traffic calming and pedestrian safety measures with City Engineer.
Economic Development
I. Create a Business Incubator —start relationship with HUB of Human Innovation: V1, V3, V4, M1, M2
a) Set up meeting to establish a relationships with the HUB of Human Innovation.
b) Research grants for incubator and apply to any that are available.
c) Research existing properties that may be available to place incubator.
II. Create a Public Improvement District: V3, M1, M3
a) Continue involvement to pursue PID for Valley Chile Rd
b) Meet to recruit businesses for PID
III. Establish taskforce to survey and identify gaps in types of businesses and service offered in Vinton: V3,
M1, M4
a) Create a census to identify the different services & products that local businesses offer.
b) Find five additional members for taskforce group
c) Taskforce (see steps under Economic Development Plan)
2016 Strategic Plan Update 11
IV. Educate and promote business incentives to encourage new business development, promote existing
businesses and recruit private transportation company for public use: V1, V3, V4, M1, M2
a) Meet with Small Business Administration
b) Plan for quarterly small business workshops
c) Create a local directory to promote local business and services
d) Research possibility to recruit Uber drivers
V. Annexation implementation to ensure sustainable growth: V3, M3
a) Review annexation procedures with City Attorney
b) Prepare annexation packet.
c) Meet with property owners
Civic Engagement:
I. Develop & implement a volunteer initiative in the community and create a student engagement
program: V3, V4, M2, M4
a) Create a program for youth engagement and a citizens academy for adults
b) Implement a public awareness program to promote programs
c) Implement other volunteer programs
II. Improve communication between staff and council: V3, M2, M4
a) Create training for Council members on tablet usage.
b) Develop briefing report to be carried out on a monthly basis by Council Members during
Council meetings.
III. Public Awareness—Maintain environment of transparency: V2, M2
a) Encourage community to subscribe to an email list and to other social media outlets
IV. Provide ESL / Citizenship classes: V4, M1, M2
a) Find teachers for English and Citizenship classes through UTEP & EPCC.
b) Set dates for classes and implement program
c) Purchase supplies
d) Begin establishing citizenship classes
V. Identify procedures and expectations of all volunteer committees: V3, M4
a) Identify existing volunteer committees.
b) Prepare information for committee members
c) Use website and social media to educate and encourage new membership.
12 Village of Vinton
Cultural Pride:
I. Create a logo and slogan for the city to be used in public awareness, educational material and
marketing of the city: V2, V3, M1, M4
a) Create request for proposal (RFP) for marketing consultant
b) Publish RFP, score and award
II. Create a historical preservation program to educate the public on the history of Vinton and the
surrounding area: V2, V3, M1, M2
a) Start a historical preservation program and encourage residents to participate—Public
Awareness
b) Contact UTEP History department to create an internship program
c) Create brochure to promote Vinton historical information (interns)
d) Submit historical sites to County of El Paso for designation.
III. Create cultural events to promote the character and history of the community and surrounding area:
V3, V4, M1
a) Host an open house or “Pride Day”
b) Create a Charro festival to be held in August
c) Riverfest
d) Host a Mexican American Art/photo event
Health & Safety
I. Create two year plan for a weekly farmers market: V1, V2, V3, V4, M1, M2, M3
a) Local Foods Local Places goals 1.1.– 1.5
b) Visit other farmer’s markets to get ideas and vendors.
c) Marketing (poster, flyers)
d) Purchase signs, incentives & canopy
II. Survey local health services and providers to identify gaps in services and seek to fill those gaps:
V2, V3, V4, M2, M4
a) Survey local medical or health providers including food banks
b) Contact the City of El Paso Health department for services
c) Plan for quarterly health fairs (to include blood donations?)
III. Update the street lighting plan to determine the need for street safety: V4, M4
a) Update lighting plan
b) Determine project cost estimate after plan has been updated
IV. Create Neighborhood Watch groups in the community: V3, V4, M2, M4
a) Meet with Sherriff's Department
b) Identify target neighborhoods
2016 Strategic Plan Update 13
V. Continue remediation for a multi-purpose center: V4, M1, M4
a) Review summary
b) Prepare plan
Recreation
I. Identify area mountain bike trails, cycling trails and tie the existing trails to the existing river trail:
V2, V4, M1, M4
a) Locate existing bike trail maps to be incorporated into Vinton and the Camino Real
b) Create public awareness brochure (Vinton only / Outside Vinton)
c) Research grants for public awareness (sustainable community)
d) Research Bike Share Program
II. Continue creating parks as per the existing Master Park Plan: V2, V4, M1, M4
a) Research land owners and contact to acquire 1/4 acre—1/2 acre
b) Research grant opportunities, create timeline for applications
c) Survey local population for need of skate park on north side of Vinton
d) Create fund raising packet for Mariposa Park II
III. Continue creating trails as per the existing Master Park Plan: V2, V4, M1, M4
a) Research land owners for donation of land along arroyos
b) Acquire arroyos through donation or purchase
c) Research grant opportunities, create timeline for applications
IV. Complete development of the Community Garden: V2, V4, M1, M4
a) Research grant applications under U.S. Department of Agriculture (USDA)
b) Research grant application under Environmental Protection Agency (EPA)
c) Continue recruiting volunteers for improvements on community garden
V. Identify funding sources for Community Learning Center: V2, V4, M1, M4
a) Research grant applications under U.S. Department of Agriculture (USDA)
b) Research grant application under Environmental Protection Agency (EPA)
c) Continue recruiting volunteers for improvements on Community Learning Center
14 Village of Vinton
Village of Vinton
2015-2016 Strategic Plan Update
Infrastructure Strategic Initiative Action steps Budget Timeline
Water– Continue to work toward a city wide water system. (V3, V4, M1, M3)
a) Pursue grants for design & construction (TWDB,
USDA, BECC) 12 Months
b) Pursue acquisition of private systems 6-12 Months
Waste Water– Continue to work toward a city wide sewer system. (V3, V4, M1, M3)
a) Continue to look for construction funds under the fol-
lowing funding sources: Texas Water Development
Board, Border Environment Cooperation Commission,
U.S. Department of Agriculture
12 Months
b) Create public awareness material to update the pub-
lic twice a year. $ 1,200.00 60 days/ 6 month
follow up
City Streets– Evaluate and address needed city street improvements (V2, V4, M1, M4)
a) Create an assessment from the property taxes collect-
ed for street projects (collaborate with city attorney) $0.00 14 days
b) Meet with city engineer to revise cost estimates $0.00 30 days
c) Public works director to collaborate with engineer and
develop street maintenance plan. $ 8,000.00 2 months
d) Review and compare pricing to stripe Valley Chile
Road $ 15,000.00 30 days
e) Research traffic calming and pedestrian safety
measures with city engineer. N/A 90 days
Team Facilitator: Mayor Praino
Team Members: Perch Valdez, Arturo Marquez, Engineer
Partners:
2016 Strategic Plan Update 15
Village of Vinton
2015-2016 Strategic Plan Update
Economic Development Strategic Initiative Action steps budget timeline
Business Incubator - Start relationship with HUB of Human innovation (V1,V3, V4, M1, M2)
a) Set up meeting to establish a relationships with the
HUB of Human Innovation. N/A 30 days
b) Research grants for incubator and apply to any that
are available. 90 days
c) Research existing properties that may be available to
place incubator. N/A 6 months
Create a Public Improve-ment District. (V3, M1, M3)
a) Continue involvement to pursue PID for Valley Chile
Rd $0.00 60 days
a) Meet to recruit businesses for PID $0.00 30 days
Establish taskforce to survey and identify gaps in types of businesses and service offered in Vinton (V3, M1, M4)
a) Create a census to identify the different services &
products that local businesses offer. $ 100.00 60 days
b) Find five additional members for taskforce group N/A 30 days
c) Taskforce (see steps under Economic Development
Plan) N/A 30 days
Educate and promote busi-ness incentives to encourage new business development, promote existing businesses and recruit private transpor-tation company for public use. (V1, V3, V4, M1, M2)
a) Meet with Small Business Administration $0.00
30 days
b) Plan for quarterly small business workshops $ 500.00 3 months
c) Create a local directory to promote local business and
services $0.00 45 days
d) Research possibility to recruit Uber drivers
45 days
Annexation implementation to ensure sustainable growth. (V3, M3)
a) Review annexation procedures with City Attorney N/A 30 days
b) Prepare annexation packet. N/A 60 days
c) Meet with property owners 60 days
Team Facilitator: Mr. Leos
Team Members: Perch Valdez, Marina Ramirez, Andrea Carrillo, Michael Garay
Partners:
16 Village of Vinton
Village of Vinton
2015-2016 Strategic Plan Update
Civic Engagement Strategic Initiative Action steps budget timeline
Develop & implement volunteer initiative in the community and create a student engagement program (V3, V4, M2, M4)
a) Create a program for youth engagement
and a citizens academy for adults TBD 45 days
b) Implement a public awareness program
to promote programs $250.00 45 days
c) Implement budget for additional over-
time TBD 120 days
Improve communication be-tween staff and Council (V3, M2, M4)
a) Train Council member on tablet usage N/A 30 days
b) Develop briefing report to be carried out
on a monthly basis by Council Members
during Council meetings
N/A
45 days
Public Awareness - maintain en-vironment of transparency (V2, M2)
a) Promote people to subscribe to email list N/A 30 days
b) Promote academy program for teenagers N/A 45 days
c) Promote academy program for adults N/A 45 days
Provide ESL / Citizenship classes (V4, M1, M2)
a) Find teachers for English and Citizen-
ship classes through UTEP & EPCC $400.00 30 days
b) Set dates for classes and implement pro-
gram N/A 45 days
c) Purchase supplies (dry erase boards) $400.00 60 days
d) Begin establishing citizenship classes N/A 60 days
Identify procedures and expecta-tions of all volunteer com-mittees. (V3, M4)
a) Identify existing volunteer committees. N/A 30 days
b) Prepare information for committee
members N/A 60 days
c) Use website and social media to educate and
encourage new membership. N/A 90 days
Team Facilitator: Mr. Carrejo
Team Members: Frankie Ruiz, Marina Ramirez, Arturo Marquez, Michael Garay.
Partners:
2016 Strategic Plan Update 17
Village of Vinton
2015-2016 Strategic Plan Update
Cultural Pride Strategic Initiative Action steps budget timeline
Create a logo and slogan for the city to be used in public aware-ness, educational material and marketing of the city. (V2, V3, V4, M1)
a) Create request for proposal (RFP) for
a marketing consultant 90 days
b) Publish RFP, score and award $ 10,000.00 1-3 months
Create a historical preservation program to educate the public on the history of Vinton and the sur-rounding area. (V2,V3, M1, M2)
a) Start a historical preservation program
and encourage residents to participate—
Public Awareness $500.00
60 days
b) Contact UTEP History department to
create an internship program 30 days
c) Create brochure to promote Vinton
historical information (interns) $3,000.00
180 days
d) Submit historical sites to County of El
Paso for designation. N/A 240 days
Create cultural events to promote the character and history of the community and surrounding area. (V4, V3, M1)
a) Host an open house- Pride Day $1,000.00 90 days
b) Create a Charro festival to be held in
August $1,500.00
90 days
c) Riverfest $2,000.00 12 months
d) Host a Mexican American Art/photo
event $1,500.00 TBD
Team Facilitator: Mrs. Lucero
Team Members: Jannette Monrreal, Jessica Garza, Andrea Carrillo
Partners:
18 Village of Vinton
Village of Vinton
2015-2016 Strategic Plan Update
Health & Safety Strategic Initiative Action steps budget timeline
Create two year plan for a weekly farmers market (V1, V2, V3, V4, M1, M2, M3)
a) Local Food local places Goal 1.1 - 1.5 45 days
b) Visit other farmer’s markets to get ideas and vendors. N/A 90 days
c) marketing (poster, flyers) $ 1,000.00 30 days
d) Purchase signs, incentives & canopy $ 2,000.00 90 days
Survey local health services and providers to identify gaps in services and seek to fill those gaps. (V2, V3, V4, M2, M4)
a) Survey local medical or health providers including food banks
90 days
b) Contact the City of El Paso Health department for ser-vices
30 days
c) Plan for quarterly health fairs (to include blood dona-tions?)
$ 500.00
90-180-210
Update the street lighting plan to determine the need for street safety. (V4, M4)
a) Update lighting plan $ 5,000.00 30 days
b) Determine project cost estimate after plan has been updated
Create Neighborhood Watch groups in the community. (V3, V4, M2, M4)
a) Meet with Sherriff's Department 30 days
b) Identify target neighborhoods 60 days
c) Recruit a meeting host 90 days
d) Plan meetings $ 60 days
Continue remediation pro-cess for a multi-purpose cen-ter. (V4, M1, M4)
a) Review summary N/A 30 days
b) Prepare plan N/A 120 days
Team Facilitator: Ms. Arceo
Team Members: Frankie Ruiz, Jannette Monrreal, Jessica Garza, Arturo Marquez
Partners:
2016 Strategic Plan Update 19
Village of Vinton
2015-2016 Strategic Plan Update
Recreation Strategic Initiative Action steps budget timeline
Identify area mountain bike trails, cycling trails and tie the existing trails to the existing river trail. (V4, V2, M1, M4)
a) Locate existing bike trail maps to be incorpo-
rated into Vinton and the Camino Real 60 days
b) Create public awareness brochure (Vinton on-
ly / Outside Vinton) $1,500.00
120 days
c) Research grants for public awareness
(sustainable community) 120 days
d) Research Bike Share Program
Continue creating parks as per the existing Master Park Plan. (V4, V2, M1, M4)
a) Research land owners and contact to acquire
1/4 acre—1/2 acre 31-Jul
b) Research grant opportunities, create timeline
for applications 6 months
c) Survey local population for need of skate park
on north side of Vinton 6 Months
d) Create fund raising packet for Mariposa Park
II $ 30,000.00 12 months
Continue creating trails as per the existing Master Park Plan. (V4, V2, M1, M4)
a) Research land owners for donation of land
along arroyos 31-Jul
b) Acquire arroyos through donation or purchase TBD 6 months
c) Research grant opportunities, create timeline
for applications 6 Months
Complete development of the Community Garden (V4, V2, M1, M4)
a) Research grant applications under U.S. De-
partment of Agriculture (USDA) $15,000.00 3-4 months
b) Research grant application under Environmen-
tal Protection Agency 3-4 months
c) Continue recruiting volunteers for improve-
ments on community garden 3-4 months
Identify funding sources and apply for funds to de-velop the community learning center (V4, V2, M1, M4)
a) Research grant applications under U.S. De-
partment of Agriculture (USDA) $15,000.00 3-4 months
b) Research grant application under Environmen-
tal Protection Agency 3-4 months
c) Continue recruiting volunteers for improve-
ments on community garden 3-4 months
Team Facilitator: Mr. Santos Lucero