8/10/2019 Updates on PIC/S GMP Standard
1/162
Updates on PIC/S GMP Standard
nc u ng te aster e gu ancePresented by:
Boon Meow Hoe, Dy Director / Senior GMP Auditor,Overseas Audit Unit(OAU),
Audit Branch (AB)
Audit & Licensing Division (ALD)Health Product Regulatory Group (HPRG)
Health Sciences Authority )HSA)
1
8/10/2019 Updates on PIC/S GMP Standard
2/162
(A) An update on PIC/S memberships
(B) PIC/S publications
(C) An update on proposed revision toPIC/S GMP Guide in the pipeline
In the EMA (EU) pipeline
(D) Site Master File
(E) Q&A. Discussion
2
8/10/2019 Updates on PIC/S GMP Standard
3/162
A C A C
3
8/10/2019 Updates on PIC/S GMP Standard
4/162
PIC/S MembershipPIC/S MembershipSlovenia / Agency for Medicinal Products and Medical Devices(JAZMP)
Submitted & accepted Membership Accession Application on 28 Oct2008
At last PIC/S COMMITTEE OF OFFICIALS MEETING held on 7 & 8,
/ JAZMP to join the PIC/S Scheme with effect from 1 January 2012.
40 YEARS ANNIVERSARY AND 40th
MEMBERS WITH THEACCESSION OF SLOVENIA / JAZMP
4
8/10/2019 Updates on PIC/S GMP Standard
5/162
To-date: PIC/S has 40 participating authorities (38 Countries)
A
B
C
C
D
E
ISouth Africa
Israel
F
F
G
G
H
I
I
Argentina
Canada
USA
Australia
5
8/10/2019 Updates on PIC/S GMP Standard
6/162
SINGAPORE
CANADA
40 PIC/S Members January 2012
USA
AUSTRALIA
ARGENTINASOUTH AFRICA
MALAYSIA
ISRAEL
UKRAINE
6
8/10/2019 Updates on PIC/S GMP Standard
7/162
PIC/S PublicationsPIC/S Publications
7
8/10/2019 Updates on PIC/S GMP Standard
8/162
Documents for industry
PIC/S GMP Guide
Site Master Files
Documents for inspectorates
Inspectorates
Documents for inspectors
Q&A Documents
Current PIC/S PublicationsCurrent PIC/S Publications
Aide-Memoires
Guidance documents
Documents for the public
Information documents
Press Release
PIC/S Seminars
Miscelleneous
8
8/10/2019 Updates on PIC/S GMP Standard
9/162
Documents for industry
PIC/S GMP Guide PE 009-9 ZIP-File
PIC/S GMP GUIDE 2009-09-01
PE 009-9 (Intro)
PIC/S GMP GUIDE (INTRODUCTION) 2009-09-01
PE 009-9 (Part I)PIC/S GMP GUIDE (PART I: BASIC REQUIREMENTS FOR MEDICINAL PRODUCTS) 2009-09-01
Current PIC/S Publications (Conti.)Current PIC/S Publications (Conti.)
PE 009-9 (Part II)PIC/S GMP GUIDE (PART II: BASIC REQUIREMENTS FOR ACTIVE PHARMACEUTICAL INGREDIENTS) 2009-09-01
PE 009-9 (Annexes)PIC/S GMP GUIDE (ANNEXES) 2009-09-01
Site Master Files PE 008-4
EXPLANATORY NOTES FOR INDUSTRY ON THE PREPARATION OF A SITE MASTER FILE 2011-02-15
PI 019-3SITE MASTER FILE FOR SOURCE PLASMA ESTABLISHMENTS 2007-09-26
PI 020-3SITE MASTER FILE FOR PLASMA WAREHOUSES 2007-09-25
9
8/10/2019 Updates on PIC/S GMP Standard
10/162
Documents for inspectorates
Inspectorates
PICS 1/95 (Rev 5)
PIC/S SCHEME 2012-01-12 PS/INF 21/2002 (Rev 13)
PARTICIPATING AUTHORITIES & PARTNERS 2012-01-13
PIC ConventionPIC CONVENTION 2006-12-07
PI 002-3
Current PIC/S Publications (Conti.)Current PIC/S Publications (Conti.)
- -
PI 010-4PROCEDURE FOR HANDLING RAPID ALERTS AND RECALLS ARISING FROM
QUALITY DEFECTS 2010-12-21
PI 013-3STANDARD OPERATING PROCEDURE PIC/S INSPECTION REPORT FORMAT 2007-09-25
PI 031-1STANDARD OPERATING PROCEDURE TEAM INSPECTIONS 2012-01-13
PI 037-1PIC/S RECOMMENDATION ON RISK-BASED INSPECTION PLANNING 2012-01-16
10
8/10/2019 Updates on PIC/S GMP Standard
11/162
8/10/2019 Updates on PIC/S GMP Standard
12/162
Documents for the public
Information Documents
PIC/S BROCHURE MAY 2011 EDITION 2011-06-09
PS W 8 2005 PIC/S BLUEPRINT 2006-05-02
Press Releases (e.g.) PR Nov 2011 PRESS RELEASE NOVEMBER 2011 2011-11-18
PR 02 Jun 2011 PRESS RELEASE NO 2 JUNE 2011 2011-06-09
PR 01 Jun 2011 PRESS RELEASE NO 1 JUNE 2011 2011-06-09
Annual Reports
Current PIC/S Publications (Conti.)Current PIC/S Publications (Conti.)
12
8/10/2019 Updates on PIC/S GMP Standard
13/162
Documents for the public PIC/S Seminars B 028 THE INTERFACE BETWEEN GOOD CLINICAL PRACTICES AND MANUFACTURING PRACTICES 2004-10-
27 (Montebello, Canada, October 2002)
SB 029 THE INSPECTION OF QUALITY CONTROL LABORATORIES 2004-10-27 (Bratislava, Slovak Republic, June 2003)
SB 030 THE INSPECTION OF API MANUFACTURERS 2007-01-17 (El Vendrell, Spain, June 2004)
SB 031 PRIMARY PACKAGING MATERIAL, LABELLING & PREVENTION OF MIX-UPS 2007-01-17 (Bucharest, Romania,September 2005)
SB 032 QUALITY RISK MANAGEMENT AND RELATED ICH TOPICS 2007-01-17 (Dsseldorf, Germany, 31 May - 2 June 2006) SB 033 INSPECTION OF MANUFACTURERS OF SOLID DOSAGE FORMS 2008-01-30 (Singapore, November 2007)
SB 034 GOOD DISTRIBUTION PRACTICES 2008-10-15 (Krakow, Poland, May 2008)
SB 035 ASEPTIC & STERILE MANUFACTURING FROM API TO FINISHED DOSAGE FORMS 2010-09-06 (Uppsala, Sweden,November 2009)
SB 036 GMP INSPECTION OF MANUFACTURERS OF TRADITIONAL / HERBAL MEDICINAL PRODUCTS 2011-02-28 KualaLumpur, Malaysia, November 2010
Current PIC/S Publications (Conti.)Current PIC/S Publications (Conti.)
SB 037 GOOD PHARMACEUTICAL INSPECTION PRACTICES 2011-12-27 Cape Town, South Africa, November 2011
Miscelleneous
/ 1/2010 A A AA A20100108 A G IC/ () .
IC/ / G
IC/ . IC/ IC/
.
C/DA& 20090129 IC/ DA IE
(EIC/ G A 1) G 1314 2008 ( ).
13
8/10/2019 Updates on PIC/S GMP Standard
14/162
PIC/S GMP Guide = Introduction + Part I + Part II + 20 Annexes
IC/ G G
Originally, the PIC/S GMP Guide (PIC Basic Standards of 1972) derivesfrom the WHO GMP Guide and was further developed subsequently.
In 1989, the EU adopted its own GMP Guide, which in terms of GMPrequirements was equivalent to the PIC/S GMP Guide. Since that time,
History of PIC/S GMP GuideHistory of PIC/S GMP Guide
whenever a change has been made to one, the other has been amendedso that both Guides are practically identical.
IC/ G G
22 2001, IC/ G G AI (ICH 7A) (E 007).
2930 2006, IC/ II G.
14
8/10/2019 Updates on PIC/S GMP Standard
15/162
IC/ G G
Revisions History of PIC/S GMP GuideRevisions History of PIC/S GMP Guide
Date Version Number Reasons for revision
21 December 2000 PH 1/97 (Rev.) Revision of Annex 14 Renumbering of all annexes Change in the editors address and insertion of copyrightstatement
Inclusion of revision history
10 August 2001 PH 1/97 (Rev. 2)
Amendment of para. 42 of Annex 1 Revision of Annex 6 New Annex 15 New Annex 17 Amendment to the glossary
15 January 2002 PH 1/97 (Rev. 3)
New Annex 4 New Annex 5 Reference to Annex 18 of EC GMP Guide
1 September 2003 PE 009-1 Amendment of Annex 1 (mainly section 3)
1 July 2004 PE 009-2 Revision of Annex 13 Change in the Editors co-ordinates 15
8/10/2019 Updates on PIC/S GMP Standard
16/162
Revisions History of PIC/S GMP Guide (Conti.)Revisions History of PIC/S GMP Guide (Conti.)
Date VersionNumber
Reasons for revision
1 January 2006
1 June 2006
1 August 2006
PE 009-3 Revision of Chapter 1 (Add PQR)
PE 009-4 o Revision of Chapter 6 (Add On-Going stability Programme)
PE 009-5 Corrections to revision of Chapter 6
Revision of Chapter 8 (add requirements on counterfeit products)
5 April 2007 PE 009-6
,
(EU level came into operation in Oct 2005) Incorporation of PE 007 (APIs guide) as Part II
New Annex 19 (EU level came into operation on 1 Jun 2006)
Revision of the Introduction
Change in the Editors co-ordinates
1 September 2007 PE 009-7 Revision of General Introduction (History) and Introduction to Part
II Deletion of footnotes in Chapter 6 (Part I) and Annex 13
15 January 2009 PE 009-8
Revision of Chapter 1 (Part I) (Add QRM)
Revision of Annex 1
New Annex 20 (QRM) (EU level came into operation in Mar 2006)
1 September 2009 PE 009-9 Revision of Annex 3 Manufacture of Radiopharmaceuticals (EU level
came into operation on 1 Mar 2009)16
8/10/2019 Updates on PIC/S GMP Standard
17/162
ChangesChanges
An update on revision to PIC/S GMP
Guide
Adopted by PIC/S
In the PIC/S pipeline (i.e. adopted by EMA but notPIC/S)
In the EMA (EU) pipeline (i.e. not adopted by bothEMA and PIC/S)
17
8/10/2019 Updates on PIC/S GMP Standard
18/162
No change since last HPRG Regulatory Workshop 2011conducted on 20 January 2011
PIC S has not ublished released an new chan es
Changes to PIC/S GuideChanges to PIC/S Guide
since last revision -- Version: PE-009-9 released on 1 Sept2009
18
8/10/2019 Updates on PIC/S GMP Standard
19/162
A new consultation procedure between PIC/S and the
Harmonisation of guidance documentsHarmonisation of guidance documents
EA C C IC/
uropean e c nes gency a een scusse norder to ensure further improvements in theharmonisation between the EU and the PIC/S GMPGuides and related documents. This new procedure aimsat informing each party of ongoing revisions of current
documents and endorsement of new documents, includingthe sharing of early drafts in order to facilitate appropriateinvolvement in the adoption process.
19
8/10/2019 Updates on PIC/S GMP Standard
20/162
Adopted by PIC/S Adopted by PIC/S
PIC/S Recommendation for Risk-based InspectionPlanning in the GMP Environment
Status:
Adopted and entered into force on 1st January 2012.
20
8/10/2019 Updates on PIC/S GMP Standard
21/162
In theIn the PIC/SPIC/S pipelinepipeline (i.e. adopted by EMA but not PIC/S)(i.e. adopted by EMA but not PIC/S)
Part I , Part II &Annexes
EU/EMA PIC/S
A 6 (
)
A
31 2010.
BA
A 7 (
)
A
1 2009.
BA
A 11 (C ) A BA
.
A 13 (
)
A
31 2010
BA
A 14 (
)
A
30 2011.
A
C 4 (D) A
30 2011.
BA
(AI)
A
31 2010.
BA
21
8/10/2019 Updates on PIC/S GMP Standard
22/162
In theIn the PIC/SPIC/S pipelinepipeline (i.e. adopted by EMA but not PIC/S)(i.e. adopted by EMA but not PIC/S)
Part I , Part II &Annexes
EU/EMA PIC/S
G Part III of GMP Guide wascreated and include:Site Master File;ICH Q9; andICH Q10
TBA
: F
E
PIC/S version of Site Master Fileapproved and published by EC.
The revised documententered into force on 1
.
2011, the PIC/S Secretariatadded a footnote into therevised SMF without formallyamending the document. Thefootnote indicates that aD-U-N-S reference is requiredfor Site Master Filessubmitted to EU/EEAauthorities for manufacturingsites located outside of theEU/EEA.
22
8/10/2019 Updates on PIC/S GMP Standard
23/162
REVISION OF ANNEX 6 MANUFACTURE OF MEDICINAL GASES
Status:
At EU level, this revised Annex 6 has come into operation on 31st July 2010.
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoO
meeting (Switzerland/Geneva ) in May 2012
The proposed revised Annex 6 was initiated as a consequence of the restructuringof the GMP Guide and the need to modify the requirements of Part II of the Guide
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
what should be considered as a starting material as opposed to a bulkpharmaceutical product. The opportunity has also been taken to update the annexin general.
On 1 Feb 2012, we received the following progress update:
(i) Australia/TGA had underlined that a number of terms were unclear or needed to be
better defined, e.g. paragraph 29 required traceability without specifying to whichextent (i.e. per individual cylinder, batch or customer?). It was proposed the bestway to address this issue was for PIC/S to adopt a Question & Answer document.
(ii) Canada/HPFBI suggested to amend paragraphs 35 and 36 dealing with the sealingof cylinders and mobile cryogenic vessels to authorise devices in addition to seals
(e.g. Cylinders and mobile cryogenic vessels should be fitted with tamper-evidentseals or devices). 23
8/10/2019 Updates on PIC/S GMP Standard
24/162
REVISION OF ANNEX 7 -Manufacture of Herbal Medicinal Products
Status:
At EU level, this revised Annex 7 has come into operation on 1st Sept 2009.
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoOmeeting (Switzerland/Geneva ) in May 2012
A 7 E G G. A 7
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
.
G A C (GAC) .
7 E A 7 :
H
G A .
C , . A
.
/
G A C .
24
8/10/2019 Updates on PIC/S GMP Standard
25/162
REVISION OF ANNEX 7 -Manufacture of Herbal Medicinal Products (Conti.)
Revised paragraph 7 regarding GACP requirement
Australia / TGA has expressed its concerns on the compulsory requirement for
GACP-compliance. TGA has thus counter proposed:
The manufacturer should verify, where appropriate, whether the
suppliers of the herbal substance / preparation are in compliance with Good
A ricultural and Collection Practice or e uivalent and if not a l a ro riate
E
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
controls in line with QRM.
Italy / AIFA is in favour of the original EU version. AIFA has also counterproposed:
The manufacturer should ensure that the suppliers of the herbal substance /
preparation are in compliance with Good Agricultural and Collection Practice(published by the European Medicines Agency or by WHO) in order to perform
appropriate controls in line with QRM.
25
8/10/2019 Updates on PIC/S GMP Standard
26/162
REVISION OF ANNEX 7 -Manufacture of Herbal Medicinal Products (Conti.)
The final proposal: Revised paragraph 7 regarding GACP requirement
Taking into both proposals made by Australia / TGA and Italy / AIFA into consideration:
.The manufacturer should verify, where appropriate, whether the suppliers of theherbal substance / preparation are in compliance with Good Agricultural andCollection Practice* and if not apply appropriate controls in line with QRM.
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
* EMA, WHO or equivalent
(This reference to the EMA or WHO take the form of a footnote and the words orequivalent would be added).
26
8/10/2019 Updates on PIC/S GMP Standard
27/162
Proposed Revision of ANNEX 11 (Computerised Systems) andChapter 4
Status:
At EU level, this revised Annex 11 has come into operation on 30th Jun 2011.
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoOmeeting (Switzerland/Geneva ) in May 2012
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
Key proposed changes:
C 4
27
8/10/2019 Updates on PIC/S GMP Standard
28/162
REVISION OF ANNEX 13 MANUFACTURE OF INVESTIGATIONALMEDICINAL PRODUCTS
Status:
At EU level, this revised Annex 13 has come into operation on 31st July 2010.
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoOmeeting (Switzerland/Geneva ) in May 2012.
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
The revision was initiated in order to reinforce the principle of independence betweenproduction and quality control functions in cases where the number of personnelinvolved is small. Changes have been made to sections 36 and 37 in order tosupplement, for investigational medicinal products, the guidance for reference andretention samples given in Annex 19. A few editorial changes have been made inthe interest of consistency with terminology used throughout the GMP Guide.
28
8/10/2019 Updates on PIC/S GMP Standard
29/162
On 1 Feb 2012, we received the following progress update:
(i) A/GA : ( 26 1, ) '' ,
/ /
. ( 26 1 )
'' , : " 300
".
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
.
(ii) I/IC (.. " 2C8C"). I ,
" ", A 13,
30.
It was proposed to integrate the above comments as footnotes in the revised Annex 13
of the PIC/S GMP Guide.
29
8/10/2019 Updates on PIC/S GMP Standard
30/162
Proposed Revision of ANNEX 14 (Medicinal Products Derived fromHuman Blood or Plasma)
Status:
At EU level, this revised Annex 14 has come into operation on 31st July 2010.
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
,
meeting (Switzerland/Geneva ) in May 2012
:
3
D G B
30
8/10/2019 Updates on PIC/S GMP Standard
31/162
CHAPTER 4 of the GMP Guide (Documentation)
Status:
At EU level, this revised Chapter 4 (Documentation)has come into operation
on 30
th
June 2011. (Same as Annex 11 on Computerized systems)
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoOmeeting (Switzerland/Geneva ) in May 2012
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
: A 11
G ( )
F,
I (, )
;
, , I;
();
; .
31
8/10/2019 Updates on PIC/S GMP Standard
32/162
Re i ion to the GMP G ide in theRe i ion to the GMP G ide in the PIC/SPIC/S pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
33/162
CHAPTER 4 of the GMP Guide (Documentation) (Conti)
E..4.29 There should be written policies, procedures, protocols, reports and the associated
records of actions taken or conclusions reached, where appropriate, for the followingexamples:
- Validation and qualification of processes, equipment and systems;- Equipment assembly and calibration;
- Technology transfer;
- Maintenance, cleaning and sanitation;
-
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
, ,hygiene and verification of the effectiveness of training.
- Environmental monitoring;
- Pest control;
- Complaints;
- Recalls;
- Returns;
- Change control;
- Investigations into deviations and non-conformances;
- Internal quality/GMP compliance audits;
- Summaries of records where appropriate (e.g. product quality review);
- Supplier audits.
33
R i i h GMP G id i hR i i h GMP G id i h PIC/SPIC/S i lii li
8/10/2019 Updates on PIC/S GMP Standard
34/162
REVISION OF Part II (Basic Requirements for Active Substances used as Starting Materials)
Status:
At EU level: this revised Part II has come into operation on 31 July 2010.
PIC/S level: Not adopted yet, it is likely to be adopted at next PIC/S CoOmeeting (Switzerland/Geneva ) in May 2012
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
Changes:
The proposed revised Part II was initiated in order to incorporateprinciples of QRM corresponding to similar changes made to Part I,Chapter 1 of the Guide. A new section on QRM was introduced as section2.2. The remaining sections of chapter 2 are renumbered. No otherchanges have been made.
34
8/10/2019 Updates on PIC/S GMP Standard
35/162
Proposed new Part III of the GMP guide
Status:
EU Level :Both revision to SMF explanatory notes and Part III
concept - adopted and published at EU level.
PIC/S Level : Revision to SMF explanatory notes adopted with effect
from 1 Jan 2011 Part III conce t -- Not ado ted b
Revisions to the GMP Guide in theRevisions to the GMP Guide in the PIC/SPIC/S pipelinepipeline
PIC/S yet
SMF has also become a standard expectation of EU authorities.
It is proposed to create a new informational Part III of the EU GMP Guidefor collection of GMP related documents which are not themselves GMPguidelines and have no statutory force (i.e. non-binding documents) butwhich complement the GMP guidelines and related regulatory proceduressuch as inspections. It is expected that in the future, further documentswill be added to the new Part III [E.g. introductory part of GMP Guide,ICH documents (Q9 and Q10) are proposed to be included in Part III].
35
P d R i i t th EU GMP G idP d R i i t th EU GMP G id I th EU (EMA)I th EU (EMA)
8/10/2019 Updates on PIC/S GMP Standard
36/162
Proposed Revisions to the EU GMP GuideProposed Revisions to the EU GMP Guide ---- In the EU (EMA)In the EU (EMA)pipelinepipeline (i.e. Not adopted yet)(i.e. Not adopted yet)
Part I , Part II &Annexes
EU/EMA PIC/S
I C 1 2 New texts of chapter 1 proposedduring last EMAs GMP/GDP IWGmeeting. Revision of chapter 2 willbe done after consolidation ofchapter 1.
Participating Authoritiesrequested to send theirfeedback on proposedrevisions by 15 Feb 2012.
I C 3 5
(D F)
EMAs Safety Working Party haspublished Concept Paper ondevelopment of toxicological tools.
Participating Authorities areinvited to comment onproposed Concept Paper
I C 5(AI
)
Slight changes proposed during last
EMAs GMP/GDP IWG meeting.
New draft is invited for
comments till 15th Feb 2012.
I C 5(
)
&A ,
.
Q&A is invited for commentstill 15th February 2012.
I C 6 (
C)
Work on text has been started; firstdraft will be available for next EMAsGMP/GDP IWG meeting.
After first draft will be sharedwith PIC/S.
I C 7(C
A)
EC.
will be shared with PIC/S.
Part I Chapter 8(notification of productshortage)
First draft should be available fornext EMAs GMP/GDP IWG meeting.
First draft will be shared withPIC/S once it is available.
36
Proposed Revisions to the EU GMP GuideProposed Revisions to the EU GMP Guide In the EU (EMA)In the EU (EMA)
8/10/2019 Updates on PIC/S GMP Standard
37/162
Proposed Revisions to the EU GMP GuideProposed Revisions to the EU GMP Guide ---- In the EU (EMA)In the EU (EMA)
pipelinepipeline (i.e. Not adopted yet)(i.e. Not adopted yet)
Part I , Part II &Annexes
EU/EMA PIC/S
A 2 (B) Final draft prepared and was sharedwith PIC/S. Adopted and sent to EC
for publication.
Will be tabled for adoption atnext PIC/S CoO
(Switzerland/Geneva) in may2012.
16 Concept paper will be ready fornext EMAs GMP/GDP IWG meeting.
be shared with PIC/S onceavailable.
D GDP Guideline approved for publicconsultation. The work should becoordinated with PIC/S working
group.Format of GDP licence approved forpilot phase till end of 2011.
Ongoing work of PIC/Sworking group. Proposed EUGDP guide are to be sent to
PIC/S PA for their commentsand local public consultation.(this has to be confirmed bychair of PIC/S working groupas discussed at last PIC/Scommittee meeting).
37
i i h G G id i hi i h G G id i h ( )( ) i lii li
8/10/2019 Updates on PIC/S GMP Standard
38/162
Part I Proposed Revision of CHAPTER 1 (Quality Management ) &
CHAPTER 2 (Personnel)
Status:
EU/EMA: New texts of chapter 1 proposed during last EMAs GMP/GDP IWG meeting.Revision of chapter 2 will be done after consolidation of chapter 1.
PIC/S: Participating Authorities requested to send their feedback on proposed revisionsby 15 Feb 2012.
Revisions to the GMP Guide in theRevisions to the GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
Proposed changes made to Chapter 1 is to harmonise with ICH Q10 (PartIII) A pharmaceutical quality system designed for the entire product lifecycle.
The following key changes are recommended to be added to Chapter 1:
- Quality Management System
Achieve Product Realisation
Establish and Maintain a State of Control
Facilitate Continual Improvement
38
R i i t th GMP G id i thR i i t th GMP G id i th EMA(EU)EMA(EU) i lii li
8/10/2019 Updates on PIC/S GMP Standard
39/162
Part I Proposed Revision of CHAPTER 1 (Quality Management ) &
CHAPTER 2 (Personnel) Continue
Quality Manual (or equivalent)
Management responsibilities
CAPA
Revisions to the GMP Guide in theRevisions to the GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
Process Performance and Product Quality Monitoring
Management of Outsourced Activities and Purchased Materials
Management Review & monitoring of the QMS formalised periodic review process
internal and external factors to be considered
output from review process (documentation, timely and effectivecommunication of results)
39
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
40/162
Part I Proposed revision of CHAPTER 3 (Premises and Equipment) &
CHAPTER 5 (Production)
Status:
EU: EMAs Safety Working Party has published Concept Paper on development oftoxicological tools.
PIC/S: Participating Authorities are invited to comment on proposed Concept Paper
Key Proposed Changes:
-
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
CA 3 AD ()
3.6. I ,
, (.. )
(.. ).
, , , ,
. F
, ,
. , , . 40
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
41/162
Part I Proposed revision of CHAPTER 3 (Premises and Equipment) &
CHAPTER 5 (Production)
CA 5 DC ()
5.18. C
.
, , , ,
, ' .
. A
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
, , , .
,
/ .
41
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
42/162
Part I Proposed revision of CHAPTER 3 (Premises and Equipment) &
CHAPTER 5 (Production)
CA 5 DC ()
5.19 C
, :
) ( , ,
), ( )
;
) ;
pp ( )( ) p pp p
)
;
)
;
) ,
;
) ;
) .
42
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
43/162
Part I Proposed revision of CHAPTER 3 (Premises and Equipment) &
CHAPTER 5 (Production)
C 3 3.6 & C 5 5.18 & 5.19
I G G ...
, . 3.6 ICH 9
.
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA(EU)EMA(EU) pipelinepipeline
(
...
) C EA
G (G) G/GD IF 2011. F
F 2012.
43
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
44/162
Proposed amendment to CHAPTER 5 : Production (API pedigree)
Status:
EU: Slight changes proposed during last EMAs GMP/GDP IWG meeting.
PIC/S: New draft is invited for comments till 15th Feb 2012.
Key proposed changes
Qualification of Suppliers of Starting Materials
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
Supp y c ain tracea i ity or starting materia s
Testing for starting materials
Control of contamination (Dedicated facilities)
44
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
45/162
Proposed amendment to CHAPTER 5 : Production (API pedigree)
What is Pedigree?
A pedigree is a family tree for an active pharmaceutical ingredient
(API) tracing its history or supply chain from critical rawmaterial(s) used in the manufacture of the API to themanufacturer of the dosage form.
Proposed Revisions to the EU GMP Guide in theProposed Revisions to the EU GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
The pedigree should be reviewed periodically to ensure that it is upto date (Chapter 1 proposal)
GMP Guide revision (Chapter 5 proposal):Pedigree = Traceability
45
Proposed Revisions to the GMP Guide in theProposed Revisions to the GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
46/162
Proposed revision of CHAPTER 6 (Quality Control)
Status:
EU: Work on text has been started; first draft will be available for
next EMAs GMP/GDP IWG meeting.PIC/S: After first draft will be shared with PIC/S.
Proposed Revisions to the GMP Guide in theProposed Revisions to the GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
Key proposed changes:
Analytical method transfer
46
Proposed Revisions to the GMP Guide in theProposed Revisions to the GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
47/162
Proposed Revision of CHAPTER 7 (Contract Manufacture and Analysis tobe renamed as Outsourced Activities)
Status:
EU : Last draft sent for publication by EC.PIC/S : will be shared with PIC/S.
Key proposed changes:
oposed e s o s to t e G Gu de t eoposed e s o s to t e G Gu de t e ( U)( U) p pe ep pe e
Harmonise with ICH Q10 guideline ( ICH )
Proposed revised Chapter 7 provides updated guidance on outsourcedGMP regulated activities beyond the current scope of contract
manufacture and analysis operations. The title of the Chapter has beenchanged to reflect this.
47
Proposed Revisions to the GMP Guide in theProposed Revisions to the GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
48/162
Proposed Revision of CHAPTER 8 (Complaints and Product Recall)
Status:
EU: First draft should be available for next EMAs GMP/GDP IWG meeting.
PIC/S: To be shared with PIC/S once available
Key proposed changes:
pp ( )( ) p pp p
Defect contact points held at EMA on 7-8 October 2009 on productshortage notifications and to introduce specific Quality Risk Managementconcepts in the context of this chapter.
i.e. reporting where product shortage arises due to manufacturing issues
48
Proposed Revisions to the GMP Guide in theProposed Revisions to the GMP Guide in the EMA (EU)EMA (EU) pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
49/162
Proposed Revision of ANNEX 2 of the GMP Guide (BiologicalMedicinal Products)
Status:
EU :Final draft prepared and was shared with PIC/S. Adopted and sent to EC forpublication. The European Commission will decide about the entry into forceof the revised EU Annex 2.
pp ( )( ) p pp p
onsu ng ar c pa ng u or es, n par cu ar, non-
Participating Authorities, on some unresolved issues .
Key proposed changes
Annex 2 of the EU GMP Guide has been revised as a consequence of the restructuring
of the GMP Guide, new manufacturing technology and concepts, the increased
breadth of biological products to include several new product types such astransgenic derived products and the Advanced Therapy Medicinal Products, (ATMPs)together with associated new EU legislation. The GMP guidance drawn up for thelatter products is to meet the requirements of Article 5 of Regulation 1394/2007and to align with details in Directive 2009/120/EC.
49
Other Revisions to the GDP Guide in theOther Revisions to the GDP Guide in the PIC/SPIC/S pipelinepipeline
8/10/2019 Updates on PIC/S GMP Standard
50/162
Good Distribution Practice (GDP) Guide
StatusEU : Public consultation ended on 31 Dec 2011, coordinated with PIC/S GDP
working group.
PIC/S: From a GDP Working Group, forming an Expert Circle on GDP 1st meetingproposed to be conducted on 18-20 April 2012 in Helsinki/Finland with a viewto adopt EMAs revised Guidelines on Good Distribution Practice.
Reasons for change: The content of the EMA Guidelines on Good DistributionPractice published in 1994 is no longer adequate. It needs to be reviewed to takeinto account advancements of practices for an appropriate storage and distributionof medicinal products in the European Union. Moreover, it should take into accountthe amendments to the Community Code which have been introduced with
Directive 2011/62/EU of the European Parliament and of the Council amendingDirective 2001/83/EC on the Community code relating to medicinal products forhuman use, as regards the prevention of the entry into the legal supply chain offalsified medicinal products.
50
SMFSMF
8/10/2019 Updates on PIC/S GMP Standard
51/162
PIC/S Explanatory Notes forpharmaceutical manufacturers on there aration of a site master file
SMFSMF
(SMF)(PE 008-4 dated 1 January 2011)
Revision adopted on 1 January 2011
51
PIC/S Explanatory NotesPIC/S Explanatory Notes for pharmaceutical manufacturers on thefor pharmaceutical manufacturers on thepreparation of a site master file (SMF)preparation of a site master file (SMF) (PE 008(PE 008--4 dated 1 January 2011)4 dated 1 January 2011)
8/10/2019 Updates on PIC/S GMP Standard
52/162
preparation of a site master file (SMF)preparation of a site master file (SMF) (PE 008(PE 008--4 dated 1 January 2011)4 dated 1 January 2011)Revision adopted on 1 January 2011Revision adopted on 1 January 2011
Status:
At PIC/S level: this revised document has been adopted and hascome into operation on 1 January 2011 (First time inhistory that a document is adopted by PIC/S beforeEU level)
At its meeting in Kuala Lumpur (8-9 November 2010), the PIC/S Committee hasadopted the revision of the Explanatory Notes for Industry on the Preparation of a SiteMaster File (PE 008-4).
The main objectives of the revision are the simplification of the document and theimplementation of requirements in relation with quality risk management.
On 15 February, the PIC/S Secretariat added a footnote into the revised SMF withoutformally amending the document. The footnote indicates that a D-U-N-S reference isrequired for SMFs submitted to EU/EEA authorities for manufacturing sites locatedoutside of the EU/EEA.
At EU level: this revised document has also been adopted
(Ref:Brussels, SANCO/C8/AM/sl/ares(2010)1064603). 52
PIC/S Explanatory NotesPIC/S Explanatory Notes for pharmaceutical manufacturers on thefor pharmaceutical manufacturers on thepreparation of a site master file (SMF)preparation of a site master file (SMF) (PE 008(PE 008--4 dated 1 January 2011)4 dated 1 January 2011)
8/10/2019 Updates on PIC/S GMP Standard
53/162
preparation of a site master file (SMF)preparation of a site master file (SMF) (PE 008(PE 008 4 dated 1 January 2011)4 dated 1 January 2011)Revision adopted on 1 January 2011Revision adopted on 1 January 2011
Both documents arealmost identical.
53
PIC/S new SMF GuideRev. 4 (PE 008-4)
1 Jan 2011
EU new SMF Guide10 Feb 2011
SMFSMF (Table of Contents))
8/10/2019 Updates on PIC/S GMP Standard
54/162
1. Document History
2. Introduction
3. Purpose
4. Scope
( ))
5. Content of SMF
6. Revision History
7. Appendices for a Site Master File
54
Purpose of the Site Master File
8/10/2019 Updates on PIC/S GMP Standard
55/162
Purpose of the Site Master File
A Site Master File is a dossier prepared by the manufacturer thatcontains specific information about the Quality Managementsystems, policies and activities of the Company, Manufacturing Site
and/or quality control of manufacturing operations carried out bythe Site.
can be utilized in planning and conducting GMP inspections. A Site
Master File is essential for pharmaceutical companies as itis the basis for the regulatory authority to prepare for aGMP inspection.
The SMF has become compulsory in the EU/EEA as the revisedChapter 4 of the EU GMP Guide has already come into operation on30th June 2011(the SMF will be included in Part 3 of the EU/EEAGMP Guide). The Commission has published the EU/EEA SMF on
its website. 56
8/10/2019 Updates on PIC/S GMP Standard
56/162
SMF should contain information on the Sites GMP related activities.
SMF is a detailed document but should not exceed 25-30 pages
plus Appendices.
Dossier should have an Edition Number, and effective and expirydates and should be updated and reviewed to ensure it is
representative of current Site activities.
Format and headings should follow the outlined guidance notes.
57
8/10/2019 Updates on PIC/S GMP Standard
57/162
These Explanatory Notes apply to the preparation and content of the SMF.Manufacturers should refer to regional / national regulatory requirementsto establish whether it is mandatory for manufacturers of medicinalproducts to prepare a SMF.
These Explanatory Notes apply for all kind of manufacturing operations suchas production, packaging and labelling, testing, relabelling andrepac ag ng o a ypes o me c na pro uc s. e ou nes o s gu e
could also be used in the preparation of a SMF or corresponding documentby Blood and Tissue Establishments and manufacturers of ActivePharmaceutical Ingredients.
58
8/10/2019 Updates on PIC/S GMP Standard
58/162
Several possibilities regarding the indication of the geographiclocation of the site have been added
A listing of the GMP inspections conducted in the past 5 yearsmust be included in the Site Master File
Higher importance is attached to the topic "supplier qualification"(the indication of the supply chain is now required)
Introduction of the P R oint
New requirement on the description of relevant utilities (steam,compressed air, nitrogen, etc.)
Concrete information on the storage of documents outside thepremises is required
Description of the system which ensures appropriateenvironmental conditions during transportation
Measures taken against illegal infiltration in the supply chain
59
8/10/2019 Updates on PIC/S GMP Standard
59/162
Notes address supply chain with Risk Management and incorporateICH Q 8, 9 and 10
General Company Information GPS details must be provided to ensure accurate location of the facility
Information on GMP inspections, dates, relevant authority and outcomes
Quality Management System of the Company Information regarding relevant standards for the company (ISO, ICH etc)
Dates and approvals for accreditation's and certified activities
Description of validation and change control policies Actual names of responsible person(s) and QP(s) ;additional detail on their role
Information on PAT and real time release
Included Company Risk Management policies, qualification and oversight ofsuppliers
Compliance with TSE guidelines
60
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
60/162
1. GENERAL INFORMATION ON THE MANUFACTURER
1.1 Contact information on the manufacturer (also see 4.1)
4th bullet point - Identification number of the site as e.g. GPS details,
D-U-N-S (Data Universal Numbering System) Number (a unique
identification number provided by Dun & Bradstreet) of the site or anyother geographic location system1.
This new requirement is to better identify the location of manufacturingsite(s). These additional data are GPS co-ordinates, and (if available) aDUNS number.
The purpose is to provide more reliability of the site location. Experienceshowed that the way the applicants express their address may be either
incomplete or inconsistent. The GPS coordinates or DUNS number will allow NDRA to unambiguously
identify the location of a manufacturing site.
60
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
61/162
Identification number: DUNS (Data Universal Numbering System)
What?
An unique, separate and distinct nine-digit number assigned to each businesslocation developed and maintained solely by a private company known as
Duns & Bradstreet (D&B).
This D&B DUNS Number is used by industries and organizations around the .
This number can be applied for through the company website(http://www.dnb.com/).
Local contact: Dun & Bradstreet (Singapore) Pte Ltd
Tel: (65) 6513 8347, Fax : (65) 6778-4627
Address :20 Harbour Drive, PSA Vista #06-02, Singapore 117612
(There is a charge of SGD 37.45 (inclusive of 7% GST) per DUNS Number request).
Your D-U-N-S Number will be sent to you within 3 days from receipt of the request andpayment confirmation.
61
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
62/162
Identification number: GPS details,
GPS CO-ORDINATES (Global Positioning System)
Which system (or datum)?
Provide GPS co-ordinates as per the WGS 84 system (World Godetic System).
Which unit should be used for GPS coordinates?
,format: DD MM SS,S (Degrees Minutes Seconds to 1 decimal place).
Alternatively the latitude and longitude may be expressed in Degrees to at least 5decimal places or Degrees Minutes to at least 3 decimal places.
62
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
63/162
Identification number: GPS details,
?
C
. I , .
, G , .
G E
, .
63
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
64/162
Identification number: DUNS (Data Universal Numbering System)
GPS details,
Other geographic location system
PIC/S Foot note: 1 : A D-U-N-S reference is required for Site Master Filessubmitted to EU/EEA authorities for manufacturing sites located outside ofthe EU/EEA.
Notes: EDQM -- Since 15 April 2011, applicants for new certificates ofsuitability (CEP) or revisions of CEPs are requested to provide informationin the application form to better identify the location of theirmanufacturing site(s). These additional data are GPS co-ordinates, and(if available) a DUNS number. (i.e. Providing the DUNS number is notmandatory in the framework of the submission of a CEP dossier).
64
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
65/162
1.2 Authorised pharmaceutical manufacturing activities of the site.
- ..
-
-
- List of GMP inspections of the site within the last 5 years; including dates andname/country of the Competent Authority having performed the inspection. A copyof current GMP certificate (Appendix 3) or reference to the EudraGMP databaseshould be included, if available.
2. QUALITY MANAGEMENT SYSTEM OF THE COMPANY
2.1 Description of the quality management system of the company
Provide information on quality management systems, maintenance ofthe systems and senior management responsibilities
Provide reference to the relevant standards (i.e. ISO, ICH)
Provide information of accredited and certified activities carried out bythe company
65
SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
66/162
2. QUALITY MANAGEMENT SYSTEM OF THE COMPANY (Conti)
2.2. Release procedure of finished products
- Detailed description of qualification requirements (education and work experience)
of the Authorised Person(s) / Qualified Person(s) responsible for batch certificationand releasing procedures;
- General description of batch certification and releasing procedure;
- Role of Authorised Person / Qualified Person in quarantine and release of finishedproducts and in assessment of compliance with the Marketing Authorisation;
- The arrangements between Authorised Persons / Qualified Persons when severalAuthorised Persons / Qualified Persons are involved;
- Statement on whether the control strategy employs Process Analytical Technology(PAT) and/or Real Time Release or Parametric Release.
66
2 3
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
67/162
2.3
- A brief summary of the establishment/knowledge of supply chain and the externalaudit program;
- Brief description of the qualification system of contractors, manufacturers of activepharmaceutical ingredients (API) and other critical materials suppliers;
- Measures taken to ensure that products manufactured are compliant with TSE(Transmitting animal spongiform encephalopathy) guidelines.
- Measures adopted where counterfeit/falsified products, bulk products, activep armaceu ca ngre en s or exc p en s are en e ;
- Use of outside scientific, analytical or other technical assistance in relation tomanufacture and analysis;
- List of contract manufacturers and laboratories including the addresses and contactinformation and flow charts of supply-chains for outsourced manufacturing andQuality Control activities; e.g. sterilisation of primary packaging material for asepticprocesses, testing of starting raw materials etc, should be presented in Appendix 4;
- Brief overview of the responsibility sharing between the contract giver and acceptorwith respect to compliance with the Marketing Authorisation (where not includedunder 2.2).
67
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
68/162
2. QUALITY MANAGEMENT SYSTEM OF THE COMPANY (Conti)
2.4 Quality Risk Management (QRM)
- Brief description of QRM methodologies used by the manufacturer;
- Scope and focus of QRM including brief description of any activities which areerformed at cor orate level and those which are erformed locall . An
application of the QRM system to assess continuity of supply should be mentioned.
2.5 Product Quality Reviews
- Brief description of methodologies used
68
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
69/162
4. PREMISES AND EQUIPMENT
4.1 Premises
- Short description of plant; size of the site and list of buildings. If the production fordifferent markets, i.e. for local, EU, USA, etc. takes place in different buildings onthe site, the buildings should be listed with destined markets identified (if notidentified under 1.1);
- Simple plan or description of manufacturing areas with indication of scale(architectural or engineering drawings are not required);
-classification and pressure differentials between adjoining areas and indicating the
production activities (i.e. compounding, filling, storage, packaging, etc.) in therooms;
- Lay-outs of warehouses and storage areas, with special areas for the storage andhandling of highly toxic, hazardous and sensitising materials indicated, ifapplicable;
- Brief description of specific storage conditions if applicable, but not indicated on thelay-outs.
69
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
70/162
4.2.3 GMP critical computerised systems
- Description of GMP critical computerised systems (excluding equipment specific
Programmable Logic Controllers (PLCs).
5. DOCUMENTATION
- Description of documentation system (i.e. electronic, manual);
- When documents and records are stored or archived off-site (includingpharmacovigilance data, when applicable): List of types ofdocuments/records; Name and address of storage site and an estimate of
time required retrieving documents from the off-site archive.
70
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
71/162
6. PRODUCTION6.1. Type of products(references to Appendix 1 or 2 can be made):
- Type of products manufactured including
list of dosage forms of both human and veterinary products which aremanufactured on the site
list of dosage forms of investigational medicinal products (IMP)manufactured for an clinical trials on the site and when different from thecommercial manufacturing, information of production areas and personnel
- Toxic or hazardous substances handled (e.g. with high pharmacological activityand/or with sensitising properties);
- Product types manufactured in a dedicated facility or on a campaign basis, if
applicable;
- Process Analytical Technology (PAT) applications, if applicable: general statement of
the relevant technology, and associated computerised systems.
71
SMF (Changes)SMF (Changes)
8/10/2019 Updates on PIC/S GMP Standard
72/162
6.2 Process validation - Brief description of general policy for process validation;
- Policy for reprocessing or reworking.
8. DISTRIBUTION, COMPLAINTS, PRODUCT DEFECTS AND RECALLS
8.1 Distribution (to the part under the responsibility of themanufacturer)
- Types (wholesale licence holders, manufacturing licence holders, etc) and locations(EU/EEA, USA, etc.) of the companies to which the products are shipped from the
site;- Description of the system used to verify that each customer / recipient is legally
entitled to receive medicinal products from the manufacturer;
- Brief description of the system to ensure appropriate environmental conditionsduring transit, e.g. temperature monitoring/ control;
- Arrangements for product distribution and methods by which product traceability ismaintained;
- Measures taken to prevent manufacturers products to fall in the illegal supply
chain.
72
Appendices of Site Master Files
8/10/2019 Updates on PIC/S GMP Standard
73/162
Appendix 1 - Copy of valid manufacturing authorization
Appendix 2 - List of products (dosage forms and/or APIs)
manufactured including for dosage forms the INN-
names of APIs used Appendix 3 - Copy of valid GMP Certificate
Appendix 4 - Organizational charts
Appendix 5 - Lay outs of production areas including process,
equipment, waste and personnel flows
Appendix 6 - Schematic drawings of water systems
Appendix 7 - List of major production and laboratory equipment
used indicating the frequency for re-qualification
Appendix 8 - List of contractors including the addresses and
contact information
73
8/10/2019 Updates on PIC/S GMP Standard
74/162
74
8/10/2019 Updates on PIC/S GMP Standard
75/162
THANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOU
Together we will meet thechallenges of the future
75
8/10/2019 Updates on PIC/S GMP Standard
76/162
TOPIC: APPLICATION OF
Presented by:
Lai Weng FaiActing Director / Senior GMP AuditorLicensing & Certification Branch (LCB)
15 February 2012
1
8/10/2019 Updates on PIC/S GMP Standard
77/162
E F EEAE F EEA
Q R M (QRM)
B BI QRM E
A A E
S
2
8/10/2019 Updates on PIC/S GMP Standard
78/162
QRMQRM B BB B
.
GMP .oT ...
... ...
, .
,
oT
. ,
o GMP (PIC/S GMP
G, A 1)
.
3
8/10/2019 Updates on PIC/S GMP Standard
79/162
QRMQRM B BB B GMP .
oA
, .oA
,
S .
4
8/10/2019 Updates on PIC/S GMP Standard
80/162
QRMQRM B BB B PIC/S GMP G
.
F GMP , (P, I, P, S, .)
.., Q R M.
.
5
8/10/2019 Updates on PIC/S GMP Standard
81/162
I QRMI QRM EE
C/ ( 15 2009):
C 1 T
Q A
,
R M. I
.
T Q A, G M P,Q C Q R M .
6
8/10/2019 Updates on PIC/S GMP Standard
82/162
I QRMI QRM EE
C/ ( 15 2009):C 1
Q R M1.5 Q ,
,
.
.
7
1.6 T :
,
;
,
.
8/10/2019 Updates on PIC/S GMP Standard
83/162
I QRMI QRM EE
D
,
8
( )
,
,
() .
.
&
8/10/2019 Updates on PIC/S GMP Standard
84/162
I QRMI QRM EE
? /
QRM .
G .
.
R & QMS.
F ( ).
T QRM .
I & QRM .
9
8/10/2019 Updates on PIC/S GMP Standard
85/162
I QRMI QRM EE A
L SOP .
S , , .
O , .
E .
10
8/10/2019 Updates on PIC/S GMP Standard
86/162
I QRMI QRM EE
R ,
, & .
.
.
L / QRM
.
H & .
L .
11
8/10/2019 Updates on PIC/S GMP Standard
87/162
I QRMI QRM EE
C 1. F /
2. /
I / .
L .
L / .
R .
R .
I .
.
12
8/10/2019 Updates on PIC/S GMP Standard
88/162
I QRMI QRM EE
C I , :
A QRM QMS
(.. , , , PQR, .).
A
QRM .
A / .
I ,
, ,
.
13
I QRMI QRM E E
8/10/2019 Updates on PIC/S GMP Standard
89/162
I QRMI QRM EE
C (C) NC ,
QRM.
QRM NC QMS NC (QRM
QMS).
M NC QRM .
C NC QRM
.
14
I QRMI QRM E E
8/10/2019 Updates on PIC/S GMP Standard
90/162
I QRMI QRM EE
C (C) I
, NC ' NC GMP
.
, NC .
15
A A A A
8/10/2019 Updates on PIC/S GMP Standard
91/162
A AA A
Risk Assessment
Risk Analysis
Risk Identification
InitiateQuality Risk Management Process
A
16
Teamapproach
Risk Review
RiskCommunication
Risk Evaluation
unacceptable
Risk Control
Risk Reduction
Review Events
Risk Acceptance
Output / Result of theQuality Risk Management Process
Ris
kManagementtools
A A A A
8/10/2019 Updates on PIC/S GMP Standard
92/162
A AA A C :
1) C .
R
.
, ,
, .
4 QRM ( , ,
& ).
3) A
(F 1 ).
17
A A A A
8/10/2019 Updates on PIC/S GMP Standard
93/162
A AA A
18
F 1
A AA A
8/10/2019 Updates on PIC/S GMP Standard
94/162
A AA A C :
4) E
, , .
5) R
.
D =
6) I
(.., ).
(.. )
.
19
A AA A
8/10/2019 Updates on PIC/S GMP Standard
95/162
A AA A :
D /
A . N /
T :
o
o
o
R
.
20
A AA A
8/10/2019 Updates on PIC/S GMP Standard
96/162
A AA A :
F M E A (FMEA)
.
O .
21
8/10/2019 Updates on PIC/S GMP Standard
97/162
A AA A
C C
8/10/2019 Updates on PIC/S GMP Standard
98/162
C C
23
A AA A
S S
8/10/2019 Updates on PIC/S GMP Standard
99/162
S S .. ..
24
A AA A
8/10/2019 Updates on PIC/S GMP Standard
100/162
A AA A
25
x
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
101/162
F EF EB
O ,, , ,
.
M
.
A
.
I
.
26
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
102/162
F EF E H,
.
(.., ,).
A
..,
)
.
27
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
103/162
F EF E I ,
:
R
R
P SME
?
A , , .
D .
28
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
104/162
F EF E & A
R :
C
() : I , ,
.
I .
29
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
105/162
F EF E & A
T . I
:
F , , .
P (.., ) .
R F A (FA) .
FTA .
30
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
106/162
F EF E , A & E
T
'
.
T (F 1 ).
31
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
107/162
F 1 F A
E &
32
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
108/162
F 1 F T AF 2 F A
F
33
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
109/162
C
F 2 FTA,
, :
.
.
.
34
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
110/162
C
T :
M C
F
().
E E T 1
( ).
35
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
111/162
1
C
36
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
112/162
D & C
T :
.
T .
37
1 E R1 E R
F EF E
8/10/2019 Updates on PIC/S GMP Standard
113/162
R (.., ,
, ).
A /
.
38
2 P D2 P D
E P CE P C
B
8/10/2019 Updates on PIC/S GMP Standard
114/162
B
A , .
M .
L ABC .
T .
B , .
F ,:
( SOP) .
39
2 P D2 P D
E P CE P C
B
8/10/2019 Updates on PIC/S GMP Standard
115/162
B
F .
T .
.
T .
H .
40
2 P D2 P D
E P CE P C
& A
8/10/2019 Updates on PIC/S GMP Standard
116/162
& A
R Q:
, ,
, .
F E A (FEA)
.
N .
I ?
41
2 P D2 P D
E P CE P C
& A
8/10/2019 Updates on PIC/S GMP Standard
117/162
& A
T FMEA (.., , ,
).
H, : FMEA.
42
2 P D2 P D
E P CE P C
A & E
8/10/2019 Updates on PIC/S GMP Standard
118/162
, A & E
FMEA &
.
,
E :
,
/ .
43
2 P D2 P D
E P CE P C
A & E
8/10/2019 Updates on PIC/S GMP Standard
119/162
, A & E
N FMA :
1) S
2) F
3) A
A 13 ,
FMEA (T 1 ).
44
8/10/2019 Updates on PIC/S GMP Standard
120/162
2 P D2 P D
E P CE P C
, A & E
8/10/2019 Updates on PIC/S GMP Standard
121/162
, A & E
I FMEA , :
I .
> 9 .
I , 9, .
F , . C .
A R E S T 2 ().
46
2 P D2 P D
E P CE P C
T 2
8/10/2019 Updates on PIC/S GMP Standard
122/162
T 2
47
8/10/2019 Updates on PIC/S GMP Standard
123/162
2 P D2 P D
E P CE P C
C
8/10/2019 Updates on PIC/S GMP Standard
124/162
M ,
.
A ,
(..,
) , .
49
2 P D2 P D
E P CE P C
D & C
8/10/2019 Updates on PIC/S GMP Standard
125/162
S Q .
T .
,
. ,
, .
T
.
50
2 P D2 P D
E P CE P C D & C
8/10/2019 Updates on PIC/S GMP Standard
126/162
A, FEMA :
M .
A .
& C
T :
E .
A .
F .
51
33 GMP SGMP SII
B
8/10/2019 Updates on PIC/S GMP Standard
127/162
F GMP .
I (.., ,, , )
.
O
(QC) .
T QC ,
.
I .
52
33 GMP SGMP SII
B
8/10/2019 Updates on PIC/S GMP Standard
128/162
T .
I,
.
.
T
.
T .
53
33 GMP SGMP SII
B
8/10/2019 Updates on PIC/S GMP Standard
129/162
S GMP .
(QRM) .
54
33 GMP SGMP SII
& A
8/10/2019 Updates on PIC/S GMP Standard
130/162
R Q:
, , ,
A
.
T, (.., , , ).
A
.
55
33 GMP SGMP SII
& A
8/10/2019 Updates on PIC/S GMP Standard
131/162
T .
H, . A .
: .
56
33 GMP SGMP SII
& A
T
8/10/2019 Updates on PIC/S GMP Standard
132/162
T
(T 1 ).
57
33 GMP SGMP SII
1
8/10/2019 Updates on PIC/S GMP Standard
133/162
1
58
33 GMP SGMP SII
& A
T QRM ()
8/10/2019 Updates on PIC/S GMP Standard
134/162
T QRM () .
T , .
.
T :
(P S O S) = R E S
N 1, 2, 3 ,, , .
59
33 GMP SGMP SII
& A
T
8/10/2019 Updates on PIC/S GMP Standard
135/162
T T I.
I , .
:
(P S O S) + ( ) =
R E S
QRM,
.
60
33 GMP SGMP SII
C
R
8/10/2019 Updates on PIC/S GMP Standard
136/162
R ,
.
I .
F ,
.
61
33 GMP SGMP SII
D
8/10/2019 Updates on PIC/S GMP Standard
137/162
D
.
T / , /
.
E
:
/
62
33 GMP SGMP SII
D & C
C QRM
8/10/2019 Updates on PIC/S GMP Standard
138/162
C QRM
.
D Q :
T
A
E .
63
SS
T QRM
GMP . B
8/10/2019 Updates on PIC/S GMP Standard
139/162
QRM.
E QRM ,
.
T QRM
/ .
, QRM
.
I QRM ,
( ).
64
SST QRM
/ .
8/10/2019 Updates on PIC/S GMP Standard
140/162
T
.
M ,
.
QRM GMP .
A / .
65
F RF RT. F ., P. T. 35 (7), (8), (10), (12) 2011
PIC/S G GMP (PE 0099) & A 20 (..)
8/10/2019 Updates on PIC/S GMP Standard
141/162
/ ( ) ( )
QRM I ICH Q9 , PS/INF
1/2010
A (HACCP)
, .
A . . 2, 2
. G . G, HO,2007.
ICH Q9 B P (..)
ICH Q8/Q9/Q10 T M (..)
. ..
...
66
! !
8/10/2019 Updates on PIC/S GMP Standard
142/162
67
HPRG JOINT REGULATORY WORKSHOP Year: 2012
Case Study Review of a Quality System Procedure
.
1 . ( .)
8/10/2019 Updates on PIC/S GMP Standard
143/162
)
( ) /
)
( ).
.
.
: A AEA E AEE, AA AD
D .: A204303
D : D: A (A) : A204302
:
C D
:
A :
: 1 5
E D: 30/09/2010
D: D: D:
8/10/2019 Updates on PIC/S GMP Standard
144/162
1.0
( )
.
: .
2.0
2.1 A (A) :
2.1.1 .
2.1.2
,
E CA E D .
2.1.3 / .
2.1.4 A E CA E D
.
2.2 C (C) :
2.2.1 .
2.2.2 A .
2.2.3 E
2.2.4 .
2.3 C (C) :2.3.1 .
2.3.2 E
: A AEA E AEE, AA AD
D .: A204303
: A204302
D : D: A (A) : 2 5
E D: 30/09/2010
4.0
A
8/10/2019 Updates on PIC/S GMP Standard
145/162
.
A
.. , , .
A
C.
.
5.0
5.1
/ C. , ,
,
.
5.2
C ,
. A , C
E CA E D :
5.2.1
E CA E D
/
5.2.2
,
E CA E D .
5.3
, C & A
.
5.4
, C .
: A AEA E AEE, AA AD
D .: A204303
: A204302
D : D: A (A) : 3 5
E D: 30/09/2010
E: , 3 3 ,
A
. D A.
8/10/2019 Updates on PIC/S GMP Standard
146/162
5.7
C A
1 .
5.8
C A
5.8.1
E C
C . C
A .
5.8.2
.
, / . C .
5.8.3
C , .
, C .
5.8.4
, &D D
(AD025).
5.8.5
&D D C D
.
5.8.6
C .
5.8.7
C , C 2
A .
5.9
A ,
, . . A
D.
: A AEA E AEE, AA AD
D .: A204303
: A204302
D : D: A (A) : 4 5
E D: 30/09/2010
5.12
C
.
8/10/2019 Updates on PIC/S GMP Standard
147/162
5.14
, A C. C .
. C D
( ) .
E: ,
.
.0
6.1 A
C (AD188)
6.2
C .
6.3 A C . / .
6.4 , A
6.5
,
.
6.5.1
A
.
0
: A AEA E AEE, AA AD
D .: A204303
: A204302
D : D: A (A) : 5 5
E D: 30/09/2010
.0
A (AD135)
8/10/2019 Updates on PIC/S GMP Standard
148/162
A (AD 135)
A (AD162)
(AD025) (AD194)
A (AD193)
A
Workshop 5Workshop 5
8/10/2019 Updates on PIC/S GMP Standard
149/162
Presented by:
Ng Liong ThiamDy Dir (GMPL Unit)
Audit Branch (AB)
A
.
8/10/2019 Updates on PIC/S GMP Standard
150/162
.
.
8/10/2019 Updates on PIC/S GMP Standard
151/162
.
A
:
A
.
8/10/2019 Updates on PIC/S GMP Standard
152/162
,
.
()
8/10/2019 Updates on PIC/S GMP Standard
153/162
( )
A
( )
() ()A
.. ,
8/10/2019 Updates on PIC/S GMP Standard
154/162
( ) /
, ,
AA ( )
( )
8/10/2019 Updates on PIC/S GMP Standard
155/162
( )
A
A 1
8/10/2019 Updates on PIC/S GMP Standard
156/162
1
4
( )
5.5
5.8 A
( )
: 5.6 5.13
5 9 A :
8/10/2019 Updates on PIC/S GMP Standard
157/162
5.9 A : ,
. A , A
.
5.9
5.10.1
5.11 A
.
8/10/2019 Updates on PIC/S GMP Standard
158/162
, ,
( ) .A
.
5.14 & 6.4 A .
6.1 6.4
( )
8/10/2019 Updates on PIC/S GMP Standard
159/162
( )
.. ,
6.5
( )
.
6.5.1 A
.
8 :
A
(.. A )
8/10/2019 Updates on PIC/S GMP Standard
160/162
(.. A )
(A188) 6.1
(A194 A193)
..
,
.
8/10/2019 Updates on PIC/S GMP Standard
161/162
A
.
/
A 4 A 2011.
8/10/2019 Updates on PIC/S GMP Standard
162/162