Updating Contractor Schedules in a Hosted Transportation Environment Updating Contractor Schedules in a Hosted Transportation Environment February 2-6, 2011 Presented by: Jonathan McNatty – DRMcNatty & Associates , Inc.

Updating Contractor Schedules in a Hosted Transportation ......• Export from P6 into an XLS (Microsoft Excel) File from the project in P6 AACE International’s 50 th. Annual Western

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Updating Contractor Schedules in a Hosted Transportation EnvironmentUpdating Contractor Schedules in a Hosted Transportation Environment

    February 2-6, 2011

    Presented by: Jonathan McNatty – DRMcNatty & Associates , Inc.

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Author Biography

    • 21 years of construction industry experience

    • 19 years experience with Primavera Software

    • 11 years Certified Primavera Trainer and

    Implementation Consultant

    • 16 years experience as CPM Scheduler

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    2

    • 16 years experience as CPM Scheduler

    • AACE member for 6 years

    • Member of PMI and AGC

    • Hobbies Include: Ice Hockey, Cross Country

    Skiing, Surfing, Bowling, Fishing, Camping and

    being outdoors with my Chocolate Lab

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    NYSDOT Capital Improvement Program

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    3

    The NYSDOT 2010-2015 Capital Program describes the future needs and

    challenges facing the State’s transportation system, the objectives and

    performance measures recommended to be used to determine the State’s

    investments and outlines a proposed $25.8 billion multimodal infrastructure investment program to achieve those objectives.

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    NYSDOT Requires P6 Software

    B. Scheduling Software:

    The State will provide Primavera P6 software, or newer release, and

    computer system for use by the Engineer to review the schedules submitted

    by the Contractor. The Department has installed Primavera P6 software, or

    ITEM 639.1022 20 – CPM (CRITICAL PATH METHOD) PROGRESS SCHEDULE

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    by the Contractor. The Department has installed Primavera P6 software, or

    newer release, on internet accessible servers for use by the Department’s

    construction inspection staff. Appropriate Department personnel,

    Consultants, and Contractors will also have access to these schedules on the

    Department’s Enterprise Project Management Database (EPMD). The

    Department will determine the location to store the project schedule files on

    the EPMD, and will provide the Contractor the naming convention for all

    progress schedule submissions.

    • CONTRACTOR DOES NOT HAVE TO PURCHASE ANY SOFTWARE!

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Contractor Access to EPMD

    • The Contractor shall submit Request for Access Forms to the Regional

    Construction Engineer (EIC) for each proposed Primavera user to obtain the

    User ID’s and Passwords for access to the P6 software and data on the

    Department’s network servers after being awarded the contract.

    • The form can be downloaded from the following web page

    https://www.nysdot.gov/main/business-center/contractors/construction-

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    https://www.nysdot.gov/main/business-center/contractors/construction-

    division/primavera, or can be provided by the Department’s Construction

    Supervisor.

    • These forms may submitted any time following the contract letting date and

    announcement by the Department that the Contractor is the apparent low

    bidder.

    • Access forms can be sent to [email protected]

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Contractor Request for Access Form

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    CITRIX Web Interface

    • Login to the CITRIX Web Interface to access the NYSDOT P6 EPMD with

    User Name and Password provided by the NYSDOT

    https://www4.dot.state.ny.us/Citrix/MetaFrame/auth/login.aspx

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    P6 CITRIX Web Interface

    • Click on the Primavera P6 Icon to login to the software

    https://www4.dot.state.ny.us/Citrix/MetaFrame/site/default.aspx

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Click the P6 Icon Link

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Contractor Work Area in NYSDOT P6

    • The Contractor Work Area gives access only to the projects that the

    contractor has been assigned rights too

    • Multiple projects can be assigned under one contractor account

    • Up to two user accounts per Contractor can be assigned to each project

    • Contractors can request more users to be added by the NYSDOT

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    NYSDOT Project Templates

    • The Department or its agents will make available to the apparent low bidder

    on network servers the Suggested Preliminary Construction CPM Schedule in

    Primavera P6 format within seven (7) calendar days of the letting date as a

    template to assist the Contractor in developing the Baseline CPM Progress

    Schedule in a timely manner. The template will have the “CON” designation.

    – WBS Structure to be modified by the Contractor

    – Standard/global calendars to be used by the Contractor

    – Standard/global activities required by the NYSDOT

    – Standard activity codes required by the NYSDOT

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    – Standard activity codes required by the NYSDOT

    • The Contractor will then modify the WBS and input the contractor activities,

    durations, logic, project calendars, and project codes

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    DRMcNatty & Associates, Inc. Overview of Consulting Services for Contractors on NYSDOT Projects

    • Certified Consulting, Training, and Mentoring for P6 Project Manager Software

    for Contractors awarded NYSDOT Projects

    • Mentoring of the NYSDOT CPM Schedule Specifications

    • Create the Initial Project Baseline Progress Schedule for the Preconstruction

    Meeting and WBS project structure

    • Create the At Award Baseline Progress Schedule @ Award for submission and

    approval to the NYSDOT to establish the approved baseline schedule before

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    approval to the NYSDOT to establish the approved baseline schedule before

    construction

    • Create the Monthly Progress Schedule Updates recording actual progress of

    work including changes /delays to the schedule

    • Create Baseline and monthly progress update schedule narratives

    • Generate Appendix Reports required by the NYSDOT CPM Schedule

    Specifications

    • Attend project schedule meetings

    • Online training & consulting support via the internet

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Creating the Baseline Schedule

    • Create the Contractor WBS Structure

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Import Contractor Activities with Excel

    • Export from P6 into an XLS (Microsoft Excel) File from the project in P6

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Import Contractor Activities with Excel cont.

    • Contractor can update the XLS (Microsoft Excel) document with all activities

    • Import includes the Activity ID, Activity Name, and Original Duration

    • Do not change the Column Headings

    • NO IMPORTING FROM SURETRAK, PRIMAVERA P3 or MS PROJECT!

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Activity ID’s

    can be created

    using Excel

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Import Contractor Activities with Excel cont.

    • Contractor does not have rights to Import the Excel file

    • Contractor emails the Excel file to the NYSDOT for verification and import

    • Activities can then be assigned to the WBS by drag and drop and filters

    • NYSDOT Global data is not effected or replaced by importing with Excel

    Group & Sort by WBS

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Use P6 Drag & Drop feature to

    move activities under the

    correct WBS name

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Submit Final Baseline Schedule• Contractor makes a copy of the “CON” file per the NYSDOT Schedule

    Filename Convention when Final Baseline Schedule is approved

    • The CON file is the main “editing” file for all future updates

    • All submitted files are marked “Inactive” so they cannot be edited after

    submission to the NYSDOT

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Submit Final Baseline Schedule cont.

    • Contractor submits the Baseline Schedule to the NYSDOT via email

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Monthly Progress Schedule Submissions

    • First Monthly Progress Schedule Submission – Within three State Business Days following acceptance of the Final Baseline Progress Schedule @ Award or the closing date for the first months contract payment period whichever is later, the Contractor shall perform a Progress Schedule Update to reflect the status of all activities where work was performed in the time period between the start of work and acceptance of the Final Baseline Progress Schedule @ Award.

    • Data Date - the “Data Date” shall be the date the Project Scheduler last edits

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    • Data Date - the “Data Date” shall be the date the Project Scheduler last edits the schedule prior to submission to the Engineer (generally the last working day of the contract payment period).

    • The Engineer will review the Monthly Progress Schedule submissions and will prepare a written response (Progress Schedule Review Report) to the Contractor’s submission within five (5) State Business Days following receipt of the Contractor’s complete schedule submission. The Engineer will either “accept” the schedule, “accept as noted”, or “reject” the schedule for re-submittal by the Contractor

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Monthly Progress Schedule

    • Access the main “editing” file with the CON designation for Contractor

    • This is the main file for all updates each month

    • The CON file is the only “Active” file all other schedule submissions are

    “Inactive” so they can not be edited after being submitted and approved

    by the NYSDOT

    • Once the monthly update is complete and ready for submission a copy is

    made per the NYSDOT naming convention and submitted via email for

    review and approval

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Updating a Monthly Progress Schedule

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    How Data is Collected

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    The Data Date

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    The Data Date cont.

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Progress SpotlightA

    AC

    E I

    nte

    rnati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Setting the New Data Date

    Click on the Data

    Date & Drag to the

    New Data Date

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    New Data Date

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Setting the New Data Date cont.

    New Data Date for

    All Activities that fall into

    the status period will be

    highlighted in Yellow

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    New Data Date for

    the Current Update

    Status Period for

    Current Update

    highlighted in Yellow

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Entering Actuals

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Statusing Activities in Progress

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Using Layouts to Collect Update Data

    • Use customized “Layouts” to send as an Adobe PDF document via email to

    field personal to mark up with update information

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Using Excel to Collect Update Data

    • Copy activities from P6 and paste into an Excel file and customize columns

    • Send via email to field personal to provide update information

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Use GoToMeeting for Online Updates

    • Collaborate online for Monthly Updates & Review sessions

    • Email participants that need to attend the online meeting

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Submit Monthly Update to NYSDOT

    • Contractor makes a copy of the “CON” file per the NYSDOT Schedule

    Filename Convention when Monthly Update Schedule is ready for review

    • The NYSDOT copies the submitted file and pastes into the NYSDOT

    schedule review area in P6 to perform their review and approval

    • All submitted files are marked “Inactive” so they cannot be edited after

    submission to the NYSDOT

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Submit Monthly Update to NYSDOT• Contractor submits the all Monthly Update Progress Schedules to the

    NYSDOT via email

    • Contractor provides specific Monthly Submission documents to the NYSDOT

    per the CPM Specifications

    • Monthly Update Narrative / Schedule Log Report / Size D 24x36 Plot

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Why the NYSODT CPM Spec Works

    • Cost included as a bid item in the contract

    • No software to purchase

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    • Access from any location via the internet

    • Importing and overriding of Global P6 Date not an issue

    • No importing from Microsoft Project, SureTrak, P3

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Why the NYSODT CPM Spec Works cont.

    • Do not need to create lots of reports, NYSDOT has

    standard/global reports, layouts and filters

    • All schedule submission and review is done electronically

    thru email and Adobe PDF attachments

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    thru email and Adobe PDF attachments

    • The CPM Specifications were written with a combined

    effort from NYSDOT, AGC, CPM Consultants, and NY

    State Contractors

    • NYSDOT commitment from the top down

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Questions?

    AA

    CE

    In

    tern

    ati

    on

    al’s 50

    thA

    nn

    ual

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Questions?

  • An

    nu

    al

    Weste

    rn W

    inte

    r W

    ork

    sh

    op

    Contact Information

    Jonathan McNatty4955 Chestnut Ridge Road, Suite 201

    Orchard Park, NY 14127P. (716) 417-7094 F. (716) 299-2034

    Email: [email protected]: www.drmcnatty.com