95
5/21/2018 UpgradetoNetWeaverBW7.30-TechnicalAspects-slidepdf.com http://slidepdf.com/reader/full/upgrade-to-netweaver-bw-730-technical-aspects 1/95 Upgrade to NetWeaver BW 7.3x New features with ABAP Upgrade to 7.30 and 7.31 (EhP 1 for 7.30) Roland Kramer, Product Expert PM BW/In-Memory July 2012  November 2013 Please refer to Document - http://scn.sap.com/docs/DOC-30452 

Upgrade to NetWeaver BW 7.30 - Technical Aspects

  • Upload
    saranpc

  • View
    84

  • Download
    4

Embed Size (px)

DESCRIPTION

BW 7.3 Upgrade - Technical Guide

Citation preview

  • Upgrade to NetWeaver BW 7.3x

    New features with ABAP Upgrade

    to 7.30 and 7.31 (EhP 1 for 7.30)

    Roland Kramer, Product Expert PM BW/In-Memory

    July 2012 November 2013

    Please refer to Document - http://scn.sap.com/docs/DOC-30452

  • SAP AG 2009. All rights reserved. / Page 2

    Agenda

    1. Technology/Roadmap facts

    2. Whats new with the Upgrade to BW 7.3x

    3. Usage of the ASU toolbox for BW

    4. General checks prior to the Upgrade

    5. Details of the Upgrade Process

  • SAP AG 2009. All rights reserved. / Page 3

    Evolving In-Memory Footprint in SAP

    NetWeaver BW 7.30 and 7.31

    Planning Engine

    Data Manager

    InfoCubes

    DataStore Objects

    Analytic Engine

    Data Persistency

    and Runtime

    Data

    Modeling

    Ente

    rprise D

    ata

    Ware

    house a

    nd D

    ata

    Mart

    Modelin

    g w

    ith S

    AP

    NetW

    eaver

    BW

    BWA instead of

    aggregates

    Filter +

    aggregation

    BWA-only

    InfoCubes

    BWA reporting

    for DSOs

    In-Memory

    optimized

    DataStore Objects

    In-memory

    planning engine

    First calculation

    scenarios in BWA

    Additional

    calculations

    in-memory

    MultiProvider

    handling and

    flexible joins

    BW 7.0

    DB + BWA 7.0

    BW 7.3

    DB + BWA 7.2 Planned: BW 7.3 on HANA

    SP5 and beyond

    EDW Processes

    In-Memory

    optimized

    InfoCubes

    Consumption of

    HANA models in

    BW

    HANA data for

    BW Staging

    This presentation outlines our general product direction and should not be relied on in making a purchase decision. This presentation is not subject to your license agreement or any other agreement with SAP. SAP has no obligation to pursue any course of business outlined in this presentation or to develop or release any functionality mentioned in this presentation. This presentation and SAP's strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. This document is provided without a warranty of any kind, ei ther express or implied, including but not limited to, the implied warranties of

    merchantability, fitness for a particular purpose, or non-infringement. SAP assumes no responsibility for errors or omissions in this document, except if such damages were caused by SAP intentionally or grossly negligent.

  • SAP AG 2009. All rights reserved. / Page 4

    SAP NetWeaver BW 7.30 vs. 7.31

    choose the Go-To Release for NetWeaver BW

    SAP NW BW 7.3

    (on HANA) SP07

    Already General Available

    All SAP NW BW 7.3 functionality plus SAP

    HANA enablement

    SAP NW BW 7.31 (on HANA) SP05

    New Installation on anyDB/HANA available: Q2/2012 Upgrade/EhP1 on any DB available: Q2/2012

    Install of EhP1 on HANA available: Q3/2012

    All SAP NW BW 7.3 functionality plus:

    Improved fresh Installation based on 7.31 SP04

    Simplified Upgrade with SAP Upgrade Manager (SUM) 1.0

    All Post Copy Automation - BW Basis functionality is included in SP04 which enables a quick and stable migration to BW on HANA

    From every NetWeaver 7.0x Release, the Installation/Upgrade of the SEM Add-on 7.36 is possible.

    The Gateway Add-on (OData) can be implemented for BW EasyQuery access on a NW 730 EhP1 system.

    BW 7.31 SP04 is released between SP07/08 for BW 7.30

    (which includes 3 Month of further development)

    Recommendation for the upgrade to BW 7.31 SP04 : Customers on NW BW 7.0 should upgrade directly Customers on NW BW 7.3 should plan the EhP 1 upgrade for their next regular maintenance cycle

  • SAP AG 2009. All rights reserved. / Page 5

    Upgrade to BW 7.3x - ABAP

    NetWeaver Java 7.3x is now shipped together with BW 7.3x. Mandatory you should separate

    the Java Stack prior to the Upgrade of the ABAP Backend, if not already done.

    The new split/deinstallation tool for the Java Stack is expected to be available November

    2011. If you are already in the process, consider the manual deinstallation of the Java Add-In

    until its availability.

    The BICS are moving to the upcoming SAP BusinessObjects Application Platform BI 4.x,

    which is also a prerequisite for the full usage of the BEx successor - Analysis -

    The Java component BW-IP modeler is redeveloped for BW 7.3x in ABAP HTTP, so the Java

    Server will not be used anymore for the BW-IP infrastructure in the future after BW 7.3x

    The new BI Authorization concept is now mandatory. Despite the fact that you either create a

    7.0x System beforehand to migrate the old BW Authorization, a potential Upgrade from BW

    3.5 to 7.3x would be possible.

    NetWeaver 7.0 EhP3 is merged into NetWeaver 7.3x EhP1 (there is no 7.03, only 7.31).

    All Components are using one consolidated Version of the Kernel (7.20 Unicode-EXT 64-BIT).

    For compability reasons there are non UC/non EXT Versions available (no 32-BIT anymore)

    The full (currently only limited by size of the DB) BW on HANA Support is available

    with 7.30 SP07 and 7.31 SP04

    Note 1641432 - SAP Product Master Releases

    Some technology facts and updates

  • SAP AG 2009. All rights reserved. / Page 6

    Solution Manager pre requisites

    incorrect stack.xml can create unwanted follow up errors

    In order to successfully work with the Solution Manager to create necessary

    stack.xml, which is a new requirement in NetWeaver based upgrades the following

    checks had to be fulfilled prior to the creation of the stack.xml.

    Sufficient privileges for the s-user, which is connected to the Service Market Place (SMP)

    Updated PPMS data, to ensure the correct processing of the desired Upgrade Targets

    Note 1603103 - SMSY: NetWeaver 7.3 upgrade

    Latest SPs/correction/Notes for the correct usage of the Solution Manager applications

    For more information about the Maintenance Optimizer, see SAP Support Portal at

    http://service.sap.com/solman-mopz

    Furthermore if you have ERP components installed, e.g. the SEM Add-On, consider

    Note 1326576 - SAP NetWeaver Systems Containing SAP ERP Software Components

    Note 1927083 - SAP NetWeaver Systems with SEM-BW

    new Option allows you more flexibility, see Blog

    Good News - Easier Modeling of the SEM Add-On in Solution Manager

  • SAP AG 2009. All rights reserved. / Page 7

    Upgrade to BW 7.3x - ABAP

    Note 1532805 - Add-On Compatibility of SAP NetWeaver 7.3

    There is a SEM Add-On (only for the Upgrade) available with BW 7.30. The SEM (6.34) Add-

    On is available since end of Q1/2011 for all Customers. See Notes 1539356 and 1531022 for

    more details. SEM 6.34 cannot be installed on a fresh BW 7.30 Installation

    SEM 6.34 is HANA enabled, see Note 1648413 for more Details.

    The direct update from BW 7.0/SEM 6.0 to BW 7.31/SEM 7.36 is possible (Note 1326576)

    An Upgrade to NetWeaver 7.31 (7.3x EhP1 equal with 7.0 EhP3) is possible, when SP02 or

    higher is available for 7.31 and the equivalent SP for SEM 7.36.

    This Combination is currently in Rampup (November 2011) and will run until End of May 2012

    There is also the BPC 10.0 Add-On available with BW 7.30 which is currently in Rampup

    (GA expected for November 2011). With NetWeaver Version there is no Windows Server

    necessary anymore (web based maintenance). See Notes 1585589 and 1620027 for details.

    It is planned with SP06 (CPMBPC 800) to be HANA enabled

    Additional Add-Ons like GRC or DMIS will be enabled for the Upgrade to NetWeaver 7.31

    Decision about installed Add-Ons

  • SAP AG 2009. All rights reserved. / Page 8

    Upgrade to BW 7.3x - ABAP

    SEM Add-On Implications - http://help.sap.com/sem

    BW 7.3/SEM 6.34

    (specific case for EhP4)

    Upgrade to

    NetWeaver 7.31

    SEM 7.36

    possible!

    Choose your NetWeaver BW Start Release

    BW 7.01/SEM 6.04

    (specific case for EhP4)

    Upgrade to

    NetWeaver 7.3

    SEM 6.34

    possible!

    BW 7.0x/SEM 6.0x

    (generic EhP approach)

    Upgrade to

    NetWeaver 7.03/7.31*

    SEM 7.36

    possible!

    (Note 1326576 and

    1927083)

    Consider Options in Notes 1539356 (7.30), 1681435 (7.31) and 1531022 (SEM)

    * technically BW 7.31 with label NW 7.03 for product version; see Note 1681435

    Additional option: Upgrade BW 7.02/SEM 6.05 to BSi2011/BW 7.31/SEM 7.36 possible

    (via Rampup SAP Business Suite 7 Innovations 2011 since November 2011)

    BW 7.0/SEM 6.0

    (EhPs except EhP4)

    Upgrade to

    NetWeaver 7.3

    SEM 6.34

    Not possible

    directly (only via

    BW 7.01/SEM 6.04)!

  • SAP AG 2009. All rights reserved. / Page 9

    New BI 4.0 Installation for SAP BW Customers

    Platform View - Proposal

    SAP BW 7.0

    Physical Server

    (optional)

    SAP NetWeaver

    SAP NetWeaver

    Functions

    J2EE 7.0

    ABAP 7.0

    SAP Usage Type and

    SAP BusinessObjects

    Tiers, Apps, Services

    The XI 3.1/BI 4.0 Java apps can deployed either on an existing SAP J2EE 7.0x or 7.3x Engine, or ideally

    capsulated with BI with Tomcat. Consider the SAPJVM 4.1. A JVM switch tool is available as well

    SAP BW 7.01

    J2EE 7.01

    BEx Web

    BICS

    EP

    ABAP 7.01

    Split

    J2EE 7.3x

    BEx Web

    BICS

    EP (opt)

    SAP BW 7.3x

    ABAP 7.3x

    BI Java

    EP

    BI Java

    EP

    BI Java EP

    LCM Client BI Launch Pad

    (*)

    BI 4.x

    BI Reporting & Infrastructure Services

    BI Web Apps

    BI Web Tier

    BO XI 3.1

    BOE XI Web Tier

    XI Reporting & Infrastruc. Services Migr.

  • SAP AG 2009. All rights reserved. / Page 10

    J2EE Options for BI 4.0 together with BW 7.3x

    use the recommendation with the BI 4.0 inbuilt Java Server

    BI 4.0

    SAP NetWeaver J2EE

    7.3x

    Other J2EE

    (see PAM)

    BI 4.0 SP2

    BICS

    BEx Web

    BI 4.0 SP2 Only

    BICS

    BEx Web

    BI 4.0 SP2

    Usage Type EP

    Usage Type BI Java

    (BICS, BEx Web)

    BEx Web Limitations*

    - No Broadcasting (Portal/KM)

    - No Documents (Portal/KM)

    - No Xcelsius BW Connection

    Install Upgrade from BW 7.0x Install

    BEx Web Limitations*

    - No Broadcasting (Portal/KM)

    - No Documents (Portal/KM)

    - No Xcelsius BW Connection

    *Broadcasting is either a direct ABAP process (Excel) or an ABAP HTTP process publishing in a separate SAP EP Distinguish between 3.x and 7.x Web templates. 3.x Web template to not require BI-JAVA 7.x

  • SAP AG 2009. All rights reserved. / Page 11

    Single ABAP 7.0x Stack

    Dualstack Options prior to the Upgrade BW 7.3x

    separation of ABAP and JAVA easies the upgrade process

    BW 7.0x Dualstack

    Deinstall JAVA Add-In Use Split tool

    Upgrade

    to JAVA 7.3x*

    Upgrade

    to BW 7.3x ABAP

    Fresh Install of

    JAVA 7.3x (without ADS)

    BW 7.3x

    ABAP Stack

    NetWeaver 7.3x

    JAVA Stack (with ADS) JAVA 7.3x Upgrade limitation* - no automatic file system 7.x

    - no automatic SAPCryptoLib

    - disable SNC configuration ADS = Adobe Document Services (obsolete with NetWeaver 7.3x BI-Java)

    Deinstall JAVA 7.0x Stack Deinstall JAVA 7.0x Stack

  • SAP AG 2009. All rights reserved. / Page 12

    SAP Business Intelligence Architecture 2013

    Choose the suitable combination

    BW 7.3x Upgrade JAVA fresh Install

    (Not the central EP)

    BI 4.0 Upgrade

    BI 4.1 fresh Install

    BW 3.5

    BW 7.0

    BW 7.0x

    Depended from

    SEM Add-On and

    Analysis Authorizations

    Deinstall/Split Java Add-In

    Deinstall JAVA Instance

    BW 7.01 SP08 and higher

    BW 7.0 (not recommended)

    BW 3.5 (not recommended)

    JAVA

    7.0x

    Add-On

    or sep.

    Install

    Deinstall/Split Java Add-In

    Deinstall JAVA Instance Fresh JAVA 7.3x Install

    Upgrade/Migrate to BI 4.x

    Fresh BI 4.x Install

    Use BI 4.x In-Build JAVA

    Application Server

    XI 3.1

    XI 3.1 SP04 Fresh JAVA 7.01 Install

    Fresh JAVA 7.3x Install

    Upgrade/Migrate to BI 4.x

    Use BI 4.x In-Build JAVA

    Application Server

    BI 4.0/4.1 together with BW

    7.3/7.31 (Note 1750236)

  • SAP AG 2009. All rights reserved. / Page 13

    New authorization concept must be in place

    Former and new authorization concept

    It is mandatory to setup/migrate to the new concept prior to the upgrade

    The former authorization concept is no longer supported with BW 7.3x

    You cannot switch back to the former concept

    New Transaction RSECADMIN, see SAP Notes 942799 and 944929

  • SAP AG 2009. All rights reserved. / Page 14

    Example Project schedule for the Migration

    Combined technical Upgrade & Authorization Migration

    Plan phase (6 weeks)

    Upgrade

    Authorizations

    DEV system (4 weeks)

    Upgrade & Test

    Authorization migration

    QAS system (5 weeks)

    Upgrade & Test

    Authorization Test

    PRD system (1 weekend)

    Upgrade & GoLive

    Cutover & GoLive

    KickOff Legend: Duration Milestone

    Start Upgrade

    1st month 2nd month 3rd month 4th month 5th month

    GoLive

    Remark

    Overall project duration dependents on the system complexity.

    Given example is based on a higher complexity.

    To match with typical technical Upgrade Plan, start two month in advance.

  • SAP AG 2009. All rights reserved. / Page 15

    General Guidelines and Notes

    ALM BW operations page in SCN http://scn.sap.com/docs/DOC-7856#section8

    NetWeaver BW 7.3 Online Help http://help.sap.com/saphelp_nw73/helpdata/en/ca/6fbd35746dbd2de10000009b38f889/frameset.htm

    Useful Notes

    Note 586648 - Invalid SID entries in /BI 0/SIOBJNM

    Note 1022704 - Upgrade Phase EHP_INCLUSION und SPSTACK_REQUEST

    Note 1088717 - Active services for Web Dynpro ABAP in transaction SICF

    Note 1390477 - Additional info for upgrade to SAP NetWeaver 7.3 (using SUM)

    Note 1403832 - Central Note: Upgrade Systems on SAP NetWeaver 7.3

    Note 1539356 - Upgrade to NW 7.3 with SEM-BW, FINBASIS, SAP_BS_FND, WEBCUIF

    Note 1405878 - SAP Solution Manager - Basic functions SP22 and higher

    Note 1484437 - BI_CONT 7.35: Information about installation and upgrade

    Note 1543092 - Upgrade of BP_BIADMIN 1.0 to BP_BIADMIN 3.0(BP BW ADMINISTRATION)

    Note 1562522 - SAPINST aborts during central instance installation

    Note 1603103 - SMSY: NetWeaver 7.3 upgrade

    Note 1636053 - Upgrade to SAP NetWeaver 7.3x: BW server: Useful note

    Note 1627683 - SCWB/SNOTE/SPAU: Changed development package

    Note 1528990 - SP Equivalence for update/upgrade to SAP NW 7.3x

    Note 1636841 - Version management: Compatibility with SAP BASIS 7.x0

  • SAP AG 2009. All rights reserved. / Page 16

    Agenda

    1. Technology/Roadmap facts

    2. Whats new with the Upgrade to BW 7.3x

    3. Usage of the ASU toolbox for BW

    4. General checks prior to the Upgrade

    5. Details of the Upgrade Process

  • SAP AG 2009. All rights reserved. / Page 17

    SAP Upgrade Manager (SUM) 1.0

    The SUM 1.0 as part of the SL Toolset 1.0

  • SAP AG 2009. All rights reserved. / Page 18

    The Software Update Manager for the SAP

    Business Suite

    The Software Update Manager is the Software Maintenance Tool for the SAP

    Business Suite 7 Innovations 2011*).

    *) For further information on the currently available Software Update Manager, see SAP Central Note - Software Update Manager 1.0

    SP03 1591328 and regarding replaced tools, see Replacements of outdated tools via SL Toolset SAP Note 1589311.

  • SAP AG 2009. All rights reserved. / Page 19

    SAP Upgrade Manager (SUM) 1.0

    outlook for 2012

    It is planned that future versions of the Software Update Manager will replace

    well known tools.

    For further information on tool replacements, see Replacements of outdated tools via SL Toolset SAP Note 1589311.

  • SAP AG 2009. All rights reserved. / Page 20

    System Switch Upgrade

    New upgrade directory now located at \\sapmnt\\upg

    New with NetWeaver EhP1 onwards

  • SAP AG 2009. All rights reserved. / Page 21

    New Upgrade UI

    following the EhP development guidelines

  • SAP AG 2009. All rights reserved. / Page 22

    New Upgrade UI

    Providing the JCE Jurisdiction Policy Files beforehand

    New Security Concept used: See Notes 1240081 and 1238121

    Start of SAPup STARTUP JCE_POLICY_ZIP = " If JCE_POLICY_ZIP already set in the Environment

    you can directly use STARTUP without Parameter

  • SAP AG 2009. All rights reserved. / Page 23

    Put all components/patches/updates to one

    directory and all Add-Ons as SAINT packages

    All Add-Ons/Patches will be found automatically in the EPS inbox and all other files in the download directory

    Create your XML File for ABAP Support Packages in the MOPZ

  • SAP AG 2009. All rights reserved. / Page 24

    New Preconfiguration Modes available

    Or manual selection see Upgrade Guide Page 46

  • SAP AG 2009. All rights reserved. / Page 25

    Upgrade Planning

    working until Downtime is possible now

  • SAP AG 2009. All rights reserved. / Page 26

    Changeability of BW Objects during Upgrade

  • SAP AG 2009. All rights reserved. / Page 27

    Agenda

    1. Technology/Roadmap facts

    2. Whats new with the Upgrade to BW 7.3x

    3. Usage of the ASU toolbox for BW

    4. General checks prior to the Upgrade

    5. Details of the Upgrade Process

  • SAP AG 2009. All rights reserved. / Page 28

    Accelerated Upgrade to NetWeaver BW 7.3x

    Your single source for all pre and post upgrade steps

    Use the predefined content for:

    upgrade to NetWeaver 7.x BW

    upgrade to ERP 6.0 EhPx (upcoming)

    upgrade to any SAP Product based on

    the NetWeaver 7.x Platform

    create/modify own content (XML based)

    Complete Business Suite 7

    connectivity (with EhP1):

    abap - java connection (available) for

    connection BW-IP, EP, ESS/MSS, etc.

    abap - abap (with EhP1) for backend

    connection e.g. ERP, CRM, BW, PI, etc.

    java - java (upcoming) for frontend

    connection e.g. FPM, etc.

    Note 1178800

    Lower your TCO and time efforts

    by Managing your Upgrade with innovative tools

    1. ASU toolbox (incl. BW Content)

    one single truth for all pre/post Upgrade Steps

    (Note 1000009)

    2. CTC for BW-Java

    automatic connection between Abap and Java (Note 983156)

    Check out the success story from the German Customer Karcher:

    http://service.sap.com/~sapidp/011000358700000162292010E/

  • SAP AG 2009. All rights reserved. / Page 29

    Application Post

    checks and functional

    tests

    Technical post Steps

    and Go-Live

    Preparation

    Application testing

    New 7.0 EDW features

    Technical testing

    BI-Java CTC and

    testing of new 7.0

    features

    Application checks/

    cleansing and

    Upgrade Preparation

    Technical checks and

    Upgrade preparation

    Agree on result

    Last checks

    PREPARE

    UPGRADE

    Pre Upgrade

    Steps

    PREPARE/

    UPGRADE

    Post Upgrade

    Steps Testing

    Upgrade Process with the ASU toolbox for BW

    in average 3 days per systems

    1 day 1 day 1 day 1 Week

    Note: Elapsed time may be longer due to scheduling and lags, etc.

    Key Highlights of the ASU toolbox for BW

    One single source of all pre and post steps for a successful upgrade

    Clear distribution of tasks between SAP Basis Administration and the Application Development

    Additions, Remarks, Documentation can be added immediately as well

    XML editor makes adoptions to other SAP upgrades easy.

  • SAP AG 2009. All rights reserved. / Page 30

    Typical Scenario for an Upgrade

    See Details in SAP Note 1000009

    SAP Solution Manager SAP UP SAP System

    Start Upgrade RoadMap

    Start ASU-Toolbox

    before Upgrade Phase (download Content from SMP)

    Start Prepare Running Prepare-Jobs

    Running ASU-Reports via

    Schedule Manager

    Start technical Upgrade ASU-Toolbox

    before Upgrade Phase finished

    Prepare finished

    Running technical Upgrade

    Start ASU-Toolbox

    after Upgrade Phase

    Technical Upgrade finished

    Running ASU-Reports via

    Schedule Manager

    ASU-Toolbox

    after Upgrade Phase finished

    Monitoring of all started

    ASU-Reports via

    Solution Manager

    ASU-Upgrade-Note-Display

  • SAP AG 2009. All rights reserved. / Page 31

    Typical Upgrade Project Plan

    typical duration 6-8 weeks for a 3-System Landscape

    Start after first comp. Stack (3d/Sys)

    3d

    3d + 1w Test

    Ongoing (several weeks)

    Steps/Milestones

    3d + 1w Test

    3d

    Start after first Upgrade (2d/Sys.)

    2w

    Upgrade Tasks

    Upgrade Planning

    Upgrade of Development

    Additional testing

    Setup of BWA or BW on HANA

    Upgrade of Test

    Upgrade of Production

    SAP Java Server/EP

    Go Live BWA or BW on HANA

    today Legend: Duration Milestone 6 weeks 8 weeks

    Time in total: 9d Upgrade, 10+d testing, 6d Java Inst, 9d het. Systemcopy, conversion IC/DSO individually, BW on HANA testing individually

  • SAP AG 2009. All rights reserved. / Page 32

    Pre Steps of ASU toolbox for BW - 1

  • SAP AG 2009. All rights reserved. / Page 33

    Post Steps of ASU toolbox for BW - 1

  • SAP AG 2009. All rights reserved. / Page 34

    ASU toolbox BW specific

    Install latest ST-PI 2008 Add-On (SP05)

    XML can now be changed within the

    same screen, e.g. new or changed

    items/checks can be added immediate.

  • SAP AG 2009. All rights reserved. / Page 35

    Agenda

    1. Technology/Roadmap facts

    2. Whats new with the Upgrade to BW 7.3x

    3. Usage of the ASU toolbox for BW

    4. General checks prior to the Upgrade

    5. Details of the Upgrade Process

  • SAP AG 2009. All rights reserved. / Page 36

    New with NetWeaver 7.0x Daemon process

    Stop all Daemon Process with Transaction RSRDA

  • SAP AG 2009. All rights reserved. / Page 37

    Activate all DataStore Objects

    Valid for all BW Releases 3.x and 7.0x

  • SAP AG 2009. All rights reserved. / Page 38

    Repair Inconsistent InfoPackages

    Transaction RSBATCH

  • SAP AG 2009. All rights reserved. / Page 39

    Further general Upgrade Checks

    SAP_DROP_TMPTABLES and RSUPGRCHECK

  • SAP AG 2009. All rights reserved. / Page 40

    Check the Secure Storage with SECSTORE

    e.g. if System is a copy from Test/Production

  • SAP AG 2009. All rights reserved. / Page 41

    Transaction SECSTORE

  • SAP AG 2009. All rights reserved. / Page 42

    Check for missing TLIBG entries

    New check from NetWeaver BW 7.0x onwards (Note 783308)

    2EETG013 "Function group frame program" "CRM_BUPA_FRG0060_BAPI" "exists without TLIBG entry"

    2EETG013 "Function group frame program" "LXE_SE63_Z_EDITOR" "exists without TLIBG entry"

    proceed as follows:

    1. TA: SE80

    2. Select the 'Function Group' option from the dropdown menu

    3. Enter: XXXXX

    4. Follow the instructions.

    5. Continue with the upgrade.

    or run the report RSTLIBG to avoid these errors in the PREPARE beforehand.

  • SAP AG 2009. All rights reserved. / Page 43

    Check for wrong source systems assignments

    Note 1564964 - Source system XYZ does not exist

    use function module RSAR_LOGICAL_SYSTEM_DELETE in advance to remove old source systems.

    Note 1546842 - Message SY530 in the transport log RS_DTRF_AFTER_IMPORT

    minimum start release for Upgrade 7.01 SP08 or higher (see also Note 1469150)

    Note 1649901 - Time-critical processes in BW upgrade/Support Package import

    table RSADMIN REPL_D_AFTER_IMPORT = X to prevent long runtimes in upgrade step AIN_NEWBAS/XPRAS_AIMMRG.

    In advance run report RS_LOGSYS_ACTIVATE before/after the upgrade

    Note 1894463 - Upgrade terminates with error RS0 871 or RS0 876

    table RSADMIN RSVERS_BI_IMPORT_ALL =

    Note 1870559 - IMPORT ALL(4): ASSERTION_FAILED in SAPLRSVERS

    import prior to the upgrade to NetWeaver 7.3x

    Note 1668456 - DTP: Fehlermeldung RSO851 bei Upgrade / Content-Installation

    import prior to the upgrade to NetWeaver 7.3x, see also Note 1633805

    Inconsistent source system can create long runtimes in XPRAs

  • SAP AG 2009. All rights reserved. / Page 44

    Usage of the SAP Solution Manager

    Create the Stack XML File

    Transaction SOLMAN_WORKCENTER

  • SAP AG 2009. All rights reserved. / Page 45

    Choose the Option Upgrade for your source system

    Create the Stack XML File

  • SAP AG 2009. All rights reserved. / Page 46

    Create the Stack XML File

    Choose the Option Maintenance for the Upgrade

  • SAP AG 2009. All rights reserved. / Page 47

    Create the Stack XML File

    Confirm the Major Target

  • SAP AG 2009. All rights reserved. / Page 48

    Create the Stack XML File

    The XML File is created and available for download or in the EPS inbox

  • SAP AG 2009. All rights reserved. / Page 49

    Agenda

    1. Technology/Roadmap facts

    2. Whats new with the Upgrade to BW 7.3x

    3. Usage of the ASU toolbox for BW

    4. General checks prior to the Upgrade

    5. Details of the Upgrade Process

  • SAP AG 2009. All rights reserved. / Page 50

    Upgrade UI Start Page http://..:4239

  • SAP AG 2009. All rights reserved. / Page 51

    SAP JVM location/environment variables

    start DSUGui.bat separately, if the Web Browser is not working

  • SAP AG 2009. All rights reserved. / Page 52

    Upgrade UI

    Details for Step Initialization

  • SAP AG 2009. All rights reserved. / Page 53

    Upgrade Password provided in Note 1403832

    Put all updates from SMP into the download directory

    startup.bat "jce_policy_zip=SAPJVM6_crypto.zip" Password: KEYWORD: 6782622

  • SAP AG 2009. All rights reserved. / Page 54

    Include the Stack XML from Solution Manager

    A correct configured Maintenance Optimizer is a prerequisite now

  • SAP AG 2009. All rights reserved. / Page 55

    Add all main DVD here

    Remove empty lines in advance Add-Ons as SAINT packages

  • SAP AG 2009. All rights reserved. / Page 56

    Solution Manger Upgrade Key ready

    Solution Manager MOPZ connection later necessary

  • SAP AG 2009. All rights reserved. / Page 57

    Upgrade UI Note 96317 and 962955 check with Page 88 of the Upgrade Guide modify /etc/hosts

  • SAP AG 2009. All rights reserved. / Page 58

    Non Unicode Upgrade to 7.3x is possible

    To save time the Unicode decision can be done later

  • SAP AG 2009. All rights reserved. / Page 59

    New Upgrade pre configuration options

    High resource use (minimal downtime, fast import, archiving off)

  • SAP AG 2009. All rights reserved. / Page 60

    Overview of upgrade configuration

    Accept choice

  • SAP AG 2009. All rights reserved. / Page 61

    Overview of manual upgrade configuration

    Manual selection will not apply maximum values

  • SAP AG 2009. All rights reserved. / Page 62

    Procedure with further Add-Ons

    Add additional packages as SAINT packages into EPS/in

  • SAP AG 2009. All rights reserved. / Page 63

    Mandatory connection to MOPZ needed

    See Notes 1539356 (7.30) 1681435 (7.31) how to handle SEM Add-On

  • SAP AG 2009. All rights reserved. / Page 64

    Decision about EhP1 during Upgrade to 7.3x

    Note 1022704 EHP_INCLUSION and SPSTACK_REQUEST

  • SAP AG 2009. All rights reserved. / Page 65

    Further decision about Add-Ons

    UPG WITH SAINT PACK or DELETE (for ST-PI possible)

  • SAP AG 2009. All rights reserved. / Page 66

    Decision about included Support Packages

  • SAP AG 2009. All rights reserved. / Page 67

    Problem occurs with the archive LUP.SAR

    follow the mentioned Note for the component LUP

    You have to give the Source out of DVD/zip from Number 51041560

    there is the missing component LUP.SAR (SL controller)

    See also:

    Note 1562522 - SAPINST aborts during central instance installation

    Note 1432609 - Inst.Systems Based on NW 7.3 - UNIX

  • SAP AG 2009. All rights reserved. / Page 68

    Decision about included SPAM update

  • SAP AG 2009. All rights reserved. / Page 69

    Optional: include SPDD and/or SPAU request

  • SAP AG 2009. All rights reserved. / Page 70

    ASU toolbox for BW

    Even that ASU toolbox is optional, it contains ALL pre and post steps

  • SAP AG 2009. All rights reserved. / Page 71

    Installing BI_CONT on SAP NetWeaver 7.3

    3800300 version 7.35

  • SAP AG 2009. All rights reserved. / Page 72

    Development is locked after this Phase

    Depending on your Upgrade preconfiguration

    Please Note:

    from BW Perspective is is now not possible anymore to

    change the following objects,

    even that you are not jet in the

    downtime phase

    Query structures

    InfoPackages definitions

    Process Chains

    This behavior didnt changed from former BW Upgrades prior

    to EhP1 (7.01)

  • SAP AG 2009. All rights reserved. / Page 73

    Decision about SPDD prior the ACT phase

    For BW type system you can continue without adjustments

  • SAP AG 2009. All rights reserved. / Page 74

    Unlock/Lock the shadow system is necessary

    A friendly reminder/recap

    D:\usr\sap\trans\bin>tp unlocksys FBM pf=TP_DOMAIN_FBM.PFL

    This is tp version 372.04.65 (release 700, unicode enabled)

    tp finished with return code: 0

    meaning:

    Everything OK

    D:\usr\sap\trans\bin>tp unlock_eu FBM pf=TP_DOMAIN_FBM.PFL

    This is tp version 372.04.65 (release 700, unicode enabled)

    tp finished with return code: 0

    meaning:

    Everything OK

    D:\usr\sap\trans\bin>tp locksys FBM pf=TP_DOMAIN_FBM.PFL

    This is tp version 372.04.65 (release 700, unicode enabled)

    tp finished with return code: 0

    meaning:

    Everything OK

    D:\usr\sap\trans\bin>tp lock_eu FBM pf=TP_DOMAIN_FBM.PFL

    This is tp version 372.04.65 (release 700, unicode enabled)

    tp finished with return code: 0

    meaning:

    Everything OK

  • SAP AG 2009. All rights reserved. / Page 75

    Reset the Upgrade with report RSUPGRES

    Another friendly reminder/recap (run with user DDIC in client 000)

    Note 417670 - Additional information on resetting upgrade as of Release 6.10

    Note 1518145 - FM DD_DB_MISSING_OBJECTS returns incorrect no. of objects

  • SAP AG 2009. All rights reserved. / Page 76

    Decision about ACT phase

    Accept non-severe errors will be solved in a later phase

  • SAP AG 2009. All rights reserved. / Page 77

    Old PREPARE is now finished

    Until this phase working with the system was possible

  • SAP AG 2009. All rights reserved. / Page 78

    End of phase Preprocessing

    To ensure the recovering please backup the upgrade directory

  • SAP AG 2009. All rights reserved. / Page 79

    End of phase Downtime backup of DB

    Upgrade is already over the top

  • SAP AG 2009. All rights reserved. / Page 80

    End of phase Postprocessing

    Think about the start of BTCTRNS2 after the post work is finished

  • SAP AG 2009. All rights reserved. / Page 81

    End of phase Postprocessing

    Think about the start of SGEN after the post work is finished

  • SAP AG 2009. All rights reserved. / Page 82

    End of phase Postprocessing

    Might not occur with higher support package

  • SAP AG 2009. All rights reserved. / Page 83

    End of phase Postprocessing

    Decision about SPAU create transport for further upgrades

  • SAP AG 2009. All rights reserved. / Page 84

    End of phase Postprocessing

    Your technical Upgrade is finished

  • SAP AG 2009. All rights reserved. / Page 85

    Technical Upgrade has ended

    End of phase Finalization

  • SAP AG 2009. All rights reserved. / Page 86

    Example runtime for BW 7.3x upgrade

    Running at the end of the technical upgrade

  • SAP AG 2009. All rights reserved. / Page 87

    Post work after 7.3x upgrade new Note 1165059 - ALE: Generating and reading change pointers after upgrade

    Run Report RBDCPMIG_ALL_WITHOUT_MIG_FLAG in Test and Productive Mode

  • SAP AG 2009. All rights reserved. / Page 88

    Migrate the BI Authorization to 7.3x

    More Details:

    http://help.sap.com/saphelp_nw73/helpdata/en/45/5ae49cee142a50e10000000a11466f/frameset.htm

  • SAP AG 2009. All rights reserved. / Page 89

    Post Activites after Upgrade to BW 7.3x Note 1636053 - Upgrade to SAP NetWeaver 7.3x: BW server: Useful note

    Note 1720495 - Invalid deimplementation of obsolete notes by SNOTE tool

    Note 1553608 - Changelog Deletion Variant doesnt work in BW 7.01-7.3x

    Note 1572695 - MDX: System-wide call of old parser implementation

    Note 1678212 - Deleting DTPs that do not have a transformation not possible

    Note 1668991 - BW730: exception aggregation - new and old implementation

    Note 1709947 - SP29:Field length wrong in source and target of TRF

  • SAP AG 2009. All rights reserved. / Page 90

    Post Activites after Upgrade to BW 7.3x Note 1636053 - Upgrade to SAP NetWeaver 7.3x: BW server: Useful note

    Note 1610259 - Controlling 'Returncode' behavior in update rules RSAU_RETURNCODE_NEW = X

    (optional: this simplifies the migration of the update rules to a transformation).

    You can switch on/off the new behavior for BAdI in 7.3x

    Note 1489064 - DataSource problems after BW upgrade from 7.0 to 7.3

    run Report RSAR_PSA_NEWDS_MAPPING_CHECK to check inconsistencies in

    DataSources after Upgrade

    Note 1521903 - Regenerate all inconsistent BAdI's

    run Report ENHS_BADI_ANALYZE_GENERATE_ALL or BADI_RSANALYZE

    Note 1633303 - RSMDATASTATE inconsistencies after upgrade from 7.0x to 7.3x

    run function module RSDDTREX_AFTER_UPGRADE_70X_73X after the Upgrade

    Note 1632284 - Program RSCOMPCONS should generate warning messages (SP06)

    run Report RSCOMPCONS and repair the compounding of MultiProviders is necessary

    Note 1532874 - Upgrade: Changing the HTTP reauthentication Add the profile Parameter icf/user_recheck =1 to the instance profile

    Note 1026944 - New cache mode with no directory for BI 7.0

    transaction RSRT2 mass maintenance

    Note 1635588 - Problems with Start / End routine created at BW 7.0+ Release (SP06)

    Note 1572882 - Problems loading 3.5 views after upgrade to 7.0/7.01 (SP07)

    Note 1716329 - Planning function formula: Syntax error in generated program

  • SAP AG 2009. All rights reserved. / Page 91

    Post Activites after Upgrade to BW 7.3x SEM/FINBASIS 6.34/6.36 related

    In most cases the Note 603642 solves the Problem with UCWB and UCMON startup,

    however Note 948201 has to be also take into consideration.

    Note 603642 - FinBasis: Manual deletion of obsolete read buffers

    run report UGMD_DEL_BUFFER

    Note 948201 - Dump MESSAGE_TYPE_X in

    IF_UC_APPLICATION_MODEL~READ_CHAR_HRY

    Note 1629760 - Syntax error in webdynpro FINBASIS/SEM-BW (UGWB_EVENT)

    Check after the upgrade your MultiProvider against DeltaPair classes

    goto MuliProvider additions DeltaPairs

    Note 1148288 - Reports for the Migration of Package Data

    run report RS_MIGRATE_PACKAGES for customer owned packages, if needed.

  • SAP AG 2009. All rights reserved. / Page 92

    Post Activites after Upgrade to BW 7.3x BI-JAVA/EP related

    Please Note that a lot of corrections are done with the current Patch set

    Note 1622303 - Delivery of BI Java v.13 in NW 7.30 SP7#30 and other clients

    the HotFix for SP7#30 is expected for Week 27, 2012

    Hinweis 1512355 - SAP NetWeaver 7.30: Schedule for BI Java Patch Delivery

    Note 1535174 - Post upgrade step for AFP in NW Portal 730 and 702

    if the related JAVA was upgrade from previous Version you must run the described

    migration procedure from the Note.

    Note 1371703 - WPC for SAP NetWeaver 7.3 - Upgrade Information

  • SAP AG 2009. All rights reserved. / Page 93

    Post work after 7.3x upgrade - existing

    Get everything which is needed here:

    Managing your Upgrade with Innovative Tools http://scn.sap.com/docs/DOC-7856

    The upgrade Bible to 7.x from page 52 http://scn.sap.com/docs/DOC-11608

    Check the generic post upgrade steps from here

  • SAP AG 2009. All rights reserved. / Page 94

    Thank you!

    Roland Kramer Product/Solution Management BW/In-Memory

    Mobil +49 (151) 4260 3219 [email protected]

    http://scn.sap.com/docs/DOC-7856

  • SAP AG 2009. All rights reserved. / Page 95

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

    Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

    Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

    Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

    Oracle is a registered trademark of Oracle Corporation.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

    Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

    HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium, Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc.

    JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

    SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

    Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects S.A. in the United States and in other countries. Business Objects is an SAP company.

    All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

    These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warrant.

    Copyright 2013 SAP AG All Rights Reserved