1
116 BILLION 273 PUBLIC 5 YEARS 49 PRIVATE 25 YEARS 426 HOUSEHOLDS PROJECT COST (NPR) DPR 2011 AFTER FC AFTER COD CONCESSION PERIOD TO BE ACQUIRED LAND (HECTARES) CONSTRUCTION PERIOD 57 HOUSEHOLDS 27 PERCENT FREE SHARE TO GoN RESETTLEMENT REQUIRED AFFECTED HOUSEHOLDS 108 MW FREE ENERGY TO GoN 2 MW FREE RURAL ELECTRIFICATION 5,000 DIRECT EMPLOYMENT SKILLS DEVELOPMENT LOCAL RESOURCES UTILIZATION INFRASTRUCTURE DEVELOPMENT 25 YEARS GoN TO GET THE PROJECT FREE OF COST (IN GOOD OPERATING CONDITION) EXPECTED BENEFITS NPR 431B ECONOMIC BENEFITS TO GoN OVER CONCESSION PERIOD (ROYALTY, DIVIDENT, INCOME TAX, FREE ENERGY, VAT, CUSTOMS) UPPER KARNALI HYDROPOWER

UPPER PROJECT COST (NPR) CONCESSION PERIOD ......116 BILLION 273 PUBLIC 5 YEARS 49 PRIVATE 25 YEARS 426 HOUSEHOLDS PROJECT COST (NPR) DPR 2011 AFTER FC AFTER COD CONCESSION PERIOD

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UPPER PROJECT COST (NPR) CONCESSION PERIOD ......116 BILLION 273 PUBLIC 5 YEARS 49 PRIVATE 25 YEARS 426 HOUSEHOLDS PROJECT COST (NPR) DPR 2011 AFTER FC AFTER COD CONCESSION PERIOD

116BILLION

273PUBLIC

5YEARS

49PRIVATE

25YEARS

426HOUSEHOLDS

PROJECT COST (NPR)

DPR 2011

AFTER FC

AFTER COD

CONCESSION PERIOD

TO BE ACQUIRED LAND (HECTARES)

CONSTRUCTION PERIOD

57HOUSEHOLDS

27 PERCENTFREE SHARE TO GoN

RESETTLEMENT REQUIRED

AFFECTED HOUSEHOLDS

108 MWFREE ENERGY TO GoN

2 MWFREE RURAL ELECTRIFICATION

5,000DIRECT EMPLOYMENT

SKILLS DEVELOPMENTLOCAL RESOURCES UTILIZATION

INFRASTRUCTURE DEVELOPMENT

25 YEARSGoN TO GET THE PROJECT FREE OF COST (IN GOOD OPERATING CONDITION)

EXPECTED BENEFITS

NPR 431BECONOMIC BENEFITS TO GoN OVER CONCESSION PERIOD(ROYALTY, DIVIDENT, INCOME TAX, FREE ENERGY, VAT, CUSTOMS)

UPPER KARNALI HYDROPOWER