Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
13-week Rolling forecast
�Upside/Downside rule
�Model transition by BUPM
�SKU transition by CPM
SYSBG Sales Div.
Project Office
Upside/Downside rule in a nutshell
Plan ahead
ETA
Biz type/Customer
Upside/downside rule
ETD
Country
2
ETD 1 2 3 4 5 6 7 8 9 10
±% 0 0 0 25 25 50 50 50 50 FCST
90SKU 9N barebones
ETD wk Rules PA constraint
W10 ∞ ∞ ∞
W9 50% 50% 150%
W8 50%
W7 50%
W6 50%
3
W6 50%
W5 25% 37.5% 187.5%
W4 25%
W3 0% 37.5% 187.5%
W2 0%
W1 0%
Rolling forecastRolling forecast
with upsize/downsize rule
CPM
Complete 13-wk rolling FCST
If failed
Option 1: Upside/Downside Correction
5
Save as draft
Submit to TPM
Option 2: Escalate to TPM
Submit to TPM again
Click for back order/carry overSell-thru by model
Default show all SKUs
Mouse-over for the key-parts
1) Complete rolling forecast
till the ETA week, highlighted in GREEN
2) Click Save as draft
for channel and retail forecast separately
3) Submit to TPM
after whole country forecast are saved
4) If failed, check the magnifier
Option1:
Adjust the ETA Qty and then click Save
Submit the PA to TPM again
Option2:
Escalate to TPM to check the Territory pool
Submit the PA to TPM again
Model Transition by BUPMModel Transition by BUPM
Launch in Oct/2011
• Handle unexpected key parts changes of the same model
• Handle unexpected key parts changes of the same model
Feature
• Systemize and put on record• Systemize and put on record
Advantage
• Systemize and put on record• Systemize and put on record
• 3 steps to refine forecast
• System automatically complete the 3 tasks
• 3 steps to refine forecast
• System automatically complete the 3 tasks
Benefit
1) Click Confirm Model Trans
3) Click Confirm
2) Select the new SKU
CPM
Click “Confirm Model Trans”
System
Complete country lineup
Work efficiently to do Model Transition
Select the new SKU
Click “Confirm”
Complete Dist price
Transfer Plan ahead to new SKU (from ETA this week)
SKU Transition by CPMSKU Transition by CPM
Launch in April/2012
• Deal with delayed transition info from HQ
• React to the changes of sales planning
• Deal with delayed transition info from HQ
• React to the changes of sales planning
Feature
Advantage
• Systemize and put on record• Systemize and put on record
• 3 steps to refine forecast
• System automatically complete the 3 tasks
• 3 steps to refine forecast
• System automatically complete the 3 tasks
Benefit
1) Click Model name on the “Country
lineup” and “Dist price”
or Shipway on the “Plan ahead”
2) Define the new SKU, Start week
and End week
3) Click Search and 3) Click Search and
then Save
CPM
Click “Model name” or Shipway
System
Complete country lineup
Work efficiently to do SKU Transition
Define new SKU, Start week, and End week
Click “Search” and then “Save”
Complete Dist price
Transfer Plan ahead to new SKU (from ETA this week)