US Army Corps of Engineers

BUILDING STRONG®

PNWA Conference Update

COLONEL Jose Aguilar

District Commander

Portland District

2 October, 2014

BUILDING STRONG®PORTLAND DISTRICT 2

Projects

Mouth of the Columbia (MCR) Jetties Columbia River Status Coastal Dredging Navigation Structures 2017 Navigation Lock Work at The Dalles

BUILDING STRONG®PORTLAND DISTRICT 3

Pacific

Ocean

Baker Bay

Clatsop Spit

Peacock Spit

Washington

Oregon

Sand Island

Ilwaco

AstoriaHammond

Chinook

Jetty “A”

Long Beach

North Head

Columbia River Estuary

N

Pacific

Ocean

Baker Bay

Clatsop Spit

Peacock Spit

Washington

Oregon

Sand Island

Ilwaco

AstoriaHammond

Chinook

Jetty “A”

Long Beach

North Head

Columbia River Estuary

NN

Mouth of the Columbia (MCR) Jetties

BUILDING STRONG®PORTLAND DISTRICT 4

North Jetty - construction

North jetty construction 1914North jetty construction 1914

Modern Day Peacock Spit & Benson Beach

Old Peacock Spit

North jetty construction 1914North jetty construction 1914

Modern Day Peacock Spit & Benson Beach

Old Peacock Spit

BUILDING STRONG®PORTLAND DISTRICT 5

South Jetty – Dune Stabilization

• FY13 O&M Funding• Prevents further dune erosion and

Pacific Ocean connecting to Trestle Bay• Completed 30 October 2013• Dynamic cobblestone revetment: over

35,000 CY of stone placed

BUILDING STRONG®PORTLAND DISTRICT 6

North Jetty Lagoon Fill and Critical Repairs (O&M)

FY14 & Proposed FY 15 O&M funds: North Jetty Lagoon Fill: Completion June 2015 North Jetty Critical Repairs: Completion September 2016

Oct. 2012

Critical Repairs

Stabilization Areas

BUILDING STRONG®PORTLAND DISTRICT 7

MCR Jetty Major Rehabilitation

FY14 “New Construction” start for Major Rehab Project

$257M project includes repairs to all 3 jetties

$1M received in FY14 to start Jetty A repairs

$1M in FY15 PBUD to initiate North Jetty repairs

BUILDING STRONG®PORTLAND DISTRICT 8

Coastal Dredging FY14 “Funding Pot” Allocation & Work:

► Yaquina Dredging:• Chetco River- 9,101CY in June• Rogue River- 39,155CY in June• Coquille River- 28,177CY in July and September• Umpqua River- 169,634CY in July and September• Siuslaw River- 74,670CY in June• Yaquina Bay –156,442CY in April through September

► Coast Clamshell Contract:• Port Orford – 34,774CY in July• Charleston – 40,630 CY in July• Yaquina Bay – 238,245 CY in August• State Funded:

• Rogue River- 15,000CY in July• Winchester Bay- 26,302CY in August

• USCG Funded – Rogue River SARDET 5,766Cy in July

BUILDING STRONG®PORTLAND DISTRICT 9

Oregon MOA for Low-Use Harbor Maintenance

MOA signed on August 28, 2013

Up to $5 million a year for 5 years

State funds leverage Appropriations and USCG funds

FY14 Accomplishments► Over 360,000 cubic yards dredged in a clamshell contract (Rogue, Port Orford,

Charleston, Winchester Bay, and Yaquina Bay)► 641,633 cubic yards dredged with the dredge Yaquina (Chetco, Rogue, Coquille,

Umpqua, Siuslaw, Yaquina Bay and Skipanon)► Estimated 45,000 cubic yards to be dredged with a pipeline contract (Depoe Bay

and Garibaldi Boat Basin)

HME HMEYaquina

BUILDING STRONG®PORTLAND DISTRICT 10

03 October 2014

Columbia River Channel Status

Astoria

Longview

Kalama

Portland & Vancouver

MOUTH OF COLUMBIA RIVER 57 57 52 MOUTH OF COLUMBIA RIVER 42MOUTH OF COLUMBIA RIVER 52 53 52 MOUTH OF COLUMBIA RIVER 42LOWER DESDEMONA SHOAL 46 47 49 50UPPER DESDEMONA SHOAL 44 45 44 41FLAVEL BAR 43 43 44 36UPPER SANDS 41 43 44 42UPPER SANDS 41 44 43 40TONGUE POINT CROSSING 40 44 44 44TONGUE POINT CROSSING 41 44 42 38MILLER SANDS 39 45 44 36MILLER SANDS 41 45 44 40MILLER SANDS 42 44 45 41PILLAR ROCK RANGES 40 44 43 38PILLAR ROCK RANGES 46 48 45 42BROOKFIELD-WELCH ISLAND 46 48 46 44BROOKFIELD-WELCH ISLAND 46 49 42 31SKAMOKAWA BAR 38 43 42 40SKAMOKAWA BAR 45 45 45 42PUGET ISLAND BAR 52 55 52 47PUGET ISLAND BAR 42 43 44 42WAUNA & DRISCOLL RANGES 40 43 42 38WAUNA & DRISCOLL RANGES 40 44 44 42WESTPORT BAR 42 43 43 42WESTPORT BAR 42 44 44 39EUREKA BAR 41 43 42 40EUREKA BAR 45 46 42 41EUREKA BAR 41 43 44 42GULL ISLAND BAR 43 45 43 41GULL ISLAND BAR 49 45 44 38STELLA-FISHER BAR 47 48 46 42STELLA-FISHER BAR 42 43 43 40WALKER ISLAND REACH 46 48 46 40WALKER ISLAND REACH 44 45 44 40WALKER ISLAND REACH 47 48 43 41SLAUGHTERS BAR 41 43 43 41SLAUGHTERS BAR 41 43 43 41LOWER DOBELBOWER BAR 42 43 45 41LOWER DOBELBOWER BAR 45 45 44 40UPPER DOBELBOWER BAR 45 42 43 37UPPER DOBELBOWER BAR 41 43 43 42KALAMA BAR 47 57 57 57KALAMA BAR 41 45 44 33KALAMA BAR 41 44 43 40LOWER MARTIN BAR 39 44 44 42LOWER MARTIN BAR 43 44 44 41LOWER MARTIN BAR 44 44 45 39UPPER MARTIN BAR 48 45 44 41UPPER MARTIN BAR 42 43 43 43UPPER MARTIN BAR 41 43 43 41ST. HELENS BAR 39 42 43 37ST. HELENS BAR 42 44 41 38WARRIOR ROCK BAR 49 50 50 45WARRIOR ROCK BAR 40 42 42 43WARRIOR ROCK BAR 39 43 44 43HENRICI BAR 39 43 41 38HENRICI BAR 43 43 43 41WILLOW BAR 44 44 40WILLOW BAR 40 43 42 41MORGAN BAR 42 44 44 44MORGAN BAR 44 46 49 50MORGAN BAR 43 44 43 43LOWER VANCOUVER BAR 47 47 46 36LOWER VANCOUVER BAR 42 42 42 38LOWER VANCOUVER BAR 45 44 41 40VANCOUVER TURNING BASIN 39 33 41VANCOUVER TURNING BASIN 30 24 22

Comparison of Draft Restrictions

Year Days Percent of Time

2014 39 11

2013 67 18

2012 121 33

2011 258 71

7 or more feet above project depth5 or 6 feet above project depth3 or 4 feet above project depth1 or 2 feet above project depthAt or 1 foot below project depth2 or 3 feet below project depth4 feet or more below project depth

BUILDING STRONG®PORTLAND DISTRICT 11

Coastal Structures

District Portfolio: 44 Jetty and Breakwater Structures Over 230 Pile Dike Structures

Condition: 14 have a structural condition rating of D or lower (D = An extensive portion of the structure has deteriorated to a condition that repairs are required)

Need to protect the Federal investment and maintain function

BUILDING STRONG®PORTLAND DISTRICT 12

Pile DikesPassive Channel Maintenance

• Pile Dikes: decreased dredging requirements and increased habitat creation

• Focusing Attention – 2013 OCA review of 4 most critical near Mouth of the Columbia River

• Poor condition and expensive rehab requirements

BUILDING STRONG®PORTLAND DISTRICT 13

The Dalles 2017 Extended Lock Outage

Plan

Scope of work limited to critical items► Improve life safety concerns► Improve lock reliability

2017 Scope:► Replace downstream gate gudgeon hardware► Replace upstream gate► Upgrade controls

Current Status (Fall 2014)► Completing Design Reports► Initiating Plans & Specifications