Upload
dangtu
View
216
Download
0
Embed Size (px)
Citation preview
USA Roadshow September 2009
Ian Smith CEO & Managing Director
2
Disclaimer
Forward Looking Statements
These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis and are
subject to significant uncertainties, risks and contingencies, many of which are outside of the control of, and may be unknown to, the company.
Actual results and developments may vary materially from those expressed in these materials. The types of uncertainties which are relevant to
the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to
the business of the company and general economic conditions. Given these uncertainties, readers are cautioned not to place undue
reliance on
such forward looking statements.
Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any
relevant stock exchange listing rules, the company does not in providing this information undertake any obligation to publicly update or revise any
of the forward looking statements or any change in events, conditions or circumstances on which any such statement is based.
Competent Persons StatementThe information in this report that relates to Exploration Results is based on information compiled by C. Moorhead, EGM Minerals
for Newcrest
Mining Limited who is a Member of The Australasian Institute of Mining and Metallurgy, and a full-time employee of Newcrest Mining Limited. Mr
Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Moorhead consents to the inclusion in the report of the matters based on this information in
the form and context in which it appears.
3
Newcrest
Top 10 global gold producer
Top 20 ASX listed company (US$12–14 Billion)
Proven ability to find, build and operate world class gold mines
Multiple growth options
4
Net Debt and Gearing Declined
Record EBITDA and Cash Flow from Operations Strong Capital and Cash Returns
EBIT and EBITDA Margin
Financial Year Ended 30 June 2009
31
41
0
10
20
30
40
50
EBIT Margin EBITDA Margin
%
ROCE = EBIT/ Shareholder Equity + Net DebtROIC = EBITDA / Shareholder Equity + Net Debt
1,039 1,024
800
900
1,000
1,100
1,200
EBITDA Operating Cashflow
A$M
0
40
80
120
160
200
Net Debt Gearing0
5
10
15
20
84
2
%A$M
%
17
23
0
5
10
15
20
25
30
ROCE ROIC
5
0
100
200
300
400
500
600
0% 10% 20% 30% 40% 50%
Global Mid Point US$483/oz
Newcrest Mid Point US$350/oz
Cumulative Production %
Cas
h C
ost U
S$ p
er O
unce
Source: GFMS
First Cost Quartile Producer
Gold Industry Costs for Twelve Months ended June 30 2009
6
Declining cost trend
-4
-2
0
2
4
6
8
10
H1 FY2008 H2 FY2008 H1 FY2009
H2 FY2009
% change relative to preceding half year
1.6
8.4
4.8
(2.4)
AUD depreciation increased costs by A$50M
7
Cost Reduction –
Telfer
400
600
800
1000
Dec 08 Mar 09 Jun 09
A$/oz
Gross Unit Cash Costs -
▼34%
690
908
599
Gross cash costs are prior to stripping and ore inventory adjustments
Gross cash costs pre by product credits declined 17% from December 08 to June 09
Cost reduction programs have reduced Telfer’s cash costs to the mid point of the global gold industry
FY09 cost reduction program focusing on:
Reducing on-site labour by natural attrition
Power station operating strategy
Improved maintenance profile
Reduced consumable consumption
Cost reduction program to continue in FY10
8
Cost Reduction –
GosowongUS$ Unit Cash Cost -
▼ 20%
A$ Unit Cash Cost -
▼ 29%
296280
238
200
250
300
350
Dec 08 Mar 09 Jun 09USD Gross Cash Costs
US$/oz
440 422
314
200
250
300
350
400
450
500
Dec 08 Mar 09 Jun 09
AUD Gross Cash Costs
A$/oz
Significant cost reduction in FY09
–
Modifying mining method–
Centralised administration–
Ongoing mine & mill optimisation
In FY10 expect to see further cost reductions
–
Implementation of owner mining
–
Continued mine & mill optimisations
9
Resources & Reserves
1030 June 2009 Resource and Reserve estimates are based on Newcrest’s production interest. For details refer to the Newcrest Annual Statement of Mineral Resources and Ore Reserves
Reserves 42.8 Million Ounces
Resources80.0 Million Ounces
Gold Resources & Reserves
Cadia
Valley, 55%
Gosowong, 6%
Telfer, 33%
Cracow, 1%Morobe, 5%
Cadia
Valley,54%
Gosowong, 4%
Telfer, 24%
Cracow, 1%
Marsden, 2%
Morobe, 10%Namosi, 5%
Based on US$650/ozBased on US$700/oz
11
Reserves4.67 Million Tonnes
Resources14.36 Million Tonnes
Copper Resources & Reserves
Cadia
Valley, 80% Telfer, 11%
Morobe, 9%
30 June 2009 Resource and Reserve estimates are based on Newcrest’s production interest. For details refer to the Newcrest Annual Statement of Mineral Resources and Ore Reserves
Cadia
Valley, 56%
Morobe, 6%
Namosi, 27%
Telfer
6%
Marsden, 5%
Based on US$2.00/Ib Based on US$1.70/Ib
12
Additional Resources
O’Callaghans
Inferred Resources Contained Metal
Grade Million Tonnes
Dry Tonnes
(millions)
Tungsten Trioxide (% W03)
Copper (% Cu)
Zinc(% Zn)
Lead (% Pb)
Tungsten Trioxide
Copper Zinc Lead
59 0.29 0.27 0.77 0.39 0.17 0.16 0.46 0.23
30 June 2009 Resource and Reserve estimates are based on Newcrest’s production interest. For details refer to the Newcrest Annual Statement of Mineral Resources and Ore Reserves
Silver 2009 -
44.6 Million Ounces(based on US$13/oz)
Gosowong, 5%
Cracow, 1%
Morobe
JV, 94%
13
Newcrest Operations & Projects
Telfer(100%)
Gosowong(82.5%)
Hidden Valley & Wafi/Golpu(50%)
Cracow(70%)
Cadia Valley(100%)
Namosi (69.94%)
Australia
Indonesia
Fiji
PNG
Mine Sites3 X Surface Mines4 X Underground Mines4 X Major Advanced Exploration Targets
14
Cadia
Valley
“Robust long term production future”
Huge resource base1
44 million ounces of gold
8 million tonnes of copper
Cadia East
Ridgeway Deeps
Near mine growth potential
1. Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2009
15
Caving Technology Evolution
CAVE BACK
CAVE ORE
DRAWPOINTS
NEXT PANEL
UNDERCUT ADVANCE
AIRGAP
OREBODY
Ridgeway 2000
Ridgeway Deeps 2009
Cadia
East 2012
Telfer 2005
Blind Sublevel Caving
Deep Sublevel Caving
Integrated High Panel Caves
Deep Block CavingRapid
Development
Cave Design
Preconditioning
New Processes Developed
16
Telfer
“Re-emerging…”
Large resource base1
19.6 million ounces of gold
0.92 million tonnes of copper
0.17 million tonnes of tungsten
0.46 million tonnes of zinc
0.23 million tonnes of lead
Brownfields exploration focus in 2009/10
1. Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2009
17
O’Callaghans Skarn
Resource area
ExistingJuly drilling
Drill hole
500m
15.2m @ 0.30 WO3, 0.18% Cu, 1.71% Zn
6m @ 0.35 WO3, and 41.5m @ 0.30 WO3
0.38% Cu
33m @ 0.30 WO3, 0.38% Cu, 5.4% Zn
41.75m @ 0.37 WO3, 0.38% Cu, 2.6% Zn, 2.1% Pb
Inferred Resource1
59 millions tonnes at average grade:
0.29% WO3
0.27% Cu
0.77% Zn
0.39% Pb
1. Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2009. Details of drilling results can be found on the Newcrest website.
18
Gosowong
“A very high grade gold field”
450koz pa mine
5 million ounces discovered to date1
Reserves replaced in 2009
Targeting a second mining front at Toguraci North
Includes past production from Gosowong, Toguraci and Kencana + Mineral Resources to June 30, 2009. Refer annual statement.
19
Toguraci North –
Strong Results
Damar
TND007: 2.3m @ 331g/t Au
TND003: 7.7m @ 12g/t Au
Yahut
TND013: 8.2m @ 24g/t Au
Lengket
TFD037: 5.5m @ 19g/t Au
Toguraci Pit470 kOz
Au
Toguraci NorthToguraci North
Legend
Exploration Targets
400m
.
Details of drilling results can be found on the Newcrest website.
20
Namosi
JVSPL1420
0 5kilometres
Waivaka
Waisoi
Wainabama
2km
“Enormous potential”
69.94% equity earn-in completed
Waisoi resource1 estimated at 1300 Mt @ 0.14g/t gold + 0.42% copper
NCM share 4 million ounces gold and 3.83 million tonnes copper
High grades intercepted recently at Waivaka
Extensive target inventory
1. Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2009. Waisoi Resource shown is 100%.
21
High Grades at Waivaka
Next hole = NVD008
(drilled 200 metres to the west along strike)
603m @ 0.53% copper + 0.03g/t gold
including high grade 94m@ 1.21% copper and 0.23g/t gold
drilling ongoing
Earlier drill holeSection Line
Details of drilling results can be found on the Newcrest website.
22
Hidden Valley
First gold poured in June 2009
Existing resource 5.4 million ounces gold and 42.0 million ounces silver
Resource drilling and expansion studies underway
Multiple near mine targets
“Delivered, producing … expanding”
Mineral Resource numbers based on 100% equity. For details refer Harmony website.
2
kilometres
0 1
Hidden Valley
Mill Site
Tais CreekAwei Tuwe
Nosave
Bulldog
EL 677
EL 497
ML 151
PuruwangBig Wau
Apu Creek
Yafo
Hamata
SalembaUpper Bulolo
Pihema
Yava
23
RODS EDITSWafi-Golpu
Porphyry exploration TargetGold Target
Diatreme
Nambonga North Porphyry1.0 Moz AuNambonga North Porphyry1.0 Moz Au
Wafi Gold 6.2 Moz AuWafi Gold 6.2 Moz Au
Golpu Porphyry2.9 Moz Au, 1.7 Mt CuGolpu Porphyry2.9 Moz Au, 1.7 Mt Cu
MiapilliNorthern Margin Au
Resource
Highly mineralised district – > 10Moz
Delivered Nambonga Resource – FY09
Focus on unlocking Wafi-Golpu potential
Testing Northern Margin for high grade gold
Drilling below Golpu resource planned
Mineral Resource numbers based on 100% equity for Wafi, Golpu and Nambonga North. For details refer to Harmony website.
24
Gold production to increase 40% over 5 years
1.63Moz
2.30Moz
FY2009 FY2014
1.81 –
1.91Moz
5 %
5 %
5 %
5 %
Hidden ValleyGosowong
Hidden ValleyCVO
Ridgeway Deeps Cadia East
Hidden ValleyCadia East
TelferCadia East
5 year Copper production to increase 30% from FY2009. Total copper to exceed 100,000t pa from FY2013.
Excludes future production from the following internal opportunities :
Wafi/Golpu, O’Callaghans, Namosi, Camp Dome, Gosowong 2 Vertical Stockwork
Corridor, West Dome Deeps, Marsden.
25
Guidance –
5 Year Capital
0
20
40
60
80
100
120
FY2009 FY2010 FY2011 FY2012 FY2013 FY2014
Rel
ativ
e $M
Bas
e Ye
ar F
Y200
9
PNG Acquisition & Ridgeway Deeps Construction
Construction
of Cadia
East Project
100 = $1.27 Billion for Capital Expenditure in FY09
Additional Future Growth Options?
26
Appendices
27
Project Portfolio Doubled
+= Pre 2008 = Now
28
Ridgeway Deeps Block Cave
Cadia Hill
Cadia East Panel Cave
Resource of 94 million gold equivalent ounces1
(Approximation calculated at Gold: US$700 per ounce; Copper: US$2.00 per pound)
Ridgeway Sublevel Cave
Cadia Valley
1. Cadia Province Gold Resource 44.0Moz and Copper Resource 7.98Mt. Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2009. Refer to Newcrest website for more details.
29
Lift 0
Lift 1
Lift 2
Conveyor Decline Main Decline
Orebody Open
1,200m
Cadia Hill Pit
Cadia Valley -
Cadia East Feasibility
Development of Australia’s largest underground mine
Feasibility on track for completion at end calendar 2009
Capital expenditure less than A$2 Billion
Mine life of 30+ years
Production increasing
–
Gold over 700koz pa by 2013
–
Copper over 75kt pa by 2012
Newcrest resource & reserve estimates as at 30 June 2009For details refer to the Newcrest 2009 Annual Report
Gold Mineral Resource 33.2MozOre Reserve 18.7Moz
CopperMineral Resource 6.59MtOre Reserve 3.16Mt
30
Gosowong
Expansion Project
Increased gold production targeting 450,000oz per annumOre Reserve 2.4Moz & Mineral Resource 2.8Moz (Kencana) Successful commissioning of vertimill in May 09Capital spend around US$200M to completion
K1 (existing) K2 & K Link (expansion)
IRR > 50%(on current
reserves)
Newcrest Resource & Reserve estimates as at 30 June 2009 For details refer to the Newcrest 2009 Annual Report
31
Porphyry Belt
Mining Locations
Papua New Guinea Joint Venture
New Britain
LaeAureFLY PLATFORMTrough
Lihir
Port Moresby
Madang
Lae
Grasberg
LihirPorgera
OK Tedi
PNG JV Projects
32
Morobe PNG Province
PapuaNew
Guinea
Bulolo
Lae
N
S
EW
0 25 50kilometres
Hidden Valley project
Wafi/Golpu project
Morobe Coast project
Kesiago
Biamena
Hamata Yafo
Hidden Valley
Wafi-GolpuNambonga