Use of Kaizen in the Re-design of an Emergency Department
WCBF 10th Annual Lean Six Sigma and Process Improvement in Healthcare
Summit
Presented by: Greg Horner, Operational Excellence Leader
Loyola University Health SystemMaywood, IL
• Loyola is a nationally recognized leader in providing health care and in conducting groundbreaking research to treat heart disease, cancer, organ transplantation and neurological disorders.
• Loyola University Medical Center (LUMC) is the core of Loyola and one of the nation’s leading academic medical centers.
Loyola University Medical Center is a teaching, tertiary-care, 570 licensed-bed
facility that includes a Level 1 trauma center and a Burn Center.
A Sense of Urgency
• Change in the world economy– Recession/depression with collapse of mortgage industry
and stock market
• Change in state finances– Arrest and indictment of state governor
– Threat of financial insolvency of the State of Illinois
• Institutional “financial challenge” – Decrease in patient volumes
– Increase in “state insured patients” in a state where we were not receiving payment
– Health Care reform
Lean Transformation
• A change in thinking– Individual optimization to process optimization
– Questioning “what we’ve always done”
– Considering improvement as part of our daily job
• A change in behavior– Defining the critical few metrics and opportunities
– Measuring performance at all levels
Phases of a Transformation
N/10 pace and 1–3% dedicated to Continuous Improvement
Changing
Actions
Apply tools
Borrowing th
en
Developing Technique
Developing
New Beliefs
Forever Improve
Culture Change
Impr
ovem
ents
in H
D, Q
, C, D
Introduction
Year 1-2
Intense
Year 3-5Development
Year 5 - 10
Changing
Habits
Changing
Values
Understanding
&
Embedding
Principles
Kaizen“How We Do It”
Kaizen Event WeekDay 1 Day 5Day 4Day 3Day 2
Tool Specific Training
Observe & Analyze Current Process / Begin Improvements
Continued Improvements
Refinement And Finalize
Improvements Final Presentation
Leader Meeting
Leader Meeting
Leader Meeting
For Quality Improvement Purposes
Areas of Work……..
Creating Flow
• Education & Training
• Patient Flow– Identify access points
– Elimination of Waiting
– Establish discharge processes
• Supply Chain– Product movement
• Care Coordination– Ambulatory
– Inpatient
Through a series of Kaizen Events
In the GI Lab
• Increased capacity by 70%
• Cost avoidance: $13m expansion
• How:– Value Stream Mapping
– Roadmap of events
– 5S/Std Work
– TPI
– MDI
In Supply Chain
• Implemented pull systems
• Cost reduction: $14m
• How:– Value Stream Mapping
– Roadmap of events
– 5S/Std Work
– TPI
– MDI
Kaizen to support the OR
7 Flow Lines Setup Feeding the SterilizersDisciplined Execution
Numeric Driven Preference CardsFemur Facture
Numeric Alias Numeric Alias Numeric Alias
Femur FactureSvc Line Level
Preference Card
MD Customization
Table Positioning Implants
Carmen/Jon
Emergency DepartmentRe-design
Building the bridge while we walk on it
“A Burning Platform”
• Level I Trauma Center• 142 patients a day• 29 treatment bays• 6 hour average cycle time• Increase in “Care Accelerated”• Change in Senior Management Team• Financial challenge to the Medical Center• Workforce reduction program• Physician foundation joins medical center• Vacant ED manager position• Loss of geography for the ED
Mark Cichon, DOED Medical Director
An Opportunity
• Generous Donor
• Make a visible difference
• Improve patient experience
• Improve staff experience
• Implement lean
“Let’s do something different…”Deborah Kull
System Director, Operational Excellence
Engagement
• Administration
• ED Leadership
• Operational Excellence
• Next Level Partners
• Pratt Design
• Walsh Construction
• Operations
What is 3P?
• A method for designing facility layouts that better meet
Patient and Caregiver needs with improved Safety,
Quality, Delivery and at Lower Total Cost
• A rapid cycle process that focuses on generating lots
of ideas; with simultaneous input from all stake holders
up front for the layout of the Emergency Department
• A method to prioritize and rank the outcomes (layouts)
relative to each other
• Trystorming and mockups of the preferred solutions
“Executive leadership is critical to success of the process”
Jason KeelerVP of Healthcare Operations
Lessons LearnedExecutive Leadership
Voice of the Customer
Group Issue Customer Type Occurrence Weight (1-5)
Pt experience Lack of signage Pt 5
Pt experience Walk in Entry allows cold/hot air into the reception area Pt, Sec, Reg, RN 5
Pt Experience Long wait time for bed assignments Pt, RN, MD 4
Pt experience Triage and waiting area looks old and dirty Pt 4
Pt experience Lack of Triage Flow Pt, RN, MD 3
Staff Experience Desk positioning and layout in ED RN, MD 5
Staff Experience Computers are not located near ED patient bay. Staff has back to pt Pt, RN, MD 5
Staff Experience Computers not located near ED peds bay. Staff is out of pt room Pt, RN, MD 5
Staff Experience Security desk location draws people at walk in entry Sec, Pt 3
Staff Experience Resources and supplies are not located in area of need RN, MD 3
Tranlated Customer Requirement
I want a clean treatment area
I want a clean waiting area
I want a comfortable waiting area
I want a efficient charge capture and billing
I want a safe environment
I want an efficient environment of care
I want care with minimal waiting
I want computer access near the patient and ability to maintain pt visibility
I want effective EMS communication
I want equipment and supplies at POU when I need them
I want timely test results
I want to move the ED patient to a bed in another unit
12 Ideas
• Separated Into 2 Teams with all Functions; Architects, Construction, Clinical, Facilities, Security, Admin
• Each Team Generated 6 Layout Ideas• Each Team Evaluated & Ranked Each Layout per the Criteria
12 Ideas to Top 3
• Teams Presented Each of the 12 Ideas• Entire Team Evaluated then Ranked to
Determine the Top 3 Layout Ideas• Similar Ideas Were Consolidated to Final 2
Layouts
Trystorming
• Constructed the Current State ED• Built a Full Size Half Scale Mock-Up of Layouts• Walked the RN, MD & Patient Flows for Current
State and New Layouts• Generated Spaghetti Diagrams of Each Acuity
Level of the New Layout
Layout
“Bend over: This is going to hurt”Carol Schleffendorf, RN ED Director of Nursing
Lessons LearnedIt is a Painful Process
Detailed Design - Trauma• Teams presented each of
the 10 ideas• Entire team evaluated
then ranked to determine the top layout ideas
• Similar ideas were consolidated to a final layout
Gaming
Design
Consolidate
Ready to Trystorm
Trystorming in a full scale mock-up
“No Problem is a problem”Sharon O’Keefe
President
Lessons Learned:Surface Problems
Detailed Design – Staff & Support
Detailed Design – Patient Bays
Kiosk
Greeter
Triage
ED Bay
Layout Design
15 Min CT
30 Min CT
4 Hr CT
ResultsCategory Baseline Layout 1 % Change
Patient Travel
ES 1 & 2 700 638 8.9%
ES 3 & 4 & 5 1652 370 77.6%
Trauma 268 240 10.4%
Nurse Travel
ES 1 & 2 1325 898 32.2%
ES 3 & 4 1876 210 88.8%
Trauma 483 282 41.6%
Physician Travel
ES 1 & 2 215 132 38.6%
ES 3 & 4 375 24 93.6%
Trauma 200 96 52.0%
Totals 7094 2890 59.3%
Nurse 3684 1390 62.3%
Results Matrix
“No additional rooms???Are you Nuts?”
ED Staff
Lessons Learned:Flow Builds Trust
Acuity Totals
Avg per
Day Area Beds Turns Capacity
Avg Daily
Demand*
Daily
Utilization
1 112 1
2 1748 19
3 3928 44
4 2421 27
5 155 2
7 28 0
8 87 1
8479 94 29 16 98 94
Acuity Totals
Avg per
Day Area Beds Turns Capacity
Avg Daily
Demand*
Daily
Utilization
1 112 1
2 1748 19
3 3928 44
4 2421 27
5 155 2
7 28 0
8 87 1
8479 94 29 16 107 94
Acuity Totals
Avg per
Day Area Beds Turns Capacity
Avg Daily
Demand*
Daily
Utilization
1 112 1
2 1748 19
3 3928 44
4 2421 27
5 155 2
7 28 0
8 87 1
8479 94 29 21 136 94
* ESI 4,5 and 1/3 of
ESI 3 in Quick Care90%
22 2 44 50* ESI 1,2 and 2/3 of
ESI 3 are in these
beds
4 12 48 43 * ESI 4,5 and 1/3 of
ESI 3 in Quick Care90%
Peak Period Analysis - 12 Hours 10:00 AM to 9:00 PM
22 2.4 52.8 50* ESI 1,2 and 2/3 of
ESI 3 are in these
beds
94%
3 2 6 1 21%
113%
4 12 48 43
66 50* ESI 1,2 and 2/3 of
ESI 3 are in these
beds
75%
3 2 6 1 21%
ED
Quick
Care
Trauma
ED
Quick
Care
Trauma
ED
Quick
Care
Trauma
3 2 6 1 21%
4 16 64 43 * ESI 4,5 and 1/3 of
ESI 3 in Quick Care67%
22 3
Impact of Flow – Peak Hours
“Respect your extended network of partners”
Jeffery K. LikerThe Toyota Way
Lessons Learned:Include the Vendors
Lessons Learned: Cycle Through the Stages
Forming
Storming
Norming
Performing
Re-Forming
Concerns
Questions?
Speaker Bio
Greg Horner is an Operational Excellence Leader at Loyola University Medical Center where he is leading transformational change and utilizing lean principles to improve the staff and patient experience.
Greg is an ASQ certified Six Sigma Black Belt and a student of the Toyota Production System (Lean). He has studied TPS under a 1st generation Sensei from Toyota including the proper use of 3P and standard work.
Greg is a certified systems engineer, database administrator and is currently earning a master’s degree in Enterprise Improvement and Innovation from DePaul University in Chicago.