15
User Manual of Survey NOC For Licensed Architect Municipal Corporation of Greater Mumbai Prepared by SoftTech Engineers Ltd.

User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual of Survey NOC

For

Licensed Architect

Municipal Corporation of Greater Mumbai

Prepared by

SoftTech Engineers Ltd.

Page 2: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

1. Introduction ............................................................................................................................................... 1

2. MCGM Login Page and Architect’s Console .............................................................................................. 1

3. Applying for Survey NOC ........................................................................................................................... 2

4. Selecting Permission Type ......................................................................................................................... 3

5. Application Summary ................................................................................................................................ 5

6. Survey Form Details ................................................................................................................................... 6

7. Document Checklist ................................................................................................................................... 7

8. Additional Documents ............................................................................................................................... 8

9. Submitting Application .............................................................................................................................. 9

10. Approval Flow .......................................................................................................................................... 10

11. Survey NOC Approved ............................................................................................................................. 11

12. Survey NOC Certificate ............................................................................................................................ 11

Page 3: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

Figure 1 : MCGM Login Page ................................................................................................................................ 1

Figure 2: Architect’s Console ................................................................................................................................ 2

Figure 3 : Creating Application for Applying Survey NOC .................................................................................... 2

Figure 4: Selecting Permission Type as Survey ..................................................................................................... 3

Figure 5: Draft Stage of Suvey Application ........................................................................................................... 4

Figure 6: Selecting Application form Survey Draft list ......................................................................................... 4

Figure 7: Application Summary ............................................................................................................................ 5

Figure 8: Survey Form Details ............................................................................................................................... 6

Figure 9: Document Checklist ............................................................................................................................... 7

Figure 10: Adding Additional Documents ............................................................................................................ 8

Figure 11: Submitting Application ........................................................................................................................ 9

Figure 12: Statue of Recently Created File ........................................................................................................... 9

Figure 13: Approval Flow .................................................................................................................................... 10

Figure 14: Status of Approved Proposal ............................................................................................................. 11

Figure 15: Survey NOC Certificate Approved .................................................................................................... 11

Figure 16: Survey NOC Certificate ...................................................................................................................... 12

Page 4: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 1 | P a g e

1. Introduction

The term Survey plays an important and crucial role in constuctions. It contains like producing the plans of

the areas in which the the work is going to be carried out, establishing the control points as well as

boundries, determining the required areas and volumes of the land, recording the final position of the

construction and so on. So, the Survey NOC proposal should be submitted along with the mandatory

documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms

along with the relevant construction plans.

Survey NOC Application for Licensed Architect document introduces about the steps to be followed for

applying the Survey NOC application.

2. MCGM Login Page and Architect’s Console

1. Click the link https://autodcr.mcgm.gov.in/bpamsclient2/Login.aspx, it redirects to the MCGM Login

page. Login with username, password and captcha. Click Login button to proceed further.

Figure 1 : MCGM Login Page

Page 5: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 2 | P a g e

2. After login, the Architect Console appears. It includes Project Action and Applications buttons as

highlighted in Figure 2. User can select their project proposal type from the dropdown list and can

check their status in tabular form.

Figure 2: Architect’s Console

3. Applying for Survey NOC

3. To create the new application for Survey NOC:

(i) Click Applications button.

(ii) Select Create Application.

Figure 3 : Creating Application for Applying Survey NOC

Page 6: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 3 | P a g e

4. Selecting Permission Type

4. After selecting the create application, following window appears.

Figure 4: Selecting Permission Type as Survey

(i) Select Planning Authority for the Project as:

MCGM To grant the NOCs’ only within the MCGM’s zone

Other To grant the NOCs’ within or outside the MCGM’s zone

(ii) Select Department as Development Plan.

(iii) Select Project as per requirement.

(iv) Select Permission Type as Survey.

(v) Select Type of Notice as 337.

337 To erect a building newly or to re-erect a exsisting

building entirely.

302 For submission of layout cases.

342 To make any addition/alteration to a building or

change of existing user.

(vi) Select Application Type as New

There are two options - (1) New (If Proposal is New)

(2) Amended (To do the modifications in existing proposal)

5. Click Create Application button as highlighted in Figure 4.

Page 7: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 4 | P a g e

6. Now the proposal is present in the Draft stage of the Survey. To select the proposal:

(i) Go to the architect’s console; click the number (35 - Number can vary) in Survey row as shown

in Figure 5.

Note: Here, 35 represents the number of proposals present in Survey Draft stage.

Figure 5: Draft Stage of Suvey Application

(ii) Select the proposal from the list of Survey Draft as shown in Figure 6. The recently created

proposal appears at the top of draft list.

Figure 6: Selecting Application form Survey Draft list

Page 8: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 5 | P a g e

5. Application Summary

7. After selecting the proposal, following window appears which contains Proposal Summary,

Application Summary and Application Progress. The window also consists of five tabs on the left

hand side.

The information under green colored tab (Area Details tab) is already filled while creating one

project. This tab is un-editable.

Figure 7: Application Summary

Page 9: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 6 | P a g e

6. Survey Form Details

8. Under the Survey Form tab, there are three sub-tabs like Description of Land, Survey 1, Survey 2

and Conditions. Fill the information under these tabs.

Click buttons - Signed Survey, GIS Plan and Plot Information(GIS) to get the information with respect

to it.

Figure 8: Survey Form Details

Page 10: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 7 | P a g e

7. Document Checklist

9. Under the Document Checklist tab, Click the Attach Here icon as shown in Figure 9. Click Select Files

to attach the file.

Note: Attach .dwg or .PDF file only.

Figure 9: Document Checklist

Page 11: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 8 | P a g e

8. Additional Documents

10. Click the Additional Document tab to add any additional documents.

Now, there are three tabs available to upload the additional documents:

Documents (Current Permission)

Documents (Current Stage)

Documents (Project)

To add the additional documents:

(i) Click ADD button.

(ii) First, click check box.

(iii) Write the name of the additional document. (E.g. AD Factsheet)

(iv) Select Stage as Survey.

(v) Click Save As Draft button.

(vi) Attach the document in Attachments column.

(vii) Click Submit button.

Figure 10: Adding Additional Documents

Page 12: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 9 | P a g e

9. Submitting Application

11. Click Submit Application button to send the application to the concerned authority.

Figure 11: Submitting Application

12. Now, the file is present under the In Process column of Survey’s row as highlighted in Figure 12. Click

the number 1 (Number can vary) to choose the recently created proposal.

Figure 12: Statue of Recently Created File

Page 13: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 10 | P a g e

10. Approval Flow

13. In Application summary tab, under Proposal Summary block:

(i) Click Proposal Stages label.

(ii) In the NOC Summary tab and click Development Plan, click View from Survey to see the proposal

status flow.

The green box indicates the proposal has gone through the approval from the component authority.

The yellow box indicates the proposal is holding by the competent authority.

Figure 13: Approval Flow

Page 14: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 11 | P a g e

11. Survey NOC Approved

14. In the final step, when the submitted proposal gets approval from the competent authority (after

scrutinizing all the documents and drawing) the file can be seen in the Approved or Verified column

as highlighted in Figure 14.

Figure 14: Status of Approved Proposal

12. Survey NOC Certificate

15. Once the proposal gets an approval from competent authority, the Survey NOC certificate gets

uploaded by the officer. It is seen at Approved stage.

Figure 15: Survey NOC Certificate Approved

Page 15: User Manual of IOD Process - Mumbai · 2019. 4. 1. · documents. Here, Municipal Corporation of Greater Mumbai (MCGM) authorizes the Survey NOC forms along with the relevant construction

User Manual | MCGM

Municipal Corporation of Greater Mumbai (MCGM) © Copyright 2019 12 | P a g e

16. To check and download the Survey certificate:

(i) Click Proposal Stage label in Proposal Summary block. (Refer Figure 16)

(ii) Select the NOC summary tab and click Development Plan.

(iii) Click View from Survey row and Certificate column, Survey NOC certificate opens in another

window.

Figure 16: Survey NOC Certificate

Scan to Open MCGM AutoDCR Online

Application