Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
WEST ROAD
BE
RT
NE
R A
VE
.
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-D
M.dw
gM
ay 0
3, 20
16
- 2:06
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
LEGEND
Project Benchmark:
Temporary Benchmark No. 16
Horizontal Datum:
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
NOTE:
KEY NOTES:
CIVIL SITE DEMOLITION
C1.0
05/02/2016 CONSTRUCTION DOCUMENTS
GA
TE
SLIDING GATE
GATE
GATE
SL
ID
IN
G G
AT
E
WEST ROAD
BE
RT
NE
R A
VE
.
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-LA
.dw
gM
ay 0
3, 20
16
- 2:07
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
LEGEND
Project Benchmark:
Temporary Benchmark No. 16
Horizontal Datum:
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
KEY NOTES:
CIVIL SITE LAYOUT
C2.0
NOTES:
PARKING COUNT:
05/02/2016 CONSTRUCTION DOCUMENTS
GA
TE
SLIDING GATE
GATE
GATE
SL
ID
IN
G G
AT
E
WEST ROAD
BE
RT
NE
R A
VE
.
5
3
5
5
56
51
53
53
51
5
2
51
5
1
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-G
R.dw
gM
ay 0
3, 20
16
- 2:07
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
LEGEND
Project Benchmark:
Temporary Benchmark No. 16
Horizontal Datum:
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL SITE GRADING
C3.0
NOTES:
05/02/2016 CONSTRUCTION DOCUMENTS
GA
TE
SLIDING GATE
GATE
GATE
SL
ID
IN
G G
AT
E
WEST ROAD
BE
RT
NE
R A
VE
.
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-U
T.dw
gM
ay 0
3, 20
16
- 2:08
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
LEGEND
Project Benchmark:
Temporary Benchmark No. 16
Horizontal Datum:
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL SITE UTILITY
C4.0
KEY NOTES:
DETENTION CALCULATIONS:
05/02/2016 CONSTRUCTION DOCUMENTS05/02/2016 CONSTRUCTION DOCUMENTS
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-G
N-D
T.dw
gM
ay 0
3, 20
16
- 2:08
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
GENERAL NOTES
C5.0
GENERAL NOTES
1. BOUNDARY AND TOPOGRAPHIC INFORMATION OBTAINED FROM A SURVEY BY KUO & ASSOCIATES,
DATED 03-31-2016.
2. THE PLANS AND SURVEYS UPON WHICH THEY ARE BASED ARE TIED INTO THE OFFICIAL CITY OF
HOUSTON SURVEY SYSTEM IN COMPLIANCE WITH ORDINANCE NO. 69-1978.
3. CONTRACTOR IS RESPONSIBLE FOR HIS OWN HORIZONTAL AND VERTICAL CONTROL, REFERENCE
POINTS AND CONSTRUCTION STAKING AS INCIDENTAL TO THE PROJECT.
4. CONTRACTOR TO FIELD VERIFY ALL BOUNDARY AND TOPOGRAPHIC INFORMATION PRIOR TO
BEGINNING WORK.
5. EXISTING UTILITIES ARE SHOWN IN AN APPROXIMATE LOCATION BASED ON AVAILABLE INFORMATION.
CONTRACTOR TO FIELD VERIFY LOCATION OF ANY EXISTING UTILITIES AND OTHER FACILITIES BEFORE
COMMENCING WORK. CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MIGHT OCCUR BY HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL EXISTING FACILITIES.
CONTRACTOR SHALL INFORM THE ENGINEER OF ANY DISCREPANCY IN FLOWLINES LID AND GRATE
ELEVATIONS.
6. THE LENGTHS OF PROPOSED UNDERGROUND UTILITY LINES SHOWN ARE APPROXIMATE ONLY.
LENGTHS OF LINES MAY VARY DUE TO FIELD CONDITIONS ENCOUNTERED AT THE TIME OF CONSTRUCTION.
CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS NECESSARY FOR UTILITY LINES TO SERVE THEIR
INTENDED PURPOSE AND SHALL BE RESPONSIBLE FOR THE REROUTING OF LINES WHICH MAY CONFLICT
WITH OTHER UTILITIES AND SITE FEATURES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY BUILDING PERMITS AND FOR
NOTIFICATION OF ALL AUTHORIZED INSPECTORS, SUPERINTENDENTS OR PERSONS IN CHARGE OF PRIVATE
OR PUBLIC UTILITIES AFFECTED BY HIS OPERATIONS PRIOR TO COMMENCEMENT OF WORK.
8. CONTRACTOR SHALL NOTIFY TEXAS ONE CALL BY TELEPHONE AT 713-223-4567 OR 1-800-245-4545 AND
LONE STAR ONE CALL AT 1-800-669-8344 AND CITY OF HOUSTON PUBLIC WORKS AND ENGINEERING CIVIL
CONSTRUCTION SECTION BY TELEPHONE AT 832-395-2511, AT LEAST TWO FULL WORKING DAYS BEFORE
STARTING WORK IN ANY STREET RIGHT-OF-WAY OR PUBLIC EASEMENTS.
9. CONTRACTOR TO BE RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL BARRICADES, WARNING
SIGNS, FLASHING LIGHTS AND TRAFFIC CONTROL DEVICES IN CONFORMANCE WITH PART VI OF THE “TEXAS
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES”, (TEXAS M.U.T.C.D. MOST RECENT EDITION AS REVISED)
DURING CONSTRUCTION.
10. IF CONTRACTOR OPTS TO USE OPEN CUT METHOD OF CONSTRUCTION, TRENCH BEDDING AND
BACKFILL SHALL MEET CITY OF HOUSTON DEPARTMENT OF PUBLIC WORKS AND ENGINEERING STANDARD
SPECIFICATIONS REQUIREMENTS AND ALL OPEN EXCAVATIONS IN VEHICULAR TRAFFIC AREAS SHALL BE
COVERED WITH ANCHORED STEEL PLATES CAPABLE OF SUPPORTING HS 20 LOADING AT END OF EACH
DAYS WORK OR WHEN NOT IN USE. **[FOR PROJECTS WITHIN HOUSTON CITY LIMITS. EDIT WITH
APPROPRIATE CONTACT INFORMATION FOR AREAS OUTSIDE HOUSTON. DELETE IF NOT APPLICABLE TO
WORK ON PRIVATE PROPERTY]**
11. CONTRACTOR SHALL COMPLY WITH O.S.H.A. REGULATIONS AND STATE OF TEXAS LAW CONCERNING
EXCAVATION, TRENCHING AND SHORING. CONTRACTOR TO MAINTAIN TRENCH SAFETY SYSTEM IN
ACCORDANCE WITH OSHA STANDARDS, 29 CFR, PART 1926 SUBPART P INCLUDING FINAL RULE PUBLISHED IN
THE FEDERAL REGISTER VOL. 54, NO 209., AND TEXAS LEGISLATURE UNDER TEXAS HEALTH AND SAFETY
CODE ANN., 756.021. EXCAVATIONS OVER 4 FEET DEEP TO FOLLOW STATE OF TEXAS REQUIREMENTS WITH
REGARDS TO (BUT NOT LIMITED TO) ACCESS STIRS, LADDERS, RAMPS WITH NECESSARY BENCHING AND
SLOPING. EXCAVATIONS OVER 5 FEET DEEP TO BE SHEETED AND PROTECTED (IN ACCORDANCE WITH THE
“TRENCH SAFETY DETAILS” CONTAINED IN THE PLANS) AS REQUIRED BY STATE LAW AND O.S.H.A. ANY
DEVIATION FROM THE METHOD SHOWN IN THE PLANS MUST BE DESIGNED AND SEALED BY A REGISTERED
PROFESSIONAL ENGINEER LICENSED IN THE STATE OF TEXAS AND IN GOOD STANDING. SAID DESIGN MUST
BE FORWARDED TO THE ENGINEER AND IN HIS HANDS AT LEAST 48 HOURS BEFORE BEGINNING EXCAVATION
OPERATIONS. FAILURE TO COMPLY WITH THE REQUIREMENTS HEREIN WILL CONSTITUTE AGREEMENT BY
THE CONTRACTOR TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED
BY HIS FAILURE TO COMPLY. ASSUME TYPE “C” SOIL.
12. PEDESTRIAN WALKWAY MUST BE MAINTAINED ON AT LEAST ONE SIDE OF BERTNER STREET AND WEST
ROAD AT ALL TIMES.
13. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF SHRUBS,
PLANTS, AND TREES ALONG THE AREA OF EXCAVATION. REFER TO SPECIFICATIONS AND LANDSCAPE
ARCHITECT DRAWINGS FOR FURTHER INSTRUCTIONS ON TREE PROTECTION.
14. CONTRACTOR SHALL PREPARE A SET OF “AS-BUILT” DRAWINGS SHOWING ANY FIELD CHANGES MADE
TO THE APPROVED ENGINEERING PLANS AND SUBMIT TO THE ENGINEER.
15. CONSTRUCT WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET
PAVING IN ACCORDANCE WITH THE LATEST EDITION OF THE PUBLICATIONS STANDARD CONSTRUCTION
SPECIFICATIONS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET
PAVING PUBLISHED BY THE CITY OF HOUSTON, DEPARTMENT OF PUBLIC WORKS AND ENGINEERING.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING WATER, WASTEWATER, STORM
WATER LINES, AND TRAFFIC CONTROL DEVICES. DAMAGE SHALL BE REPAIRED IN ACCORDANCE WITH THE
CITY OF HOUSTON, DEPARTMENT OF PUBLIC WORKS AND ENGINEERING'S STANDARD CONSTRUCTION
SPECIFICATIONS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET
PAVING AND STANDARD CONSTRUCTION DETAILS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES,
STORM DRAINAGE, AND STREET PAVING, REFERENCED ABOVE, AT NO ADDITIONAL COST.
17. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION AND ANY
DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING
CONDITIONS OR BETTER.
GENERAL GRADING NOTES
1. ALL GRADING SHALL CONFORM TO THESE CONSTRUCTION DOCUMENTS.
2. THE PROJECT GEOTECHNICAL ENGINEER SHALL PROVIDE OBSERVATION AND TESTING
DURING GRADING OPERATIONS IN THE FIELD. SOIL TESTS SHALL BE CONDUCTED IN ACCORDANCE
WITH THE SPECIFICATIONS.
3. AREAS TO BE GRADED SHALL BE CLEARED OF ALL VEGETATION, INCLUDING ROOTS AND
ROOT STRUCTURES, AND OTHER UNSUITABLE MATERIAL FOR FILL, THEN SCARIFIED TO A DEPTH
OF 6 INCHES PRIOR TO PLACING ANY FILL. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM
THE PROJECT SITE AND TRANSPORTED TO A SUITABLE DISPOSAL AREA PRIOR TO PLACING ANY
FILL MATERIAL. THE AREA SHALL BE INSPECTED BY THE PUBLIC WORKS INSPECTOR (ALLOW
48-HOUR MINIMUM ADVANCED NOTICE). DISPOSAL MUST BE IN ACCORDANCE WITH LOCAL, STATE
AND FEDERAL GUIDELINES AT NO ADDITIONAL COST TO THE OWNER.
4. AREAS WITH EXISTING SLOPES WHICH ARE TO RECEIVE FILL MATERIAL SHALL BE KEYED AND
BENCHED. THE DESIGN AND INSTALLATION OF THE KEYWAY SHALL BE PER THE DETAILS PROVIDED
IN THESE PLANS, AS MODIFIED BY THE GEOTECHNICAL ENGINEER.
5. FILL MATERIAL SHALL BE PLACED IN LIFTS PER THE SPECIFICATIONS. ANY DISCREPENCY
BETWEEN THE SPECIFICATIONS AND THE GEOTECHNICAL REPORT MUST BE BROUGHT TO THE
ENGINEER'S ATTENTION PRIOR TO START OF CONSTRUCTION.
6. ALL AREAS RECEIVING FILL SHALL BE STABILIZED IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS.
7. ALL TREES TO REMAIN ON SITE SHALL BE PROTECTED FROM DAMAGE BY TEMPORARY
FENCING AROUND THE DRIP LINE DURING GRADING OPERATION.
8. PRIOR TO PLACEMENT OF COMPACTED FILL, LOOSE SOILS SHALL BE COMPLETELY REMOVED
DOWN TO COMPETENT MATERIAL AS APPROVED BY THE GEOTECHNICAL ENGINEER.
OVER-EXCAVATION AND RECOMPACTION ACTIVITIES SHALL BE COORDINATED WITH THE
GEOTECHNICAL ENGINEER.
9. STONES LARGER THAN 6 INCHES IN DIAMETER SHALL NOT BE PLACED IN THE FILL. STONES
LESS THAN 6 INCHES IN DIAMETER SHALL BE THOROUGHLY MIXED WITH THE SOIL IN SUCH A
MANNER THAT NO VOIDS ARE CREATED IN THE FILL. STONES LARGER THAN 3 INCHES IN
DIAMETER SHALL NOT BE PLACED IN THE UPPER THREE FEET OF FILL.
10. EARTH MOVING AND WORKING OPERATION SHALL BE CONTROLLED TO PREVENT WATER
FROM RUNNING INTO THE EXCAVATED AREAS. EXCESS WATER SHALL BE PROMPTLY REMOVED
AND THE SITE KEPT DRY. FILL MATERIAL SHALL NOT BE PLACED, SPREAD, OR ROLLED DURING
UNFAVORABLE WEATHER CONDITIONS. WHEN THE WORK IS INTERRUPTED BY HEAVY RAIN, FILL
OPERATIONS SHALL NOT RESUME UNTIL FIELD TEST BY THE SOIL ENGINEER INDICATES THAT THE
MOISTURE CONTENT AND DENSITY OF THE FILL ARE ABLE TO BE PLACED AND MEET THE
REQUIRED COMPACTION.
11. FILL MATERIAL SHALL NOT BE PLACED IF NOT WITHIN PROPER MOISTURE REQUIREMENTS
PER THE SPECIFICATIONS.
12. IMPORT OR ON-SITE SOILS USED IN FILL OPERATION SHALL BE FREE FROM ORGANIC
MATERIAL OR OTHER DELETERIOUS MATERIALS.
13. FINAL GRADES AS SHOWN ON THE PLANS ARE FINAL ELEVATIONS REGARDLESS OF SURFACE
MATERIALS (SOD, MULCH, PAVEMENT, SIDEWALK, LANDSCAPING, SOFTSCAPE, HARDSCAPE, ETC.).
ENSURE ROUGH AND FINE GRADING OPERATIONS TO ACCONT FOR SURFACE MATERIAL
THICKNESS.
PAVING CONSTRUCTION NOTES
1. ALL ROAD WIDTHS, RADII AND ALIGNMENT SHOWN INDICATE FACE OF CURB OR EDGE OF
PAVEMENT WHICHEVER IS APPLICABLE.
2. CONCRETE PAVEMENTS SUPPORTING VEHICULAR TRAFFIC SHALL BE PORTLAND CEMENT
CONCRETE AND HAVE A COMPRESSIVE STRENGTH OF 3,500 PSI MINIMUM AT 7 DAYS AND 4,000
PSI MINIMUM AT 28 DAYS. REBARS SHALL BE ASTM A615 STEEL
3. EXISTING PAVING, IN PUBLIC STREET RIGHTS-OF-WAY OR EASEMENTS, DAMAGED BY
CONSTRUCTION SHALL BE REPAIRED AS PER CITY OF HOUSTON DWG. NO. 02902-01, AS
APPLICABLE. ALL OTHER EXISTING PAVING, NOT SHOWN TO BE REMOVED, DAMAGED BY
CONSTRUCTION SHALL BE REPAIRED IN ACCORDANCE WITH THE DETAILS CONTAINED IN THE
PLANS.
4. EXISTING CURBS, SIDEWALKS, AND DRIVEWAYS IN PUBLIC STREET RIGHTS-OF-WAY OR
EASEMENTS DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED TO CITY OF
HOUSTON STANDARDS. ALL OTHER CURBS, SIDEWALKS AND DRIVEWAYS, NOT SHOWN TO BE
REMOVED, DAMAGED BY CONSTRUCTION SHALL BE REPLACED IN ACCORDANCE WITH THE
DETAILS CONTAINED IN THE PLANS.
STORM SEWER CONSTRUCTION NOTES
1. STORM SEWER CONSTRUCTION, INCLUDING PIPE, INLETS AND MANHOLES, OUTSIDE OF
PUBLIC STREET RIGHTS-OF-WAY OR EASEMENTS SHALL BE IN ACCORDANCE WITH THE DETAILS
CONTAINED IN THE PLANS.
2. UNLESS OTHERWISE NOTED ON THESE PLANS, ACCEPTABLE PIPE MATERIALS FOR STORM
SEWERS ARE RCP AS FOLLOWS:
a. REINFORCED CONCRETE PIPE (RCP) SHALL CONFORM TO ASTM C-76, CLASS III,
3. CIRCULAR AND ELLIPTICAL REINFORCED CONCRETE PIPE SHALL BE INSTALLED USING
RUBBER GASKET JOINTS CONFORMING TO ASTM C443 AND ASTM C877 RESPECTIVELY.
4. MAINTAIN A 12” MINIMUM CLEARANCE BETWEEN OUTER EDGES OF STORM SEWER AND ANY
OTHER UTILITY CROSSINGS.
5. BEDDING AND BACKFILLING FOR STORM SEWERS SHALL BE IN ACCORDANCE WITH THE CITY
OF HOUSTON DRAWING NOS. 02317-02, 02317-03, 02317-05, 02317-06, AND 02317-07 (2008) AS
APPLICABLE UNLESS OTHERWISE SHOWN ON THE DRAWINGS. ALL SEWER UNDER PROPOSED OR
FUTURE PAVEMENT AND TO A POINT ONE (1) FOOT BACK OF ALL PROPOSED OR FUTURE CURBS
SHALL BE BACKFILLED WITH 1-1/2 SACK CEMENT/C.Y. STABILIZED SAND TO WITHIN ONE (1) FOOT
OF SUBGRADE. THE REMAINING DEPTH OF TRENCH SHALL BE BACKFILLED WITH SUITABLE EARTH
MATERIAL.
6. ALL TRENCH BACKFILL SHALL BE IN 8” LIFTS, WITH TESTS TAKEN AT 100 FOOT INTERVALS ON
EACH LIFT, AND MECHANICALLY COMPACTED TO A DENSITY OF NOT LESS THAN 95% OF THE
MAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD PROCTOR COMPACTION TEST (ASTM
D-698/AASHTO T99). WHENEVER TRENCHES ARE EXCAVATED BELOW THE SPECIFIED DEPTH FOR
CLASS “B” BEDDING, THE PIPE SHALL BE LAID WITH CLASS “A” BEDDING.
7. ADJUST MANHOLE COVERS TO GRADE CONFORMING TO REQUIREMENTS OF CITY OF
HOUSTON STANDARD SPECIFICATION SECTION 02086-ADJUSTING MANHOLES, INLETS AND VALVE
BOXES TO GRADE.
8. WHERE MANHOLES, GRATE INLETS, OR JUNCTION BOXES ARE LOCATED WITHIN PAVED
AREAS, CONTRACTOR SHALL SET RIM ELEVATIONS TO MATCH TOP OF PAVEMENT ELEVATIONS.
FOR OUTSIDE OF PAVED AREAS, SET MANHOLE RIMS AND TOP OF GRATE AT ELEVATIONS SHOWN
ON THE PLANS. FOR SOLID MANHOLE RIMS ONLY, IF SPECIFIC ELEVATIONS ARE NOT SHOWN ON
THE PLANS, SET THE RIM ELEVATION 2” ABOVE THE FINISHED GRADE OF ADJACENT GRADES.
11. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS OF ALL EXISTING GRAVITY SEWER LINES
SHOWN ON DRAWINGS PRIOR TO START OF CONSTRUCTION.
12. PRIOR TO ORDERING ANY MATERIALS FOR CONSTRUCTION OF STORM SEWER PROPOSED
UNDER THE PROJECT, CONTRACTOR SHALL REVIEW THE DRAWINGS FOR ANY DISCREPANCIES
BETWEEN SURVEY INFORMATION OF EXISTING SEWER LINES AND WHAT IS FOUND IN THE FIELD.
SUCH DISCREPANCIES SHALL BE BROUGHT TO ENGINEERS ATTENTION FOR POSSIBLE
ADJUSTMENT.
13. CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT ALL “POINTS OF CROSSING” TO
DETERMINE IF CONFLICT EXISTS BEFORE COMMENCING ANY CONSTRUCTION. NOTIFY THE
ENGINEER AT ONCE OF ANY CONFLICT FOR POSSIBLE ADJUSTMENT.
14. CONTRACTOR SHALL CONSTRUCT ALL GRAVITY SEWER LINES STARTING AT THE OUTFALL
POINT OR AT THE ULTIMATE POINT OF CONNECTION TO THE SERVICING LINE AND THEN CONTINUE
CONSTRUCTUING UPSTREAM
15. LENGTHS OF STORM SEWER PIPE IN PROFILE IS BASED ON STRAIGHT CENTER LINE SEWER
LINE LENGTHS BETWEEN MANHOLE'S VERTICAL CENTER LINES. FLOW-LINE ELEVATIONS ARE
BASED ON CENTER LINE LENGTHS BETWEEN MANHOLES' VERTICAL CENTER LINES.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING AND MAINTAINING THE
EXISTING DRAINAGE CONDITIONS. ANY DAMAGED OR ALTERED DRAINAGE CONDITIONS OUTSIDE
PROJECT SCOPE SHALL RESTORED.
17. ALL DITCHES SHALL BE REGRADED TO PROPOSED ELEVATIONS TO INSURE PROPER
DRAINAGE. ALL DISTURBED AREA SHALL BE STABILIZED PER THE SPECIFICATIONS.
18. CONTRACTOR TO NOTIFY ENGINEER IF PROPOSED DRIVEWAYS CONFLICT WITH AN EXISTING
INLET PRIOR TO START OF CONSTRUCTION.
EROSION CONTROL PLAN CONSTRUCTION NOTES
1. CONTRACTOR TO FURNISH SWPPP PER TCEQ REQUIREMENTS. THE EROSION CONTROL
PLAN AS CONTAINED IN THE DRAWING SET CAN BE USED IN THE STORM WATER POLLUTION
PREVENTION PLAN
2. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVISES, REINFORCED FILTER FABRIC
BARRIER, STABILIZED CONSTRUCTION ENTRANCES AND OTHER STORM WATER POLLUTION
PREVENTION MEASURES AT LOCATIONS SHOWN ON THE PLAN(S) TO KEEP SILT AND/OR
EXCAVATED MATERIALS FROM ENTERING THE STORM WATER INLETS AND DITCHES, EVENTUALLY
POLLUTING THE RECEIVING STORM SYSTEM. NO HAY BALES WILL BE ALLOWED.
3. DURING THE EXCAVATION/FILL PHASE OF THE PROJECT, CONTRACTOR SHALL SCHEDULE
THE WORK IN APPROPRIATE SEGMENTS SO THAT EXCESS MATERIAL CAN BE QUICKLY HAULED
AWAY PREVENTING IT FROM STAYING UNCOLLECTED ON THE EXISTING PAVEMENT. ANY LOOSE
EXCAVATED MATERIAL WHICH FALLS ON PAVEMENT OR DRIVEWAYS SHALL BE REMOVED
APPROPRIATELY.
4. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND DRIVEWAYS
DAILY AND ADDITIONALLY AS NECESSARY TO REMOVE EXCESS MUD, SOIL, SILT OR ROCK
TRACTED FROM THE EXCAVATED AREA.
5. CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING THE
CONSTRUCTION OF THE PROJECT, ALWAYS CLEANING UP DIRT AND LOOSE MATERIAL AS
CONSTRUCTION PROGRESSES.
6. CONTRACTOR TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW AT LEAST ONCE EVERY
FOURTEEN (14) CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM EVENT OF 0.5
INCHES OR GREATER.
A. DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED.
B. AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION
C. STRUCTURAL CONTROL MEASURES.
D. LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING EXISTING DITCHES AND/OR
CULVERTS FOR UNOBSTRUCTED DRAINAGE AT ALL TIMES. WHERE SODDING IS DISTURBED BY
EXCAVATION ON BACKFILLING OPERATIONS, SUCH AREAS SHALL BE REPLACED BY SEEDING OR
SODDING. SLOPES STEEPER THAN 4:1 SHALL BE REPLACED BY BLOCK SODDING. SLOPES
STEEPER THAN 3:1 SHALL BE STABILIZED WITH PLANT MATERIALS NOT REQUIRING MOWING FOR
MAINTENANCE AND/OR GEOTEXTILE FABRICS AS REQUIRED IN THE PLANS AND SPECIFICATIONS.
05/02/2016 CONSTRUCTION DOCUMENTS
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-G
N-D
T.dw
gM
ay 0
3, 20
16
- 2:08
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL DETAILS
C5.1
XXXXXX
XXXXX
X
XXXXXX
XXXX
XXXX
XX
XXXXX
XX
XXX
X
XX X
X X XX
X X X XX
XX
X X XX X
X X
XXXX
XXXX
XX
XXXXX
XX
XXX
X
XXX
XXX
X XX
05/02/2016 CONSTRUCTION DOCUMENTS
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-G
N-D
T.dw
gM
ay 0
3, 20
16
- 2:08
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL DETAILS
C5.2
05/02/2016 CONSTRUCTION DOCUMENTS
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-G
N-D
T.dw
gM
ay 0
3, 20
16
- 2:08
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL DETAILS
C5.3
05/02/2016 CONSTRUCTION DOCUMENTS
GA
TE
SLIDING GATE
GATE
GATE
SL
ID
IN
G G
AT
E
WEST ROAD
BE
RT
NE
R A
VE
.
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-S
WP
PP
.dw
gM
ay 0
3, 20
16
- 2:09
pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
LEGEND
Project Benchmark:
Temporary Benchmark No. 16
Horizontal Datum:
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL SITE STORM
WATER POLLUTION
PREVENTION PLAN
C6.0
05/02/2016 CONSTRUCTION DOCUMENTS
PROJECT NAME
SHEET NUMBER
SHEET TITLE
DESIGNED BY
NO.
REVIEWED BY
DRAWN BY
PROJECT NUMBER
DATE
DATE REVISION
MAG
AB
SP
04-05-2016
C03-16005-00
UTHS
SURFACE LOT
IN ASSOCIATION WITH
P:\C
03\2016\16005-00 U
T S
C
am
pus P
kg Lot\C
ad\S
ite\C
03-16005-00-S
WP
PP
-D
T.dw
gM
ay 03, 2016 - 2:09pm
Copyright C WALTER P. MOORE AND ASSOCIATES, INC. 2016
122342 RR
N
LA
L
S
O
S
E
F
I
C
E
N
O
I
I
G
S
E
D
N
E
E
E
N
MANOJ H. ADWANEY
F
P
T
A
T
S
O
E
X
E
T
S
A
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
CIVIL SITE SWPPP
DETAILS
C6.1
05/02/2016 CONSTRUCTION DOCUMENTS