• Founded in 1963• 95% of our work is for PA Public School Districts• Completed 27 Feasibility Studies• Designed 39 New Elementary Schools or major
additions
Feasibility Study preparation team:Robin Breslin, AIAStephen Behrens, AIA, LEED AP® BD+CTerry DeGroot, PE - TerraForm EngineeringCharles Rightmyer - Consolidated Engineers
Special Thanks to:Dale Lauver, Director of FacilitiesRobert Giering, PrincipalJames McCusker, Head Custodian
UWCHLAN HILLS ELEMENTARY SCHOOL
BRESLIN ARCHITECTSDECEMBER 5, 2016
OVERALL APPROACH TO FACILITY ASSESSMENT:
• Gathered Building Plans (Architectural, Mechanical, Electrical, Plumbing, Structural, & Site)
• Field surveyed existing School Building and Site
• Interviewed District and Building Administration to obtain input and information
• Prepared updated Floor Plan and compared sizes to PDE recommendations
• Met with Township Officials to understand municipal perspective and priorities
• Developed prioritized list of infrastructure needs looking out 10 years
• Prepared Options for future of Uwchlan Hills Elementary School and reviewed with Administration and Board Facilities Committee
• Developed Room Schedules, Construction Phasing, Budgets, and evaluated advantages/disadvantages for each Option
INFRASTRUCTURE ASSESSMENTUWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016
1
School Building Description
Description:
Total Sq. Ft:
Date Built:
HVAC Renovations:
Space Room # Floors Bases Walls Ceilings Soffits CaseworkMarker/Tack
BoardsMulti-Media
SystemDoor Condition Comments
MAIN FLOOR - SECTION A
Multi-Purpose Room A100 VCT - 2 RB - 3 CMU - 3 APC - 3 NA NA NA NA 3 Folding partition
Cafeteria A101 VCT - 2 RB - 3 CMU - 3 APC - 3 NA NA NA NA 2 Very small - No ADA access
Multi-Purpose Room - Platform A102 WD - 3 WD - 3 CMU - 3 ES - 3 NA PLAM - 3 CB - SB - 2 Proj - 2 2
Table and Chair Storage (Gym Storage) A103 VCT - 3 RB - 3 CMU - 3 APC - 3 NA
Outside Storage A104 CONC - 3 NA CMU - 3
Boiler Room A105 CONC - 3 NA CMU - 4 ES - 3
Gym Storage A106 VCT - 3 RB - 3 CMU - 3 APC - 3 NA
Music Room A107 CARP - 3 RB - 2 CMU - 3 APC - 3 NA
Girl's Locker Room (Storage) A108 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Girl's Shower (Storage) A109 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Girl's Toilet Room A110 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Storage A111
Boy's Locker Room (Storage) A112 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Boy's Shower (Storage) A113 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Boy's Toilet Room A114 CMT - 3 GWT - 3 CMU - 3 P - 2 NA
Passage A115 CARP - 3 RB - 3 CMU - 3 APC - 3 NA
Music and Practice Storage A116 CARP - 2 RB - 2 CMU - 2 APC - 3 NA CB - 3 TV Used for instruction
Corridor A117 CARP - 4 RB - 3 CMU - 3 APC - 3 NA
Serving A118 QT - 3 GWT - 3GWT - 3CMU - 3
APC - 3 NA
Dishwashing A119 QT - 3 GWT - 3GWT - 3CMU - 3
P NA
Dry Storage A120 CONC - 3 RB - 3 CMU - 3 APC - 3 NA
A Corridor CARP - 3 RB - 3 CMU - 3 APC - 3 NA Non-compliant -- railings < 1-1/2"
Chiller Building CONC - 3 NA CMU - 3 ES - 4 NA NA NA NA 3
Passage A121 QT - 3 GWT - 3GWT - 3CMU - 3
APC - 3
APC - Acoustic Panel Ceiling GCMU - Glazed Concrete Masonry Unit S - Steel 1 = Excellent ConditionAS - Acoustic Spray GFB - Ground Face Block SB - Smart Board 2 = Very Good ConditionBRK - Brick GWB - Gypsum Wall Board STRUC - Exposed Structure 3 = Good ConditionCARP - Carpet MB - Metal Base SV - Sheet Vinyl 4 = Poor ConditionCB - Chalkboard MP - Metal Panels TER - Terrazzo 5 = Critical Condition / FailedCMT - Ceramic Mosaic Tile PLAM - Plastic Laminate TP - Tectum PanelsCMU - Concrete Masonry Unit P - Plaster TT - Terrazzo TileCONC - Concrete PV - Poured Vinyl VB - Vinyl BaseCT - Ceramic Tile / GWT - Glazed Wall Tile QT - Quarry Tile VCT - Vinyl Composition TileDM - Dry Marker Board RF - Resilient Flooring VF - Vinyl FabricES - Exposed Structure RB - Rubber Base WD - Wood
One-story building on three floor levels. Upper most and lower most floor elevations are separated by 10'-0". The classrooms are arranged in a "pod" configuration. The building structure is steel frame, with brick veneer exterior walls. Most of the interior partitions are CMU. The building has changed very little since it's construction in 1971 other than a major HVAC upgrade in 2003. Two temporary classrooms are positioned to the south of the main building.
DASD - Uwchlan Hills ES
K-5 Elementary School
63,443
1971
2003
BRESLIN ARCHITECTS
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
DECEMBER 5, 2016
ACCESS BARRIERS
Numerous Accessibility (ADA) issues for students and staff with disabilities:
• 3 separate floor elevations with no ramp or elevator
• Step between main building and Temporary Classrooms
• No accessible toilet facilities available • Multi-Purpose Room stage ramp not
compliant • Handrails and other features not compliant
BRESLIN ARCHITECTS
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
DECEMBER 5, 2016
SECURITY AND ADMINISTRATION:
• Poor visibility for Receptionist • Poor security layering • Administration Staff squeezed • Little storage and no lockable records room • Nurse’s suite inadequate for testing/exam
and no office for confidentiality
BRESLIN ARCHITECTS
DECEMBER 5, 2016
CORE FACILITIES UNDERSIZED:
• Library - work room lost to data closet • Multi-Purpose Room - insufficient safety perimeter • Kitchen - most equipment at end of life • Cafeteria serving - crowded, out-of-date configuration • Storage - M/P Room tables in the Boiler Room; paper in
showers • Exterior - no loading dock; no grounds storage
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
BRESLIN ARCHITECTS
DECEMBER 5, 2016
BUILDING MECHANICAL SYSTEMS:
• Original components at end of life • Last major upgrade 13 year ago (not total replacement) • Main electrical service out of code compliance • Air handler condensate pan above main electrical service • Problems with water tempering at sinks • No fire sprinkler system • Original single pane windows waste energy
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
BRESLIN ARCHITECTS
DECEMBER 5, 2016
NEGATIVE IMPACT ON 21st CENTURY EDUCATION:
• Rigid 4-classroom cluster limits flexibility • Inadequate small group instruction space • Inadequate assembly space • Instrumental Music in a former storage room • Technology integration is difficult • Extremely limited Teacher Planning and locking storage
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
BRESLIN ARCHITECTS
SPEC.ED
SPEC.ED
K
K
ART
MUSIC
MULTI- PURPOSEROOM BOILER
RM.
KITCHENSERV.
FAC.
S.
S. LOCKERRMS.
STAGE
S.
EXISTINGFIELD HOCKEY
EXISTINGPLAY AREA
EXISTING BASEBALL &SOCCER FIELDS
EXISTINGBASKETBALL
COURT
PECK R
OAD
EXISTINGPARKING
EXISTINGPARKING
EXISTINGPARKING
EXISTINGPARKING
STORAGE
SEM. SEM.
LOBBY
O.
LIBRARY
CR
BGST. J
CHILLERBUILDING
CR
CR
CR
CR
CR
CR
CR
CR
FULL DAYK
SPECED
CR
CR
CR
CR
CR
CR
CR
CR
ST. ST.BGADMIN.
NURSECR CR
CR CR
SPECED
SPECED
SPECED
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-EXISTING CONDITIONS
0 25 100 200DECEMBER 5, 2016BRESLIN ARCHITECTS
UWCHLAN HILLS ELEMENTARY SCHOOL - BUILDING DEFICIENCIES
SITE DEFICIENCIES: • Commingling of bus and car traffic • Inadequate queuing space for cars • Students must cross bus lane from
parent drop-off • Insufficient parking for staff and visitors • No existing stormwater management
SUMMARY OF OPTIONS
OPTION 1 Interior and Site work per Capital Improvement Plan (not a complete renovation)
OPTION 2 Eliminate UHES and distribute students to other schools
OPTION 3 Renovate existing classrooms and add new Multi-Purpose Room and 3-story Classroom Wing
OPTION 4 Retain only existing Multi-Purpose Room, demolish classrooms and add new 2-story Classroom Wing, core facilities and Administration
OPTION 5 Construct new UHES and demolish existing building
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016BRESLIN ARCHITECTS
SPEC.ED
SPEC.ED
K
K
ART
MUSIC
BOILERRM.
KITCHENSERV.
FAC.
S.
S. LOCKERRMS.
STAGE
S.
PARKING8 SPACES
PARKING22 SPACES
PARKING14 SPACES
PARKING35 SPACES
PARKING67 SPACES
EXISTINGFIELD HOCKEY
EXISTINGPLAY AREA
EXISTING BASEBALL &SOCCER FIELDS
EXISTINGBASKETBALL
COURT PECK R
OAD
MULTI- PURPOSEROOM
STORAGE
LOBBY
O.
CR
BGST. J
CHILLERBUILDING
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
ST. ST.BGADMIN.
NURSECR CR
CR CR
CR
FULL DAYK
SPECED
SPECED
SPECED
SPECED
LIBRARY
SGI TCH.PLN.
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 1 - PARKING IMPROVEMENTS
0 25 100 200
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 1
DECEMBER 5, 2016
PHASE 2
PHASE 3PHASE 4
PHASE 5
PHASE 1
P1-5 P1-5
BRESLIN ARCHITECTS
P2-5 P2-3
PHASE 1: (6 months) • Multi-Purpose Room Wing
and Boiler Room “head end” • 4 Temporary Classrooms
needed
PHASE 2 & 3: (8 months) • 8 Classrooms affected • 8 Temporary Classrooms
needed
PHASE 4: (4 months) • Library, Administration and 4
Classrooms affected • 4 Temporary Classrooms
needed
PHASE 5: (4 months) • 4 Classrooms affected • 6 Temporary Classrooms
needed
PHASING PLAN
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016BRESLIN ARCHITECTS
OPTION 1 - Summary
TOTAL PROJECT COST: $ 17,836,000 DURATION: 24 months min. CONSTRUCTION COST / SQ. FT.: $ 210 * * includes temporary classrooms
ADVANTAGES: • Lowest cost project that retains school operations • Traff ic Study may not be required • Al l athlet ic f ields and play areas remain in place
DISADVANTAGES: • Most complex phasing and greatest disruption of
school operations • Temporary classrooms st i l l required post-construction • Net loss of education space due to interior alterat ions • Many space deficiencies and program challenges
inherent in the exist ing bui lding remain • Stormwater management l ikely needed for new parking
SPEC.ED
SPEC.ED
K
K
ART
MUSIC
BOILERRM.
KITCHENSERV.
FAC.
S.
S. LOCKERRMS.
STAGE
S.
PARKING8 SPACES
PARKING22 SPACES
PARKING14 SPACES
PARKING35 SPACES
PARKING67 SPACES
EXISTINGFIELD HOCKEY
EXISTINGPLAY AREA
EXISTING BASEBALL &SOCCER FIELDS
EXISTINGBASKETBALL
COURT PECK R
OAD
MULTI- PURPOSEROOM
STORAGE
LOBBY
O.
CR
BGST. J
CHILLERBUILDING
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
ST. ST.BGADMIN.
NURSECR CR
CR CR
CR
FULL DAYK
SPECED
SPECED
SPECED
SPECED
LIBRARY
SGI TCH.PLN.
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 1 - PARKING IMPROVEMENTS
0 25 100 200
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016BRESLIN ARCHITECTS
OPTION 2 - Summary Eliminate UHES and distribute students to other schools
TOTAL PROJECT COST: $ 2,200,000
ADVANTAGES: • Lowest cost option • Reduction in distr ict operating cost (one less bui lding) • Reduced Administrat ive Staff ing needs
DISADVANTAGES: • Permanently removes the school bui lding • Limits DASD future f lexibi l i ty for redistr ict ing • Loss of any exist ing impervious credit i f a school
bui lding were considered for the site in the future • Zoning chal lenges increase i f a school bui lding were
considered for the site in the future
STAGE
MULTI-PURPOSEROOM
CAFETERIA
KITCHEN
BOILER
O.
S.
S.
T. T.
S.
outdoorstoragebelowstage
NEW ADDITION-FIN. FLR. 144.00'
d
NEW ADDITION-FIN. FLR. 144.00'
RECEIVING
EE.
d
NEW PARKING
PARENT DROP-OFF
101 SPACES
INSTRUM.MUSIC
EXISTINGFIELD HOCKEY
EXISTING BASEBALL &SOCCER FIELDS
PECK R
OAD
BASKETBALLCOURT
ART
DATA
u d
ELEV.
8 VISITORSPACES
TWO-WAY CAR ACCESSAND BUS ENTRY
BUSSES ONLY EXIT
C.
E.
FAC.
T.
T.
STORAGE
SGI TCH.PLN.
LOBBY
CR
BGST. J
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
ST. ST.BGADMIN.
NURSEPORTION OF EXIST.BLDG. TO BEDEMOLISHED
CR
CR
PORTION OF EXISTINGBUILDING TO BEDEMOLISHED
NEW TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
EXIST. TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
NEW TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
LIBRARY
CR
O.
CR
SPEC.ED.
CR
SPEC.ED.
SPEC.ED.
SPEC.ED.
SPEC.ED.
PLAY AREA/OVERFLOW
PARKING
MUSIC
BUSLOADING
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 3 - MAIN FLOOR LEVEL
0 25 100 200
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 3
DECEMBER 5, 2016
ADEQUATE PARKING
BU
SES
ON
LYVIS
ITORS
ADDITIONAL TEMPORARY CLASSROOMS
BRESLIN ARCHITECTS
OVERFLOW PARKING
u
T. T.
S.
NEW PARKING
BUSLOADING
PARENT DROP-OFF
101 SPACES
UNEXCAVATED
OUTDOORSTO.
d
EXISTING BASEBALL &SOCCER FIELDS
PECK R
OAD
BASKETBALLCOURT
u
ELEV.
NEW ADDITION-FIN. FLR. 130.00'
TWO-WAY CAR ACCESSAND BUS ENTRY
K
K
SPEC.ED.
K
PORTION OF EXISTINGBUILDING TO BEDEMOLISHED
PLAY AREA/OVERFLOW
PARKING
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 3 - LOWER FLOOR LEVEL
0 25 100 200
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 3
BRESLIN ARCHITECTS
UPPER STAGE
UPPERMULTI-PURPOSE
T. T.
S.
outdoorstoragebelowstage
d
NEW ADDITION-FIN. FLR. 158.00'
RECEIVING
EE.
d
NEW PARKING
PARENT DROP-OFF
101 SPACES
UPPERMUSIC
ROOF OFEXISTING BUILDING
ROOF OFNEW BUILDING
EXISTINGFIELD HOCKEY
EXISTING BASEBALL &SOCCER FIELDS
PECK R
OAD
BASKETBALLCOURT
d
ELEV.
8 VISITORSPACES
PORTION OFEXISTING BUILDINGTO BE DEMOLISHED
CR
CR
CR
PORTION OF EXISTINGBUILDING TO BEDEMOLISHED
CR
PLAY AREA/OVERFLOW
PARKING
BUSLOADING
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 3 - UPPER FLOOR LEVEL
0 25 100 200
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 3
DECEMBER 5, 2016BRESLIN ARCHITECTS
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 3
BRESLIN ARCHITECTS
PHASING PLAN
PHASE1
PHASE2
PHASE2A
PHASE1A
PHASE1A
PHASE2A
P1 P1 P2 P2EX
PHASE3
CONTRACTOR ACCESS
PHASE 1:• Multi-Purpose Room addition• (4) additional Temp. Classrooms• Existing parking remains
PHASE 1A:• New entry drive• Begin parking lot, remove fuel tank
PHASE 2:• Classroom Wing addition• (4) additional Temp. Classrooms• Balance of new parking lot
PHASE 2A:• Building interior alterations• Bus Loop
PHASE 3:• Service drive• Remove Temp. Classrooms
(12 months)
(summer work)
(12 months)
(summer work)
(3 months)
OPTION 3 - Summary
TOTAL PROJECT COST: $ 27,313,000 DURATION: 27 months CONSTRUCTION COST / SQ. FT.: $ 265 * * includes temporary classrooms
ADVANTAGES: • Lowest cost expansion option • Addresses deficiencies of some core spaces • El iminates Temporary Classrooms at completion • Improves bus/car traff ic separation • Maintains athlet ic f ields
DISADVANTAGES: • Most complex phasing and construction safety r isk • Highest unforeseen change order r isk • Security concerns with Temporary Classrooms • Flexibi l i ty chal lenges remain in Classroom areas • Creates windowless spaces and further isolates
classrooms from views to the landscape
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016
STAGE
MULTI-PURPOSEROOM
CAFETERIA
KITCHEN
BOILER
O.
S.
S.
T. T.
S.
outdoorstoragebelowstage
NEW ADDITION-FIN. FLR. 144.00'
d
NEW ADDITION-FIN. FLR. 144.00'
RECEIVING
EE.
d
NEW PARKING
PARENT DROP-OFF
101 SPACES
INSTRUM.MUSIC
EXISTINGFIELD HOCKEY
EXISTING BASEBALL &SOCCER FIELDS
PECK R
OAD
BASKETBALLCOURT
ART
DATA
u d
ELEV.
8 VISITORSPACES
TWO-WAY CAR ACCESSAND BUS ENTRY
BUSSES ONLY EXIT
C.
E.
FAC.
T.
T.
STORAGE
SGI TCH.PLN.
LOBBY
CR
BGST. J
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
ST. ST.BGADMIN.
NURSEPORTION OF EXIST.BLDG. TO BEDEMOLISHED
CR
CR
PORTION OF EXISTINGBUILDING TO BEDEMOLISHED
NEW TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
EXIST. TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
NEW TEMP.CLASSROOMS
(REMOVE WHENNEW CONSTRUCTION
IS COMPLETED)
LIBRARY
CR
O.
CR
SPEC.ED.
CR
SPEC.ED.
SPEC.ED.
SPEC.ED.
SPEC.ED.
PLAY AREA/OVERFLOW
PARKING
MUSIC
BUSLOADING
DOWNINGTOWN AREA SCHOOL DISTRICTN
BLDG.NORTH
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 3 - MAIN FLOOR LEVEL
0 25 100 200
BRESLIN ARCHITECTS
EX.MULTI- PURPOSE
ROOMEX.
STAGE
S.MUSIC
ART
INST.CR.
CAFETERIAKITCHEN MECH.
LOBBY
LIBRARY
PARKING11 SPACES
M.
W.
BUSSES ONLYENTRANCE
TWO-WAY CAR ACCESSAND BUS EXIT
TEACH.PLAN.
TV
DATA
STO
ADMIN. NURSE
FAC.DIN. C. REC'G/
STO.
NEW BUILDING-MAIN FLOOR LEVELELEV. 134.00'
EXISTING BUILDINGTO BE DEMOLISHED
EXISTING BASEBALLAND SOCCER FIELDS
TO REMAIN
NEWATHLETIC
FIELD
K
T.
K
C.S.
CRCR
CRCR
C.S.
CRCR
CRCR
C.S.
T.
T.
T.
T.
T.
PARENTDROP-OFF
PARKING87 SPACES
PARKING16 SPACES
SERVICEACCESS
ENTRANCE
BASKETBALLCOURTS
UNEXCAVATED
K
SPEC.ED.
SPEC.ED.
SPEC.ED.
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 4 - MAIN FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 4
BRESLIN ARCHITECTS
UPPERLOBBY
L.G.I./STEM
UPPERLIBRARY
EX.MULTI- PURPOSE
ROOM
ROOF OFNEW BUILDING
SGI.
STO
DATA
SGI.
ROOF OFEXIST. BUILDING
NEW BUILDING-UPPER LEVELELEV. 148.00'
EXISTING BUILDINGTO BE DEMOLISHED
CRCR SPEC.ED.
T.
CRCR
C.S.
CRCR
CRCR
C.S.
CRCR
CRCR
C.S.
T.
T.
T.
T.
T.
BASKETBALLCOURTS
SPEC.ED.
SPEC.ED.
SPEC.ED.
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 4 - UPPER FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 4
BRESLIN ARCHITECTS
PHASE1
PHASE2
PHASE2A
PHASE3
PHASE1A
PHASE 1: (16 months)• Majority of New Construction
PHASE 1A: (summer work)• New entry drive
PHASE 2: (6 months)• Demolition of Existing Building• New Parking Lots and Driveways
PHASE 2A: (summer work)• Selective Building Demolition• Interior Alteration of Existing Building• New Bus Lane and Parking
PHASE 3:• Demolish Existing Bus Lane and
Parking
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 4
BRESLIN ARCHITECTS
(1 month)
PHASING PLAN
8
OPTION 4 - Summary
TOTAL PROJECT COST: $ 35,594,000 DURATION: 25 months CONSTRUCTION COST / SQ. FT.: $ 266
ADVANTAGE: • Al l new Instruct ional Space (except Gym and Stage)• El iminates Temporary Classrooms at completion• Improves bus/car traff ic separation• Classrooms take ful l advantage of access and views to
natural landscape
DISADVANTAGES: • Most costly option and most complex sitework• Largest bui lding to maintain and supervise• Work around exist ing bui lding increases construction
safety chal lenges and r isk• Space deficiencies and safety chal lenges remain in
the Mult i-Purpose Room
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016BRESLIN ARCHITECTS
EX.MULTI- PURPOSE
ROOMEX.
STAGE
S.MUSIC
ART
INST.CR.
CAFETERIAKITCHEN MECH.
LOBBY
LIBRARY
PARKING11 SPACES
M.
W.
BUSSES ONLYENTRANCE
TWO-WAY CAR ACCESSAND BUS EXIT
TEACH.PLAN.
TV
DATA
STO
ADMIN. NURSE
FAC.DIN. C. REC'G/
STO.
NEW BUILDING-MAIN FLOOR LEVELELEV. 134.00'
EXISTING BUILDINGTO BE DEMOLISHED
EXISTING BASEBALLAND SOCCER FIELDS
TO REMAIN
NEWATHLETIC
FIELD
K
T.
K
C.S.
CRCR
CRCR
C.S.
CRCR
CRCR
C.S.
T.
T.
T.
T.
T.
PARENTDROP-OFF
PARKING87 SPACES
PARKING16 SPACES
SERVICEACCESS
ENTRANCE
BASKETBALLCOURTS
UNEXCAVATED
K
SPEC.ED.
SPEC.ED.
SPEC.ED.
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 4 - MAIN FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
PARENTDROP-OFF
NEW BUILDING-UPPER LEVELELEV. 142.00'
PARKING78 SPACES
BUSSESONLY
NEWATHLETIC
FIELD
NEWSOFTBALL
FIELD
BUS DROP-OFF
EXISTING BUILDINGTO BE DEMOLISHED
CR CR CR CR
CR CR CR
K K K TV
T.
T.
T.
T.
CAFE. KIT.
REC.
MECH.
LIBRARY
NURSE
ADMIN.
STAGE GYMNASIUM
ENTRANCE
STO.
LOBBY
ART
C.S.
C.S.
C.S.
K
CR
SPECED
SPECED
MUSIC
INSTR.MUSIC
SERVICEACCESS
28 SPACESPARKING
S.
LGI
TEACH.PLN.
PLAY AREA/OVERFLOW
PARKING
CR
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 5 - MAIN FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 5
BUSES ONLY
CARS
COMMUNITY ACCESS
BRESLIN ARCHITECTS
T.
T.
T.
T.
T.
T.
C.S.
C.S.
C.S.
NEW BUILDING-LOWER LEVELELEV. 128.00'
SPEC.ED.
SPEC.ED.
SGI
CR CR CR CR
CR CR CR CR
CR CR CR CR
CR
UNEXCAVATED
S.
PLAY AREA/OVERFLOW
PARKING
SERVICEACCESS
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 5 - LOWER FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 5
BRESLIN ARCHITECTS
PHASE1
PHASE2A
PHASE2 PHASE
1A
DECEMBER 5, 2016
UWCHLAN HILLS ELEMENTARY SCHOOL - OPTION 5
BRESLIN ARCHITECTS
PHASING PLAN
PHASE 1: (16 months) • Construct New School
PHASE 1A: (summer work) • New entry drive connection
PHASE 2: (5 months) • Demolition of existing school • New athletic fields
PHASE 2A: (summer work) • Partial Demolition of existing
school • Bus loop and Parent Drop off
OPTION 5 - Summary
TOTAL PROJECT COST: $ 32,692,000 DURATION: 21 months CONSTRUCTION COST / SQ. FT.: $ 276 * * includes complete demoli t ion of exist ing bui lding
ADVANTAGES: • Al l new construction offers best f lexibi l i ty in design to
meet current and future goals• Safest vehicle circulat ion scheme• Classrooms take ful l advantage of access and views to
natural landscape
DISADVANTAGES: • More expensive than Option 3• Loss of some athlet ic f ields• Requires relocation of exist ing playground equipment
UWCHLAN HILLS ELEMENTARY SCHOOL
DECEMBER 5, 2016
PARENTDROP-OFF
NEW BUILDING-UPPER LEVELELEV. 142.00'
PARKING78 SPACES
BUSSESONLY
NEWATHLETIC
FIELD
NEWSOFTBALL
FIELD
BUS DROP-OFF
EXISTING BUILDINGTO BE DEMOLISHED
CR CR CR CR
CR CR CR
K K K TV
T.
T.
T.
T.
CAFE. KIT.
REC.
MECH.
LIBRARY
NURSE
ADMIN.
STAGE GYMNASIUM
ENTRANCE
STO.
LOBBY
ART
C.S.
C.S.
C.S.
K
CR
SPECED
SPECED
MUSIC
INSTR.MUSIC
SERVICEACCESS
28 SPACESPARKING
S.
LGI
TEACH.PLN.
PLAY AREA/OVERFLOW
PARKING
CR
UWCHLAN HILLSELEMENTARY SCHOOL-OPTION 5 - MAIN FLOOR LEVEL
DOWNINGTOWN AREA SCHOOL DISTRICT N
BLDG.NORTH
0 25 100 200
BRESLIN ARCHITECTS
PARENTDROP-OFF
NEW BUILDING-UPPER LEVELELEV. 142.00'
PARKING78 SPACES
NEWNEW
BUS DROP-OFF
EXISTING BUILDINGTO BE DEMOLISHED
CR CR CR CR
CR CR CR
K K K TV
T.
T.
T.
T.
CAFE. KIT.
REC.
MECH.
LIBRARY
NURSE
ADMIN.
STAGE GYMNASIUM
ENTRANCE
STO.
LOBBY
ART
C.S.
C.S.
C.S.
K
CR
SPECED
SPECED
MUSIC
INSTR.MUSIC
SERVICEACCESS
28 SPACESPARKING
S.
LGI
TEACH.PLN.
PLAY AREA/OVERFLOW
PARKING
CR
SUMMARY OF OPTIONS
OPTION 1………………………………………………………….…$17.8 Interior and Site Improvements 24 months
OPTION 2………………………………………………………………$2.2 Eliminate UHES and distribute students to other schools
OPTION 3…………………………………………………………….$27.3 Renovate existing classrooms and add new Multi-Purpose Room and 27 months 3-story Classroom Wing
OPTION 4…………………………………………………………….$35.6 Retain only existing Multi-Purpose Room, demolish classrooms and 25 months add new 2-story Classroom Wing, core facilities and Administration
OPTION 5…………………………………………………………….$32.7 Construct new UHES and demolish existing building 21 months