THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
UWPD PRE-DESIGN PROGRESS PRESENTATIONDECEMBER 2011
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
UW POLICE DEPARTMENT FACILITY PROJECT
UNIVERSITY DISTRICT
UNIVERSITY OF WASHINGTON CAMPUS
EXISTING UW POLICE DEPARTMENT
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
SR-520 INTERCHANGE PROJECT
500’
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
INFORMATION J F M A M J J A S O N D 2011
J F M A M J J A S O N D 2012
J F M A M J J A S O N D 2013
J F M A M J J A S O N D 2014
J F M A M J J A S O N D 2015
PHASES
ACTION 2011
J F M A M J J A S O N D
2012 J F M A M J J A S O N D
2013 J F M A M J J A S O N D
2014 J F M A M J J A S O N D
2015 J F M A M J J A S O N D
UWPD Building Design and Construction Schedule
December 2011
Pre-Design Finalized
February 2012
UWPD Design Begins
December 2014
UWPD New Facility Complete
DECEMBER 2015
Park Construction Complete
DECEMBER 2012 Approved agreement expected by National
Park Service (NPS)
July 2013 Commence UWPD site
work & building construction
December 2014 Commence Bryants site Work & reconstruction
of park
UWPD BUILDING DESIGN AND CONSTRUCTION SCHEDULE
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
UWPD PRE-DESIGN ADVISORY GROUP
Director for Finance and Building Services, Facilities ServicesUniversity Architect, UW Office of Planning and Budgeting Advisory Group ChairUW Office of Planning and BudgetingAssociate Dean of University Libraries and Campus Security Advisory CommitteeUW Health Sciences Administration, and Campus Security Advisory CommitteeChair of Faculty Council on Student AffairsUW Office of Planning and BudgetingASUW Student RepresentativeDeputy Director, Office of Regional and External RelationsDirector for Fraternity & Sorority LifeUWPDDirector of Transportation ServicesUW Capital Projects OfficeDirector of Housing and Food ServicesUW Capital Projects OfficeExecutive Director Planning and Facilities UW Information TechnologyUWPD
Jim AngelosanteRebecca BarnesMichael Carette
Charles ChamberlinBob Ennes
Brian FabienGina Fernandes
Desiree HanssenAaron Hoard
David HotzSergeant Chris Jaross
Josh KavanaughKen Kubota
Pam SchreiberEric Smith
Pam StewartChief John Vinson
UWPD DESIGN TEAM
ArchitectPolice Facility ConsultantCost Estimator
Miller Hull PartnershipMcClaren, Wilson & Lawrie
JMB Consulting
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFER
RED SIT
E
UNIV
ERSI
TY O
F WAS
HING
TON
POLIC
E PRE
-DES
IGN
SCHE
DULE
OVERARCHING GOALSAugust 9, 20111AD
VISOR
YGR
OUP
ANALYZE SITESSeptember 23, 2011AD
VISOR
YGR
OUP 3
SITE RANK BRIEFINGOctober 4, 2011AD
VISOR
YGR
OUP 4
UW REGENTS REVIEW January 12, 2012UW BO
ARD
OF REG
ENTS
SEPTEM
BER
DECEM
BER
JANU
ARY
NOVEM
BER
JULY
AUGU
STOC
TOBE
R
SCOPE
UW DE
CISION
MAKER
S
DOCUME
NTSCO
PE, SC
HEDULE
, BUDGE
T SIT
E CRIT
ERIA
POTENT
IAL SITE
SSCO
PE IDE
NTIFIC
ATION
SPACE/
SITE NEE
DS
SITE RECOMMENDATION REPORTDeliverable: Week of October 10, 2011
FINAL PRE-DESIGN DOCUMENTDeliverable: December 2011
IDENTIFY SITESSeptember 9, 20112AD
VISOR
YGR
OUP
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
UWPD PROGRAM SPACES
Evidence StorageFitness and Locker RoomsCommunity Multi-Purpose and Training RoomsFirearm Range
OfficesDispatch CenterSuspect Processing Forensic Lab
EXISTING UWPD PROPOSED UWPDNET BUILDING AREA 22,000 SF 24,700 SFGROSS BUILDING AREA 27,600 SF 33,500 SFSITE AREA 50,000 SF + (SHARED FACILITY) 30,000 SF MIN
UWPD SITE NEEDS
(2) Vehicular AccessesSecure Storage for Specialized Police EquipmentSally Port (Suspect Transfer)
Secure Fleet ParkingEmergency Generators
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
HYPOTHETICAL BUILDING & SITE CONFIGURATIONS
B2RAMP
40,000 SF SITE
16,500 SF FOOTPRINT
B3
30,000 SF SITE
16,500 SF FOOTPRINT
B1
40,000 SF SITE
11,000 SF PARKING BELOW
11,000 SF MAIN LEVEL
C16,500 SF FOOTPRINT
50,000 SF SITE
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
Drumheller
Fountain
Portage Bay
Lake Washington Ship Canal
Dra
inage C
anal
Union Bay
Dra
inage C
ana
l
H
E5
S12
C1
4
C1
5
W14W13
E12
E10
E10
C8
C10 E9
E90
N26
W4V
W24
W29
W40
W39
W42 N24
W34
W10
W12
W14
W13
W9
W41
X-Lot
H17-18
C12
C12
P
TriangleParking GarageC20, 21
C12
C10
N24
PadelfordParking Garage
N22
C1
9
N6
N9,10,11
N13,14, 15
N7
N6
N8
N8N5
W35
H17-18
W8
C10
C10
E15
C1–C5 LevelsCentral Plaza
Parking Garage
W1
1
E16
To SandpointHousing
To
Blakely Villa
ge
N2
6
C6
N16, 18,20, 21
N25
E2
E8
P
N28top
floor
E1
C12
N12
E16
South Campus
Parking Garage
S7
S5
S6
C15 C15
W4
0
E14
E4
E3 H12
H12
S8
S8
N24
C7
C17
C7
E6
N1
E15
W38
N12
N8
C17
P
W50
W28
(W51)
N3
P
PP
P
PP
P
P
P
P
PP
P
P
P
4041
Gate 5
Gate 3
Gate 4
Gate 2
Gate 1
Gate 6
DennyField
IMA Sports Field #2
Tennis Courts
IMA SportsField #3
Soccer Field
Tenn
is C
ourts
SunDeck
Archery
Range
ClimbingRock
Golf Driv
ing Range
IMA Sports
field #1
CorpYard 1
Corp Yard 2
Chaffey Field
Union Bay Natural Area
ParringtonLawn
Den
ny
Yard
WATERFRONT TRAIL
Flagpole
EmergencyHelistop
HospitalEmergencyEntrance
The GladeSculpture
Viaduct
SakumaViewpoint
SalmonHoming Pond
To N
ord
heim
Court
WarMemorial
Institute for Learning and Brain Sciences
Paul G. Allen
Ctr. for Comp.
Sci. & Eng.
UWMCSurgeryPavilion
Anderson
Kirs
ten
Rob
erts
Wilcox
Win
ken-
werd
er
Oce
an
Sci
ence
s
Botany
Green-
house
Hitch
cock
Padelford
McMahon
Mackenzie
ChildCareCntr.
EthnicCultrl.
Cntr.
Mercer
3716
Annex 4
Mari
ne
S
tud
ies
Purch.Acctg.
Atmospheric
Sci.
Geophysics
McCarty
Com
munic
atio
ns
HUB Yard
Edmundson Pavilion
Physics / Astronomy
StudentUnionBuilding(HUB)
Engr.
Libr.
TheUniv.ofWash.Club
Fluke
HallHealth
Pla
nt
Op
s.
Aero
sp.
Rsch.
Hen
ryA
rt
Gallery
4311
Architect.
43
2
1
Tow
er
Loew
Me
ch
. E
ng
r.
En
g A
nn
ex
PowerPlant
Guthrie
Den
ny
Parrin
gton
Art
Smith
Thomson
Cla
rk
Bal
mer
Kane
SuzzalloLibrary
Bagley
Magnuson Health Sciences
Center
Kincaid
Auditorium
Gould
Meany
Schmitz
Hansee
Haggett
North P
hysics
Laboratory
PortageBay Parking
Facility
OdegaardUndergrad
Library
Chem
Lib
rary
Gra
ves
An
nex
NordstromTennisCenter DempseyIndoorCenter
HuskyStadium
CENPAInstrumentShop
Lewis
Hutchinson
Johnson
Mary
Gates
FisherySciences
J
K M
L
A
B
CD
StaffSvcs.
Henderson
Condon
FisheriesTeachingRsch.Ctr.
Bryants
Bloedel
Gra
ves
IntramuralActivities
Rai
tt
Music
Mill
er
Gow
en
Allen
Library
Burke Museumof Natural History
and Culture
More
Sieg
3941
4545
Merrill
Harris
Lab
.
Oceanog.
Clin
ic
South
Experimental
Education
Unit
Fisheries Center
SouthCam
pus
Center
Oce
an T
ch.
Marine
Sciences
Gerberding
Ch
em
istr
y
Benson
Terry
University of Washington
Medical Center
SC
Pla
nt
Se
rvic
es
4625
Electrical Engineering
4100
3939
3935
3947
1429
SylvanTheater and
Columns
909
4512
4516
4518
4522
4534-1/2
4507
4535
Univ
ers
ity
Booksto
re
Qua
d
William H. Gates
1100
Pavilio
nP
oo
l
Sports Med. Clinic
Mercer
42
25
UWMCRoosevelt
4245
4225
Will
iam
H. F
oeg
e
MarkMcDermottPlaza
Lander
Saver
y
1107
U o
f W
Info
. & V
isitors
Cente
r
T
S
C
O
A
(Gara
ge A
)
Collegiana
(Ga
rag
e B
)W
45
W4
6
M N P
Q
R S3D4M T
U
V
X
Y
W
Paccar
Jo
hn
M.
Wallace
CreativeCommunications
Women'sSoftball
Field
University Village Shopping Center
Hughes Penthouse
Theatre
BryantsAnnex
MetroStation
NorthWestHorticulturalSociety Hall
Issacson
Miller Library
Trans. Svcs.and MotorPool
Aerodyn.Lab
MedicinalHerb
Garden
Comm. Duch.Apt.
Social Work/Speach and Hearing Sciences Building
BrooklynBuilding
Floyd and Delores JonesPlayhouse
1303
Court
3945
3937 Guth
erie A
nnexe
s 1
- 4
EnvironmentalSafety Storage Bldg.
LewisAnnexes
ArtsTicket Office
Mue
ller
Univ. Facilities
4 3
6 2
Guggenheim
Annex
Facility Services.Admin. BldgInstructionalCenter/Theater
MoreAnnex
Theodor Jacobsen
Observatory
Oceanog.Research
Cunningham
WilsonAnnex
WinkenwerderAnnex
RobertsAnnex
Plant Op.Annexes 2-6
12
TVSatelliteTerm.
StaffEmploy.
Quaternary
Rsch. Ctr.
3902
NorthlakeBldg.
Center on Human
Development and
Disability
Out
door
Pra
ctic
eFa
cilit
y
WaterfrontActivitiesCenter
Canoe House
Campanile
Douglas ResearchConservatory
RussianHouse
ShellhouseAnnex
WilsonCeramic Lab
AlumniHouse
SouthCampus
Construction Office
Plant Lab
CeramicMetal Arts
Laurel Village
ConibearShellhouse
Plant Op.Annex 7
668
OceanographyDock
OceanographyStorage
Eagleson
U.S. PostOffice
WestReceivingStation
5
EnvironmentalSafety Office Bldg.
UrbanHorticultrue
Center
1 2
CommunityDesign Center
Motor Pool
Parking
3900
Entrance toGate 4
Lander-Terry Halls
TS Annex 1
PS
Annex
1
Allen Centerfor theVisual Arts
UWTower
Guggenheim
Stevens
Plant Lab Annex
Bank ofAmericaExecutiveEducationCenter
RooseveltCommons
UniversityTrans Cntr
N
E
S
W
E5
P
e
Fence
Construction Area
Road Gate
Bank Machine
Branch Library
University of WashingtonCampus & Vicinity
August 2010
©2010 UW Creative Communications & UW Facilities Services
http://www.washington.edu/home/maps/
Not for commercial purposes
Emergency Phone
Pay Phone
Bus StopBus Route
Automatic Parking Gate
Gatehouse (with emergency phone)
Campus EntrancesBuilding
Bridge/Overpass
Campus Parking Area
Public Parking Area
Parking (underground)
Building (underground)
Path/Sidewalk/Walkway
KEY TO MAP SYMBOLS
Removable BollardsOne Way Road (arrow indicates flow)
500' 1000'0
0 1/4 mile1/8 mile
Benjamin D. HallInterdisciplinary
Research
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
YXWVUTSRQPONMLKJIHGFEDCB
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
YXWVUTSRQPONMLKJIHGFEDCB
HA
RV
AR
D A
VE
. E
MASO
N ROAD
WAHKIAKUM
LANE
NE NORTHLAKE PLACE
22N
D A
VE
NE
JEF
FE
RS
ON
RO
AD
ISLA
ND
LA
NE
BURKE-G
ILM
AN
TR
AIL
Grie
g G
arde
n
NE CAMPUS PARKWAY
OK
AN
OG
AN
LA
NE
BR
OO
KLY
N A
VE
NE
Rain
ier V
ista
UN
IVE
RS
ITY
WAY
NE
NE 40TH STREET
PLACE
SNOHOMISH LANE
WA
LLA
WA
LLA
R
OA
D
GEORGE WASHIN
GTO
N L
ANE
SKAMANIA LANE
15TH
AVE N
E
NE 42ND STREET
MA
SO
N R
OA
D
SKAGIT
LAN
EWAHKIAKUM LANE
MO
NT
LA
KE
B
OU
LE
VA
RD
N
E
BU
RK
E-G
ILM
AN
TR
AIL
WH
ITM
AN
CO
UR
T
CHELA
N L
ANE
CLA
LLA
M L
AN
E
KLICKIT
AT L
ANE
THURSTON LANE
LEWIS LANE
NE NORTHLAKE WAY
UN
IVE
RS
ITY
BR
IDG
E
NE PACIFIC STREET
BURKE-GILMAN TRAIL
NE PACIFIC STREET
COLUMBIA ROAD
COLUMBIA ROAD
BR
OO
KLY
N A
VE
NE
11T
H A
VE
NE
RO
OS
EV
ELT
WA
Y N
E
NE 45TH & 50THSTREET EXITS
NE 42ND STREET
ST
EV
EN
S W
AY
W
Urban HorticultureFieldhouse
NE 41ST STREET
NE 42TH STREET
36T
H A
VE
NE
35T
H A
VE
NE
21S
T A
VE
NE
WA
LLA
WA
LLA
R
OA
D
WAHKIAKUM LANE
NE 43RD STREET
12T
H A
VE
NE
LINCOLN WAY
NE 40TH STREET
NE NORTHLAKE WAY
SH
IP C
AN
AL B
RID
GE
NE 44TH STREET
INT
ER
STAT
E 5
FR
EE
WA
Y
NE 47TH STREET
17T
H A
VE
NE
20T
H A
VE
NE
19T
H A
VE
NE
16T
H A
VE
NE
ME
MO
RIA
L W
AY
CHELA
N L
ANE
PIERCE
L
ANEKIN
G LAN
E
YA
KIM
A
LA
NE
15T
H A
VE
NE
RO
AD
WA
LLA
W
ALLA
R
OA
D
WA
LLA
WA
LLA
RO
AD
NE 45TH STREET
NE 45TH P
LACE
NE 45TH STREET
NE 44TH STREET
NE 43TH STREET
SAN JUAN
ROAD
GA
RF
IELD
LA
NE
BE
NTO
N L
AN
E
GRANT LANE
NE 41ST ST
NE 42ND STREET
NE 43RD STREET
4T
H A
VE
NU
E N
E
5T
H A
VE
NU
E N
E
9T
H A
VE
NE
8T
H A
VE
NE
NE 43RD STREET
NE 45TH STREET
5T
H A
VE
NU
E N
E
FAIR
VIE
W A
VE
. E
INT
ER
STA
TE
5 F
RE
EW
AY
EA
STLA
KE
AV
E. E
E ALLISON ST.
7T
H A
VE
NE
25T
H A
VE
NE
CLARK ROAD
MA
RY
GAT
ES
ME
MO
RIA
L D
RIV
E
WHATCOM
NE 44TH PLACE
SPOKAN
E LANE
ROAD
NE PACIFIC STREET
NE PACIFIC PLACE
18T
H A
VE
NE
15T
H A
VE
NE
KITSAP LANE
KIT
TITA
S LA
NE
UN
IVE
RS
ITY
WA
Y N
E
E HAMLIN ST.
FR
AN
KLIN
AV
E. E
NE 40TH STREET
6T
H A
VE
NE
NE 47TH STREET
NE 47TH STREET
36T
H A
VE
NE
NE BOAT STREET
ST
EV
EN
S W
AY
E
RO
AD
COWLITZ
MO
NT
LA
KE
BR
IDG
E
ASO
TIN
CLALLAM LANE
LANE N
FR
AN
KLIN
P
LA
CE
SPOKANE LANE
SNOHOMISH LANE S
WALLA WALLA LANE
WALLA WALLA LANE
WHITMAN LANE
KLIC
KIT
AT
LA
NE
KING LAN
E
SAN
JUAN
RO
AD
FER
RY P
LAC
E
SNOHOMISH
STEVENS LANE
CLALLAM
PLACE
GRANT PLACE
GA
RF
IELD
PLA
CE
TH
UR
STO
N
LAN
E
TH
UR
STO
N P
LACE
CHELA
N P
LACE
MA
SO
NP
LA
CE
BU
RK
E-G
ILM
AN
TR
AIL
NE 45TH STREET
CLA
RK
PLA
CE
UN
ION
ROAD
BAY
UW SERVICEROAD
PE
ND
OR
EIL
LE
PLA
CE
RA
INIE
R V
ISTA
COWLITZ PLACE
AD
AM
S P
LA
CE
AD
AM
S R
OA
D
KITSAP LANE FR
AN
KLIN
LA
NE
BA
Y P
LA
CE
U
NIO
N
WAY WSTEVENS
WAY
E
STEVEN
S
STE
VENS W
AY E
JOHNSONCIRCLE
LANE S
OU
TH
OR
EIL
LE
PEND
DO
UG
LA
S R
OA
D
CA
NA
L R
OA
D
WAHKIAKUM
SNOHOMISH
Stronghold
15
1413
11
12A7
6
4
3
2A
16
Red SquareParking Below
8
9
10
15
West Parking Garage
Block Containing W12 Parking Lot
Block Containing W14 Parking Lot
Previous Outreach Site
West of Condon Parking Lot W41
Not Used
Parking Lot on Roosevelt Between 43rd and 45th
Post Office Site
University Bookstore Parking Lot Main, North
Parking Lot on Brooklyn Between 45th and 47th
Alumni House Site
Parking Structure North of 45th, N28
North Parking Lot, Burke Museum
North Parking Lot, Observatory
Russian House Site
Plant Services
Parking Lot South of Pend Oreille
Wilson Annex Site
Padelford Parking N24
Grey Fill: Areas NOT Considered for Site
Dashed: Estimated 200' Setback from Water
1
4
5
5
6
7
8
9
10
13
14
18
17
2B
12B
1
17
16
12B
12A
11
4
3
2B
2A
UWPD SITE SELECTION MAP
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
Pos
t Offi
ce S
ite
Wes
t of C
ondo
n,P
arki
ng L
ot W
41
Par
king
Lot
on
Roo
seve
lt B
etw
een
43rd
and
45t
h
Pre
viou
s O
utre
ach
Site
Nor
th P
arki
ng L
ot,
Bur
ke M
useu
m
Par
king
Lot
Sou
th
of P
end
Ore
ille
Pla
nt S
ervi
ces
Blo
ck C
onta
inin
g W
12 P
arki
ng L
ot
Alu
mni
Hou
se S
ite
Par
king
Stru
ctur
e N
orth
of 4
5th,
N28
Rus
sian
Hou
se S
ite
2B 3 4 5 6 7 8 9 10 11 13 14 15
Wils
on A
nnex
Site
16 17
Uni
vers
ity B
ooks
tore
Par
king
Lot
Mai
n, N
orth
Par
king
Lot
on
Bro
okly
n B
etw
een
45th
and
47t
h
2A
Wes
t Par
king
Gar
age
1
Blo
ck C
onta
inin
g W
14 P
arki
ng L
ot
12A
Nor
th P
arki
ng L
ot,
Obs
erva
tory
12B
Pad
elfo
rd P
arki
ng N
24
Impact on Potential Future Site Uses
Program Fit
Visibility
Vehicular Accessibility
Future Growth for UWPD
Essential Facility Criteria
Pedestrian Impact
Perception of Safety
UW Community Connection
Access to Secure Parking for UWPD
Relative Construction Cost
Impact on Existing Uses
Other Project Costs
+FF
oo
o
o
o
o
o
o
FF
FF
FF
FF
FF
o
o
o -
-
--
++
+
++
+
+
+++ +
+++
o
o
++
+++
FF
FFFF
FF
-
o
FF
+
oo
o
ooo
ooo
-
o
-
o
-
+
o
-
o
+
-
+
o- +
LOCA
TION
INST
ITUT
IONA
L ISS
UES
UWPD
PROG
RAM
Advisory Group Recommendation
+
FFN
ot A
vaila
ble
oo
o
-
o
-o
-o
-o+
-
-o+ Site Exceeds Criteria
Site Meets Criteria
Site Meets Criteria with Significant Compromises
Fatal Flaw
Recommended Site
Site Not Recommended
FFR
NR
RRR NRRNR
MATR
IX LE
GEND
SITE CRITERIA MATRIX
THE MILLER HULL PARTNERSHIP, DESIGN ARCHITECT, ARCHITECT OF RECORD
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
WEST PARKING GARAGE1
100’
• Use of the existing Transportation Services offices for non essential UWPD functions would add relocation costs. Use of the offices for essential functions would add a premium for construction cost.
• Depending on the ultimate configuration, construction of a new building on the site could necessitate demolition of the Ocean Research Building 2 and relocation of associated functions.
• Construction on this site would displace approximately 60 parking stalls.
• An important pedestrian connection between 15th and Brooklyn must be maintained.
INSTITUTIONAL ISSUES
• Site can accommodate the program with room for a future building footprint of up to 27,000 square feet for a maximum of 108,000 gross square feet.
• Existing parking structure offers potential use for non essential service program elements.
PROGRAM
• Visibility and accessibility are not an improvement over existing UWPD location and not ideal for promoting connections between the UWPD and the greater UW community.
LOCATION
SITE NOT RECOMMENDED
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
WEST OF CONDON PARKING LOT W414
100’
• Construction on this site would displace approximately 30 parking stalls.
• The site is not currently being considered for future uses, but future street realignment improvements may infringe upon the available site area.
• Accommodating the grade change and retaining wall revisions would add significantly to the construction cost.
• The footprint is barely large enough to accommodate the site program and would necessitate vacation of 11th Avenue, adding cost, additional permitting complexities and time. The configuration of the site will make accommodation of the site program challenging.
• This site is highly visible from a busy arterial, but located at the very western edge of campus. It is near new student housing.
• Access is very challenging as Campus Parkway is a one way street leading away from campus at this location.
SITE NOT RECOMMENDED
INSTITUTIONAL ISSUES
PROGRAM
LOCATION
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
BLOCK CONTAINING W12 PARKING LOT2A
100’
• A visible, recognizable site close to the new campus housing.
• Accessible to the central campus, the hospitals and Montlake via Pacific, and the Burke Gilman Trail.
INSTITUTIONAL ISSUES
PROGRAM
• Construction on this site would displace approximately 80 parking stalls.
• Potential for co-location of new parking garage and UWPD facility.
• This block represents one of the few sites on campus where many parcels can be assembled to form a large, full block site for future use.
• This block offers flexibility for future development.
• Site can accommodate the building program on the existing parking lot W12.
LOCATION
SITE RECOMMENDED
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
BLOCK CONTAINING W14 PARKING LOT2B
100’
• Construction on this site would displace approximately 40 parking stalls at parking lot W14 and would necessitate demolition of buildings 3937 and 3945, requiring the relocation of the UW Care Clinic and additional functions. The CBE working yard south of Gould Hall would be reduced in size.
• The Church of Latter Day Saints and PSE West Receiving Station are not owned by the University and cannot be assumed to be part of any future UW development on this block.
• This block has been identified as a potential site for a future central utility plant with a building footprint estimated between 38,000 and 51,000 square feet. Construction of the UWPD on this site would leave approximately 18,000 square feet for a future use.
• A visible, recognizable site close to the new campus housing.
• Accessible to the central campus, the hospitals, and Montlake via Pacific.
SITE RECOMMENDED
INSTITUTIONAL ISSUES
LOCATION
PROGRAM• Site can accommodate the building program.
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
12A NORTH PARKING LOT, BURKE MUSEUM
• Development would displace approximately 90 parking stalls at north campus parking lot N1. The site is also an excellent site for academic use.
• This site lends itself to development of below grade parking in conjunction with the UWPD building.
• Use of prominent site at ceremonial campus entrance is extremely sensitive. 100’
• Access to Memorial Drive is excellent but a second access point, necessary for the UWPD, would require a new curb cut somewhere on 15th Avenue, which would require coordination with SDOT.
• There is adequate space at this location to accommodate the program.
• This site is very visible and would promote community connections.
• Proximity to Greek Row and the community north of campus, along with a UWPD presence activating 15th Avenue, are desirable.
SITE RECOMMENDED
INSTITUTIONAL ISSUES
PROGRAM
LOCATION
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
NORTH PARKING LOT, OBSERVATORY12B
100’
• Construction on this site would displace approximately 60 parking stalls.
• A 40,000 square foot building footprint will remain for future development of an academic building at the corner of Memorial Drive and Stevens Way.
• Use of prominent site at ceremonial campus entrance is extremely sensitive.
• This site is very visible at the main campus entry and would promote community connections. The building could have a visible presence on 45th Street, while buffered from the formal campus entrance with existing planting.
• Proximity to Greek Row in the North Campus is desirable.
• Access to Memorial Drive is excellent and there is an existing traffic light at 45th and 19th that would provide access to 45th Street from this site.
• There is adequate space on the site to accommodate the program, but the building configuration will be limited to maintain appropriate distances between the UWPD building and the campus entry and theater.
SITE RECOMMENDED
INSTITUTIONAL ISSUES
PROGRAM
LOCATION
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE2A
100’
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE2A
Drumheller
Fountain
Portage Bay
Lake Washington Ship Canal
Dra
inage C
anal
Union Bay
Dra
inage C
ana
l
H
E5
S12
C1
4
C1
5
W14W13
E12
E10
E10
C8
C10 E9
E90
N26
W4V
W24
W29
W40
W39
W42 N24
W34
W10
W12
W14
W13
W9
W41
X-Lot
H17-18
C12
C12
P
TriangleParking GarageC20, 21
C12
C10
N24
PadelfordParking Garage
N22
C1
9
N6
N9,10,11
N13,14, 15
N7
N6
N8
N8N5
W35
H17-18
W8
C10
C10
E15
C1–C5 LevelsCentral Plaza
Parking Garage
W1
1
E16
To SandpointHousing
To
Blakely Villa
ge
N2
6
C6
N16, 18,20, 21
N25
E2
E8
P
N28top
floor
E1
C12
N12
E16
South Campus
Parking Garage
S7
S5
S6
C15 C15
W4
0
E14
E4
E3 H12
H12
S8
S8
N24
C7
C17
C7
E6
N1
E15
W38
N12
N8
C17
P
W50
W28
(W51)
N3
P
PP
P
PP
P
P
P
P
PP
P
P
P
4041
Gate 5
Gate 3
Gate 4
Gate 2
Gate 1
Gate 6
DennyField
IMA Sports Field #2
Tennis Courts
IMA SportsField #3
Soccer Field
Tenn
is C
ourts
SunDeck
Archery
Range
ClimbingRock
Golf Driv
ing Range
IMA Sports
field #1
CorpYard 1
Corp Yard 2
Chaffey Field
Union Bay Natural Area
ParringtonLawn
Den
ny
Yard
WATERFRONT TRAIL
Flagpole
EmergencyHelistop
HospitalEmergencyEntrance
The GladeSculpture
Viaduct
SakumaViewpoint
SalmonHoming Pond
To N
ord
heim
Court
WarMemorial
Institute for Learning and Brain Sciences
Paul G. Allen
Ctr. for Comp.
Sci. & Eng.
UWMCSurgeryPavilion
Anderson
Kirs
ten
Rob
erts
Wilcox
Win
ken-
werd
er
Oce
an
Sci
ence
s
Botany
Green-
house
Hitch
cock
Padelford
McMahon
Mackenzie
ChildCareCntr.
EthnicCultrl.
Cntr.
Mercer
3716
Annex 4
Mari
ne
S
tud
ies
Purch.Acctg.
Atmospheric
Sci.
Geophysics
McCarty
Com
munic
atio
ns
HUB Yard
Edmundson Pavilion
Physics / Astronomy
StudentUnionBuilding(HUB)
Engr.
Libr.
TheUniv.ofWash.Club
Fluke
HallHealth
Pla
nt
Op
s.
Aero
sp.
Rsch.
He
nry
Art
G
all
ery
4311
Architect.
43
2
1
Tow
er
Loew
Me
ch
. E
ng
r.
En
g A
nn
ex
PowerPlant
Guthrie
Den
ny
Parrin
gton
Art
Smith
Thomson
Cla
rk
Bal
mer
Kane
SuzzalloLibrary
Bagley
Magnuson Health Sciences
Center
Kincaid
Auditorium
Gould
Meany
Schmitz
Hansee
Haggett
North P
hysics
Laboratory
PortageBay Parking
Facility
OdegaardUndergrad
Library
Chem
Lib
rary
Gra
ves
An
nex
NordstromTennisCenter DempseyIndoorCenter
HuskyStadium
CENPAInstrumentShop
Lewis
Hutchinson
Johnson
Mary
Gates
FisherySciences
J
K M
L
A
B
CD
StaffSvcs.
Henderson
Condon
FisheriesTeachingRsch.Ctr.
Bryants
Bloedel
Gra
ves
IntramuralActivities
Rai
tt
Music
Mill
er
Gow
en
Allen
Library
Burke Museumof Natural History
and Culture
More
Sieg
3941
4545
Merrill
Harris
Lab
.
Oceanog.
Clin
ic
South
Experimental
Education
Unit
Fisheries Center
SouthCam
pus
Center
Oce
an T
ch.
Marine
Sciences
Gerberding
Ch
em
istr
y
Benson
Terry
University of Washington
Medical Center
SC
Pla
nt
Se
rvic
es
4625
Electrical Engineering
4100
3939
3935
3947
1429
SylvanTheater and
Columns
909
4512
4516
4518
4522
4534-1/2
4507
4535
Un
ive
rsity
Bo
oksto
re
Qua
d
William H. Gates
1100
Pavilio
nP
oo
lSports Med. Clinic
Mercer
42
25
UWMCRoosevelt
4245
4225
Will
iam
H. F
oeg
e
MarkMcDermottPlaza
Lander
Saver
y
1107
U o
f W
Info
. & V
isitors
Cente
r
T
S
C
O
A
(Gara
ge A
)
Collegiana
(Ga
rag
e B
)W
45
W4
6
M N P
Q
R S3D4M T
U
V
X
Y
W
Paccar
Jo
hn
M.
Wallace
CreativeCommunications
Women'sSoftball
Field
University Village Shopping Center
Hughes Penthouse
Theatre
BryantsAnnex
MetroStation
NorthWestHorticulturalSociety Hall
Issacson
Miller Library
Trans. Svcs.and MotorPool
Aerodyn.Lab
MedicinalHerb
Garden
Comm. Duch.Apt.
Social Work/Speach and Hearing Sciences Building
BrooklynBuilding
Floyd and Delores JonesPlayhouse
1303
Court
3945
3937 Guth
erie A
nnexe
s 1
- 4
EnvironmentalSafety Storage Bldg.
LewisAnnexes
ArtsTicket Office
Mue
ller
Univ. Facilities
4 3
6 2
Guggenheim
Annex
Facility Services.Admin. BldgInstructionalCenter/Theater
MoreAnnex
Theodor Jacobsen
Observatory
Oceanog.Research
Cunningham
WilsonAnnex
WinkenwerderAnnex
RobertsAnnex
Plant Op.Annexes 2-6
12
TVSatelliteTerm.
StaffEmploy.
Quaternary
Rsch. Ctr.
3902
NorthlakeBldg.
Center on Human
Development and
Disability
Out
door
Pra
ctic
eFa
cilit
y
WaterfrontActivitiesCenter
Canoe House
Campanile
Douglas ResearchConservatory
RussianHouse
ShellhouseAnnex
WilsonCeramic Lab
AlumniHouse
SouthCampus
Construction Office
Plant Lab
CeramicMetal Arts
Laurel Village
ConibearShellhouse
Plant Op.Annex 7
668
OceanographyDock
OceanographyStorage
Eagleson
U.S. PostOffice
WestReceivingStation
5
EnvironmentalSafety Office Bldg.
UrbanHorticultrue
Center
1 2
CommunityDesign Center
Motor Pool
Parking
3900
Entrance toGate 4
Lander-Terry Halls
TS Annex 1
PS
Annex
1
Allen Centerfor theVisual Arts
UWTower
Guggenheim
Stevens
Plant Lab Annex
Bank ofAmericaExecutiveEducationCenter
RooseveltCommons
UniversityTrans Cntr
N
E
S
W
E5
P
e
Fence
Construction Area
Road Gate
Bank Machine
Branch Library
University of WashingtonCampus & Vicinity
August 2010
©2010 UW Creative Communications & UW Facilities Services
http://www.washington.edu/home/maps/
Not for commercial purposes
Emergency Phone
Pay Phone
Bus StopBus Route
Automatic Parking Gate
Gatehouse (with emergency phone)
Campus EntrancesBuilding
Bridge/Overpass
Campus Parking Area
Public Parking Area
Parking (underground)
Building (underground)
Path/Sidewalk/Walkway
KEY TO MAP SYMBOLS
Removable BollardsOne Way Road (arrow indicates flow)
500' 1000'0
0 1/4 mile1/8 mile
Benjamin D. HallInterdisciplinary
Research
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
YXWVUTSRQPONMLKJIHGFEDCB
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
YXWVUTSRQPONMLKJIHGFEDCB
HA
RV
AR
D A
VE
. E
MASO
N ROAD
WAHKIAKUM
LANE
NE NORTHLAKE PLACE 22N
D A
VE
NE
JEF
FE
RS
ON
RO
AD
ISLA
ND
LA
NE
BURKE-G
ILM
AN
TR
AIL
Grie
g G
arde
n
NE CAMPUS PARKWAY
OK
AN
OG
AN
LA
NE
BR
OO
KLY
N A
VE
NE
Rain
ier V
ista
UN
IVE
RS
ITY
WAY
NE
NE 40TH STREET
PLACE
SNOHOMISH LANE
WA
LLA
WA
LLA
R
OA
D
GEORGE WASHIN
GTO
N L
ANE
SKAMANIA LANE
15TH
AVE N
E
NE 42ND STREET
MA
SO
N R
OA
D
SKAGIT
LAN
EWAHKIAKUM LANE
MO
NT
LA
KE
B
OU
LE
VA
RD
N
E
BU
RK
E-G
ILM
AN
TR
AIL
WH
ITM
AN
CO
UR
T
CHELA
N L
ANE
CLA
LLA
M L
AN
E
KLICKIT
AT L
ANE
THURSTON LANE
LEWIS LANE
NE NORTHLAKE WAY
UN
IVE
RS
ITY
BR
IDG
E
NE PACIFIC STREET
BURKE-GILMAN TRAIL
NE PACIFIC STREET
COLUMBIA ROAD
COLUMBIA ROAD
BR
OO
KLY
N A
VE
NE
11T
H A
VE
NE
RO
OS
EV
ELT
WA
Y N
E
NE 45TH & 50THSTREET EXITS
NE 42ND STREET
ST
EV
EN
S W
AY
W
Urban HorticultureFieldhouse
NE 41ST STREET
NE 42TH STREET
36T
H A
VE
NE
35T
H A
VE
NE
21S
T A
VE
NE
WA
LLA
WA
LLA
R
OA
D
WAHKIAKUM LANE
NE 43RD STREET
12T
H A
VE
NE
LINCOLN WAY
NE 40TH STREET
NE NORTHLAKE WAY
SH
IP C
AN
AL B
RID
GE
NE 44TH STREET
INT
ER
STAT
E 5
FR
EE
WA
Y
NE 47TH STREET
17T
H A
VE
NE
20T
H A
VE
NE
19T
H A
VE
NE
16T
H A
VE
NE
ME
MO
RIA
L W
AY
CHELA
N L
ANE
PIERCE
L
ANEKIN
G LAN
E
YA
KIM
A
LA
NE
15T
H A
VE
NE
RO
AD
WA
LLA
W
ALLA
R
OA
D
WA
LLA
WA
LLA
RO
AD
NE 45TH STREET
NE 45TH P
LACE
NE 45TH STREET
NE 44TH STREET
NE 43TH STREET
SAN JUAN
ROAD
GA
RF
IELD
LA
NE
BE
NTO
N L
AN
E
GRANT LANE
NE 41ST ST
NE 42ND STREET
NE 43RD STREET
4T
H A
VE
NU
E N
E
5T
H A
VE
NU
E N
E
9T
H A
VE
NE
8T
H A
VE
NE
NE 43RD STREET
NE 45TH STREET
5T
H A
VE
NU
E N
E
FAIR
VIE
W A
VE
. E
INT
ER
STA
TE
5 F
RE
EW
AY
EA
STLA
KE
AV
E. E
E ALLISON ST.
7T
H A
VE
NE
25T
H A
VE
NE
CLARK ROAD
MA
RY
GAT
ES
ME
MO
RIA
L D
RIV
E
WHATCOM
NE 44TH PLACE
SPOKAN
E LANE
ROAD
NE PACIFIC STREET
NE PACIFIC PLACE
18T
H A
VE
NE
15T
H A
VE
NE
KITSAP LANE
KIT
TITA
S LA
NE
UN
IVE
RS
ITY
WA
Y N
E
E HAMLIN ST.
FR
AN
KLIN
AV
E. E
NE 40TH STREET
6T
H A
VE
NE
NE 47TH STREET
NE 47TH STREET
36T
H A
VE
NE
NE BOAT STREET
ST
EV
EN
S W
AY
E
RO
AD
COWLITZM
ON
TLA
KE
BR
IDG
E
ASO
TIN
CLALLAM LANE
LANE N
FR
AN
KLIN
P
LA
CE
SPOKANE LANE
SNOHOMISH LANE S
WALLA WALLA LANE
WALLA WALLA LANE
WHITMAN LANE
KL
ICK
ITAT
LA
NE
KING LAN
E
SAN
JUAN
RO
AD
FER
RY P
LAC
E
SNOHOMISH
STEVENS LANE
CLALLAM
PLACE
GRANT PLACE
GA
RF
IELD
PLA
CE
TH
UR
STO
N
LAN
E
TH
UR
STO
N P
LACE
CHELA
N P
LACE
MA
SO
NP
LA
CE
BU
RK
E-G
ILM
AN
TR
AIL
NE 45TH STREET
CLA
RK
PLA
CE
UN
ION
ROAD
BAY
UW SERVICEROAD
PE
ND
OR
EIL
LE
PLA
CE
RA
INIE
R V
ISTA
COWLITZ PLACE
AD
AM
S P
LA
CE
AD
AM
S R
OA
D
KITSAP LANE FR
AN
KLIN
LA
NE
BA
Y P
LA
CE
U
NIO
N
WAY WSTEVENS
WAY
E
STEVEN
S
STE
VENS W
AY E
JOHNSONCIRCLE
LANE S
OU
TH
OR
EIL
LE
PEND
DO
UG
LA
S R
OA
D
CA
NA
L R
OA
D
WAHKIAKUM
SNOHOMISH
Stronghold
15
1413
11
12A7
6
4
3
2A
16
Red SquareParking Below
8
9
10
15
West Parking Garage
Block Containing W12 Parking Lot
Block Containing W14 Parking Lot
Previous Outreach Site
West of Condon Parking Lot W41
Not Available
Parking Lot on Roosevelt Between 43rd and 45th
Post Office Site
University Bookstore Parking Lot Main, North
Parking Lot on Brooklyn Between 45th and 47th
Alumni House Site
Parking Structure North of 45th, N28
North Parking Lot, Burke Museum
North Parking Lot, Observatory
Russian House Site
Plant Services
Parking Lot South of Pend Oreille
Wilson Annex Site
Padelford Parking N24
Grey Fill: Areas NOT Being Considered for Site
Dashed: Estimated 200' Setback from Water
1
4
5
5
6
7
8
9
10
13
14
18
17
2B
12B
1
17
16
12B
12A
11
4
3
2B
2A
N
VIEW FROM NORTHERN EDGE OF SITE LOOKING SOUTHEAST VIEW FROM UNIVERSITY WAY LOOKING WEST
VIEW FROM SOUTHERN EDGE OF SITE LOOKING NORTH WITH NEW STUDENT HOUSING BEYONDPREFERRED SITE UW HOUSING DEVELOPMENT
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
MAIN ENTRANCE TO CENTRAL CAMPUS
SLOP
E 12 F
EET
N
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
MAIN ENTRANCE TO CENTRAL CAMPUS
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
MAIN ENTRANCE TO CENTRAL CAMPUS
THE AVE
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
MAIN ENTRANCE TO CENTRAL CAMPUSNEW ETHNIC
CULTURAL CENTER
THE AVE
NEW ECC
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
NEW UW HOUSING
MAIN ENTRANCE TO CENTRAL CAMPUSNEW ETHNIC
CULTURAL CENTER
THE AVE
NEW UW HOUSING
NEW ECC
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
NEW UW HOUSING
MAIN ENTRANCE TO CENTRAL CAMPUSNEW ETHNIC
CULTURAL CENTER
THE AVE
NEW UW HOUSING
NEW ECC
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
FUTURE NEW UW HOUSING
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - SITE DIAGRAM2A
SITE
2A
BURKE GILMAN TRAIL
NEW UW HOUSING
MAIN ENTRANCE TO CENTRAL CAMPUSNEW ETHNIC
CULTURAL CENTER
THE AVE
NEW UW HOUSING
NEW ECC
BURKE GILMAN TRAILSL
OPE 1
2 FEE
T
N
FUTURE NEW UW HOUSING
FUTU
RE D
EVEL
OPME
NT O
PPOR
TUNI
TY
THE MILLER HULL PARTNERSHIP, ARCHITECT
MCCLAREN, WILSON & LAWRIE, POLICE FACILITY CONSULTANT UW POLICE DEPARTMENT
PREFERRED SITE - PRELIMINARY MASSING2A