Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC V-GISC Project Office

An Introduction

by

Dieter Schröder (ECMWF)

Page 2: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

V-GISC PO: What is V-GISC?

V-GISC – The West European Approach to a GISC

Page 3: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

What is V-GISC and the Project Office?

V-GISC = SIMDAT Software

+ additional Software for integration of local systems

+ organisational concept (the so-called VO)

V-GISC Project Office: Develops concepts / guidelines to reach an operational V-GISC (no software development) System Integration Architecture Organisational Concept of V-GISC

V-GISC Project Office: A VO with 2 staff members (Météo France and ECMWF)

Page 4: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

System Integration Approach

Collaboration DMZ

Catalogue Node

Data Repository

SIMDAT Components

Local Intranet

Local Databases

Reverse Proxy I

Reverse Proxy 2

GTS - Switch

Decoding SW

Customer DMZ

Push Mode Umbrella

Serving GISC Customers via PUSH

Mirror DB

User Access Management

Data Dissemination System

Serving Site Customers

Page 5: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

What is a Virtual Organisation?

Definition: VO, inside view Co-operating independent organisations VO, outside view One comprehensive organisation

Layer Model:1. Organisation Layer : Cooperation of people and org. unit2. Product Layer: Meteorological Data, Data Policy3. Operational Layer: Basic IT Infrastructure (Grid Technology)4. Application Layer: Interoperability of the V-GISC components

PO deals with concepts of the Organisation Layer

Counterparts: Organisation Layer IT-LayersStructural VO Model IT-Architecture

Organisation Chart UML Class Diagram

Process Organisation Use Cases

Organisation Flow Chart UML Use Case Diagram

Page 6: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Structural Organisation for V-GISC

Central Support Office (at one partner site)

Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties

Implementation Team D

EUMETSAT

ECMWF

Implementation Team F

Implementation Team UK

Implementation BoardSyst. Engineers from all sitesQM-Supervision/Change Manag./Escalation/Implem. Governance

Steering Committee / Management BoardExecutive Representatives from all sitesSupervision/Escalation/Strategic Decisions

Project Manager(Ideally: Head of Central Support Office)

Leading the Project,/ Keep Things Going

VGISC Operational Team

System Operation/Monitoring/Backup/

Change Management.

GTS-Teamleader DGTS/VGISC-Op Team D

GTS-Teamleader UKGTS/VGISC-Op Team UK

GTS-Teamleader FGTS/VGISC-Op Team F

EUMETSATECMWF

Operational Board“GTS-Teamleaders”

QM-Supervision/Change Management/Escalation/Functional Operative Decisions

V-GISC “Op-Teamleader”“Round-robin” from GTS-TeamleadersOperational Decisions/Delegation of tasks SW-Dev. Team D

EUMETSAT

ECMWF

SW-Dev. Team F

SW-Dev. Team UKExternal Development

Team(Contractor)

DevelopsCentral

SW-Modules

Design&Architecture Team“Chief Designer”

Representative of Each Local TeamMajor Design & Arch. Decisions/Supervision

Local “User-Group” D

EUMETSAT

ECMWF

Local “User-Group” F

Loc. “User-Group” UK

Evaluation BoardRepresentatives from Local User-GroupsEvaluation of Design,

Architecture and Software

Page 7: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Management & Central Service

Central Support Office (at one partner site)

Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties

Steering Committee / Management BoardExecutive Representatives from all sitesSupervision/Escalation/Strategic Decisions

Project Manager(Ideally: Head of Central Support Office)

Leading the Project,/ Keep Things Going

Page 8: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Structural Organisation for OperationSteering Committee / Management Board

Executive Representatives from all sitesSupervision/Escalation/Strategic Decisions

Project Manager(Ideally: Head of Central Support Office)

Leading the Project,/ Keep Things Going

VGISC Operational Team

System Operation/Monitoring/Backup/

Change Management.

GTS-Teamleader DGTS/VGISC-Op Team D

GTS-Teamleader UKGTS/VGISC-Op Team UK

GTS-Teamleader FGTS/VGISC-Op Team F

EUMETSATECMWF

Operational Board“GTS-Teamleaders”

QM-Supervision/Change Management/Escalation/Functional Operative Decisions

V-GISC “Op-Teamleader”“Round-robin” from GTS-TeamleadersOperational Decisions/Delegation of tasks

Page 9: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Structural Organisation for SW Development in V-GISC

Central Support Office (at one partner site)

Central Reference Installation / Central Test System / Central SW Doc. / Bugzilla Repository / SW Asset Management / Office Duties

External Development

Team(Contractor)

DevelopsCentral

SW-Modules

SW-Dev. Team D

EUMETSAT

ECMWF

SW-Dev. Team F

SW-Dev. Team UK

Design & Architecture Team

“Chief Designer”Responsible for an homogeneous SW Design

Representative of Each Local TeamMajor Design & Arch. Decisions/Supervision

Evaluation Board

Representatives from Local User-Groups

Evaluation of Design, Architecture and Software / Change Management / Coordination of the Integration Tasks

EUMETSAT

ECMWF

Local “User-Group” D

Operational TeamData Management Team…

Local “User-Group” F

Operational TeamData Management Team…

Local “User-Group” UK

Operational TeamData Management Team…

Steering Committee / Management BoardExecutive Representatives from all sitesSupervision/Escalation/Strategic Decisions

Project Manager(Ideally: Head of Central Support Office)

Leading the Project,/ Keep Things Going

Page 10: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Structural Organisation: Implementation

Central Support Office (at one partner site)

Central Reference Installation / Central Test System / Central SW Documentation / Bugzilla Repository / SW Asset Management / Office Duties

Implementation Team D

EUMETSAT

ECMWF

Implementation Team F

Implementation Team UK

Implementation BoardSyst. Engineers from all sitesQM-Supervision/Change Manag./Escalation/Implem. Governance

Steering Committee / Management BoardExecutive Representatives from all sitesSupervision/Escalation/Strategic Decisions

Project Manager(Ideally: Head of Central Support Office)

Leading the Project,/ Keep Things Going

Page 11: V-GISC Project Office An Introduction by Dieter Schr öder (ECMWF)

Project Office: ICG-WIS meeting at ECMWF 04 – 07/09/2007

V-

GISC

Process Organisation

Operational Process:

SW Development & Implementation

Day-to-day operation

Backup Process

Trouble Ticket Process

Missing Data Investigation

Change Management Process