Name or company name OASIS DENTAL CARE LTD
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2015
Contract end date 30/09/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 8,000
Carry forward orthodontic activity (UOA) 73
Baseline contract value £433,588.46
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 372 409 91.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 17 409 4.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 20 409 4.9% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 15 253 5.9% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 46 124 37.1% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 6 728 0.82 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 11 469 2.35 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 372 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 238 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 3 12 25.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 620
May 126 1,145
June 400 1,418
July 1,370 1,860
August 2,105 2,301
September 2,929 2,958
October 3,904
November 4,883
December 5,825
January 6,161
February 7,362
March 7,677
April 7,677
May 7,677
June 7,677
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.01 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 101281/0257 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B101281_C1012810257,,,,,SHAREPOINTSPLIT,7A1_101281_025720160930VSOQ02,,,,,,
Name or company name OASIS DENTAL CARE LTD
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2015
Contract end date 30/09/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 7,500
Carry forward orthodontic activity (UOA) -60
Baseline contract value £406,489.18
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 388 388 100.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 388 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 0 388 0.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 20 313 6.4% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 136 143 95.1% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 78 762 10.24 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 50 0.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 4 388 1.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 293 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 11 27 40.7% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 60
May 0 60
June 88 1,282
July 592 1,998
August 1,037 2,544
September 1,671 3,344
October 2,427
November 3,773
December 4,953
January 5,358
February 6,055
March 6,413
April 6,413
May 6,413
June 6,476
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.00 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 101281/0258 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B101281_C1012810258,,,,,SHAREPOINTSPLIT,7A1_101281_025820160930VSOQ02,,,,,,
Name or company name Tameside Orthodontics Ltd
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/03/2012
Contract end date 30/09/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 10,125
Carry forward orthodontic activity (UOA) 389
Baseline contract value £543,469.88
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 464 812 57.1% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 143 812 17.6% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 205 812 25.2% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 10 127 7.9% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 84 106 79.2% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 14 910 1.54 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 7 464 1.5% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 117 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 16 40 40.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 357 -389
May 1,143 -389
June 1,143 503
July 2,078 988
August 2,547 1,618
September 3,049 2,949
October 3,966
November 4,352
December 5,211
January 5,737
February 7,149
March 7,149
April 9,646
May 9,646
June 9,736
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.02 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 154857/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B154857_C1548570001,,,,,SHAREPOINTSPLIT,7A1_154857_000120160930VSOQ02,,,,,,
Name or company name Rhyl and Abergele Elwy Dental Partnership
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/03/2011
Contract end date
16/17 Contracted general activity (UDA) 49,009
Carry forward general activity (UDA) -6
16/17 Contracted orthodontic activity (UOA) 827
Carry forward orthodontic activity (UOA) 13
Baseline contract value £1,386,243.21
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 40 63 63.5% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 17 63 27.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 6 63 9.5% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 3 30 10.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 9 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 0 N/A 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 10 35 28.57 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 40 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 1 27 3.7% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 1 0.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April -4 -13
May -4 162
June 103 183
July 321 357
August 364 357
September 386 420
October 470
November 512
December 577
January 577
February 625
March 814
April 814
May 814
June 814
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.08 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 175145/0002 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B175145_C1751450002,,,,,SHAREPOINTSPLIT,7A1_175145_000220160930VSOQ02,,,,,,
Name or company name Ruthin Dental
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2013
Contract end date
16/17 Contracted general activity (UDA) 32,805
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 481
Carry forward orthodontic activity (UOA) 7
Baseline contract value £853,367.59
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 25 25 100.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 25 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 0 25 0.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 15 0.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 8 9 88.9% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 1 37 2.70 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 3 0.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 1 25 4.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 15 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 1 4 25.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April -9 14
May 33 119
June 33 182
July 117 203
August 264 266
September 264 308
October 327
November 348
December 369
January 432
February 453
March 453
April 474
May 474
June 474
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.00 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 193216/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B193216_C1932160001,,,,,SHAREPOINTSPLIT,7A1_193216_000120160930VSOQ02,,,,,,
Name or company name MR DJ PLUNKETT
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/05/2008
Contract end date 30/09/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 9,700
Carry forward orthodontic activity (UOA) -133
Baseline contract value £556,534.15
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 512 864 59.3% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 143 864 16.6% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 209 864 24.2% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 23 376 6.1% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 147 183 80.3% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 7 972 0.72 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 5 629 0.79 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 2 512 0.4% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 1 353 0.3% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 18 56 32.1% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 261 990
May 1,335 1,944
June 1,731 2,638
July 2,575 3,703
August 3,236 4,502
September 3,912 5,363
October 4,863
November 6,266
December 7,587
January 7,932
February 9,032
March 9,505
April 9,564
May 9,565
June 9,567
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.02 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 329398/0002 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B329398_C3293980002,,,,,SHAREPOINTSPLIT,7A1_329398_000220160930VSOQ02,,,,,,
Name or company name MR SJ LANGSTON
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2006
Contract end date
16/17 Contracted general activity (UDA) 560
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 350
Carry forward orthodontic activity (UOA) 0
Baseline contract value £22,852.81
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 11 31 35.5% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 1 31 3.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 19 31 61.3% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 10 0.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 4 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 0 N/A 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 11 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 10 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 1 0.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 1
May 4 2
June 34 24
July 80 25
August 104 113
September 105 156
October 106
November 128
December 129
January 154
February 155
March 178
April 182
May 182
June 181
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.39 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 826677/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B826677_C8266770001,,,,,SHAREPOINTSPLIT,7A1_826677_000120160930VSOQ02,,,,,,
Name or company name MR SJ KEEN
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2006
Contract end date
16/17 Contracted general activity (UDA) 2,772
Carry forward general activity (UDA) -69
16/17 Contracted orthodontic activity (UOA) 0
Carry forward orthodontic activity (UOA) 0
Baseline contract value £76,330.19
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 17 21 81.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 21 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 4 21 19.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 0 N/A 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 0 N/A 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 2 23 8.70 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 17 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 0 N/A 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 1 0.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 0
May 0 2
June 0 3
July 0 3
August 0 3
September 0 3
October 0
November 0
December 0
January 0
February 84
March 126
April 126
May 232
June 358
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.00 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A1 - Vital Signs Orthodontic At a Glance Contract Report for 833312/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B833312_C8333120001,,,,,SHAREPOINTSPLIT,7A1_833312_000120160930VSOQ02,,,,,,
Name or company name Q Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/07/2011
Contract end date 31/03/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 18,000
Carry forward orthodontic activity (UOA) -900
Baseline contract value £1,156,817.54
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 1,114 1,117 99.7% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 1,117 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 3 1,117 0.3% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 73 646 11.3% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 193 225 85.8% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 5 2,190 0.23 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 11 1,131 0.97 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 1,114 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 573 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 7 24 29.2% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 141 900
May 141 7,417
June 2,466 8,819
July 4,325 10,408
August 5,990 11,342
September 7,135 12,270
October 8,653
November 10,843
December 13,561
January 15,250
February 18,620
March 18,853
April 18,937
May 19,065
June 19,065
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.05 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A2 - Vital Signs Orthodontic At a Glance Contract Report for 176710/0007 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B176710_C1767100007,,,,,SHAREPOINTSPLIT,7A2_176710_000720160930VSOQ02,,,,,,
Name or company name Q Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2015
Contract end date 31/03/2018
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 2,200
Carry forward orthodontic activity (UOA) 10
Baseline contract value £56,350.11
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 1 2,477 0.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 111 2,477 4.5% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 2,365 2,477 95.5% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 0 N/A 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 0 N/A 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 0 N/A 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 1 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 0 N/A 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 0 N/A 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 -10
May 0 139
June 0 308
July 239 466
August 398 756
September 486 772
October 679
November 782
December 1,027
January 1,177
February 1,543
March 1,796
April 2,151
May 2,186
June 2,190
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.03 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A2 - Vital Signs Orthodontic At a Glance Contract Report for 176710/0008 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B176710_C1767100008,,,,,SHAREPOINTSPLIT,7A2_176710_000820160930VSOQ02,,,,,,
Name or company name Cwmtawe Dental Practice Ltd
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2008
Contract end date
16/17 Contracted general activity (UDA) 11,510
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 2,064
Carry forward orthodontic activity (UOA) 0
Baseline contract value £416,449.07
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 73 313 23.3% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 20 313 6.4% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 220 313 70.3% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 25 262 9.5% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 179 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 0 N/A 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 104 386 26.94 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 73 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 2 237 0.8% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 2 4 50.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 367 351
May 781 412
June 1,107 519
July 1,670 585
August 1,941 623
September 2,208 627
October 2,419
November 2,855
December 2,988
January 2,997
February 3,283
March 3,290
April 3,294
May 3,294
June 3,295
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.22 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 117234/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B117234_C1172340001,,,,,SHAREPOINTSPLIT,7A3_117234_000120160930VSOQ02,,,,,,
Name or company name Dr EV Johnstone, Dr D Ainsworth and Dr J Williams
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2006
Contract end date
16/17 Contracted general activity (UDA) 9,742
Carry forward general activity (UDA) 51
16/17 Contracted orthodontic activity (UOA) 694
Carry forward orthodontic activity (UOA) 0
Baseline contract value £426,685.19
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 29 73 39.7% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 5 73 6.8% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 39 73 53.4% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 8 0.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 2 5 40.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 3 55 5.45 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 1 16 6.25 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 29 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 8 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 1 2 50.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 24 1
May 54 47
June 119 93
July 167 183
August 210 209
September 298 260
October 384
November 490
December 514
January 535
February 621
March 668
April 691
May 691
June 691
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.16 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 153729/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B153729_C1537290001,,,,,SHAREPOINTSPLIT,7A3_153729_000120160930VSOQ02,,,,,,
Name or company name Neat-Teeth Orthodontics Limited
Contract type name GDS Contract
Purpose of contract Orthodontic
Contract start date 01/09/2011
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 5,258
Carry forward orthodontic activity (UOA) 0
Baseline contract value £338,102.48
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 376 679 55.4% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 58 679 8.5% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 245 679 36.1% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 30 282 10.6% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 98 134 73.1% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 3 376 0.80 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 376 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 252 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 12 31 38.7% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 14
May 203 273
June 697 803
July 2,144 1,496
August 3,516 2,539
September 5,103 3,665
October 6,045
November 6,045
December 6,671
January 6,817
February 7,453
March 7,835
April 8,866
May 8,952
June 9,016
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.04 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 162868/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B162868_C1628680001,,,,,SHAREPOINTSPLIT,7A3_162868_000120160930VSOQ02,,,,,,
Name or company name Q Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/07/2011
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 4,563
Carry forward orthodontic activity (UOA) 87
Baseline contract value £297,645.66
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 291 362 80.4% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 24 362 6.6% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 47 362 13.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 29 313 9.3% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 101 138 73.2% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 10 579 1.73 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 27 549 4.92 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 1 291 0.3% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 284 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 7 17 41.2% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 68 -87
May 818 1,013
June 1,486 1,210
July 2,363 2,013
August 3,559 2,373
September 4,330 2,587
October 5,282
November 6,134
December 6,896
January 7,134
February 7,418
March 7,632
April 7,800
May 7,800
June 7,800
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.01 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 176710/0005 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B176710_C1767100005,,,,,SHAREPOINTSPLIT,7A3_176710_000520160930VSOQ02,,,,,,
Name or company name Q Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/07/2011
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 6,313
Carry forward orthodontic activity (UOA) 41
Baseline contract value £413,776.98
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 450 791 56.9% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 24 791 3.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 317 791 40.1% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 32 419 7.6% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 8 297 2.7% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 113 850 13.29 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 45 729 6.17 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 9 450 2.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 2 387 0.5% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 12 29 41.4% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 481 -41
May 1,373 660
June 2,170 1,280
July 3,103 2,277
August 3,913 2,693
September 4,693 3,614
October 5,700
November 6,558
December 7,250
January 7,980
February 8,211
March 8,211
April 8,211
May 10,758
June 10,781
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.06 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 176710/0006 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B176710_C1767100006,,,,,SHAREPOINTSPLIT,7A3_176710_000620160930VSOQ02,,,,,,
Name or company name Cwmdulais Dental Practice
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/01/2014
Contract end date
16/17 Contracted general activity (UDA) 8,575
Carry forward general activity (UDA) 164
16/17 Contracted orthodontic activity (UOA) 1,351
Carry forward orthodontic activity (UOA) 0
Baseline contract value £410,899.54
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 75 315 23.8% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 48 315 15.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 192 315 61.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 3 38 7.9% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 18 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 37 141 26.24 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 24 63 38.10 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 4 75 5.3% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 3 35 8.6% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 4 0.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 6 12
May 65 138
June 81 349
July 119 609
August 311 797
September 497 851
October 590
November 672
December 805
January 872
February 1,117
March 1,291
April 1,365
May 1,365
June 1,366
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.10 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 181382/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B181382_C1813820001,,,,,SHAREPOINTSPLIT,7A3_181382_000120160930VSOQ02,,,,,,
Name or company name MR J KNOX
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2006
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 1,458
Carry forward orthodontic activity (UOA) 0
Baseline contract value £94,212.03
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 125 469 26.7% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 151 469 32.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 193 469 41.2% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 37 160 23.1% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 35 47 74.5% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 4 182 2.20 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 125 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 123 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 4 14 28.6% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 45
May 37 128
June 41 299
July 224 365
August 243 431
September 323 448
October 357
November 669
December 917
January 1,040
February 1,468
March 1,800
April 2,371
May 2,350
June 2,308
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.05 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 636126/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B636126_C6361260001,,,,,SHAREPOINTSPLIT,7A3_636126_000120160930VSOQ02,,,,,,
Name or company name MR RR WESTERHOLM
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2006
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 2,917
Carry forward orthodontic activity (UOA) 0
Baseline contract value £187,734.21
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 221 513 43.1% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 79 513 15.4% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 213 513 41.5% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 21 157 13.4% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 30 62 48.4% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 371 0.00 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 2 0.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 221 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 136 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 4 10 40.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 19
May 177 159
June 271 523
July 932 968
August 1,392 1,108
September 2,122 1,793
October 2,977
November 3,737
December 3,889
January 4,275
February 4,545
March 5,012
April 5,056
May 5,014
June 5,014
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.09 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 658472/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B658472_C6584720001,,,,,SHAREPOINTSPLIT,7A3_658472_000120160930VSOQ02,,,,,,
Name or company name MISS CE ECKHARDT
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2006
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 1,458
Carry forward orthodontic activity (UOA) 0
Baseline contract value £94,212.03
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 124 264 47.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 41 264 15.5% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 99 264 37.5% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 5 110 4.5% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 35 55 63.6% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 142 0.00 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 124 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 105 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 1 4 25.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 0
May 9 11
June 15 50
July 339 121
August 287 130
September 336 201
October 547
November 866
December 1,295
January 1,386
February 1,883
March 2,100
April 2,441
May 2,462
June 2,483
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.03 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 846473/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B846473_C8464730001,,,,,SHAREPOINTSPLIT,7A3_846473_000120160930VSOQ02,,,,,,
Name or company name MRS AJ EGGAR
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2006
Contract end date 31/10/2016
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 1,750
Carry forward orthodontic activity (UOA) 0
Baseline contract value £111,285.92
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 159 338 47.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 54 338 16.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 125 338 37.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 16 128 12.5% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 25 53 47.2% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 1 147 0.68 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 159 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 112 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 2 9 22.2% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 11
May 33 12
June 223 99
July 677 406
August 738 816
September 979 1,074
October 992
November 1,526
December 1,526
January 1,560
February 2,115
March 2,223
April 3,027
May 3,048
June 3,048
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.06 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A3 - Vital Signs Orthodontic At a Glance Contract Report for 933430/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B933430_C9334300001,,,,,SHAREPOINTSPLIT,7A3_933430_000120160930VSOQ02,,,,,,
Name or company name Blakeridge Limited
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/09/2012
Contract end date
16/17 Contracted general activity (UDA) 7,839
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 106
Carry forward orthodontic activity (UOA) 0
Baseline contract value £157,823.37
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 6 8 75.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 8 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 2 8 25.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 0 N/A 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 0 N/A 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 2 11 18.18 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 6 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 0 N/A 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 0 N/A 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 0 0
May 0 0
June 1 0
July 1 1
August 1 1
September 1 1
October 2
November 23
December 44
January 86
February 86
March 107
April 107
May 128
June 128
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.07 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 127981/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B127981_C1279810001,,,,,SHAREPOINTSPLIT,7A4_127981_000120160930VSOQ02,,,,,,
Name or company name Sandusky Remills Ltd
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/09/2012
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 9,194
Carry forward orthodontic activity (UOA) 0
Baseline contract value £612,036.98
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 476 727 65.5% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 155 727 21.3% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 96 727 13.2% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 14 471 3.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 152 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 109 922 11.82 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 12 3 400.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 13 476 2.7% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 12 457 2.6% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 9 31 29.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 1,175 968
May 2,183 2,273
June 3,111 2,923
July 4,568 4,205
August 5,156 4,718
September 6,122 5,376
October 7,025
November 7,892
December 9,135
January 9,582
February 10,107
March 10,658
April 10,861
May 10,861
June 10,861
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.01 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 129100/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B129100_C1291000001,,,,,SHAREPOINTSPLIT,7A4_129100_000120160930VSOQ02,,,,,,
Name or company name Cowbridge Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/09/2011
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 1,092
Carry forward orthodontic activity (UOA) 0
Baseline contract value £69,304.82
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 58 130 44.6% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 34 130 26.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 38 130 29.2% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 4 37 10.8% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 15 18 83.3% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 16 104 15.38 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 3 63 4.76 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 3 58 5.2% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 1 33 3.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 2 6 33.3% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 34 3
May 34 75
June 103 181
July 107 181
August 236 361
September 323 391
October 398
November 640
December 737
January 760
February 961
March 1,050
April 1,118
May 1,118
June 1,118
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.04 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 140589/0002 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B140589_C1405890002,,,,,SHAREPOINTSPLIT,7A4_140589_000220160930VSOQ02,,,,,,
Name or company name Cathedral Orthodontics Ltd
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/11/2010
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 21,553
Carry forward orthodontic activity (UOA) 0
Baseline contract value £1,433,909.13
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 986 1,660 59.4% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 202 1,660 12.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 472 1,660 28.4% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 112 887 12.6% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 260 379 68.6% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 108 1,647 6.56 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 64 1,472 4.35 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 40 986 4.1% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 4 775 0.5% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 18 58 31.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 1,822 1,346
May 4,735 3,547
June 6,529 5,099
July 9,285 7,197
August 11,547 9,013
September 13,746 11,274
October 15,958
November 17,064
December 19,072
January 19,630
February 20,981
March 22,190
April 22,550
May 22,681
June 22,681
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.14 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 166332/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B166332_C1663320001,,,,,SHAREPOINTSPLIT,7A4_166332_000120160930VSOQ02,,,,,,
Name or company name Q Dental Care Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2011
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 18,178
Carry forward orthodontic activity (UOA) 0
Baseline contract value £1,211,595.37
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 767 1,227 62.5% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 101 1,227 8.2% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 359 1,227 29.3% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 25 770 3.2% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 214 393 54.5% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 28 1,468 1.91 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 16 1,441 1.11 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 22 767 2.9% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 11 745 1.5% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 24 40 60.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 1,024 1,499
May 2,571 3,410
June 4,553 4,858
July 7,672 6,746
August 10,812 8,413
September 12,799 9,933
October 14,182
November 15,643
December 17,652
January 18,660
February 19,151
March 19,172
April 19,197
May 19,197
June 19,198
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.04 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 176710/0004 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B176710_C1767100004,,,,,SHAREPOINTSPLIT,7A4_176710_000420160930VSOQ02,,,,,,
Name or company name Xeon Smiles UK Ltd
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2012
Contract end date
16/17 Contracted general activity (UDA) 31,000
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 851
Carry forward orthodontic activity (UOA) 0
Baseline contract value £796,488.53
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 48 70 68.6% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 7 70 10.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 15 70 21.4% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 1 22 4.5% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 10 10 100.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 94 0.00 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 0 N/A 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 48 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 21 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 0 4 0.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 32 0
May 32 46
June 32 46
July 32 263
August 292 263
September 292 413
October 400
November 401
December 528
January 528
February 635
March 765
April 870
May 891
June 891
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.20 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 190195/0017 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B190195_C1901950017,,,,,SHAREPOINTSPLIT,7A4_190195_001720160930VSOQ02,,,,,,
Name or company name Bay House Dental Practice Ltd
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2011
Contract end date
16/17 Contracted general activity (UDA) 2,544
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 450
Carry forward orthodontic activity (UOA) 0
Baseline contract value £102,347.60
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 20 26 76.9% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 2 26 7.7% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 4 26 15.4% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 0 6 0.0% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 1 2 50.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 36 0.00 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 1 12 8.33 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 20 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 6 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 1 3 33.3% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 20 0
May 83 42
June 83 65
July 148 86
August 190 86
September 213 192
October 255
November 255
December 276
January 298
February 340
March 425
April 447
May 447
June 447
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.02 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 190225/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B190225_C1902250001,,,,,SHAREPOINTSPLIT,7A4_190225_000120160930VSOQ02,,,,,,
Name or company name Ffynnon Aur Limited
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/09/2012
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 8,249
Carry forward orthodontic activity (UOA) 0
Baseline contract value £549,069.64
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 384 565 68.0% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 45 565 8.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 136 565 24.1% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 8 273 2.9% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 27 106 25.5% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 172 761 22.60 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 9 0.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 1 384 0.3% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 265 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 11 32 34.4% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April -156 388
May 335 1,033
June 1,123 1,570
July 1,771 2,339
August 2,386 2,687
September 3,043 3,098
October 3,765
November 4,343
December 5,078
January 5,423
February 6,523
March 8,148
April 8,155
May 8,155
June 8,156
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.04 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 190500/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B190500_C1905000001,,,,,SHAREPOINTSPLIT,7A4_190500_000120160930VSOQ02,,,,,,
Name or company name MR OB JOYNSON
Contract type name GDS Contract
Purpose of contract General and Orthodontic
Contract start date 01/04/2006
Contract end date
16/17 Contracted general activity (UDA) 28,724
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 315
Carry forward orthodontic activity (UOA) 0
Baseline contract value £648,265.03
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 14 32 43.8% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 5 32 15.6% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 13 32 40.6% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 2 15 13.3% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 4 5 80.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 0 0 N/A 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 11 26 42.31 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 14 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 13 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 1 1 100.0% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 184 25
May 271 153
June 314 175
July 315 264
August 316 265
September 316 272
October 316
November 319
December 320
January 320
February 321
March 321
April 321
May 322
June 322
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.08 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 840580/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B840580_C8405800001,,,,,SHAREPOINTSPLIT,7A4_840580_000120160930VSOQ02,,,,,,
Name or company name MRS JL ROY
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2006
Contract end date 31/03/2017
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 3,310
Carry forward orthodontic activity (UOA) 0
Baseline contract value £220,343.09
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 123 220 55.9% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 42 220 19.1% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 55 220 25.0% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinued(rolling 12 month period) 2 123 1.6% 8.7% 7.2%
% of completed treatments indicating that PAR score was taken (year to date) 0 54 0.0% 49.8% 58.9%
Rate of removable appliances per 100 fixed appliances - proposed treatment(rolling 12 month period) 27 243 11.11 5.59 5.66
Rate of removable appliances per 100 fixed appliances - completed treatment(rolling 12 month period) 0 1 0.00 4.88 4.88
% of courses of treatment with removable appliances only - proposed treatment(rolling 12 month period) 0 123 0.0% 1.5% 2.1%
% of courses of treatment with removable appliances only - completedtreatment (rolling 12 month period) 0 121 0.0% 0.7% 1.5%
% of patients satisfied with the treatment they have received (rolling 12 monthperiod) 5 8 62.5% 35.1% 95.7%
ACTIVITY
(10%)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
2016 2017
Cumulative percentage of contracted UOA delivered 2016 & 2017
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month 2016 2017
April 255 109
May 337 194
June 639 304
July 1,410 420
August 1,519 578
September 1,987 1,028
October 2,210
November 2,440
December 2,728
January 2,815
February 3,201
March 3,604
April 3,604
May 3,604
June 3,625
Adjusted Scheduled Activity (UOA)
ACCESS Contract England and Wales24 month ratio of assessments to patient IDs 1.03 1.10
* Figures in italics indicate that the base number is less than 100.
1.00
NHSDental Services
7A4 - Vital Signs Orthodontic At a Glance Contract Report for 927791/0001 - September 2016
COMPASSSPLIT,VSROQ_D20161004_YP161706_B927791_C9277910001,,,,,SHAREPOINTSPLIT,7A4_927791_000120160930VSOQ02,,,,,,
Name or company name Northrose Ltd
Contract type name PDS Contract
Purpose of contract Orthodontic
Contract start date 01/04/2014
Contract end date 31/03/2019
16/17 Contracted general activity (UDA) 0
Carry forward general activity (UDA) 0
16/17 Contracted orthodontic activity (UOA) 807
Carry forward orthodontic activity (UOA) -18
Baseline contract value £52,484.27
QUALITY ContractQuantityContract
BaseNumber
Contract * Wales England
% of all assessments that were assess and fit appliances (rolling 12 monthperiod) 37 57 64.9% 52.3% 54.1%
% of all assessments that were assess and refuse (rolling 12 month period) 0 57 0.0% 10.6% 12.4%
% of all assessments that were assess and review (rolling 12 month period) 20 57 35.1% 37.2% 33.5%
% of terminated courses where treatment was abandoned or discontinue