DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A0.00
COVER SHEETINDEX
VACAVILLE CLASSROOM BUILDING (ANNEX) RENOVATION PROJECTSOLANO COMMUNITY COLLEGE DISTRICT
2000 NORTH VILLAGE PARKWAY, VACAVILLE, CA 95688PROJECT NO:
APPLICATION NO:SUBMITTAL
GENERAL DRAWINGS
A0.00 COVER SHEET, INDEX
ARCHITECTURE DRAWINGS
A0.01 LOCAL FIRE AUTHORITY PLAN
A0.10 ACCESS PLAN
A0.20 ACCESSIBILITY - ADA DETAILS
A0.30 EGRESS PLAN
D1.01 EXISTING/DEMO ROOF PLAN
D1.01-ALT EXISTING/DEMO ROOF PLAN
D2.00 EXISTING/DEMO FLOOR PLAN
D2.01 EXISTING TOILET ROOMS & DRINKING FOUNTAINS
D3.00 EXISTING/DEMO ELEVATIONS
D5.00 DEMO/EXITING INTERIOR ELEVATIONS
D5.01 DEMO/EXISTING INTERIOR RESTROOM ELEVATIONS
D6.00 EXISTING/DEMO RCP
A1.00 SITE PLAN
A1.01 ROOF PLAN
A1.01-ALT ROOF PLAN
A2.00 FLOOR PLAN
A2.01 TOILET ROOMS & DRINKING FOUNTAINS
A3.00 EXTERIOR ELEVATIONS
A3.01-ALT ROOF PARAPET ELEVATIONS
A5.01 INTERIOR ELEVATIONS
A6.00 REFLECTED CEILING PLAN
A8.00 EXTERIOR DETAILS
A8.01 EXTERIOR DETAILS
A8.02 EXTERIOR DETAILS
A8.03 EXTERIOR DETAILS
A8.04 EXTERIOR DETAILS
A9.00 INTERIOR DETAILS
A9.01 INTERIOR DETAILS
A9.02 INTERIOR DETAILS
A9.03 INTERIOR DETAILS
GENERAL NOTE:
TOPOGRAPHIC: INFORMATION WAS PROVIDED BY SCCD TO CA
ARCHITECTS FOR USE AS EXISTING CONDITIONS FOR THIS PROJECT
1. CONTRACT DOCUMENTS ARE COMPLEMENTARY, THE CONTRACTOR
SHALL, BEFORE STARTING EACH PORTION OF THE WORK, CAREFULLY
STUDY AND COMPARE THE VARIOUS CONTRACT DOCUMENTS RELATIVE TO
THAT PORTION OF THE WORK, AS WELL AS THE INFORMATION FURNISHED
BY THE OWNER, SHALL TAKE FIELD MEASUREMENTS OF ANY EXISTING
CONDITIONS RELATED TO THAT PORTION OF THE WORK, AND SHALL
OBSERVE ANY CONDITIONS AT THE SITE AFFECTING IT. THESE OBLIGATIONS
ARE FOR THE PURPOSE OF FACILITATING COORDINATION AND
CONSTRUCTION BY THE CONTRACTOR AND ARE NOT FOR THE PURPOSE OF
DISCOVERING ERRORS, OMISSIONS, OR INCONSISTENCIES IN THE
THE CONTRACTOR SHALL PROMPTLY
REPORT TO THE ARCHITECT ANY ERRORS, INCONSISTENCIES OR
OMISSIONS DISCOVERED BY OR MADE KNOWN TO THE CONTRACTOR AS A
REQUEST FOR INFORMATION IN SUCH FORM AS THE ARCHITECT MAY
REQUIRE.
2. DEMO, CUTTING AND PATCHING SHALL BE PERFORMED AS NECESSARY
FOR THE PERFORMANCE AND INSTALLATION OF WORK SHOWN AND SHALL
MEET THE STANDARD OF CARE FOR EACH OF THE DISCIPLINES REQUIRED
TO PERFORM THE WORK.
3. UNOBSTRUCTED ACCESS TO EXISTING EXITS AND ANY EMERGENCY
LIGHTING SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. ALL EXITS,
EXIT LIGHTING, FIRE PROTECTIVE DEVICES SHALL BE MAINTAINED FOR THE
DURATION OF THE WORK OF THE PROJECT.
4. ALL WORK PERFORMED UNDER THESE DOCUMENTS SHALL BE IN
ACCORDANCE WITH ALL APPLICABLE CODES AND REQUIREMENTS. ALL NEW
WORK SHALL NOT DIMINISH ANY EXISTING CONDITIONS WITH RESPECT TO
THEIR ADHERENCE TO APPLICABLE CODES AND REQUIREMENTS (TYP.).
THIS SHALL INCLUDE INSPECTIONS AND SUPERVISION OF WORK BY A
LICENSED INSPECTOR OF RECORD (IOR) IN ACCORDANCE WITH DSA.
5. THESE DOCUMENTS ARE TO REFLECT GENERAL INTENT OF THE
ARCHITECTURAL SCOPE OF WORK. THE INFORMATION SHOWN IN THESE
DOCUMENT SHOW PURPOSE AND INTENT AND ARE NOT COMPLETE IN
EVERY DETAIL. THE CONTRACTOR SHALL COMPLY WITH THEIR INTENT AND
MEANING, TAKEN AS A WHOLE, AND SHALL NOT AVAIL ITSELF OF ANY
MANIFEST ERROR, OMISSION, AND DISCREPANCY OF AMBIGUITY WHICH
APPEAR IN THE DOCUMENTS.
6. CONTRACTOR SHALL ENGAGE USA TO VERIFY AND LOCATE ANY (E)
UTILITIES WITHIN AREA OF SCOPE OF WORK PRIOR TO COMMENCENT OF
DEMO WORK.
CIVIL DRAWINGS
C1 SITE PLAN
C2 ACCESSIBLE DETAILS
C3 ENLARGED PLANS
C4 ENLARGED PLANS
C5 PARTIAL SURVEY
TBD
X
X
X
X
07/20/2017
11/30/2017C-23410
Joshua Cohn
STATEMENT: THE POT IDENTIFIED IN THESE CONSTRUCTION
DOCUMENTS IS COMPLIANT WITH THE CURRENT APPLICABLE
CALIFORNIA BUILDING CODE ACCESSIBILITY PROVISIONS FOR PATH OF
TRAVEL REQUIREMENTS FOR ALTERATIONS, ADDITIONS AND
STRUCTURAL REPAIRS. AS PART OF THE DESIGN OF THIS PROJECT,
THE POT WAS EXAMINED AND ANY ELEMENTS, COMPONENTS OR
PORTIONS OF THE POT THAT WERE DETERMINED TO BE
NONCOMPLIANT 1) HAVE BEEN IDENTIFIED AND 2) THE CORRECTIVE
WORK NECESSARY TO BRING THEM INTO COMPLIANCE HAS BEEN
DETAILS, DRAWINGS AND SPECIFICATIONS INCORPORATED INTO
THESE CONSTRUCTION DOCUMENTS. ANY NONCOMPLIANT ELEMENTS,
COMPONENTS OR PORTIONS OF THE POT THAT WILL NOT BE
CORRECTED BY THIS PROJECT BASED ON VALUATION THRESHOLD
LIMITATIONS OR A FINDING OF UNREASONABLE HARDSHIP ARE SO
INDICATED IN THESE CONSTRUCTION DOCUMENTS. DURING
CONSTRUCTION, IF POT ITEMS WITHIN THE SCOPE OF THE PROJECT
REPRESENTED AS CODE COMPLIANT ARE FOUND TO BE
NONCONFORMING BEYOND REASONABLE CONSTRUCTION
TOLERANCES, THEY SHALL BE BROUGHT INTO COMPLIANCE WITH THE
CBC AS A PART OF THIS PROJECT BY MEANS OF A CONSTRUCTION
SEE C1, C2, C3, C4 FOR PATH OF TRAVEL REQUIREMENTS.
PROJECT WILL REQUIRE INSPECTOR (IOR) CLASS 1
CGS
DISTRICT NAME LUCKY LOFTON
EXECUTIVE BOND MANAGER
SOLANO COMMUNITY COLLEGE DISTRICT
ADDRESS 4000 SUISUN VALLEY ROAD
ADDRESS FAIRFIELD CA 94534
PHONE 707-863-7855
PHONE 707-646-7703
PM NAME KITCHELL CEM - PAM KINZIE
ADDRESS 360 CAMPUS LANE, SUITE 203
ADDRESS FAIRFIELD, CA 94534
PHONE 707-864-7189
EMAIL [email protected]
ARCHITECT NAME CA ARCHITECT
ADDRESS 475 GATE FIVE ROAD, SUITE 107
ADDRESS SAUSALITO, CA 94965
PHONE 415-331-7655
PHONE 415-609-7177
EMAIL [email protected]
CIVIL NAME FOULK CIVIL ENGINEERING, Inc.
ADDRESS 4777 MANGLES BOULEVARD
ADDRESS FAIRFIELD, CA 94534
PHONE 707-864-0784
PHONE 707-864-0793
EMAIL [email protected]
ELECTRICAL NAME C&N ENGINEERS, INC.
ADDRESS 319 SUTTER STREET, SUITE 202
ADDRESS SAN FRNACISCO, CA 94108
PHONE 415-982-1828
FAX 415-772-8005
EMAIL [email protected]
MP DRAWINGS
M0.1 MECHANICAL NOTES, SYMBOL, LEGEND AND SCHEDULE
M0.2 MECHANICAL TITLE 24
M0.3 HVAC LOAD CALCULATION
M2.1 MECHANICAL DEMO FLOOR PLAN
M2.1D MECHANICAL FLOOR PLAN DEMO
M2.2 MECHANICAL ROOF PLAN
M2.2D MECHANICAL DEMO ROOF PLAN
M4.1 MECHANICAL SCHEDULE
M6.1 MECHANICAL DETAILS
M6.2 MECHANICAL DETAILS
P0.1 PLUMBING NOTES, SYMBOL, LEGEND AND SCHEDULE
P2.1 PLUMBING DEMO FLOOR PLAN
P2.1D PLUMBING FLOOR PLAN DEMO
P2.2D PLUMBING DEMO ROOF PLAN
P4.1 ENLARGED PLUMBING FLOOR PLAN
P6.1 PLUMBING DETAILS
MEP NAME EXCEL ENGINEERS
ADDRESS 825 ORANGE AVE
ADDRESS SUNNYVALE, CA 94087
PHONE 408-230-9164
FAX 408-749-9989
EMAIL [email protected]
STRUCTURAL NAME TENNEBAUM-MANHEIM ENGINEERS
ADDRESS 414 MASON STREET, SUITE 605
ADDRESS SAN FRNACISCO, CA 94102
PHONE 415-772-9891
EMAIL [email protected]
SCOPE OF WORK IS BASED ON DSA APPROVED 02-REH-10012
(9/15/2015). REH SHALL FORM A PART OF THE REVIEW DOCUMENTS
AND HAS BEEN UPDATED TO INCLUDE ADDITIONAL TESTING DATA.
THE EXISTING BUILDING IS A ONE-STORY, 16,400 SF BUILDING AND
5,112 SF EXTERIOR COVERED WALKWAY FOR A TOTAL OF: 21,512SF,
FULLY SPRINKLED. SCOPE OF WORK SHALL BE FOR THE FOR THE
REHABILITATION OF THE (E) BUILDING FOR COMPLIANCE TO THE
2016 CALIFORNIA BUILDING STANDARDS CODE (CBC) AS OUTLINED
IN THE REH.
STRUCTURAL DRAWINGS
S0.1 GENERAL NOTES
S0.2 GENERAL NOTES & ABBREVIATIONS
S1.0 TYPICAL DETAILS
S2.1 1ST FLOOR AND FOUNDATION PLAN
S2.2 ROOF FRAMING PLAN
S3.1 WALL ELEVATIONS
S3.2 WALL ELEVATIONS
S4.1 SECTIONS & DETAILS
S4.2 SECTIONS & DETAILS
S4.3 SECTIONS & DETAILS
EXISTING BUILDING TYPE: III-B
PROPOSED BUILDING TYPE: V-B (SEE A0.03 EGRESS PLAN)
EXISTING OCCUPANCY: B/A-3
PROPOSED OCCUPANCY: B/A-3 (SEE A0.03)
EXISTING BUILDING IS CURRENTLY UNOCCUPIED AND SHALL
REMAIN UNOCCUPIED UNTIL BUILDING IS CERTIFIED BY DSA.
ELECTRICAL DRAWINGS
E0.10 GENERAL NOTES, ABBREV. & LEGENDS
E0.11 ELECTRICAL SPECIFICATIONS
E0.30 ENERGY COMPLIANCE FORMS
E0.40 ENERGY COMPLIANCE FORMS
E0.50 ENERGY COMPLIANCE FORMS
E0.60 ENERGY COMPLIANCE FORMS
E1.00 POWER PLAN
E1.01 POWER PLAN AT ROOF
E2.00 LIGHTING PLAN
E2.10 WIRING DIAGRAMS
FIRE ALARM
FA1.01 FIRE ALARM LEGEND, NOTES,
& MOUNTING HEIGHT DETAILS
FA2.00 FIRE ALARM FLOOR PLAN
FA3.00 FIRE ALARM DEVICE DETAILS
FA4.00 FIRE ALARM CALCULATIONS AND RISER DIAGRAM
FA 5.00 FIRE STOP DETAILS
FIRE ALARM NAME HCI SYSTEMS INC.
ADDRESS 1419 N. MARKET BLVD.
ADDRESS SACRAMENTO, CA 95834
PHONE 916-419-6900
EMAIL [email protected]
FIRE
PROTECTION NAME ZARI CONSULTING GROUP, INC.
ADDRESS 755 BAYWOOD DRIVE, 2ND FLOOR
ADDRESS PETALUMA, CA 95834
PHONE 925-381-2322
EMAIL [email protected]
FIRE PROTECTION
FP1-0 FIRE PROTECTION SYSTEM COVER SHEET
FP1-1 FIRE PROTECTION SYSTEM SITE PLAN
FP 2-0 FIRE PROTECTION SYSTEM SITE PLAN
FP-3-0 FIRE PROTECTION SYSTEM SITE PLAN
ABV. - Above
ADD. - Addition
ADJ. - Adjust
A.F.F. - Above Finished Floor
ALT. - Alternate
APP'D. - Approved
ARCH. - Architect,
ASPH. - Asphalt
BLDG. - Building
BM. - Beam
B.O. - Bottom of
B.U.R./BUR - Built up Roof
C.B. - Catch Basin
C.D. - Construction document
C.L. - Center Line
CL. - Closet
CLG. - Ceiling
C.O. - Clean Out
COL. - Column
CONT. - Continuous
CONTR. - Contractor
CONC. - Concrete
DBL. - Double
DEMO. - Demolition
DIA. - Diameter
DIM. - Dimension
DN. - Down
DR. - Door
EA. - Each
E.F. - Exhaust fan
ELEV. - Elevation
ELECT. - Electric, electrical
EQ. - Equal
(E) - Existing
EXT. - Exterior
F.A. - Fire alarm
F.D. - Floor drain
F.E. - Fire extinguisher
FIN. - Finish
FLR. - Floor
GA. - Gauge
GALV. - Galvanized
G.C. - General Contractor
G.F.C.I. - Ground Fault Circuit Interrupt
G.F.I. - Ground Fault Interrupt
GL. - Glass
GWB Gypsum Wall Board
H.B. - Hose bib
HDW. - Hardware
HGT. - Height
H.V.A.C. - Heating, Venting and Air
Conditioning
INV. - Invert
INSUL. - Insulation
INT. - Interior
JCT. - Junction
JST. - Joist
LIN. - Linear
LT. - Light
LTG. - Lighting
MTL. - Metal
MAX. - Maximum
MECH. - Mechanical
MFR - Manufacturer's
MIN. - Minimum
MTL. - Metal (steel)
(N) - New
N.T.S. - Not to scale
O.C. - On center
OPNG. - Opening
PTD. - Painted
PART. - Partition
PL - Property Line
PLAM - Plastic laminate
PLYWD. - Plywood
P.S.F. - Pounds per square foot
P.S.I. - Pounds per square inch
RAD. - Radius
R.D. - Roof drain
R.O. - Rough Opening
REF. - Reference
REINF. - Reinforced
RET. - Return
REV. - Revision
RM. - Room
RMV. - Remove
SED - See Electrical Docs
SHT'G. - Sheathing
SIM. - Similar
SMD - See Mechanical Docs
SPD - See Plumbing Docs
SPECS. - Specifications
SSD - See Structural Docs
ST. - Square feet
SI. - Square inches
STD. - Standard
STL. - Steel
S.Y. - Square yard
SYS. - System
T.O. - Top of
THR. - Threaded
TYP. - Typical
UNF. - Unfinished
V.B. - Vapor barrier
V.I.F. - Verify in field
VCT. - Vinyl composition tile
WP. - Weatherproof
WD. - Wood
FLOOD MAP INFO: FEMA MAP #06095C0164E
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
See General Note onC1 for POTcompliance (typ)
48"
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
Side flare shall be 10% max at all ramps (typ)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
PLANTER
PLANTER
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
ACCESS PLAN
BUILDING PLAN - ACCESS
SCALE: 1/16" = 1' - 0"10
A0.10
1 ACCESSIBLE STALLS WITH LEVELLOADING
SHEET NOTES:
2
ACCESSIBLE PATH OF TRAVELSEE CIVIL DRAWINGS, SEE C.1FOR SITE DEVELOPMENTREQUIREMENTS
3 SEE A1.00 SITE PLAN FORPARKING STALL RATIOS
4 LISTENING DEVICE
AS1.00
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
04 WHEELCHAIR TURNING REQUIREMENTSIN AN ACCESSIBLE ROUTE
05 DOORWAY REQUIREMENTS
10 SIGN LOCATION AND INSTALLATION - WOMEN'S TOILET ROOM
07 TABLE A - ADULT DIM 02 ACCESSIBLE PARKING SPACE
SLOPE SHALL NOT EXCEED
1:10 (MAX) PER
11B-406.2.2 (V.I.F.)
OUTLINE OF
(E) RAMP
INSTALL NEW DETECTABLE WARNINGS AT EXISTING CURB
RAMP AND SHALL EXTEND THE FULL WIDTH OF THE RAMP PER
11B-705.1.2.2. ONLT APPROVED DSA-AC DETECTABLE WARNING
PRODUCTS SHALL BE INSTALLED PER 11B-705.1.1.1 AND
11B-705.1.1.2
01 ACCESSIBLE CURB CUT - VIF
03 THRESHOLD REQUIREMENT @ENTRY (TYP)
WHERE INDICATED:
ACCESS AISLE
PAINTED STRIPING WITH BLUE BOARDER
AROUND ACCESS AISLE WITH WHITE
DIAGONAL STRIPES AT 36"O.C. MAX
PAINTED STRIPING WITH BLUE BOARDER
AROUND ACCESS AISLE WITH WHITE
DIAGONAL STRIPES AT 36"O.C. MAX
PER 11B-705.1.1.3.1 DETECTABLE WARNING
SURFACES SHALL BE YELLOW AND
APPROXIMATE FS 33538 OF FEDERAL
STANDARD 595C
WHITE LETTERING 12" MIN HEIGHT
PER 11B-703.7.2.6.2 WOMEN'S TOILET AND BATHING
FACILITIES. A CIRCLE,
1
4
INCH THICK AND 12 INCHES IN
DIAMETER, SHALL BE LOCATED AT ENTRANCES TO
WOMEN'S TOILET FACILITIES. THE CIRCLE SYMBOL
SHALL CONTRAST WITH THE DOOR, EITHER LIGHT ON
DARK BACKGROUND OR DARK ON LIGHT
BACKGROUND.
WHITE LETTERING 12" MIN HEIGHT
36" x 36" PAINTED ACCESSIBLE
SIGN, WHITE W/ BLUE
BACKGROUND
96" @ VAN ACCESSIBLE SPACE
ACCESSIBLE PARKING SIGN
WALK OR PLANTING
36" x 36" PAINTED ACCESSIBLE
SIGN, WHITE W/ BLUE
BACKGROUND
ACCESS PARKING
SIGN - SEE 07/SIGN B
WALK OR PLANTING
WALK OR PLANTING
11 SIGN LOCATION AND INSTALLATION - MEN'S TOILET ROOM
PER 11B-703.7.2.6.1 MEN'S TOILET AND BATHING
FACILITIES. AN EQUILATERAL TRIANGLE,
1
4
INCH
THICK AND 12 INCHES LONG AND A VERTEX
POINTING UPWARD, SHALL BE LOCATED AT
ENTRANCES TO WOMEN'S TOILET FACILITIES. THE
TRIANGLE SYMBOL SHALL CONTRAST WITH THE
DOOR, EITHER LIGHT ON DARK BACKGROUND OR
DARK ON LIGHT BACKGROUND.
12 SIGN LOCATION AND INSTALLATION
09 BATHROOM CLEARANCES
"PASSENGER LOADING
ZONE ONLY"
"ADA PARKING ONLY"
70 SQ. INCH ACCESSIBILITY
SIGN PER SEC. 11B-502.6
SIGNAGE SHALL INCLUDE
"MINIMUM FINE $250"
SEE SIGN A / SIGN B FOR DETAILS
SIGN A:
30
"
7'-0
"
TO
B
OT
TO
M O
F S
IG
N
12'-0"
RAINTIGHT
CAP
VAN SIGNAGE
CONCRETE FOUNDATION
NO. 4 RE-BAR 8" LONG
WELDED TO BOTTOM OF
SLEEVE OR DRILLED INTO
SLEEVE
COMPACTED EARTH
2" GALV. STEEL POST
SET IN 2-1/2" GALV.
STEEL SLEEVE
4"
1" S
LO
PE
T
YP
REFLECTORIZED "ADA PARKING
ONLY" 70 SQ. INCH
ACCESSIBILITY SIGN PER SEC.
11B-502.6 SIGNAGE SHALL
INCLUDE "MINIMUM FINE $250"
SIGNS (N.T.S.) SECURETO
POST WITH 3/8" GALV. STEEL
BOLTS, NUTS, AND WASHERS.
08 ACCESSIBLE SIGNAGE @ PARKING
"Unauthorized vehicles parked in designated accessible
spaces not displaying distinguishing placards or special
license plates issued for persons with disabilities will be
be reclaimed at: Violators Subject to Tow Solano
Community College Police Dept."
ADDITIONAL SIGNAGE:
SINGLE ACCOMMODATION TOILET FACILITYACCESSIBLE WATER CLOSET COMPARTMENT
WITHIN A MULTIPLE-ACCOMODATION TOILET FACILITY
TOILET STALL - SIDE ENTRY
MULTIPLE ACCOMODATION TOILET ROOM
A0.20
ADA - ACCESS
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
17"-
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
A0.30
EGRESS PLAN
EGRESS PLAN
SCALE: 3/32" = 1' - 0"10
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
1. PER TABLE 803.11CBC 2016, INTERIORFINISHES FOR WALL AND CEILING, INROOMS AND ENCLOSED SPACES SHALL BECLASS "C" OR BETTER AND CLASS "B" INCORRIDORS AND EXIT ENCLOSURES INFULLY SPRINKLED SPACES. CRITERIA FORFLAME SPREAD INDEX SHALL COMPLY WITHSEC 803 AND TABLE 803.9 (TYP).
2. NON-RESILIENT FLOOR FINISHES SHALL OFCLASS I OR CLASS II IN ACCORDANCE WITHNFPA 253 (TYP) AND SHALL COMPLY WITHTHE REQUIREMENTS IN SECTION 804
GENERAL NOTE:
3. SEE DSA APPROVED 02-REH-10012(09/15/2015) FOR CHANGE OF BUILDINGCLASSIFICATION TO TYPE V-B.
1. FIRE EXTINGUISHERS (FE) PROVIDED SHALL BE INCOMPLIANCE WITH CFC SECTION 906. CLASSIFICATION SHALLBE IN ACCORDANCE WITH CCR TITLE 19, DIV 1, SECT 565.1(A):LIGHT HAZARD (FOR CLASSROOMS), SEE A2.00 FORLOCATIONS.
2. FE SHALL BE INSPECTED PER SEC 574.1 ON A MONTHLY BASISUNLESS OTHERWISE DETERMINED BY THE GOVERNING FIREAUTHORITY. FE SHALL REMAIN FULLY CHARGED AND KEPT INTHEIR DESIGNATED PLACES AT ALL TIMES.
3. PER TITLE 19, DIV.1, SEC.568, TABLE 2, FE SHALL BE RATED AS2-A (MIN) AND SHALL BE PROVIDED WITH A MAXIMUM FLOORAREA PER FE AT 3000SF. TOTAL AREA = 16,400/3000 = 6 FE MIN.MAXIMUM TRAVEL DISTANCE FROM ANY POINT IN THEBUILDING SHALL NOT EXCEED 75' MIN. (TYP)
GENERAL NOTES FOR FIRE EXTINGUISHER (FE): :
1 ADJUST (E) DOOR OPENERS AT ACCESSIBLE ENTRIES (2 TOTAL).
SHEET NOTES:
2REINSTALL (E) METAL COILING DOOR ASSEMBLY AND (E)LOWER PLAM COUNTER FOR ACCESS COMPLIANCE.
3 CONFORM (N) CONC WITH EXISTING (SSD), PATCH IN(N)WALL/CEILING FRAMING, GWB (PREP/TAPE/PAINT),TRIM TO MATCH EXISTING. WHERE WORK OCCURS ATDOORS ,REINSTALL (E) DOORS W/ NEW FRAMING TOMATCH. NEW CARPET TILES SHALL BE REPLACED IN WHOLESQUARES ONLY (TYP).
4 REMOVE (E) SHORING ONLY AFTER SEOR CONFIRMS INWRITING WITH CONTRACTOR
GENERAL EGRESS DOOR COMPLIANCE (PER CBC SEC. 1010.1.9):
1. DOOR HANDLES, PULLS, LATCHES, LOCKS AND OTHER OPERATING DEVICES ON DOORS REQUIRED TO BE ACCESSIBLE BYCHAPTER 11A OR 11B OF THE CALIFORNIA BUILDING CODE SHALL NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING ORTWISTING OF THE WRIST TO OPERATE.
2. DOOR HANDLES, PULLS, LATCHES, LOCKS AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34 INCHES (864 MM)MINIMUM AND 48 INCHES (1219 MM) MAXIMUM ABOVE THE FINISHED FLOOR.
3. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT PERMITTED.
4. THE UNLATCHING OF ANY DOOR OR LEAF SHALL NOT REQUIRE MORE THAN ONE OPERATION. DOORS SERVING ROOMSOR SPACES WITH AN OCCUPANT LOAD OF 50 OR MORE IN A GROUP A OCCUPANCY, ASSEMBLY AREA NOT CLASSIFIED ASAN ASSEMBLY OCCUPANCY, E, OCCUPANCIES SHALL NOT BE PROVIDED WITH A LATCH OR LOCK OTHER THAN PANICHARDWARE OR FIRE EXIT HARDWARE.
5. PER 1010.1.10.1 WHERE PANIC OR FIRE EXIT HARDWARE IS INSTALLED, IT SHALL COMPLY WITH THE FOLLOWING: PANICHARDWARE SHALL BE LISTED IN ACCORDANCE WITH UL 305,FIRE EXIT HARDWARE SHALL BE LISTED IN ACCORDANCE WITH UL 10C AND UL 305, THE ACTUATING PORTION OF THERELEASING DEVICE SHALL EXTEND NOT LESS THAN ONE-HALF OF THE DOOR LEAF WIDTH, AND THE MAXIMUM UNLATCHINGFORCE SHALL NOT EXCEED 15 POUNDS (67 N).
RISER ROOM SIGNAGE:
1. PROVIDE EXTERIOR SIGN INDICATING"RISER ROOM IN ROOM 108"
2. PROVIDE INTERIOR SIGN IN ROOM 108NEAR RISER ROOM DOOR INDICATING "RISER ROOM"
PROVIDE COMPLIANT SIGNAGE FOR ASSEMBLY SPACE AT RMS 106 &120THAT NOTES MAXIMUM OCCUPANCY (BASED ON LOAD CALCULATIONSON THIS PAGE
6. ALL EXITS DOORS SHALL HAVE COMPLIANT PANIC HARDWARE, VIF (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
D1.01
EXISTING/DEMO
ROOF PLAN
EXISTING ROOF PLAN
SCALE: 1/8" = 1' - 0"10
1 REMOVE (E) BUILT-UP ROOF(BUR), IN AREAS SHOWN,COORDINATE WITHSTRUCTURAL DRAWINGS FORLOCATIONS (TYP).CONTRACTOR SHALL MOVEAND/OR CAP ALL UTILITIESTO ALLOW FOR WORK TO BEADEQUATELY PERFORMED(TYP).
3 REMOVE (E) ROOFDRAINS/OVERFLOW (TYP) - SPD
4 DEMO EXTERIOR ROOF ASSHOWN FOR NEW ACCESSHATCH , COORINDATE WITHLOCATION FOR NEW ACCESSLADDER BELOW (TYP).
SHEET NOTES:
5 DEMO TO PROVIDE FOR (N)EXHAUST FAN - SMD.
6 REMOVE (E) LADDER AND ALLRELATED ATTACHMENTS REQ'DTO PREPARE TO (N) ROOF
CONTRACTOR SHALL REMOVEAREAS OF THE ROOF ASINDICATED IN PREPARATION FOR(N) ROOF. COORDINATE WORKON ROOF WITH STRUCTURAL,MECHANICAL, ELECTRICAL ANDfa DOCUMENTS AS REQ'D FOR THEWORK TO BE PERFORMED (TYP).
2 REMOVE (E) CONCRETE ROOFTILES AND PREPARE ROOFSUBSTRATE FOR INSTALLATIONOF (N) METAL STANDING SEAMROOF (TYP.)
7 DASHED LINES INDICATEAPPROXIMATE AREAS OF (E)CRICKETS, EQUIPMENT ANDSUPPORT PLATFORMS THAT WILLREQUIRE ACCESS TOSHEATHING BELOW FORSTRUCTURAL WORK (SSD),CONTRACTOR SHALL PROVIDEACCESS AS REQ'D AND TEMPCAP AND RELOCATEEQUIPMENT WHILE WORK ISBEING PERFORMED (TYP).
GENERAL ROOF DEMO NOTE:
8REMOVE (E) EXISTING FAN TOREINSTALLION
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
D1.01 ALT
EXISTING/DEMO
ROOF PLAN
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
EXISTING ROOF PLAN
SCALE: 1/8" = 1' - 0"10
1 REMOVE (E) BUILT-UP ROOF(BUR) AS INDICATED. SEEDETAILS FOR EXTENT OFREMOVAL AT EQUIPMENTPADS AND PARAPET (TYP).
3 REMOVE (E) ROOFDRAINS/OVERFLOW (TYP) - SPD
4 DEMO FOR EXTERIOR ROOFACCESS HATCH,COORDINATE WITH INSTALLOF ACCESS LADDER BELOW.
SHEET NOTES:
5 DEMO TO PROVIDE FOR (N)EXHAUST FAN.
7 DASHED LINES INDICATEAPPROXIMATE AREAS OF (E)CRICKETS, EQUIPMENT ANDSUPPORT PLATFORMS THATWILL REQUIRE ACCESS TOSHEATHING BELOW FORSTRUCTURAL WORK (SSD),CONTRACTOR SHALL PROVIDEACCESS AS REQ'D AND TEMPCAP AND RELOCATEEQUIPMENT WHILE WORK ISBEING PERFORMED (TYP).
GENERAL ROOF DEMO NOTE:
CONTRACTOR SHALL REMOVEAREAS OF THE ROOF ASINDICATED IN PREPARATION FOR(N) ROOF. COORDINATE WORKON ROOF WITH STRUCTURAL,MECHANICAL, ELECTRICAL ANDfa DOCUMENTS AS REQ'D FOR THEWORK TO BE PERFORMED (TYP).
2 REMOVE (E) CONCRETETILES, COPING, FLASHINGAND ACCESSORIES ASREQ'D AND PREPARESUBSTRATE FORINSTALLATION OF (N) METALSEAM ROOF (TYP.)
6 REMOVE (E) LADDER AND ALLRELATED ATTACHMENTS TOPREPARE TO (N) ROOF
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
B C D E F
2
3
4
A
G
1
B C D E F
2
3
4
A
G
1
C
C.2
D.8
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
D2.00
EXISTING / DEMO
FLOOR PLAN
EXISTING / DEMO FLOOR PLAN
SCALE: 1/8" = 1' - 0"10
SHEET NOTES:
2 REMOVE (E) METAL COILING DOOR ASSEMBLY AND (E)COUNTERS, STORE FOR REASSEMBLY - SEE INTERIOR DETAILS (TYP)
3
REMOVE PORTIONS OF (E)WALL/FRAMING, CARPET AND ALLRELATED ACCESSORIES AS REQ'D TO ALLOW FOR STRUCTURALWORK (TYP).
5
DEMO PORTION OF THE CONCRETE SLAB, CARPET/VINYL FLOOR,WALL FRAMING AND ALL RELATED ACCESSORIES AS REQ'D TOADEQUATELY PERFORM THE STRUCTURAL WORK - SSD.
6 DEMO (E) WALL AS REQ'D FOR WORK - SSD
1 PROTECT ALL CARPET THAT WILL REMAIN IN DURING WORK.
7 REMOVE (E) CEILING GRID AND (E) CEILING TILES AS NEEDED TOINSTALL NEW TRUSSES.
4 OUTLINE OF EXISTING SHORING TO REMAIN UNTIL ROOF LOADSCAN BE ADEQUATELY SUPPORTED UNDER NEW TRUSS,COORDINATE SCHEDULE ACCORDINGLY WITH SEOR (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DD
PLUMBING FIXTURE ANALYSIS - ADMIN
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
D2.01
TOILET ROOMS 111 & 112 (EXISTING)
SCALE: 1/2" = 1' - 0"
10
TOILET ROOMS 122 & 123 (EXISTING)
SCALE: 1/2" = 1' - 0"
01
EXISTING DRINKING FOUNTAINS
SCALE: 3/4" = 1' - 0"
02
DEMO PLANS EXISTING
TOILET ROOMS &
DRINKING FOUNTAINS
1REMOVE (E) SINK AND CABINET, PREP WALL FORPAINTING AND NEW CARPET (WHOLE SQUARES ONLY)WHERE DAMAGEDS FOR NEW CABINET/SINK (TYP).
SHEET NOTES:
2 (E) TOILET ROOMS 111 & 112 - REMOVE ANDSALVAGE FOR REINSTALLATION TWO (2) EXISTINGTOILET FIXTURES, ADJACENT ACCESSORIES, GRABBARS AND CARRIERS. PREPARE WASTE LINES ANDWATER SUPPLY LINES TO ALLOW FOR 5' MIN STALLWIDTH. DEMO EXISTING WALL AND PREPARE FORRE-FRAMING.
PLUMBING FIXTURE ANALYSIS
SCALE: 1/2" = 1' - 0"
12
3 REMOVE AND SALVAGE ALL (3) DRINKINGFOUNTAINS. CAP POWER, WATER SUPPLY ANDWASTE LINE. DRINKING FOUNTAIN B & C TO BE KEPTFOR REINSTALLATION, DRINKING FOUNTAIN A TO BESALVAGED TO OWNER. DEMO (E) PARTITION OFTHE WALL REQUIRED TO ALLOW FOR (N) PLUMBINGAND ELECTRICAL AND BACKING (TYP.) - SEE02/D2.01
REMOVE AND SALVAGE (E) GARBAGE DISPOSA FOROWNER
6 DEMO (E) WALL- CONTRACTOR TO DETERMINE ACTUALSCOPE OF DEMIOLITION (TYP).
7REMOVE PORTIONS OF (E) CARPET TILE, COVEBASE AND CEILING TILES AS REQ.'D TO PROVIDESUFFICIENT CLEARANCE FOR NEW WALL.REPLACE TILES IN WHOLE SQUARES ONLY (TYP).
8 DEMO (E) TILE FLOOR AND CONCRETE SLABBELOW TO ALLOW FOR RE-LOCATED TOILET,SUPPLY AND WASTE LINE (SPD).OUTLINE OF DEMO AREA IS FOR REFERENCERONLY, CONTRACTOR SHALL DETERMINE ACTUALAREA OF DEMOLITIION (TYP).
4 REMOVE (E) PARTITION DOOR AT WOMEN'SRESTROOM 112 AND SALVAGE FORREINSTALLATION TO ALLOW FOR IN-SWING.PROVIDE ALL HARDWARE NECCESSARY FORSCOPE (TYP)
5
9REMOVE (E) TOILETS AND ALL RELATED ACCESSORIESFOR REINSTALLATION. DEMO CONC SLAB/TILE/WALLAS REQ'D TO ALLOW FOR STRUCTURAL WORK (SSD),CAP ALL UTILITIES AND PROTECT LINES FORREINSTALLATION. OUTLINE FOR DEMO IS FOR REFERENCEONLY, CONTRACTOR SHALL DETERMINE EXTENT (TYP).
DASHED OUTLINEOF PANEL ABOVE
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
BC
E
ABC
DEF
A
G
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
D3.00
EXISTING/DEMO
ELEVATIONS
EXISTING NORTH ELEVATIONS13SCALE: 1/8" = 1' - 0"
EXISTING SOUTH ELEVATIONS12SCALE: 1/8" = 1' - 0"
EXISTING WEST ELEVATIONS11SCALE: 1/8" = 1' - 0"
EXISTING EAST ELEVATIONS10SCALE: 1/8" = 1' - 0"
EXISTING COLORSTRIM AND PAINTED SURFACES(REFERENCE FROM A2.1 - SCCD
SET APPROVED DATE 12-25-1995)
- ROOF"LIFETILE" FLAT CONC. TILE 1220 OREQUAL- BUILDINGSTUCCO "LA HABRA STUCCO""PURE IVORY" (MAIN BUILDINGSTUCCO, STUCCO AT TEMP./PERM.SIGNAGE, DIRECTORIES, TRASHENCLOSURES, COLUMN BODIES)STUCCO TRIM "LA HABRA STUCCO""FRENCH VANILLA" (ACCENTSTUCCO, TRIM & COLUMN BASEVENEER)- WOODTRIM "DUNN-EDWARDS""RODEO TAN" OR EQUAL (ALLWOOD PAINTED TRIM)
1 CORING HOLES AT (E)CONCRETE PANELS (TYP)-SSD
SHEET NOTES:
2 REMOVE (E) CONCRETETILES AND PREPARE FORINSTALLATION OF (N) METALSEAM ROOF (TYP.)
3 PREPARE (E) WALL FOR NEWFLASHING, REMOVE CEMENTPLASTER AS REQ'D (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
B C D E F
A
G
B C D E F
A
G
B
CDEF
A
B
CDEF
A
G
4 3 32
1
1 32
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
ISSUE FORREVIEW
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
D5.00
DEMO/EXISTING
ELEVATIONS
EXISTING ELEVATIONS - A14SCALE: 1/8" = 1' - 0"
EXISTING ELEVATIONS - C13SCALE: 1/8" = 1' - 0"
EXISTING ELEVATIONS - C12SCALE: 1/8" = 1' - 0"
EXISTING ELEVATIONS11SCALE: 1/8" = 1' - 0"
EXISTING ELEVATIONS10SCALE: 1/8" = 1' - 0"
1COORDINATE ALL (N) STRUCTURAL WORK FOR (N)REINFORCING (SSD). THIS WILL REQUIRE SELECTIVEDEMOLITION AS REQ'D TO PROVIDE APPROPRIATEACCESS. GC SHALL COORDINATE WORK WITHSUBCONTRACTORS TO ENSURE APPROPRIATE SCOPE OFDEMOLITION FOR ADEQUATE ACCESS FOR STRUCTURALWORK (TYP). AFTER STRUCTURAL WORK IS COMPLETE,SCOPE SHALL INCLUDE RE-FRAMING, (N) GWB TO PATCH,PREP AND PAINT TO MATCH (TYP).
SHEET NOTES:
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
ISSUE FORREVIEW
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
D5.01
DEMO/EXISTING
ELEVATIONS
EXISTING ELEVATIONS - WOMEN'S RESTROOM13
EXISTING ELEVATIONS - DRINKING FOUNTAINS
SCALE: 3/8" = 1' - 0"10
EXISTING ELEVATIONS - MEN'S RESTROOM
SCALE: 3/8" = 1' - 0"12
SCALE: 3/8" = 1' - 0"
SCALE: 3/8" = 1' - 0"11 EXISTING ELEVATIONS - ADMIN RESTROOM WOMEN
SCALE: 3/8" = 1' - 0"05 EXISTING ELEVATIONS - ADMIN RESTROOMS MEN
04 ANNEX COUNTERTOP/SINKSCALE: 3/8" = 1' - 0"
1DEMOLISH (E) WALL, FRAMING, GWB, TILE, ETC. AND CAP (E) UTILITIES (IF FOUND)TO BE RE-LOCATED (TYP). COORDINATE CORRESPONDING DEMO @(E) FLOORS,CEILING, AND ALL ADJACENT SPACES THAT WILL BE EFFECTED BY THE DEMO (TYP).
SHEET NOTES:
2 REMOVE AND SALVAGE FOR REINSTALLATION (E) RESTROOM SIGNS.
3 REMOVE AND SALVAGE FOR OWNER ONE (1) EXISTING DRINKING FOUNTAIN -SEE 02/A2.01.
4 REMOVE AND SALVAGE FOR REINSTALLATION TWO (2) EXISTING DRINKINGFOUNTAINS - SEE 02/D2.01.
5 REMOVE AND SALVAGE FOR REINSTALLATION ACCESSORIES.
6 DEMO WALL AS REQ'D TO ALLOW FOR STRUCTURAL WORK AS SHOWN INDOCUMENTS, CONTRACTOR SHALL DETERMINE EXTENT OF DEMOLITION TOPERFORM WORK. THIS SHALL DETERMINE EXTENT OF NEW WORK AND SHALL BEINCLUDED CONTRACTOR'S SCOPE (TYP).
GENERAL NOTE: REFER TO 07/A0.20 FOR ALL FIXTURE ANDACCESSORY MOUNTING HEIGHTS AND REQUIRMENTS (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
ISSUE FORREVIEW
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
D5.01
DEMO/EXISTING
ELEVATIONS
EXISTING ELEVATIONS - WOMEN'S RESTROOM13
EXISTING ELEVATIONS - DRINKING FOUNTAINS
SCALE: 3/8" = 1' - 0"10
EXISTING ELEVATIONS - MEN'S RESTROOM
SCALE: 3/8" = 1' - 0"12
SCALE: 3/8" = 1' - 0"
SCALE: 3/8" = 1' - 0"11 EXISTING ELEVATIONS - ADMIN RESTROOM WOMEN
SCALE: 3/8" = 1' - 0"05 EXISTING ELEVATIONS - ADMIN RESTROOMS MEN
04 ANNEX COUNTERTOP/SINKSCALE: 3/8" = 1' - 0"
1DEMOLISH (E) WALL, FRAMING, GWB, TILE, ETC. AND CAP (E) UTILITIES (IF FOUND)TO BE RE-LOCATED (TYP). COORDINATE CORRESPONDING DEMO @(E) FLOORS,CEILING, AND ALL ADJACENT SPACES THAT WILL BE EFFECTED BY THE DEMO (TYP).
SHEET NOTES:
2 REMOVE AND SALVAGE FOR REINSTALLATION (E) RESTROOM SIGNS.
3 REMOVE AND SALVAGE FOR OWNER ONE (1) EXISTING DRINKING FOUNTAIN -SEE 02/A2.01.
4 REMOVE AND SALVAGE FOR REINSTALLATION TWO (2) EXISTING DRINKINGFOUNTAINS - SEE 02/D2.01.
5 REMOVE AND SALVAGE FOR REINSTALLATION ACCESSORIES.
6 DEMO WALL AS REQ'D TO ALLOW FOR STRUCTURAL WORK AS SHOWN INDOCUMENTS, CONTRACTOR SHALL DETERMINE EXTENT OF DEMOLITION TOPERFORM WORK. THIS SHALL DETERMINE EXTENT OF NEW WORK AND SHALL BEINCLUDED CONTRACTOR'S SCOPE (TYP).
GENERAL NOTE: REFER TO 07/A0.20 FOR ALL FIXTURE ANDACCESSORY MOUNTING HEIGHTS AND REQUIRMENTS (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
D6.00
EXISTING/ DEMO
RCP
EXISTING RCP
SCALE: 1/8" = 1' - 0"10
1 REMOVE EXISTING SUSPENDEDCEILING GRID, HANGERS ANDSUPPORTS.
SHEET NOTES:
2 OUTLINE OF WALLS FOR DEMO (TYP).
3 DEMO (E) LIGHTING (TYP).
4 LEAVE (E) GWB WHERE OCCURS- HALLWAYS, RESTROOMS 111 &112, RESTROOMS 122 & 123.
GENERAL NOTES:1. DEMO ENTIRE EXISTINGSUSPENDED CEILING GRID, HANGERSAND SUPPORTS. SALVAGE EXISTINGTILES AND CEILING TILE INSULATIONFOR RE-USE (TYP). EXISTING GWBCEILING SHALL REMAIN IN PLACEUNLESS OTHERWISE INDICATED.EXISTING LIGHT FIXTURES SHALL BEREMOVED FOR SALVAGE BYGC.LOCATION OF NEW SUSPENDEDCEILING SHA;LL REPLICATE EXISTINGFOR ORIENTATION AND LOCATION(TYP)2. SEE SHEET A9.03 FOR ADD'L REQ'TS(TYP)
5 REMOVE (E) GWB, FIXTURESAND EQUIPMENT TO ALLOWWORK AS OUTLINED ON S2.1
5
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
AS1.00
SITE PLAN
SITE PLAN
SCALE: 1/32" = 1' - 0"10
2 SITE CONDITIONS AT DRIVEWAYBASED ON INFORMATIONPROVIDED BY SCCD
1 SEE CIVIL DRAWINGS FORSITE ACCESS COMPLIANCEWORK
3 PARKING AS INDICATEDEQUALS 289 STALLS
SHEET NOTES:
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A1.01
ROOF PLAN
PROPOSED ROOF PLAN
SCALE: 1/8" = 1' - 0"10
1INSTALL (N) STANDING SEAM METAL ROOF OVER PROPERLY PREPARED SUBSTRATE PERMANF'RS RECOMMENDATIONS, REMOVE (E) COPING AND PREP/INSTALL FOR NEWCOPING/FLASHING AS REQ'D, SEE 01/A8.01 & 04/A8.02 FOR ADD'L DETAILS (TYP)
SHEET NOTES:
2 COORDINATE STRUCTURAL/MEP WORK, PROPERLY PATCH PREPARED SUBSTRATE ASINDICATED WITH BUR, USE MATRIX 307 PRIMER FOR TIE IN TO EXISTING ROOF, NAIL # 75BASE TO (E) WOOD DECK (REPLACE DAMAGED SUBSTRATE AS REQ'D), MOP 2 PLIES OF PLY 6
EACH SUBSEQUENT LAYER +6" OVER ALL SIDES (TYP), SEE DOCUEMENTS FOR ADD'L INFO.
3 REINSTALL PARAPET PORTION OF (E) ROOF LADDER AS REQ'D FOR USE, SEE GENNOTES AND INSTALL PER CCR TITLE 8, SEC 3277(TYP).
4 SEE DETAILS FOR EXISTING ROOF AT T.O.EQUIPMENT PAD AND PARAPET TO TIE INTONEW BUR, REPLACE DAMAGED PARAPET SHEET/SHINGLES (TYP)
5 REPLACE (E) ROOF DRAINS/OVERFLOW, SEE 11/A8.02 (TYP) - SPD
6INSTALL (N) EXTERIOR ROOF ACCESS HATCH, COORDINATE WITH ACCESS LADDERBELOW.
7DASHED LINES INDICATE PORTIONS OF CRICKETS AND EQUIPMENT PADS THATREQUIRE NEW WORK TO MATCH/CONFORM EXISTING TO ALLOW FOR PROPERDRAINAGE AND EQUIPMENT SUPPORT (TYP).
8 REINSTALL/INSTALL (N) EXHAUST FAN, REINSTALLATION OF EQUIPMENT NOTINDICATED ON EXISTING PAD, USE 10/A8.03 U.O.N. - TYP - SMD
GENERAL NOTES:
ALL ROOFING ASSEMBLIES SHALL BE REQUIRED TO BE A CLASS "A"ROOF ASSEMBLY AND TESTED IN ACCORDANCE WITH ASTM 108 OR UL790 AND COMPLY WITH THE REQUIRMENTS IN CBC 1505 (TYP).
FOR SHEET NOTE #3: BEFORE REATTACHING PARAPET PORTION OF (E)LADDER, CLEAN OUT (E) HOLES, USE WEDGE ANCHORS 1/2" DIA MIN,INSTALL PER S0.1 DETAILS FOR USE/LOAD (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
ROOF PLAN
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
PROPOSED ROOF PLAN - ADDITIVE ALTERNATE
SCALE: 1/8" = 1' - 0"10
1 INSTALL (N) STANDING SEAM METAL ROOFSHEET NOTES:
2 REPLACE (E) BUILT-UP ROOF (BUR) WITH NEW BUR (TYP). INSTALL (N) BUROVER PROPERLY PREPARED SUBSTRATE (INC. CRICKET). NAIL # 75 BASE TOWOOD DECK, MOP 2 PLIES OF PLY 6 PLY SHEET WITH TYPE III ASPHALT,
3 RE-INSTALL (E) ROOF ACCESS LADDER IF REQUIRED,RE-INSTALL PER TITLE 8, CCR SEC 3277(TYP).
4SEE DETAILS FOR EXISTING ROOF AT T.O.EQUIPMENT PAD AND PARAPET TO TIEINTO NEW BUR, REPLACE DAMAGED PARAPET SHEET/SHINGLES (TYP)
5REPLACE (E) ROOF DRAINS/OVERFLOW, SEE 11/A8.02 (TYP) - SPD
6 INSTALL (N) EXTERIOR ROOF ACCESS HATCH, COORDINATE WITH ACCESSLADDER LOCATION BELOW.
7DASHED LINES INDICATE PORTIONS OF CRICKETS AND EQUIPMENT PADSTHAT REQUIRE NEW WORK TO MATCH/CONFORM EXISTING TO ALLOW FORPROPER DRAINAGE AND EQUIPMENT SUPPORT (TYP).
A1.01 ALT
8REINSTALL/INSTALL (N) EXHAUST FAN, REINSTALLATION OFEQUIPMENT NOT INDICATED ON EXISTING PAD, USE 10/A8.03U.O.N. - TYP - SMD
GENERAL NOTES:
ALL ROOFING ASSEMBLIES SHALL BE REQUIRED TO BE A CLASS "A"ROOF ASSEMBLY AND TESTED IN ACCORDANCE WITH ASTM 108 OR UL790 AND COMPLY WITH THE REQUIRMENTS IN CBC 1505 (TYP).
FOR SHEET NOTE #3: BEFORE REATTACHING PARAPET PORTION OF (E)LADDER, CLEAN OUT (E) HOLES, USE WEDGE ANCHORS 1/2" DIA MIN,INSTALL PER S0.1 DETAILS FOR USE/LOAD (TYP).
USE (2) # 12 SSSCREWS PERCLIP (TYP)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
2
3
4
1
2
3
4
1
B C D E F
A
G
B C D E F
A
G
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A2.00
FLOOR PLAN
FLOOR PLAN
SCALE: 1/8" = 1' - 0"10
1 ADJUST (E) DOOR OPENERS AT ACCESSIBLE ENTRIES (2 TOTAL).
SHEET NOTES:
2REINSTALL (E) METAL COILING DOOR ASSEMBLY AND (E)LOWER PLAM COUNTER FOR ACCESS COMPLIANCE. SSDFOR MOUNTING DETAILS
3 CONFORM (N) CONC WITH EXISTING (SSD), PATCH IN(N)WALL/CEILING FRAMING, GWB (PREP/TAPE/PAINT),TRIM TO MATCH EXISTING. WHERE WORK OCCURS ATDOORS ,REINSTALL (E) DOORS W/ NEW FRAMING TOMATCH. NEW CARPET TILES SHALL BE REPLACED IN WHOLESQUARES ONLY (TYP).
4 REMOVE (E) SHORING ONLY AFTER SEOR CONFIRMS INWRITING WITH CONTRACTOR
5 ADD NEW FRAMING/FURRING, CONFORM WITH EXISTINGWALLS, INSTALL NEW GWB (TAPE/PREP/PAINT) TO MATCHEXISTING - SSD . IF CARPET TILES ARE DAMAGED, REPLACE INWHOLE SQUARES ONLY (TYP.)
REFER TO 07/A0.20 FOR ALL FIXTURE AND ACCESSORYMOUNTING HEIGHTS AND REQUIRMENTS (TYP).
GENERAL NOTES:
6PROVIDE SEMI-RECESSED FIRE EXTINGUISHER (FE) & FEC TOMATCH EXISTING CLASS A FE (TYP), MOUNT NO HIGHER THAN60" AFF FOR LESS THAN 40 LBS FE AND THE BOTTOM OF THE FENO LESS THAN 4" FROM THE FLOOR (TYP). PROVIDE 6 FE MIN .
6
6
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
D
33
DD
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A2.01
TOILET ROOMS 111 & 112
SCALE: 1/2" = 1' - 0"
10
TOILET ROOMS 122 & 123 - ADMIN AREA
SCALE: 1/2" = 1' - 0"
01
EXISTING DRINKING FOUNTAINS
SCALE: 3/4" = 1' - 0"
02
ENLARGED PLANS
TOILET ROOMS &
DRINKING FOUNTAINS
1
SHEET NOTES:
INSTALL ACCESSIBLE SINK CABINET, ADA ACCESSIBLE COUNTER, SINK AND FAUCET (SPD, PREP AND PAINT WALL ANDBASEBOARD TRIM TO MATCH EXISTING (TYP).
2 RE-SPACE AND RE-INSTALL (2) DRINKING FOUNTAINS B & C - SEE 02/D2.01 AND 02/A2.01, PROVIDE ALL NECESSARY BACKINGREQUIRED TO RE-HANG (E) DRINKING FOUNTAIN (TYP). RE-FRAME AND ADD (N) GWB TO MATCH (E), TAPE AND PAINT TO MATCH (TYP).
3 PROVIDE (N) CONCRETE SLAB WITH WP. BELOW, DOWEL (SEE SSD) AND CONFORM TO ALLOW (N) TILE TO ALIGN WITHEXISTING ADJACENT FLOOR. NEW TILE/GROUNT TO MATCH (E) TYP.
4 MOVE AND REINSTALL ALL ACCESSORIES/GRAB BARS, MIRRORS, PROVIDE ADEQUATE BACKING FOR ALL WALL MTD. WORK TYP. USEBACKING FOR MED. LOADS (MIN) 04/A9.01 WITH 3-#10 SCREWS MIN AT ENDS TO SUPPORT MIN LOAD OF 250LBS.
6 REHANG (E) MIRRORS TO BE HEIGHT COMPLIANT SEE A5.01.
5 REINSTALL TWO (2) EXISTING TOILETS (SPD), AND ALL ADJACENT ACCESSORIES, GRAB BARS, CARRIERS, WASTE LINES, WATER SUPPLYLINES TO NEW LOCATION AS SHOWN FOR ACCESS COMPLIANCE. INSTALL NEW WALL FRAMING/GWB, TILE WALL/FLOOR (TO MATCHEXISTING), PROVIDE BACKING AS REQ'D TO RE-ATTACH EXISTING ACCESSORIES AND GRAB-BARS (TYP.).
7 MOVE TOTAL OF 5 (FIVE) ACCESSORIES TO BE COMPLIANT. - SEE A5.01
8 PARTITION DOOR AT WOMEN RESTROOM 112 TO BE MOVED 4" DOWN TO PROVIDE 18" CLEAR SPACE AT OPENING,RE-HAND (E) DOOR TO ALLOW IN-SWING, PROVIDE DOOR HARDWARE TO ALLOW AS REQ'D.
9 PROVIDE CARPET TILES AND BASE TRIM AS REQUIRED. REINSTALL ALL WALL ACCESSORIES AS REQ'D, PREP/PAINT (N)WALL/TRIM TO MATCH EXISTING. ONLY REPLACE CARPET TILES IN WHOLE SQUARES ONLY (TYP).
10 INSTALL (N) ROOF ACCESS HATCH AT ROOM ABOVE 122, SEE 10/A8.03.
PLENUM PLATFORM ABOVE BATHROOM
SCALE: 3/4" = 1' - 0"
03
6
6
9
9
11 CONFORM NEW CONC SLAB WITH EXISTING, ADD DOWELS/WATERPROOFING AS REQ'D (SSD), PATCH IN AND WELDSEAMS AT NEW SHEET VINYL TO MATCH EXISTING AT FLOOR AND COVE BASE (TYP.) INSTALL NEW FRAMING GWB(COMPLIANT WITH TOILET ROOM) AND PATCH/PREP/PAINT TO MATCH EXISTING. REINSTALL ALL ACCESSORIES FORCOMPLIANCE FOR ACCESS (WITH BACKING) AND REINSTALL (E) TOILETS tYP.).
DASHED OUTLINEOF PANEL ABOVE
DASHED OUTLINEOF LEVEL LANDING
DASHED OUTLINEOF LEVEL LANDING
DASHED OUTLINEOF LEVEL LANDING
DASHED OUTLINEOF LEVEL LANDING
DASHED OUTLINEOF LEVEL LANDING
DASHED OUTLINEOF LEVEL LANDING
GEN NOTE:
NO STUDENT ACCESS TO
ATTIC OR ROOF ABOVE (TYP)
GENERAL NOTE: REFER TO07/A0.20 FOR ALL FIXTUREAND ACCESSORY MOUNTINGHEIGHTS AND REQUIRMENTS(TYP).
SEE S2.1 FOR FRAMING
REQUIREMENTS FOR
PLATFORM. TEMPORARILY
REMOVE AND RE-INSTALL (E)
EQUIPMENT IF REQ'D FOR
NEW FRAMING AND
SUPPORT (TYP)
16"
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
BC
E
ABC
DEF
A
G
A3.00
EXTERIOR
ELEVATIONS
EXISTING NORTH ELEVATIONS13
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
SCALE: 1/8" = 1' - 0"
EXISTING SOUTH ELEVATIONS12SCALE: 1/8" = 1' - 0"
EXISTING WEST ELEVATIONS11SCALE: 1/8" = 1' - 0"
EXISTING EAST ELEVATIONS10SCALE: 1/8" = 1' - 0"
1(N) BOLT CONNECTIONS ATCONCRETE PANEL - SEE 1/A8.04 -SSD
SHEET NOTES:
2NEW FLASHING/CEMENTPLASTER/WATERPROOFING ASREQ'D TO INSTALL NEW ROOF-SEE4/A8.01 (TYP.)
3 WHERE METAL ROOF TERMINATESINTO (E) WALL, PROVIDEAPPROPRIATEFLASHING/COUNTERFLASHING ASREQ'D PER MFR'SRECOMMENDATIONS(TYP).
GENERAL NOTES:
ALL ROOFING ASSEMBLIES SHALLBE REQUIRED TO BE A CLASS "A"ROOF ASSEMBLY AND TESTED INACCORDANCE WITH ASTM 108 ORUL 790 AND COMPLY WITH THEREQUIRMENTS IN CBC 1505 (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A3.01ALT
PARAPET ELEVATIONS
EXISTING NORTH ROOF ELEVATIONS13SCALE: 1/4" = 1' - 0"
EXISTING SOUTH ROOF ELEVATIONS12SCALE: 1/8" = 1' - 0"
EXISTING WEST ROOF ELEVATIONS10SCALE: 1/8" = 1' - 0"
EXISTING EAST ROOF ELEVATIONS11SCALE: 1/4" = 1' - 0"
SCALE: 1/4" = 1' - 0"
1
SHEET NOTES:
2
(E) ROOF LADDERATTACHMENTS - REMOVEAND RE-INSTALL AS REQ'DTO RE-ROOF PARAPET, SEENOTE #3/A1.01
REMOVE COPING AND PREP FORNEW METAL ROOF AS SHOWN. NEWCOPING AND RELATED FLASHING ISREQUIRED FOR NEW METAL ROOFAND SHALL BE INCLUDED IN BASEBID, SEE 01/A8.01FOR TYPICALSCOPE.
3 REMOVE (E) ROOF DRAINSAND INSTALL NEW DRAINS -SPD (TYP.)
3
3
3
3
3
3
4 EXISTING PARAPETWATERPROOFING TOREMAIN EXCPET IN AREAS ASNOTED. INSPECT AND PATCHAREAS OF EXISTING PARAPETTHAT APPEAR TO REQUIREREPAIR (TYP)
4
4
4
4
4
GENERAL NOTES:
ALL ROOFING ASSEMBLIES SHALLBE REQUIRED TO BE A CLASS "A"ROOF ASSEMBLY AND TESTED INACCORDANCE WITH ASTM 108 ORUL 790 AND COMPLY WITH THEREQUIRMENTS IN CBC 1505 (TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
A5.01
PROPOSED
ELEVATIONS
PROPOSED ELEVATIONS - WOMEN'S RESTROOM 11213
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
ISSUE FORREVIEW
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
PROPOSED ELEVATIONS - DRINKING FOUNTAINS
SCALE: 3/8" = 1' - 0"10
PROPOSED ELEVATIONS - MEN'S RESTROOM 111
SCALE: 3/8" = 1' - 0"12
SCALE: 3/8" = 1' - 0"
SCALE: 3/8" = 1' - 0"11 PROPOSED ELEVATIONS - ADMIN UNISEX RESTROOM122
SCALE: 3/8" = 1' - 0"05 PROPOSED ELEVATIONS - ADMIN UNISEX RESTROOM 123
04 PROPOSED - ADMIN SINK 121SCALE: 3/8" = 1' - 0"
1 PROVIDE (N) GWB/TILE (TO MATCH) EXISTING PAINT & TILE (TYP).
SHEET NOTES:
2 PROVIDE (N) BACKING IN WALLS SUFFICIENT TO RE-LOCATE (E)ACCESSORIES & GRAB BARS (TYP).
3 ADJUST HEIGHT OF ACCESSORIES TO COMPLY WITH REQUIREDADA HEIGTHS.
4 PROVIDE AND INSTALL (N) UNISEX RESTROOM SIGNS.
5 NEW AREA OF WALL TO BE REBUILT, CONTRACTOR SHALL ACCOUNTFOR EXTENT OF SCOPE BASED ON DEMO SCOPE. CONTRACTORSHALL REPLACE/REINSTALL ANY DEVICES, FIXTURES ANDACCESSORIES ON BOTH SIDES OF THE WALLS. ALL FINISHES,MATERIALS AND COLORS SHALL MATCH EXISTING ON BOTHSSIDESOF THE WALLS (TYP).
6 GENERAL NOTE: SEE 07/A0.20 FOR ADD'D ACCESSCOMPLIANCE INFORMATION AS REQ'D FOR SCOPE SHOWN(TYP)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A6.00
REFLECTED
CEILING PLAN
RCP
SCALE: 1/8" = 1' - 0"10
1 GEN NOTE: SED FOR ADDITIONALINFORMATION FOR LIGHTING ANDCONTROLS (TYP).
SHEET NOTES:
2 WALL LOCATION WILL SHIFT,ADJUST NEW CEILING GRIDACCORDINGLY TO ALLOW FOREXISTING FP/FIXTURES (TYP)
3 GEN. NOTE: REINSTALL SALVAGEDCEILING TILES AND INSULATIONTILES (ABOVE) IN NEW SUSPENDEDCEILING GRID (TYP).
4 GEN. NOTE: REPLACEDAMAGED TILES ANDINSULATION TILES (ABOVE)WHERE DAMAGED (TYP).
GEN. NOTE: WHERE GWBCEILING IS DISTURBED BY NEWSCOPE OF WORK, PATCH INNEW GWB, PREP/PAINT TOMATCH EXISTING (TYP).
5
1. RE-INSTALL ALL CEILINGMOUNTED PROJECTORS, SCREENS,ROUTERS AND SENSORS TOEXISTING LOCATIONS. PROVIDEPOWER & DATA CONNECTIONSFOR ALL REINSTALLED DEVICESAND RESTORE TO WORKINGORDER.lOCATIONS SHOWN ONPLAN MAY BE DIAGRAMMATIC,RE-INSTALL TO ORGINAL LOCATIONUON (TYP)
ALL LIGHTWEIGHT MISCELLANEOUSDEVICES, SUCH AS STROBE LIGHTS,OCCUPANCY SENSORS,SPEAKERS, EXIT SIGNS, ETC., SHALLBE ATTACHED TO THE CEILINGGRID. IN ADDITION, DEVICESWEIGHING MORE THAN 10 LBS.SHALL HAVE A #12 GAGE SLACKSAFETY WIRE ANCHORED TO THESTRUCTURE. DEVICESWEIGHING MORE THAN 20 LBS.SHALL BE SUPPORTED FROM THESTRUCTURE ABOVE USING DETAILSPROVIDED BY THE REGISTEREDDESIGN PROFESSIONAL.
2. SEE ELECTRICAL, MEP, FP AND FAFOR ADDITONAL DEVICES AS PARTOF PROJECT SCOPE (TYP).
3. SEE A9.03 FOR ADD'L DETAILS(TYP)
GENERAL NOTES:
IN RM #122: NEW GWB,PROVIDE FOR REINSTALLATIONOF EXISTING FIXTURES ANDEQUIPMENT. TAPE, PREP ANDMATCH (E) FINISH AND PAINT.SEE S2.1 DOE SCOPE OF WORK
6
6
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A8.00EXT. DETAILS
03 PARTIAL ELEVATION AT EXISTING ROOF/WALLSCALE: 3/4" =1'-0"
02 PARTIAL ELEVATION AT STANDING METAL SEAM ROOF/WALLSCALE: 3/4" =1'-0"
01 PARTIAL PLAN AT STANDING METAL SEAM ROOFSCALE: 3/4" =1'-0"
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A8.00EXT. DETAILS
03 PARTIAL ELEVATION AT EXISTING ROOF/WALLSCALE: 3/4" =1'-0"
02 PARTIAL ELEVATION AT STANDING METAL SEAM ROOF/WALLSCALE: 3/4" =1'-0"
01 PARTIAL PLAN AT STANDING METAL SEAM ROOFSCALE: 3/4" =1'-0"
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
1.
REFER TO TECHNICAL INFORMATION SHEETS2.FOR FASCIA SIZES, ACCESSORIES, AND FINISHES
3. WOOD NAILER MUST BE INSTALLED TO MEETAPPLICABLE BUILDING CODES OR 200 LBS PERLINEAR FOOT MINIMUM IN ANY GIVEN DIRECTION.
AVAILABLE.
REFER TO FIRESTONE WEBSITE FOR MOSTCURRENT INFORMATION.
4. REFER TO THE FIRESTONE TECHNICAL DATABASEFOR FASTENER COMPATIBILITY WITH METAL.
APPLICATION DETAILS ARE FOR ILLUSTRATIONPURPOSES ONLY AND MAY NOT BE APPROPRIATEFOR ALL BUILDING DESIGNS AND CONDITIONS.
5.
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
04 FIXED HEAD WALLA8.01
EXT.DETAILS
01 FIXED HIGH EAVE03 METAL ROOF EAVE AT DRIP EDGE (TYP)SCALE: 3" = 1'-0"
06 METAL ROOF EAVE AT GUTTER (TYP)SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
WHERE GUTTER TERMINATES INTO E)WALL, PROVIDE APPROPRIATE FLASHINGAND COUNTERFLASHING AS REQ'D PREMFR'S RECOMMENDATIONS (TYP).
WHERE EAVE TERMINATES INTO E) WALL,PROVIDE APPROPRIATE FLASHING ANDCOUNTERFLASHING AS REQ'D PRE MFR'SRECOMMENDATIONS (TYP).
#8 SS WOODSCREW @8"O.C., EMBED1-1/2" TYP
#8 SS WOOD SCREW @8"O.C., EMBED 1-1/2" TYP
#8 SS WOOD SCREW @
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
1" M
IN.
SUBSTRATE SUBSTRAT
E
3" (76.2 mm) MIN.
PREVAILINGWIND
3
"
(
7
6
.
2
m
m
)
M
I
N
.
SUBSTRATESUBSTRATE
04 MTL ROOF AT RAKE (TYP)
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A8.02EXT. DETAILS
01 MTL ROOF AT VALLEY (TYP)SCALE: 3" = 1'-0"NTS
10 MTL ROOF AT RIDGE (TYP)NTS
11 ROOF DRAIN FLASHING AT BUR (TYP) - SPD (P2.2) FOR OVERFLOW 06 BUR ROOF PENETRATIONS (TYP)SCALE: 3" = 1'-0"NTS USE FOR TYPICAL ROOF PENETRATIONS U.O.N.
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
SLO
PE
STEP 1 STEP 2
STEP 3 STEP 4
S
lo
p
e
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A8.03EXT. DETAILS
04 ROOF/PARAPET CONNECTION (TYP)SCALE: 3" = 1'-0"
SCALE: 6" = 1'-0"08 BUR AT EQUIPMENT SUPPORT (TYP)
SCALE: 3" = 1'-0"11 TYPICAL BUR DETAILS AT CORNERS
SCALE: 3" = 1'-0"12 TYPICAL BUR - PLY SEQUENCE
07 COPING/ROOF AT LOWER ROOF /CONC WALL (TYP)SCALE: 3" = 1'-0"
INSTALL PER MFR'S RECOMMENDATION
INSTALL PER MFR'S RECOMMENDATION
NTS03 ROOF HATCH ROOFING DIAGRAM
TYPICAL BUR DETAILS AT CORNERS
SCALE: 3" = 1'-0"10
1`-1/2" MIN EMBED(TYP)
#8 X 1-1/2" SSSCREW (TYP)
#8" SS WOOD SCREW W/1-1/2"MIN EMBED @ 12" O.C. (TYP).
TOE-NAIL ALL CRICKET SUPPORT WITH 10D @6" O.C. (TYP)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
SCALE: 1-1/2" = 1' - 0"10 ROOF HATCH SECTION A8.04
EXT. DETAILS
SCALE: 1-1/2" = 1' - 0"03 BOLLARD BASE DETAIL - SECTION - SCD
(REFERENCE 2/E0.1 - FROM SCCD SET 8-28-1995)
SCALE: 3" = 1' - 0"01 ANCHOR BOLT AT EXT WALL - SSD
SCALE: 1-1/2" = 1' - 0"11 ROOF HATCH PLAN
SCALE: NTS08 SAFETY POLE/LADDER AT HATCH (TYP)
SEE 8 & 11 / A8.04 & 3/A8.03 FOR ADD'L REQUIREMENTS (TYP)
SEE MNR'S RECOMMENDATIONS FOR ADDITIONALDETTAILS FOR FRAMING SUPPORT, FLASHING ANDCLEARANCES ADJACENT TO WALL/SCURBS TOENSURE APPROPRIATE WATERPROOFING (TYP).
GENERAL HATCH AND LADDER REQUIREMENTS PER 2016 CMC AND CEC, & CCR DIV 8, SEC 3277 (TYP):
1. PER CMC 904.10.3.3 ACCESS DOORS SHALL BE AT LEAST TWENTY-TWO (22) INCHES X TWENTY-FOUR (24)
INCHES IN SIZE, SHALL OPEN EASILY AND SAFELY UNDER ALL CONDITIONS, ESPECIALLY SNOW, AND SHALL BE
CONSTRUCTED SO AS TO PERMIT ACCESS FROM THE ROOF SIDE UNLESS DELIBERATELY LOCKED ON THE
INSIDE. AT LEAST SIX (6) FEET OF CLEARANCE SHALL BE AVAILABLE BETWEEN THE ACCESS OPENING AND THE
EDGE OF THE ROOF OR SIMILAR HAZARD (TYP).
2. ALL RUNGS SHALL HAVE A MINIMUM DIAMETER OF 3/4 INCH FOR METAL LADDERS. THE DISTANCE BETWEEN
THE TOP SURFACES OF RUNGS, CLEATS, AND STEPS SHALL NOT EXCEED 12 INCHES AND SHALL BE UNIFORM
THROUGHOUT THE LENGTH OF THE LADDER EXCEPT THE VERTICAL DISTANCE OF THE FIRST RUNG FROM
GROUND LEVEL MAY BE AS HIGH AS 14 INCHES. METAL LADDERS AND APPURTENANCES SHALL BE PAINTED OR
OTHERWISE TREATED TO RESIST CORROSION AND RUSTING WHEN LOCATION DEMANDS.
3. THE MINIMUM DESIGN LIVE LOAD SHALL BE A SINGLE CONCENTRATED LOAD OF 300 POUNDS.
4. ALL HATCH COVERS SHALL OPEN A MINIMUM OF 60 DEGREES FROM THE HORIZONTAL. THE DISTANCE FROM
THE CENTER LINE OF RUNGS OR CLEATS TO THE EDGE OF THE HATCH OPENING ON THE CLIMBING SIDE SHALL
BE NOT LESS THAN 24 INCHES FOR OFFSET WELLS OR 30 INCHES FOR STRAIGHT WELLS.
1/4" SS WOOD SCREW
3" MIN EMBED (TYP)
VARIES VIF
2-1/2"x1/4" MTL STRAP@4'-0" O.C. OF LADDER LENGTH, USE 3/8"WEDGE ANCHOR SSD FOR EMBED. @ CONC.WALL. , USE 1/4" BOLT AT LADDER (TYP)
2-1/2x1/4" MTLANGLE TO FASTEN LADDERTO (E) PLYWD SUBSTRATE,1/4" THRU BOLT TO LADDER,LAG ANGLE TO FLOOR (TYP)
1/4" SS WOODSCREW W/ 3"EMBED. ATHOLES PROVIDED(TYP).
1/4" SS WOOD SCREW @ 8" OC W/ 2-1/2" EMBED (TYP)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A9.00INTERIORDETAILS
SCALE: 1-1/2" = 1' - 0"01 SECTION @ACCESSIBLE SINK & COUNTERTOP
SCALE: 1-1/2" = 1' - 0"04 SECTION @ADMIN OFFICE COILING SHUTTER
SCALE: 3/4" = 1' - 0"06 PARTIAL PLAN @ADMIN OFFICE COILING SHUTTER
SCALE: 1-1/2" = 1' - 0"10 PARTIAL ELEVATION @ADMIN OFFICE COILING SHUTTER
SCALE: 3" = 1' - 0"14 TYPICAL JAMB DETAIL AT COILING DOOR
2"x1/8" CONT. MTL ANGLE TOATTACH CABINET BASE AT SIDESTO FLOOR, USE #8 WD SCREWSAT 8" AT WOOD SIDE (DO NOTPENETRATE OUTER FACE) AND3/16" CONC SCREWS AT 8" O.C.PREDRILLED HOLES (TYP).
ATTACH WITH#8 SMSCREWSTHROUGHMED-DUTYBACKING PER4/A0.01 @8"O.C. (TYP)
PROVIDE 2"x1/4" CONTMTL ANGLE SUPPORT@ EDGE (TYP), USE 1/4"LAG ANCHOR EA END (TYP)
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
SCALE: 3" = 1' - 0"10 NON - RATED WALL SECTION A9.01
INTERIORDETAILS
NTS07 BACKING PLATE LIGHT LOADS
NTS04 BACKING PLATE - MOD LOADS
NTS01 BACKING PLATE - HEAVY LOADS
SCALE: 1/4"=1'-0"08 TYPICAL WALL FRAMING CONTRACT
SCALE: 6"=1'-0"05 PARTIAL WALL SECTION
SCALE: 3" = 1' - 0"12 WALL SECTION @ (N) WALL RESTROOMS 111&112
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A9.02INTERIORDETAILS
SCALE: 3/4" = 1'-0"10 PARTIAL ELEVATION 07 PLAN VIEW
SCALE: 3/4" = 1'-0"
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
NTS02 COMPRESSION STRUT DETAIL (TYP)
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA BACKCHECK
A9.03INTERIORDETAILS
NTS05 HANGER GRID DETAIL (TYP)
NTS11 PERIMETER DETAILS (TYP.)
NTS10 ACCEPTABLE DETAILS - WIRE CONNECTIONS TO WOOD FRAMING
12 SUSPENDED CEILING - EXPANSION DETAILS (TYP.)NTS
06 SUSPENDED CEILING - EXITWAYS DETAILS (TYP.)NTS
1. CBC SECTION 1615A1.16 (1615.10.13*) REQUIRES THE DESIGNAND INSTALLATION TO BE IN COMPLIANCE WITH ASTM C635,C636, AND E580, SECTION 5, AS AMENDED BY 2010 CBCSECTION 1615A.1.16 (1615.10.13*).
2. NOTE: AMENDMENTS IN CBC SECTION 1615A.1.16 (1615.10.13*)REPLACE ASCE 7, SECTION 13.5.6.
3. THE REQUIREMENTS IN THIS IR APPLY TO FLAT AND LEVELCEILING SYSTEMS WHOSE TOTAL WEIGHT INCLUDING CEILINGMOUNTAED AIR TERMINALS, SERVICES AND LIGHT FIXTURES, DOESNOT EXCEED FOUR (4) PSF. HEAVY SYSTEMS, SYSTEMS THAT ARENOT FLAT AND LEVEL, AND THOSE SUPPORTING LATERAL LOADSFROM PARTITIONS ARE BEYOND THE SCOPE OF THIS IR ADN WILLREQUIRE SPECIAL DESIGN DETAILS.
4. USE TYPE S-12, 1" LONG, SELF DRILLING/TAPPING SCREW,FASTEN AT STRUCTURE, APPROX 16" OC AT 2" STANDARD 2" X 2"WALL LEDGER ANGLE TO CONNECT CEILING ASSEMBLY TO TOWALL (TYP).
GENERAL NOTES:
NTS05A COMPRESSION STRUT SIZING CHART (TYP)
USE TYPE S-12, 1" LONG, SELF DRILLING/TAPPING SCREW, FASTENAT STRUCTURE, APPROX 16" OC AT 2" STANDARD 2" X 2" WALLLEDGER ANGLE TO CONNECT CEILING ASSEMBLY TO TO WALL(TYP).
USE TYPE S-12, 1" LONG, SELF DRILLING/TAPPING SCREW, FASTENAT STRUCTURE, APPROX 16" OC AT 2" STANDARD 2" X 2" WALLLEDGER ANGLE TO CONNECT CEILING ASSEMBLY TO TO WALL(TYP).
AC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
BUILDING STANDARD QUAD / DUPLEX RECEPTACLE
LIGHTING CONTROL PANEL
BUILDING STANDARD CEILING/WALL
WALL MOUNTED / CEILING
SHEET NOTE TAG.
DATA / VOICE OUTLET BOX AT 18" AFF TO CENTER OF BOX.
DIMMING SWITCH AT 48" AFF TO TOP OF BOX
SURFACE / FLUSH MTD. PANELBOARD.
LIGHT SWITCH AND SWITCH LEG IDENTIFICATION AT
SPLIT-WIRED DUPLEX RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE
CEILING MOUNTED EXIT LIGHT
RECEPTACLE ON DEDICATED CIRCUIT AT 18" AFF TO
BUILDING STANDARD HORSEPOWER RATED SWITCH.
CEILING MOUNTED RECEPTACLE.
AT 18" AFF TO CENTER OF BOX, U.O.N
LEVITON 1221-2W, 20A, 120/277V AT 48" AFF TO TOP OF BOX
BUILDING STANDARD STROBE.
FLOOR MOUNTED DATA / VOICE OUTLET BOX
MOUNTED STROBE HORN.
208 VOLT RECEPTACLE
TELEPHONE CABINET
EQ
X
EQUIPMENT TAG
LOW LEVEL WALL MOUNTED EXIT LIGHT
MOUNTED JUNCTION BOX.
FLOOR MOUNTED RECEPTACLE.
LEVITON T5825-W, 20A, 125V
AT 18" AFF TO CENTER OF BOX.
ENERGEBCY POWER OFF BUTTON
WITH COVER
EMON DMON WATT METER
48"AFF TO TOP OF BOX
CENTER OF BOX, U.O.N.
CEILING HEAT DETECTOR
240 VOLT RECEPTACLE
LIGHTING DAYLIGHT SENSOR
LIGHTING NETWORK BRIDGE
LIGHTING ROOM/ZONE CONTROLLER
OCCUPANCY SENSOR
EMERGENCY LIGHT WITHBATTERY BACK UP
GENERAL NOTES,
ABBREV. & LEGEND
E0.10
NO SCALE
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA RESUBMIT
DSA RESUB. SET
ISSUE FORREVIEWAC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
ELECTRICAL SPECIFICATIONS
ELECTRICAL
SPECIFICATIONS
E0.11
NO SCALE
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA RESUBMIT
DSA RESUB. SET
ISSUE FORREVIEWAC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
ENERGY
COMPLIANCE FORMS
E0.30
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STAMP
OWNER:
ARCHITECT:
SHEET LEGEND:
PROJECT:
CONSULTANT TEAM:
Solano Community College District2000 North Village ParkwayVacaville, CA 95688
Vacaville Classroom Building(Annex) Renovation Project
04/25/2017 ISSUE FOR DD 100%
06/06/2017 ISSUE FOR CD 50%
06/30/2017 ISSUE FOR CD 60%
07/20/2017 ISSUE FOR CD 100%
10/18/2017 DSA RESUBMIT
DSA RESUB. SET
ISSUE FORREVIEWAC_______ FLS _____ SS ____
DATE: ________________________
IDENTIFICATION STAMPDIVISION OF THE STATE ARCHITECT
JCC GBC GBC
PVL
FILE: 48-C1
02-116082
10/31/2017
ENERGY
COMPLIANCE FORMS
E0.40
DATE: DESCRIPTION:NO:
DATE:PROJECT NO:PERMIT APPLICATION NO.:
SCALE:
ISSUE/REVISION:
KEY PLAN:
CA ARCHITECTS475 Gate Five Road, Suite 107Sausalito, CA 94965T 415.331.7655F 415.331.7656
STA