17

Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline: History: Status of 2009 cleaning Foreseen and

Embed Size (px)

Citation preview

Page 1: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and
Page 2: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 2

Cleanness of the 3-4 cold beam lines

Outline:

History: Status of 2009 cleaning Foreseen and additional activities on cold beam lines. Inspection and cleaning activities in sector 3-4 during LS1

Activity sequence Procedure Schedule

Conclusion

2 August 2013

C. Garion on behalf of TE/VSC with materials of Vincent Baglin

Page 3: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 3

History: Beam vacuum line cleanness in sector 3-4 after incident

2 August 2013

LSS3 LSS4

V1 V2 V1 V2 Total

Ok 54 39 26 % 18 % 22 %

MLI 124 129 58 % 61 % 59 %

Soot 35 45 16 % 21 % 19 %

Total 213 213 100 % 100 % 100 %

MLI

Contamination types:• MLI• Soot• (Debris)

Contamination distribution:Soot

Page 4: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 4

History: Cleaning methods after 3-4 incident (1)

2 August 2013

Foam plugs for the soot: Use of two plugs for horizontal and vertical parts of the beam screen Use of alcohol-wetted and dry foam plugs Up to 50 passages in each direction with wet foam plug and up to 15

passages with dry plug

Example of C19R3.V2

Page 5: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 52 August 2013

History: Cleaning methods after 3-4 incident (2)

Air flux for the MLI: 1st step: automatic pumping/venting

A cycle : 20 s pumping, 18 s plateau, 2 second vent The pressure is reduced from 1 atm to 0.8 atm in 2 s (to be compared to the arc pump down of 200 mbar/h) Apply this process for 30 min (40 pumping/venting cycles)

2nd step: aspiration with local pertubation controlled by endoscope nozzle blows filtered air, the MLI residues left behind the beam screen and the

RF fingers are directed towards the beam aperture where they are aspired away. Time : 5 min per PIM, speed of 3 m/min along the beam screen

Page 6: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 62 August 2013

History: cleanness after 3-4 incident

Acceptance criteria:After discussion with AB-ABP and following Chamonix it was agreed with the management that :- 1 fibre per half-cell - 2 debris (MLI or other less than 1 mm2) per magnet can be left in the beam tube after the cleaning process !

Few pictures of non-conformities:

Q29L4 V1 Q34R3 V1 A32L4 V1

Page 7: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 7

Foreseen activities on cold beam lines (at the LS1 start).

2 August 2013

QBB

I.B34L

QBB

I.A34L

QBQ

I.34L

QQBI.33L

QBB

I.B33L

QBB

I.A33L

QBQ

I.33L

QQBI.32L

QBB

I.B32L

QBB

I.A32L

QBQ

I.32L

Q31

LQQBI.31L

QBB

I.B31L

QBB

I.A31L

QBQ

I.31L

QQBI.30L

QBB

I.B30L

QBB

I.A30L

QBQ

I.30L

QQBI.29L

QBB

I.B29L

QBB

I.A29L

QBQ

I.29L

QQBI.28L

QBB

I.B28L

QBB

I.A28L

QBQ

I.28L

Q27

LQQBI.27L

QBB

I.B27L

QBB

I.A27L

QBQ

I.27L

QQBI.26L

QBB

I.B26L

QBB

I.A26L

QBQ

I.26L

QQBI.25L

QBB

I.B25L

QBB

I.A25L

QBQ

I.25L

QQBI.24L

QBB

I.B24L

QBB

I.A24L

QBQ

I.24L

Q23

LQQBI.23L

QBB

I.B23L

QBB

I.A23L

QBQ

I.23L

QQBI.22L

QBB

I.B22L

QBB

I.A22L

QBQ

I.22L

QQBI.21L

??QBB

I.B21L

QBB

I.A21L

QBQ

I.21L

QQBI.20L

??QBB

I.B20L

QBB

I.A20L

QBQ

I.20L

Q19

LQQBI.19L

QBB

I.B19L

QBB

I.A19L

QBQ

I.19L

QQBI.18L

QBB

I.B18L

QBB

I.A18L

QBQ

I.18L

QQBI.17L

QBB

I.B17L

QBB

I.A17L

QBQ

I.17L

QQBI.16L

QBB

I.B16L

QBB

I.A16L

QBQ

I.16L

Q15

LQQBI.15L

QBB

I.B15L

QBB

I.A15L

QBQ

I.15L

QQBI.14L

QBB

I.B14L

QBB

I.A14L

QBQ

I.14L

QQBI.13L

QBB

I.B13L

QBB

I.A13L

QBQ

I.13L

QQBI.12L

QBB

I.B12L

QBB

I.A12L

QBQ

I.12L

Q11

LQQEI.11L

QEBI.11L

QBB

I.11L

QBQ

I.11L

QQBI.10L

QBB

I.10L

QBQ

I.10L

QQBI.9L

QBB

I.9L

QBQ

I.9L

QQBI.8L

QBB

I.8L

QBQ

I.8L

QQDI.7L

4 Magnet exchanges

Damaged bellows (PIM cutting to be confirmed at opening: not to be changed)

Point 3

Point 4

Preventive PIM (extremity)

Preventive PIM (near by damaged or buckled PIM)

Damaged PIM (tbc)

Buckled PIM

Interconnect to dissaembled (Magnet change)

UFO

Heat loads

Tomograph

Endoscopy (max 54 m)

Sector alreay warmed-up in the past

B2B1

SSS

with

VB

V1V2

QDQ

I.7R

QQBI.7R

QBB

I.8R

QBQ

I.8R

QQBI.8R

QBB

I.9R

QBQ

I.9R

QQBI.9R

QBB

I.10R

QBQ

I.10R

QQBI.10R

QBB

I.11R

QBEI.11R

QEQ

I.11R

Q11

QQBI.11R

QBB

I.A12R

QBB

I.B12R

QBQ

I.12R

QQBI.12R

QBB

I.A13R

QBB

I.B13R

QBQ

I.13R

QQBI.13R

QBB

I.A14R

QBB

I.B14R

QBQ

I.14R

QQBI.14R

QBB

I.A15R

QBB

I.B15R

QBQ

I.15R

Q15

QQBI.15R

QBB

I.A16R

QBB

I.B16R

QBQ

I.16R

QQBI.16R

QBB

I.A17R

QBB

I.B17R

QBQ

I.17R

QQBI.17R

QBB

I.A18R

QBB

I.B18R

QBQ

I.18R

QQBI.18R

QBB

I.A19R

QBB

I.B19R

QBQ

I.19R

Q19

QQBI.19R

QBB

I.A20R

QBB

I.B20R

????

QBQ

I.20R

QQBI.20R

QBB

I.A21R

QBB

I.B21R

QBQ

I.21R

QQBI.21R

QBB

I.A22R

QBB

I.B22R

QBQ

I.22R

QQBI.22R

QBB

I.A23R

QBB

I.B23R

QBQ

I.23R

Q23

QQBI.23R

QBB

I.A24R

QBB

I.B24R

QBQ

I.24R

QQBI.24R

QBB

I.A25R

QBB

I.B25R

QBQ

I.25R

QQBI.25R

QBB

I.A26R

QBB

I.B26R

QBQ

I.26R

QQBI.26R

QBB

I.A27R

QBB

I.B27R

QBQ

I.27R

Q27

QQBI.27R

QBB

I.A28R

QBB

I.B28R

QBQ

I.28R

QQBI.28R

QBB

I.A29R

QBB

I.B29R

QBQ

I.29R

QQBI.29R

QBB

I.A30R

QBB

I.B30R

QBQ

I.30R

QQBI.30R

QBB

I.A31R

QBB

I.B31R

QBQ

I.31R

Q31

QQBI.31R

QBB

I.A32R

QBB

I.B32R

QBQ

I.32R

QQBI.32R

QBB

I.A33R

QBB

I.B33R

QBQ

I.33R

Q33

RQQBI.33R

QBB

I.A34R

QBB

I.B34R

??QBQ

I.34R

QQBI.34L

3-4

«standard» endoscopy (54 m in one direction per line)

Page 8: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 8

Foreseen and additional activities on cold beam lines.

2 August 2013

New opening: • QBBI.A14R3 (V2); • QBBI.A20R3 (V2)

Point 3

2 additional openings are asked for inspection and investigation (Endoscopy). Extended endoscopies. Air flux for MLI removal

SSS

with

VB

V1V2

QDQ

I.7R

QQBI.7R

QBB

I.8R

QBQ

I.8R

QQBI.8R

QBB

I.9R

QBQ

I.9R

QQBI.9R

QBB

I.10R

QBQ

I.10R

QQBI.10R

QBB

I.11R

QBEI.11R

QEQ

I.11R

Q11

QQBI.11R

QBB

I.A12R

QBB

I.B12R

QBQ

I.12R

QQBI.12R

QBB

I.A13R

QBB

I.B13R

QBQ

I.13R

QQBI.13R

QBB

I.A14R

QBB

I.B14R

QBQ

I.14R

QQBI.14R

QBB

I.A15R

QBB

I.B15R

QBQ

I.15R

Q15

QQBI.15R

QBB

I.A16R

QBB

I.B16R

QBQ

I.16R

QQBI.16R

QBB

I.A17R

QBB

I.B17R

QBQ

I.17R

QQBI.17R

QBB

I.A18R

QBB

I.B18R

QBQ

I.18R

QQBI.18R

QBB

I.A19R

QBB

I.B19R

QBQ

I.19R

Q19

QQBI.19R

QBB

I.A20R

QBB

I.B20R

QBQ

I.20R

QQBI.20R

QBB

I.A21R

QBB

I.B21R

QBQ

I.21R

QQBI.21R

QBB

I.A22R

QBB

I.B22R

QBQ

I.22R

QQBI.22R

QBB

I.A23R

QBB

I.B23R

QBQ

I.23R

Q23

QQBI.23R

QBB

I.A24R

QBB

I.B24R

QBQ

I.24R

QQBI.24R

QBB

I.A25R

QBB

I.B25R

QBQ

I.25R

QQBI.25R

QBB

I.A26R

QBB

I.B26R

QBQ

I.26R

QQBI.26R

QBB

I.A27R

QBB

I.B27R

QBQ

I.27R

Q27

QQBI.27R

QBB

I.A28R

QBB

I.B28R

QBQ

I.28R

QQBI.28R

QBB

I.A29R

QBB

I.B29R

QBQ

I.29R

QQBI.29R

QBB

I.A30R

QBB

I.B30R

QBQ

I.30R

QQBI.30R

QBB

I.A31R

QBB

I.B31R

QBQ

I.31R

Q31

QQBI.31R

QBB

I.A32R

QBB

I.B32R

QBQ

I.32R

QQBI.32R

QBB

I.A33R

QBB

I.B33R

QBQ

I.33R

Q33

RQQBI.33R

QBB

I.A34R

QBB

I.B34R

QBQ

I.34R

QQBI.34L

3-4

QQBI.34L

QBB

I.B34L

QBB

I.A34L

QBQ

I.34L

QQBI.33L

QBB

I.B33L

QBB

I.A33L

QBQ

I.33L

QQBI.32L

QBB

I.B32L

QBB

I.A32L

QBQ

I.32L

Q31

LQQBI.31L

QBB

I.B31L

QBB

I.A31L

QBQ

I.31L

QQBI.30L

QBB

I.B30L

QBB

I.A30L

QBQ

I.30L

QQBI.29L

QBB

I.B29L

QBB

I.A29L

QBQ

I.29L

QQBI.28L

QBB

I.B28L

QBB

I.A28L

QBQ

I.28L

Q27

LQQBI.27L

QBB

I.B27L

QBB

I.A27L

QBQ

I.27L

QQBI.26L

QBB

I.B26L

QBB

I.A26L

QBQ

I.26L

QQBI.25L

QBB

I.B25L

QBB

I.A25L

QBQ

I.25L

QQBI.24L

QBB

I.B24L

QBB

I.A24L

QBQ

I.24L

Q23

LQQBI.23L

QBB

I.B23L

QBB

I.A23L

QBQ

I.23L

QQBI.22L

QBB

I.B22L

QBB

I.A22L

QBQ

I.22L

QQBI.21L

QBB

I.B21L

QBB

I.A21L

QBQ

I.21L

QQBI.20L

QBB

I.B20L

QBB

I.A20L

QBQ

I.20L

Q19

LQQBI.19L

QBB

I.B19L

QBB

I.A19L

QBQ

I.19L

QQBI.18L

QBB

I.B18L

QBB

I.A18L

QBQ

I.18L

QQBI.17L

QBB

I.B17L

QBB

I.A17L

QBQ

I.17L

QQBI.16L

QBB

I.B16L

QBB

I.A16L

QBQ

I.16L

Q15

LQQBI.15L

QBB

I.B15L

QBB

I.A15L

QBQ

I.15L

QQBI.14L

QBB

I.B14L

QBB

I.A14L

QBQ

I.14L

QQBI.13L

QBB

I.B13L

QBB

I.A13L

QBQ

I.13L

QQBI.12L

QBB

I.B12L

QBB

I.A12L

QBQ

I.12L

Q11

LQQEI.11L

QEBI.11L

QBB

I.11L

QBQ

I.11L

QQBI.10L

QBB

I.10L

QBQ

I.10L

QQBI.9L

QBB

I.9L

QBQ

I.9L

QQBI.8L

QBB

I.8L

QBQ

I.8L

QQDI.7L

Point 4

Page 9: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 9

Inspections and cleaning activities in sector 3-4 during LS1 (1)

2 August 2013

Sequence:

Point 3

Point 4

SSS

with

VB

V1V2

QDQ

I.7R

QQBI.7R

QBB

I.8R

QBQ

I.8R

QQBI.8R

QBB

I.9R

QBQ

I.9R

QQBI.9R

QBB

I.10R

QBQ

I.10R

QQBI.10R

QBB

I.11R

QBEI.11R

QEQ

I.11R

Q11

QQBI.11R

QBB

I.A12R

QBB

I.B12R

QBQ

I.12R

QQBI.12R

QBB

I.A13R

QBB

I.B13R

QBQ

I.13R

QQBI.13R

QBB

I.A14R

QBB

I.B14R

QBQ

I.14R

QQBI.14R

QBB

I.A15R

QBB

I.B15R

QBQ

I.15R

Q15

QQBI.15R

QBB

I.A16R

QBB

I.B16R

QBQ

I.16R

QQBI.16R

QBB

I.A17R

QBB

I.B17R

QBQ

I.17R

QQBI.17R

QBB

I.A18R

QBB

I.B18R

QBQ

I.18R

QQBI.18R

QBB

I.A19R

QBB

I.B19R

QBQ

I.19R

Q19

QQBI.19R

QBB

I.A20R

QBB

I.B20R

QBQ

I.20R

QQBI.20R

QBB

I.A21R

QBB

I.B21R

QBQ

I.21R

QQBI.21R

QBB

I.A22R

QBB

I.B22R

QBQ

I.22R

QQBI.22R

QBB

I.A23R

QBB

I.B23R

QBQ

I.23R

Q23

QQBI.23R

QBB

I.A24R

QBB

I.B24R

QBQ

I.24R

QQBI.24R

QBB

I.A25R

QBB

I.B25R

QBQ

I.25R

QQBI.25R

QBB

I.A26R

QBB

I.B26R

QBQ

I.26R

QQBI.26R

QBB

I.A27R

QBB

I.B27R

QBQ

I.27R

Q27

QQBI.27R

QBB

I.A28R

QBB

I.B28R

QBQ

I.28R

QQBI.28R

QBB

I.A29R

QBB

I.B29R

QBQ

I.29R

QQBI.29R

QBB

I.A30R

QBB

I.B30R

QBQ

I.30R

QQBI.30R

QBB

I.A31R

QBB

I.B31R

QBQ

I.31R

Q31

QQBI.31R

QBB

I.A32R

QBB

I.B32R

QBQ

I.32R

QQBI.32R

QBB

I.A33R

QBB

I.B33R

QBQ

I.33R

Q33

RQQBI.33R

QBB

I.A34R

QBB

I.B34R

QBQ

I.34R

QQBI.34L

3-4

QQBI.34L

QBB

I.B34L

QBB

I.A34L

QBQ

I.34L

QQBI.33L

QBB

I.B33L

QBB

I.A33L

QBQ

I.33L

QQBI.32L

QBB

I.B32L

QBB

I.A32L

QBQ

I.32L

Q31

LQQBI.31L

QBB

I.B31L

QBB

I.A31L

QBQ

I.31L

QQBI.30L

QBB

I.B30L

QBB

I.A30L

QBQ

I.30L

QQBI.29L

QBB

I.B29L

QBB

I.A29L

QBQ

I.29L

QQBI.28L

QBB

I.B28L

QBB

I.A28L

QBQ

I.28L

Q27

LQQBI.27L

QBB

I.B27L

QBB

I.A27L

QBQ

I.27L

QQBI.26L

QBB

I.B26L

QBB

I.A26L

QBQ

I.26L

QQBI.25L

QBB

I.B25L

QBB

I.A25L

QBQ

I.25L

QQBI.24L

QBB

I.B24L

QBB

I.A24L

QBQ

I.24L

Q23

LQQBI.23L

QBB

I.B23L

QBB

I.A23L

QBQ

I.23L

QQBI.22L

QBB

I.B22L

QBB

I.A22L

QBQ

I.22L

QQBI.21L

QBB

I.B21L

QBB

I.A21L

QBQ

I.21L

QQBI.20L

QBB

I.B20L

QBB

I.A20L

QBQ

I.20L

Q19

LQQBI.19L

QBB

I.B19L

QBB

I.A19L

QBQ

I.19L

QQBI.18L

QBB

I.B18L

QBB

I.A18L

QBQ

I.18L

QQBI.17L

QBB

I.B17L

QBB

I.A17L

QBQ

I.17L

QQBI.16L

QBB

I.B16L

QBB

I.A16L

QBQ

I.16L

Q15

LQQBI.15L

QBB

I.B15L

QBB

I.A15L

QBQ

I.15L

QQBI.14L

QBB

I.B14L

QBB

I.A14L

QBQ

I.14L

QQBI.13L

QBB

I.B13L

QBB

I.A13L

QBQ

I.13L

QQBI.12L

QBB

I.B12L

QBB

I.A12L

QBQ

I.12L

Q11

LQQEI.11L

QEBI.11L

QBB

I.11L

QBQ

I.11L

QQBI.10L

QBB

I.10L

QBQ

I.10L

QQBI.9L

QBB

I.9L

QBQ

I.9L

QQBI.8L

QBB

I.8L

QBQ

I.8L

QQDI.7L

Cleaning by pulsed air flow (24h) toward point 4Analysis and decision

EndoscopyCleaning by pulsed air flow

Prudent endoscopy* analysisCleaning by pulsed air flow

* Prudent endoscopy: if too many debris are observed, the endoscopy will be stopped and the cleaning carried out endoscopy.

Page 10: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 10

Inspections and cleaning activities in sector 3-4 during LS1 (2)

2 August 2013

Same procedure as in 2009 will be applied (EDMS 989454)

Same material, available

Page 11: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 11

Schedule of inspection and cleaning activities in 3-4

2 August 2013

All interconnections and beam vacuum lines related to these activities in sector 3-4 are opened including the QBBI.A14R3 and QBBI.A20R3

VSC activities in parallel with SIT reconnection work. No closure of the beam vacuum lines (PIM installation before the end of the activity)

Start of VSC activities beginning of August (8 August)• ~ 3 weeks in total• From point 4 first (to avoid interaction with optical fibre activity, t.b.c.);• Mid august from point 3

Page 12: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 12

Conclusion

2 August 2013

A scenario of inspection and cleaning of the cold vacuum beam lines in sector 3-4 is proposed.

The additional work for the SMACC team has been minimized while providing a maximum of informations and efficiency of the cleaning.

A cleaning of the 2 beam vacuum lines will be carried out based on pulsed air flow.

Procedure and tooling have already been applied in 2009.

Page 13: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 13

Back up slides

2 August 2013

Cleanness after incident

PIM status

V1V2

QDQ

I.7R

1.0

QQBI.7R

1.0

1.0

QBB

I.8R

QBQ

I.8R

1.0

QQBI.8R

1.0

1.0

QBB

I.9R

QBQ

I.9R

QQBI.9R

1.0

1.0

QBB

I.10R

QBQ

I.10R

QQBI.10R

1.0

1.0

QBB

I.11R

QBEI.11R

QEQ

I.11R

QQBI.11R

1.0

1.0

QBB

I.A12R

QBB

I.B12R

QBQ

I.12R

QQBI.12R

1.0

1.0

QBB

I.A13R

1.0

QBB

I.B13R

1.0

QBQ

I.13R

1.0

QQBI.13R

1.0

1.0

QBB

I.A14R

1.0

QBB

I.B14R

1.0

QBQ

I.14R

1.0

QQBI.14R

1.0

1.0

QBB

I.A15R

QBB

I.B15R

1.0

QBQ

I.15R

1.0

QQBI.15R

1.0

1.0

QBB

I.A16R

1.0

1.0

QBB

I.B16R

1.0

QBQ

I.16R

1.0

QQBI.16R

1.0

1.0

QBB

I.A17R

1.0

QBB

I.B17R

1.0

QBQ

I.17R

1.0

1.0

QQBI.17R

1.0

1.0

QBB

I.A18R

1.0

QBB

I.B18R

1.0

QBQ

I.18R

1.0

QQBI.18R

1.0

1.0

QBB

I.A19R

1.0

QBB

I.B19R

1.0

QBQ

I.19R

1.0

1.0

QQBI.19R

1.0

1.0

QBB

I.A20R

1.0

QBB

I.B20R

1.0

QBQ

I.20R

1.0

1.0

QQBI.20R

1.0

1.0

QBB

I.A21R

1.0

1.0

QBB

I.B21R

1.0

1.0

QBQ

I.21R

1.0

1.0

QQBI.21R

1.0

1.0

QBB

I.A22R

1.0

1.0

QBB

I.B22R

1.0

1.0

QBQ

I.22R

1.0

1.0

QQBI.22R

1.0

1.0

QBB

I.A23R

1.0

1.0

QBB

I.B23R

1.0

1.0

QBQ

I.23R

1.0

1.0

QQBI.23R

1.0

1.0

QBB

I.A24R

1.0

1.0

QBB

I.B24R

1.0

1.0

QBQ

I.24R

1.0

1.0

QQBI.24R

1.0

1.0

QBB

I.A25R

1.0

1.0

QBB

I.B25R

1.0

1.0

QBQ

I.25R

1.0

1.0

QQBI.25R

1.0

1.0

QBB

I.A26R

1.0

1.0

QBB

I.B26R

1.0

1.0

QBQ

I.26R

1.0

1.0

QQBI.26R

1.0

1.0

QBB

I.A27R

1.0

1.0

QBB

I.B27R

1.0

1.0

QBQ

I.27R

1.0

1.0

QQBI.27R

1.0

1.0

QBB

I.A28R

1.0

1.0

QBB

I.B28R

1.0

1.0

QBQ

I.28R

1.0

1.0

QQBI.28R

1.0

1.0

QBB

I.A29R

1.0

1.0

QBB

I.B29R

1.0

1.0

QBQ

I.29R

1.0

1.0

QQBI.29R

1.0

1.0

QBB

I.A30R

1.0

1.0

QBB

I.B30R

1.0

1.0

QBQ

I.30R

1.0

1.0

QQBI.30R

1.0

1.0

QBB

I.A31R

1.0

1.0

QBB

I.B31R

1.0

1.0

QBQ

I.31R

1.0

1.0

QQBI.31R

1.0

1.0

QBB

I.A32R

1.0

1.0

QBB

I.B32R

1.0

1.0

QBQ

I.32R

1.0

1.0

QQBI.32R

1.0

1.0

QBB

I.A33R

1.0

1.0

QBB

I.B33R

1.0

1.0

QBQ

I.33R

1.0

1.0

QQBI.33R

1.0

1.0

QBB

I.A34R

QBB

I.B34R

1.0

QBQ

I.34R

QQBI.34L

1.0

1.0

QBB

I.B34L

QBB

I.A34L

QBQ

I.34L

QQBI.33L

1.0

1.0

QBB

I.B33L

QBB

I.A33L

1.0

QBQ

I.33L

QQBI.32L

1.0

1.0

QBB

I.B32L

QBB

I.A32L

QBQ

I.32L

QQBI.31L

1.0

1.0

QBB

I.B31L

QBB

I.A31L

QBQ

I.31L

QQBI.30L

1.0

1.0

QBB

I.B30L

QBB

I.A30L

QBQ

I.30L

QQBI.29L

1.0

1.0

QBB

I.B29L

QBB

I.A29L

QBQ

I.29L

QQBI.28L

1.0

1.0

QBB

I.B28L

QBB

I.A28L

QBQ

I.28L

QQBI.27L

1.0

1.0

QBB

I.B27L

QBB

I.A27L

QBQ

I.27L

QQBI.26L

1.0

1.0

QBB

I.B26L

QBB

I.A26L

QBQ

I.26L

1.0

QQBI.25L

1.0

1.0

QBB

I.B25L

QBB

I.A25L

QBQ

I.25L

QQBI.24L

1.0

1.0

QBB

I.B24L

QBB

I.A24L

QBQ

I.24L

QQBI.23L

1.0

1.0

QBB

I.B23L

QBB

I.A23L

QBQ

I.23L

QQBI.22L

1.0

1.0

QBB

I.B22L

QBB

I.A22L

QBQ

I.22L

QQBI.21L

1.0

1.0

QBB

I.B21L

QBB

I.A21L

QBQ

I.21L

QQBI.20L

1.0

1.0

QBB

I.B20L

QBB

I.A20L

QBQ

I.20L

QQBI.19L

1.0

1.0

QBB

I.B19L

QBB

I.A19L

QBQ

I.19L

QQBI.18L

1.0

1.0

QBB

I.B18L

QBB

I.A18L

QBQ

I.18L

QQBI.17L

1.0

1.0

QBB

I.B17L

QBB

I.A17L

QBQ

I.17L

QQBI.16L

1.0

1.0

QBB

I.B16L

QBB

I.A16L

QBQ

I.16L

QQBI.15L

1.0

1.0

QBB

I.B15L

QBB

I.A15L

QBQ

I.15L

QQBI.14L

1.0

1.0

QBB

I.B14L

QBB

I.A14L

QBQ

I.14L

QQBI.13L

1.0

1.0

QBB

I.B13L

QBB

I.A13L

QBQ

I.13L

QQBI.12L

1.0

1.0

QBB

I.B12L

QBB

I.A12L

QBQ

I.12L

QQEI.11L

1.0

1.0

QEBI.11L

1.0

QBB

I.11L

QBQ

I.11L

QQBI.10L

1.0

1.0

QBB

I.10L

1.0

QBQ

I.10L

QQBI.9L

1.0

1.0

QBB

I.9L

QBQ

I.9L

QQBI.8L

1.0

1.0

QBB

I.8L

QBQ

I.8L

1.0

1.0

QQDI.7L

QDQ

I.7R

QQBI.7R

QBB

I.8R

QBQ

I.8R

QQBI.8R

QBB

I.9R

QBQ

I.9R

QQBI.9R

QBB

I.10R

QBQ

I.10R

QQBI.10R

QBB

I.11R

QBEI.11R

QEQ

I.11R

Q11

QQBI.11R

QBB

I.A12R

QBB

I.B12R

QBQ

I.12R

QQBI.12R

QBB

I.A13R

QBB

I.B13R

QBQ

I.13R

QQBI.13R

QBB

I.A14R

QBB

I.B14R

QBQ

I.14R

QQBI.14R

QBB

I.A15R

QBB

I.B15R

QBQ

I.15R

Q15

QQBI.15R

QBB

I.A16R

QBB

I.B16R

QBQ

I.16R

QQBI.16R

QBB

I.A17R

QBB

I.B17R

QBQ

I.17R

QQBI.17R

QBB

I.A18R

QBB

I.B18R

QBQ

I.18R

QQBI.18R

QBB

I.A19R

QBB

I.B19R

QBQ

I.19R

Q19

QQBI.19R

QBB

I.A20R

QBB

I.B20R

QBQ

I.20R

QQBI.20R

QBB

I.A21R

QBB

I.B21R

QBQ

I.21R

QQBI.21R

QBB

I.A22R

QBB

I.B22R

QBQ

I.22R

QQBI.22R

QBB

I.A23R

QBB

I.B23R

QBQ

I.23R

Q23

QQBI.23R

QBB

I.A24R

QBB

I.B24R

QBQ

I.24R

QQBI.24R

QBB

I.A25R

QBB

I.B25R

QBQ

I.25R

QQBI.25R

QBB

I.A26R

QBB

I.B26R

QBQ

I.26R

QQBI.26R

QBB

I.A27R

QBB

I.B27R

QBQ

I.27R

Q27

QQBI.27R

QBB

I.A28R

QBB

I.B28R

QBQ

I.28R

QQBI.28R

QBB

I.A29R

QBB

I.B29R

QBQ

I.29R

QQBI.29R

QBB

I.A30R

QBB

I.B30R

QBQ

I.30R

QQBI.30R

QBB

I.A31R

QBB

I.B31R

QBQ

I.31R

Q31

QQBI.31R

QBB

I.A32R

QBB

I.B32R

QBQ

I.32R

QQBI.32R

QBB

I.A33R

QBB

I.B33R

QBQ

I.33R

Q33

RQQBI.33R

QBB

I.A34R

QBB

I.B34R

QBQ

I.34R

QQBI.34L

QBB

I.B34L

QBB

I.A34L

QBQ

I.34L

QQBI.33L

QBB

I.B33L

QBB

I.A33L

QBQ

I.33L

QQBI.32L

QBB

I.B32L

QBB

I.A32L

QBQ

I.32L

Q31

LQQBI.31L

QBB

I.B31L

QBB

I.A31L

QBQ

I.31L

QQBI.30L

QBB

I.B30L

QBB

I.A30L

QBQ

I.30L

QQBI.29L

QBB

I.B29L

QBB

I.A29L

QBQ

I.29L

QQBI.28L

QBB

I.B28L

QBB

I.A28L

QBQ

I.28L

Q27

LQQBI.27L

QBB

I.B27L

QBB

I.A27L

QBQ

I.27L

QQBI.26L

QBB

I.B26L

QBB

I.A26L

QBQ

I.26L

QQBI.25L

QBB

I.B25L

QBB

I.A25L

QBQ

I.25L

QQBI.24L

QBB

I.B24L

QBB

I.A24L

QBQ

I.24L

Q23

LQQBI.23L

QBB

I.B23L

QBB

I.A23L

QBQ

I.23L

QQBI.22L

QBB

I.B22L

QBB

I.A22L

QBQ

I.22L

QQBI.21L

QBB

I.B21L

QBB

I.A21L

QBQ

I.21L

QQBI.20L

QBB

I.B20L

QBB

I.A20L

QBQ

I.20L

Q19

LQQBI.19L

QBB

I.B19L

QBB

I.A19L

QBQ

I.19L

QQBI.18L

QBB

I.B18L

QBB

I.A18L

QBQ

I.18L

QQBI.17L

QBB

I.B17L

QBB

I.A17L

QBQ

I.17L

QQBI.16L

QBB

I.B16L

QBB

I.A16L

QBQ

I.16L

Q15

LQQBI.15L

QBB

I.B15L

QBB

I.A15L

QBQ

I.15L

QQBI.14L

QBB

I.B14L

QBB

I.A14L

QBQ

I.14L

QQBI.13L

QBB

I.B13L

QBB

I.A13L

QBQ

I.13L

QQBI.12L

QBB

I.B12L

QBB

I.A12L

QBQ

I.12L

Q11

LQQEI.11L

QEBI.11L

QBB

I.11L

QBQ

I.11L

QQBI.10L

QBB

I.10L

QBQ

I.10L

QQBI.9L

QBB

I.9L

QBQ

I.9L

QQBI.8L

QBB

I.8L

QBQ

I.8L

QQDI.7L

Interconnection status

Page 14: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 14

UFO activity

2 August 2013

Courtesy of T. Baer

Source probably identified - ongoing

To be inspected, most likely a consequence of 3-4 incident

Inspected and no cause found

Page 15: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department

Beam screens with soot in tunnel : B19R3

B19R3.V2 before cleanning

entrance mid end

After cleanning

V. BaglinChamonix 2009

Page 16: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department

Beam screens with soot in tunnel : C19R3

C19R3.V2 before cleanning

entrance mid end

After cleanning

V. BaglinChamonix 2009

Page 17: Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and

Vacuum, Surfaces & Coatings GroupTechnology Department C. Garion 17

RF ball test

2 August 2013

RF ball after test of V1 in sector 3-4:Few MLI chips found