9
Vadodara City Command and Control Centre Vadodara Smart City Development Ltd (VSCDL) 8 December 2017

Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

Embed Size (px)

Citation preview

Page 1: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

Vadodara City Command and Control Centre

Vadodara Smart City Development Ltd (VSCDL)

8 December 2017

Page 2: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

ScopeComponents:• CCTV Cameras• Area Traffic Control System (ATCS) at selected junctions• City Bus Vehicle Tracking System• Solid Waste Vehicle Tracking System• Parking Management System and Mobile App• ANPR Camera and ANPR Solution at junctions• Environmental Sensors at major locations• Variable Message Display boards at main junctions• Public Address System at junctions• Emergency Call Box at important locations• Vehicle Tracking System for Fire-brigade trucks• Integration with

– Geographical Information System (GIS)

– Water SCADA– ERP System

Page 3: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

Challenges/Difficulties Encountered

• Tight schedules for project execution

• Critical project dependencies on multiple stakeholders

• Building infrastructure work started without smart city funds

• Short timelines for procurement

Page 4: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

Overcoming the challenges

• Deadlines were met by increasing the man power and working in shifts

• Followed structured planning methodology to execute the work in parallel

• Monitoring and testing is the major aspect for CCC project, followed all compliance checks on time by cross collaborating with each stakeholders

Page 5: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

PM and PMO Tweets

Page 6: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

PM Visit being Monitored Live at CCC

Page 7: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

CCC Exterior view

Page 8: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

CCC Exterior view

Page 9: Vadodara City Command and Control Centresmartcities.gov.in/upload/uploadfiles/files/04_Vadodara...nation the Vadodara City Command Control Centre & Waghodiya Regional Water Supply

CCC Interior view